ATTACHMENT NUMBER 2 Drawings 4 21 2020 CACO HQ and Residences Sewerage System_0002.pdf

PDF 9 MB Posted

Attached to
CACO HQ and Residences Replacement of Sewer System
Solicitation number
140P4320R0014
Issued by

About this file

This notice provides details for a forthcoming request for proposal for construction services. The National Park Service Northeast Region intends to issue a solicitation seeking proposals to design and replace the septic system for the Cape Cod National Seashore Headquarters and Residences in Wellfleet, Massachusetts. Offerors will provide all labor, materials, equipment, transportation and supervision to install a new septic system with a total project estimate between $500,000 to $1,000,000. The contract period of performance is from September 20, 2020 to December 20, 2020. The solicitation will be set aside for eligible women-owned small businesses and have a NAICS code of 237110 for water and sewer line construction with a size standard of $36.5 million in average annual receipts. The full RFP is expected to be posted on July 30, 2020 on SAM.gov.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET

NUMBER

SUBSHEET

NUMBER

SHEET NAME

1 COVER SHEET

C1.1 OVERALL PLAN AND KEY SHEET

C1.2 STAGING AND CONSTRUCTION ACCESS PLAN

C2.0 DEMOLITION AND EROSION & SEDIMENT CONTROL PLAN

C3.0-C3.1 SEPTIC PLAN

C4.1 EROSION & SEDIMENT CONTROL NOTES & SITE DETAILS

C4.2-C4.3 SEPTIC DETAILS

C4.4 SEPTIC SYSTEM DESIGN CALCULATIONS AND TEST PIT INFORMATION

ENCE DRAWINGS

NG CONDITIONS SURVEY OCEAN VIEW DRIVE

TECTURAL PLANS (NOT INCLUDED)

SHEET INDEX

SHEET

NUMBER

SUBSHEET

NUMBER

SHEET NAME

1 COVER SHEET

C1.1 OVERALL PLAN AND KEY SHEET

C1.2 STAGING AND CONSTRUCTION ACCESS PLAN

C2.0 DEMOLITION AND EROSION & SEDIMENT CONTROL PLAN

C3.0-C3.1 SEPTIC PLAN

C4.1 EROSION & SEDIMENT CONTROL NOTES & SITE DETAILS

C4.2-C4.3 SEPTIC DETAILS

C4.4 SEPTIC SYSTEM DESIGN CALCULATIONS AND TEST PIT INFORMATION

ENCE DRAWINGS

NG CONDITIONS SURVEY OCEAN VIEW DRIVE

TECTURAL PLANS (NOT INCLUDED)

E0.1 E0.2 E1.1 E2.1 E3.1

ELECTRIC LEGEND AND CONVENTIONS

ELECTRICAL GENERAL NOTES

ELECTRICAL SITE PLAN

ELECTRICAL DETAILS

ELECTRICAL SCHEDULES AND DIAGRAMS

REFERENCE DRAWINGS

EXISTING CONDITIONS SURVEY OCEAN VIEW DRIVE

ARCHITECTURAL PLANS (NOT INCLUDED)

REFERENCE DRAWINGS

EXISTING CONDITIONS SURVEY OCEAN VIEW DRIVE

ARCHITECTURAL PLANS (NOT INCLUDED)

C1.0 SITE GENERAL NOTES, ABBREVIATIONS AND LEGEND

C1.1 OVERALL PLAN AND KEY SHEET

C1.2 STAGING AND CONSTRUCTION ACCESS PLAN

C2.0 DEMOLITION AND EROSION & SEDIMENT CONTROL PLAN

C3.0-C3.1 SEPTIC PLAN

C4.1 EROSION & SEDIMENT CONTROL NOTES & SITE DETAILS

C4.2-C4.3 SEPTIC DETAILS

C4.4 SEPTIC SYSTEM DESIGN CALCULATIONS AND TEST PIT INFORMATION

ENCE DRAWINGS

NG CONDITIONS SURVEY OCEAN VIEW DRIVE

TECTURAL PLANS (NOT INCLUDED)

C1.0 SITE GENERAL NOTES, ABBREVIATIONS AND LEGEND

C1.1 OVERALL PLAN AND KEY SHEET

C1.2 STAGING AND CONSTRUCTION ACCESS PLAN

C2.0 DEMOLITION AND EROSION & SEDIMENT CONTROL PLAN

C3.0-C3.1 SEPTIC PLAN

C4.1 EROSION & SEDIMENT CONTROL NOTES & SITE DETAILS

C4.2-C4.3 SEPTIC DETAILS

C4.4 SEPTIC SYSTEM DESIGN CALCULATIONS AND TEST PIT INFORMATION

ENCE DRAWINGS

NG CONDITIONS SURVEY OCEAN VIEW DRIVE

TECTURAL PLANS (NOT INCLUDED)

E0.1 E0.2 E1.1 E2.1 E3.1

ELECTRIC LEGEND AND CONVENTIONS

ELECTRICAL GENERAL NOTES

ELECTRICAL SITE PLAN

ELECTRICAL DETAILS

ELECTRICAL SCHEDULES AND DIAGRAMS

2 C0.1 OVERALL EXISTING SEWER SYSTEM

7-8 10-11

C1.01

C1.01

EOP

10.38

5.

MEG

CL

C

B

A

C

B

A

CE

12"

6"

6"

M

I N

2'(TYP.)

6'

(TYP.)

74'

6'(TYP.)

2'(TYP.)

74'

2'

1'

1'

1'

1'

Feet20100 5

Feet20100 5

1'

Dosing Tank Elevations

Item Elevation

Incremental

Height (Ft.)

Cumulative

Height (Ft.)

Incremental

Volume

(GAL.)

Cumulative

Volume

(GAL.)

BOTTOM TANK 38.57 0.00 0

N/A N/A

BOTTOM INSIDE TANK 39.24 0.58 0.67 0.0 0.0

ALL PUMPS OFF (EMERGENCY) &

LOW WATER ALARM

39.95 0.71 1.38 764.7 764.7

PUMPS OFF 40.20 0.25 1.63 269.3 1033.9

LEAD PUMP ON 41.06 0.86 2.49 926.2 1960.1

LAG PUMP ON & HIGHWATER

ALARM

41.76 0.70 3.19 753.9 2714.0

INVERT OUT 44.00 2.94 5.43 3166.4 5126.5

INVERT IN 46.20 2.20 7.63 2369.4 7495.9

TOP INSIDE TANK 47.74 1.54 9.17 1658.6 6785.1

TOP TANK 48.45 0.71 9.88

N/A N/A

FINISHED GRADE (RIM)

52.5± 4.05 13.93

N/A N/A

Sheets and Views
1 COVER - Cover
2 C1.0 NOTES - C1.0
3 C1.1 OVERALL - C1.1
4 C1.2 STAGING - C1.2
5 C2.0 DEMO - C2.0
6 C3.0-3.1 SEPTIC - C3.0
7 C3.0-3.1 SEPTIC - C3.1
8 C4.1-4.4 DETAILS - C4.1
9 C4.1-4.4 DETAILS - C4.2
10 C4.1-4.4 DETAILS - C4.3
11 C4.1-4.4 DETAILS - C4.4

File details come from the government source that posted it. Updated .