This document is an amendment to a solicitation for a visitor center renovation project at the John F. Kennedy National Historic Site. The amendment provides responses to questions from prospective offerors to clarify requirements. The work includes providing all labor, management, supervision, tools, materials, equipment and transportation necessary to perform the project. The National Park Service is the contracting agency. The proposal due date remains April 30, 2021 at 4:00pm. The period of performance is from May 3, 2021 to May 18, 2022. The contracting officer's representative is Greg Law who can be contacted by email or telephone.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P4321R0003 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Boston MA 02129-4543
PNN
Building I-1 Charlestown Navy Yard Boston National Historical Park
NPS, NER - NE MABO
191509 & 25139703/31/20210003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/31/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. This Amendment Number 0003 is issued to provide a response to each Request for
Information (RFI).
B. The Questions and Answers are as follows:
1. QUESTION: Is the elevator enclosed.
1. ANSWER: The platform lift is not enclosed. It has a cover for weather protection when the lift is not in use.
2. QUESTION: Who does the elevator company go to for permitting? Local, Federal or State?
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Wendy De Leon
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P4321R0003/0003
2. ANSWER: Any inspections and permitting will go through National Park Service AHJ or their designee.
3. QUESTION: In addition to which governing body to go to for permitting, what exact permit should we applying for?
3. ANSWER: Any inspections and permitting will go through National Park Service AHJ or their designee.
4. QUESTION: The specifications state that all wiring is to be run in conduit, if this is the case it will be very invasive to the structure.
Is this facility considered historic? If so we would like to know for bidding purposes if MC cable could be run instead of EMT? We would be able to make smaller holes which would mean less patching and painting. Please Advise.
4. ANSWER: The park is going to stay with using EMT. We will not be using MC. Most of the work will be done in the basement above the suspended ceiling. We don't anticipate much drilling of the historic fabric because of this.
Most of the EMT will be attached to the underside of the joists.
5. QUESTION: Could you please confirm that the due date for questions(RFI's) is 4/23/21?
5. ANSWER: The last day to submit Requests for Information (RFIs) is Friday, April 23, 2021.
6. QUESTION: The drawings show a retractable cover for the top of the lift. This could raise issues with code, the enclosed full height lift would be the recommended model in this situation.
6. ANSWER: The cover is for weather protection when the lift is not in service. The cover will be operated only by site management when there is a need to use the lift.
7. QUESTION: A Fire Rated Door for the upper and lower landing would be recommended for an outdoor application due to the heavier duty construction and enhanced security locks.
7. ANSWER: It is presumed this question applies to the proposed full height lift, which will not be employed on this project.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P4321R0003/0003
8. QUESTION: Please clarify the floor to floor measurements.
8. ANSWER: Vertical dimensions are indicated in details C, D, and E on Sheet A4. Contractor must verify all dimensions in the field.
9. QUESTION: Has an Asbestos survey Been completed on the property? If so will it be made available?
9. ANSWER: An asbestos survey has not been done, with the exception of the artificial log in the fireplace which had been mitigated.
10. QUESTION: 01 11 00 - 1.7 B - Are there any known underground utilities on the property?
10. ANSWER: Yes, there are underground utilities. There is a gas line that runs under the front porch into the basement. The shutoff is on the sidewalk. There is no electrical underground (overhead only). There is drainage, not sure if you would call that utilities.
11. QUESTION: The panel schedule on Drawing E5 a
150-amp 2-pole circuit breaker labeled
"contactor" in the new 200-amp panel. What is its purpose and what controls it? It appears to be powering Panel B?
11. ANSWER: The contactor panel is a panel which has its power controlled by two three-way switches. One in the basement near the entrance door and the other one in the front closet on the first floor. Most every breaker in this panel provides power to the old historic fixtures. The idea is that these historic fixtures do not have to be manually switched off, prolonging the life of the fixture, and reducing a possible fire hazard. When the three-way switch is turned on/off, it energizes/de-energizes the panel. The other panel is a constant panel which means power is always fed to the circuits inside. Essential fixtures like alarm panels, heat cables, boiler etc. are in this panel.
C. The Proposal due date remains as Friday, April
30, 2021 at 1600.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P4321R0003/0003
D. There are no changes to the Solicitation.
Period of Performance: 05/03/2021 to 05/18/2022
COR: Greg Law