Sol_140P4322Q0002_Amd_0002.pdf
PDF 91 KB Posted
- Attached to
- FIRE SPRINKLER INSPECTION SERVICES Federal contract opportunity
- Solicitation number
- 140P4322Q0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4322Q0002_Amd_0003.pdf | ||
| B03_140P4322Q0002_20211227_Service_Contract_Act_WD_2015-4165_Rev__17_0003.pdf | ||
| Attachment_4_-_Certification_of_Vaccination_Form_0003.pdf | ||
| Attachment_3_-_Vaccination_Certification_Notification_Template_0003.pdf | ||
| Sol_140P4322Q0002_Amd_0001.pdf | ||
| B03_140P4322Q0002_20211020_Service_Contract_Act_WD_2015-4165_Rev__16.pdf | ||
| A04_0040557343_20211101_Statement_of_Work.pdf | ||
| Sol_140P4322Q0002.pdf | ||
| Attachment_Q001_Price_Schedule.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P4322Q0002 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Boston MA 02129-4543
PNN
Building I-1 Charlestown Navy Yard Boston National Historical Park
NPS, NER - NE MABO
12/28/20210002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/15/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
*** Acknowledge this and all amendments with your quote ***
The purpose of this amendment is to:
1) Answer questions from interested parties:
Q2. Is a total device list available, and is there a count on the number of back flows that will need testing?
A2. 2 Dry Systems, 1 Wet System, 4 Backflow Preventors, and 1 Pre/Action System.
Q3. Are there backflow preventers associated with this job?
A3. 4 Backflow Preventors.
Q4. Since Fire Watch can't easily be quantified. How should this be accounted for in the price request?
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
MICHELLE Yates
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P4322Q0002/0002
A4. A fire watch person is required whenever testing is taking place. This is typically the person performing the testing. If service work needs to take place and the system will be down, fire watch will be the responsibility of Fort
Stanwix.
Q5. How should service and repair be accounted for in this bid because this can't be easily accounted for? (if a certain valve blows it could be a very costly repair)
A5. Services or repairs, beyond those required for quarterly inspections under NFPA 25 Fire
Sprinkler System Testing and Inspections, will be solicited by the NPS under a separate action.
Q6. Are there pre-action systems involved in this job? If so, what is the extent of pre-action system service needed.
A6. There is one pre-action system. Services as required for quarterly inspections under NFPA 25
Fire Sprinkler System Testing and Inspections.2)
Reference Provision 52.237-1, Site Visit with its
Addendum #1.
2) Reference Provision 52.237-1 Site Visit (Apr
1984) with Addendum #1:
Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
(End of provision)
Addendum #1 to 52.237-1: Site visits may be arranged during normal duty hours by contacting:
Todd Gerard at 315-336-5147 or todd_gerrard@nps.gov .
(End of Amendment 0002)
Period of Performance: 01/24/2022 to 01/23/2027
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .