STATEMENT OF WORK ADDENDUM_0001.pdf
PDF 79 KB Posted
- Solicitation number
- 140P4320R0017
About this file
This document is an addendum to a statement of work for renovations to a satellite restroom at the Salt Pond Visitor Center within Cape Cod National Seashore. The addendum removes requirements to remove and replace walls in plumbing chases with fiberglass reinforced plastic paneling and cement backing board as a substrate for new paneling. It also replaces paragraphs on demolition and installation of glass-fiber reinforced plastic paneling to clarify the removal of existing materials and reattachment of fixtures and attachments as necessary to install new wall paneling in the restrooms. The related federal contract opportunity is solicitation number 140P4320R0017 for renovations to the satellite restroom at Salt Pond Visitor Center within Cape Cod National Seashore, with the Department of the Interior National Park Service Northeast Region listed as the agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Questions and Answers_0001.pdf | ||
| Sol_140P4320R0017_Amd_0001.pdf | ||
| B03 DOL DBA GD MA20200001.pdf | ||
| Sol_140P4320R0017.pdf | ||
| A04 SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK ADDENDUM
Cyclic Maintenance and Renovations to Satellite Restroom
CAPE COD NATIONAL SEASHORE
Salt Pond Visitor Center
50 Nauset Road, Eastham, MA July 30, 2020
On page 1, Scope, Base Proposal Work Elements: Contract Line Item Number 10 - Interior work Remove the following:
· “remove and replace walls in plumbing chases with fiberglass reinforced plastic paneling,”
On page 7, Materials Remove the following:
“Wallboard Gypsum wall board for plumbing chases shall be 5/8” cement backing board: glass fiber mesh reinforced aggregated Portland cement panel, Durock, as manufactured by United States Gypsum Company, USG Corporation, Chicago Illinois, or approved equal.”
On page 10, Demolition: fourth paragraph Remove entire paragraph and replace with:
“Remove existing materials, including underlayment, shingles, siding, wallboard, trim boards, hardware and extraneous attachments not indicated to remain. Re-secure any substrate fasteners that have backed out prior to installation of new materials. Perform removal to avoid damage to items to remain or be reinstalled.”
On page 12, Installation: Glass-Fiber-Reinforced Plastic (FRP) Paneling Remove entire paragraph and replace with:
“Remove and reattach bathroom partitions, grab bars, shelves, mirrors, dispensers, air handling, electrical, plumbing and any other fixtures and attachments as necessary to remove and install wall paneling in restrooms.”
On page 13, Installation: Glass-Fiber-Reinforced Plastic (FRP) Paneling Remove the following:
“If required, install cement backing board in plumbing chases as a substrate for new FRP paneling.”
File details come from the government source that posted it. Updated .