- INDE - CYCLIC REPLACEMENT OF LBC ROOF
- Solicitation number
- 140P4225B0005
About this file
These draft drawings detail the cyclic roof replacement project for the Liberty Bell Center at Independence National Historical Park in Philadelphia, Pennsylvania. The project involves comprehensive roof renovation for both the upper and lower roof areas, including complete removal of existing EPDM roofing, stone ballast, and roof accessories, and installation of a new fully adhered PVC membrane roof system with tapered insulation and vapor retarder. Key scope elements include reinstalling roof drains, lightning protection systems, fall protection anchors, and making interior ceiling repairs. The work requires careful coordination to maintain facility operations, protect the Liberty Bell, and comply with National Park Service requirements. Specific technical details include replacing copper coping, modifying roof curbs, installing new horizontal lifelines and roof mount anchors, and ensuring minimal disruption to the historical site's public access.
The project will be executed by a general contractor who must follow strict protocols, including law enforcement scanning of materials and personnel, limited on-site parking, noise restrictions, and maintaining pedestrian access. The contractor must coordinate closely with National Park Service personnel, provide temporary protection for sensitive areas, and ensure all work around the Liberty Bell receives advanced notice and includes protective measures. The roof replacement includes detailed requirements for lightning protection recertification, fall protection system installation, and preservation of the building's architectural integrity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Draft_Specifications_1.pdf | ||
| Sources_Sought_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S 6T
H
ST
(S
IN
DE
PE
ND
EN
CE
M
AL
L
W
CHESTNUT ST S
5T
H
ST
(S
IN
DE
PE
ND
EN
CE
M
AL
L
E)
MARKET ST
WALNUT ST
S 4T
H
ST
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
UNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
DENVER SERVICE CENTER 01 09
CONSTRUCTION DOCUMENTS
CYCLIC REPLACEMENT OF LIBERTY BELL CENTER ROOF
INDEPENDENCE NATIONAL HISTORICAL PARK
SHEET INDEX
0 5 10 20 30 40
MILES
PHILADELPHIA, PENNSYLVANIA
179591
320561
A/E FIRMS
PRIME/ARCHITECT:
STRATA ARCHITECTURE, INC.
1701 OAK STREET, SUITE 100
KANSAS CITY, MO
T: 816.474.0900
ROOFING CONSULTANT:
DEDICATED ROOF AND HYDRO-SOLUTIONS
5566 GENERAL WASHINGTON DR
ALEXANDRIA, VA
LIGHTNING PROTECTION CONSULTANT:
IMEG CORP.
1600 BALTIMORE, SUITE 300
KANSAS CITY, MO
FALL PROTECTION CONSULTANT:
APPLIED TECHNICAL SERVICES
APPROVED
PARK SUPERVISOR DATE
REVIEWED
TITLE DATE
REVIEWED
TITLE DATE
TITLE OF SHEET
INDEPENDENCE NATIONAL HISTORICAL PARK
REGION
NORTHEAST
COUNTY
PHILADELPHIA
STATE
PENNSYLVANIA
NAME OF PARK
CYCLIC REPLACEMENT OF LIBERTY
BELL CENTER ROOF
5566 GENERAL WASHINGTON DR
ALEXANDRIA, VA
COVER
A0.1 ARCHITECTURAL SITE PLAN
A1.1 UPPER ROOF PLAN
A1.2 LOWER ROOF PLAN
A1.10 ENLARGED REFLECTED CEILING PLAN
A5.0 NEW ROOF DETAILS
0 100 200 400 600 700
FEET
PROJECT
NORTH
TRUE
NORTH
PROJECT LOCATION MAP
INDEPENDENCE NATIONAL HISTORICAL PARK, PHILADELPHIA, PA
LIBERTY BELL CENTER ROOF
PROJECT AREA
R. ANGIE GAEBLER
RA016339
09.22.2023
Oualt.e:rtown
--, @il \ Pnnc~ion r119 Ooyles:;a,.,m :\:.
Roils own Lansdale
,o @1
'Ktr,gcif nJG,!!a
12oiJ Exioi:1 t;;oa1@rnll@ G)
Wesrcliester'
I @_i)
~ w Wilmington 'W cp
~,iddW!il~n
1 Townsend
.CD G)
Smpna iZj r: lilrerty"B:ell Cepter
"W Oeplford
I
\rtneland
MtlMlle
Ml Laurel Township (§:fil
Wharton
S1 ate Fores!
E1jgHan,or Townsh,1p
Some~ Poi nt
B1lg&:J, ~ lant,c <my
0 [[J J l I[ llj L
L.j
□ D D u
CJ 'u-----u'_.
CONSTRUCTION DOCUMENTS
S1.1 FALL PROTECTION PLAN
S2.1 FALL PROTECTION GENERAL INFORMATION & DETAILS
E1.0 LIGHTNING PROTECTION PLAN
CONSTRUCTION
LAY-DOWN AREA.
EXISTING BUILDING EXIT TO BE TEMPORARILY CLOSED.
OTHER EXITS WITHIN THE FACILITY WILL REMAIN OPEN.
CONTRACTOR IS TO PROVIDE SIGNAGE FOR
ALTERED WAYFINDING AND EGRESS.
CONSTRUCTION
LAY-DOWN AREA
NOTE: LIMITED
ELECTRICITY MAY BE
AVAILABLE FOR
CONTRACTOR'S USE AT
THE BUILDING INTERIOR.
COORDINATE USE OF
ELECTRICAL TO MAINTAIN
A CLEAR WALKWAY FOR
THE PUBLIC WITH SIGNAGE
AS REQUIRED TO PREVENT
INJURY. CONTRACTOR ISE
OF ELECTRICAL IS TO BE
COORDINTATED IN
ADVANCE WITH NPS/
CONTRACTING OFFICER
MAINTAIN ACCESS TO
EXTERIOR BELL VIEWING
AREA AT ALL TIMES
MAINTAIN PEDESTRIAN
ACCESS WALKWAY WITH A
MINIMUM WIDTH OF 10'-0"
UPPER ROOF
LOWER ROOF
NORTH ROOF
S 6TH ST (S INDEPENDENCE MALL W)
CH
ES
TN
UT
S T
VEHICLE DENIAL BARRIERS / BOLLARD
REMOVAL FOR SITE ACCESS TYP. IF
BOLLARD REMOVAL IS NECESSARY
FOR EQUIPMENT/ LIFT ACCESS, TWO
(2) DAYS ADVANCED NOTICE TO NPS /
CONTRACTING OFFICER IS REQUIRED.
LOCKED GATE, SITE ACCESS REQUIRES
ADVANCE NOTICE TO NPS /
CONTRACTING OFFICER
S 5TH ST (S INDEPENDENCE MALL E)
M
AR
KE
T
ST
STREET CLOSURES OR PARKING ALONG STREET WILL
REQUIRE A CITY PERMIT. THE CONTRACTOR IS
RESPONSIBLE FOR ACQUIRING REQUIRED PERMITS AND
COORDINATING WITH NPS.
OVERHEAD PROTECTION SHALL BE PROVIDED
AT ALL PEDESTRIAN WALKWAYS WITHIN
CONSTRUCTION LIMITS
AS-BUILT DOCUMENTATION OF
VEGETATION IS REQUIRED PRIOR TO
MOBILIZATION
NON-POTABLE WATER /
HOSE BIB MAY BE
AVAILABLE FOR USE
NON-POTABLE WATER /
HOSE BIB MAY BE
AVAILABLE FOR USE
ACCESS TO DRINKING WATER
AND RESTROOMS IS AVAILABLE
AT THE VISITOR CENTER.
VEHICLE DENIAL BARRIER /
BOLLARDS RESTRICT VEHICLE
ACCESS TO SITE, TYP.
SIDEWALK TO REMAIN OPEN TO
PEDESTRIAN TRAFFIC AT ALL TIMES.
POINT OF ACCESS ARE TO BE
COORDINATED WITH CONTRACTING
OFFICER AND DELINEATED WITH
SIGNAGE.
CONTRACTOR SHALL PROTECT EXISTING
SIDEWALKS AND PATHS WHEN MOVING
VEHICLES ON AND OFF OF THE SITE.
CONTRACTOR IS TO DOCUMENT BEFORE
AND AFTER CONDITIONS OF SITE AND
PROVIDE IN DIGITAL FORMAT TO NPS /
CONTRACTING OFFICER FOR RECORD
PRIOR TO START OF WORK.
VEHICLE DENIAL BARRIER /
BOLLARDS RESTRICT VEHICLE
ACCESS TO SITE, TYP.
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OFINDEPENDENCE NATIONAL HISTORICAL PARK
179591
320561
JT
JT
TF
LIBERTY BELL CENTER ROOF
CYCLIC REPLACEMENT OF LIBERTY BELL
CENTER ROOF
A/E FIRMS
ARCHITECTURAL SITE PLANA0.1
GENERAL NOTES
1. THE LIBERTY BELL AND IMMEDIATE
SURROUNDS SHALL BE PROTECTED
AT ALL TIMES DURING
CONSTRUCTION.
2. ALL MATERIAL COMING ON SITE MUST
BE INSPECTED AND SCANNED BY LAW
ENFORCEMENT RANGERS PRIOR TO
ENTERING THE LAYDOWN AREA.
CONTRACTOR EMPLOYEES MUST BE
SCANNED BY LAW ENFORCEMENT
RANGERS PRIOR TO ENTERING SITE
DAILY UNLESS A TIER 1 BACKGROUND
/ FINGERPRINTING DOCUMENTATION
IS TO NPS / CONTRACTING OFFICER
BY CONTRACTOR FOR THAT
EMPLOYEE.
3. LIMITED ELECTRICAL FEEDS MAY BE
AVAILABLE VIA EXTENSION CORDS
FROM THE INTERIOR. COORDINATE
USE WITH NPS / CONTRACTING
OFFICER AND PROVIDE ADEQUATE
PROTECTION AND SIGNAGE TO
PREVENT TRIP HAZARDS AND
POTENTIAL INJURY.
4. NON-POTABLE WATER MAY BE
AVAILABLE FOR CONTRACTOR'S USE.
COORDINATE WITH NPS /
CONTRACTING OFFICER.
5. NO PARKING IS AVAILABLE ON SITE.
STREET PARKING SURROUNDING THE
SITE IS LIMITED.
6. THE CITY OF PHILADELPHIA LIMITS
HOURS FOR CONSTRUCTION NOISE
FROM 8PM-7AM ON WEEKDAYS AND
8PM-8AM ON WEEKENDS.
CONSTRUCTION NOISE SHALL NOT
EXCEED FIVE DECIBELS ABOVE THE
BACKGROUND SOUND LEVEL DURING
THESE HOURS. CONTRACTOR IS TO
COORDINATE WITH THE CITY TO
DETERMINE IF A SPECIAL USE PERMIT
IS REQUIRED.
7. USE OF THE LIBERTY BELL CENTER
BUILDING DRINKING FOUNTAINS AND
RESTROOMS BY CONTRACTORS IS
PROHIBITED. THE GENERAL
CONTRACTOR AND
SUB-CONTRACTORS ARE TO UTILIZE
THE FACILITIES AVAILABLE AT THE
VISITOR'S CENTER TO THE NORTH
DURING OPERATING HOURS.
PRIME/ARCH:
STRATA
ARCHITECTURE, INC
1701 OAK STREET,
SUITE 100
KANSAS CITY, MO
T: 816.474.0900
05.11.2023
R. ANGIE GAEBLER
RA016339
09.22.2023 09.22.2023
_J u _J
I L I
I
I
I
F
LJ
TI C--
,' I \J
I /7
__JI
I A 6 A
"., ~ il._,.;,' .,.,---"--',.l!s__;•"'
I L- :-7 LJ _J
1-~ I I =
16 0 16 -- -
SCALE OF FEET
l □
J 11r rr
I I I
=f k== □ =- LI j1
,,·+==k
,-'S.
:r
I l 1-.
7n
I' tC
- ---fl
'1 L
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OFINDEPENDENCE NATIONAL HISTORICAL PARK
179591
320561
JD/VJ
VJ
JD
0905.11.2023
LIBERTY BELL CENTER ROOF
CYCLIC REPLACEMENT OF LIBERTY BELL
CENTER ROOF
A/E FIRMS
PRIME/ARCH:
STRATA
ARCHITECTURE INC.
1701 OAK STREET,
SUITE 100
KANSAS CITY, MO
T: 816.474.0900
UPPER ROOF PLANA1.1
UPPER ROOF AREA
REMOVE EXISTING STONE BALLAST,
DEMOLISH AND REMOVE AREA OF EXISTING
EPDM MEMBRANE AND INSTALL NEW
ADHERED FLEECE BACKED EPDM MEMBRANE
LINING.
ROOF DRAINS, TYP. REMOVE AND
REINSTALL TO ACCOMMODATE NEW
ROOF MEMBRANE INSTALLATION.
LIGHTNING PROTECTION
GROUNDING CABLE. LIGHTNING
PROTECTION SYSTEM IS TO BE
TEMPORARILY REMOVED AND
REINSTALLED ONCE ROOF
MEMBRANE WORK AND REPAIRS AT
THE METAL COPING IS COMPLETE.
REFERENCE SHEET E1.1 FOR
SUPPLEMENTAL DETAILS.
EXISTING COPPER LINED GUTTER
TO REMAIN.
DESIGNATED AREA
OF ROOF REPLACEMENT
THE INTENT IS TO KEEP THE FACILITY OPEN TO THE PUBLIC DURING
CONSTRUCTION, AND TO PROVIDE PROTECTION FOR THE PUBLIC, THE
LIBERTY BELL AND SURROUNDING BUILDING WITH THE REPLACEMENT
OF FAILING ROOFING AND ROOF ACCESSORIES. THE EXISTING
ROOFING HAS EXTENDED BEYOND IT'S WARRANTY AND WILL BE FULLY
REMOVED AT THE LOWER ROOF AREA AND SELECTIVELY REMOVED AT
THE UPPER ROOF IN THE GUTTER AREA AS INDICATED.
THE UPPER ROOF SCOPE OF WORK INCLUDES THE REMOVAL OF THE
EXISTING STONE BALLAST IN ITS ENTIRETY, THE SELECTIVE REMOVAL
OF THE EPDM ROOFING IN THE INTEGRAL GUTTER AREA, THE
INSTALLATION OF FELT BACKED EPDM MEMBRANE IN THE INTEGRAL
GUTTER, THE REMOVAL AND REINSTALLATION OF THE ROOF DRAINS
AND OVERFLOW DRAINS TO COORDINATE WITH THE ROOF MEMBRANE
REPLACEMENT, THE TEMPORARY REMOVAL AND REINSTALLATION OF
THE COPPER COPING AT THE NORTH SIDE OF THE ROOF WHERE IT IS
LIFTED FROM THE CLEAT ANCHORS, THE REMOVAL AND
REPLACEMENT OF THE EXISTING HIPPED ROOF RIDGES, THE REMOVAL
AND REINSTALLATION OF THE LIGHTNING PROTECTION SYSTEM WITH
MODIFICATIONS ON THE AIR TERMINAL SUPPORTS AND CABLE
SUPPORTS. THE LIGHTING PROTECTION SYSTEM TO BE RECERTIFIED
TO COORDINATE WITH EXISTING CERTIFICATION. NEW ROOF FALL
PROTECTION ANCHORS ARE TO BE INSTALLED - THIS WILL REQUIRE
NEW PENETRATIONS THROUGH THE EXISTING STANDING SEAM
COPPER ROOFING AND ACCESS TO THE STRUCTURAL STEEL FRAMING
BELOW WHICH WILL REQUIRE COORDINATION AND TEMPORARY
REMOVAL/REINSTALLATION OF EXISTING CEILING BAFFLES AT THE
INTERIOR. ANY WORK AROUND THE LIBERTY BELL WILL REQUIRE
TEMPORARY PROTECTION BE INSTALLED AND ADVANCED NOTICE
PROVIDED TO NPS / THE CONTRACTING OFFICER.
THE LOWER ROOF SCOPE OF WORK INCLUDES THE REMOVAL OF THE
EXISTING ROOF EPDM MEMBRANE, STONE BALLAST, AND UNDERLYING
TAPERED ROOF INSULATION TO CONCRETE DECK, REMOVAL AND
REPLACEMENT OF THE EXISTING DRAINS AND OVERFLOW DRAINS,
REMOVAL AND REPLACEMENT OF THE METAL CURB FASCIA AND
COPING, CURB MODIFICATIONS TO RAISE ITS HEIGHT TO
ACCOMMODATE INCREASED DEPTH OF TAPERED INSULATION,
INSTALLATION OF ROOF FALL PROTECTION AND INSTALLATION OF
ANCHORS FOR TEMPORARY LADDER ACCESS, REMOVAL AND
SALVAGING OF THE LIGHTNING PROTECTION SYSTEM FOR ROOF
REPAIRS AND REINSTALLATION OF THE LIGHTING PROTECTION
SYSTEM TO BE RECERTIFIED TO COORDINATE WITH EXISTING
CERTIFICATION. THE NEW ROOFING IS TO BE A FULLY ADHERED PVC
MEMBRANE SYSTEM INSTALLED ON THE EXISTING CONCRETE DECK
WITH INTEGRATION OF A VAPOR RETARDER. REFERENCE
SPECIFICATIONS FOR TESTING, OBSERVATION AND MOCK-UP
REQUIREMENTS.
IN COORDINATION WITH WORK AT THE LOWER ROOF, AFTER THE NEW
ROOF MEMBRANE HAS BEEN INSTALLED, REPAIRS ARE TO BE
COMPLETED AT THE INTERIOR GYPSUM BOARD CEILING WITH DUST
BARRIER INSTALLATION, GYPSUM BOARD REPLACEMENT REPAIRS AND
PREPPING THE CEILING FOR NEW PRIMER AND PAINT AS INDICATED IN
THE DRAWINGS.
PROJECT SCOPE OF WORK
AREA OF COPPER COPING TO BE
RESECURED TO EXISTING CLEAT TO
PROVIDE FULLY ATTACHED METAL
ENCLOSURE. WIND UPLIFT HAS
UNSEATED THE METAL AT THE SEAMS.
THE STANDING SEAM JOINTS ARE TO BE
RE-HEMMED. (TYPICAL AT
FULL NORTH SIDE OF ROOF)
R. ANGIE GAEBLER
RA016339
09.22.2023 09.22.2023
KEY PLAN
' 1 ~ UPPER ROOF PLAN
'- A1.1 • • SCALE: 1/4" = 1'-o•
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OFINDEPENDENCE NATIONAL HISTORICAL PARK
179591
LIBERTY BELL CENTER ROOF
CYCLIC REPLACEMENT OF LIBERTY BELL
CENTER ROOF
A/E FIRMS
PRIME/ARCH:
STRATA
ARCHITECTURE INC.
1701 OAK STREET,
SUITE 100
KANSAS CITY, MO
T: 816.474.0900
LOWER ROOF PLANA1.2
LOW ROOF AREA
LIGHTNING GROUNDING CABLE
PENETRATION. RE: E1.1 FOR DETAILS.
REMOVE EXISTING EPDM ROOF DOWN TO STRUCTURAL
CONCRETE DECK AND REPLACE WITH A NEW VAPOR
RETARDER, TAPERED INSULATION, HD COVER BOARD
AND FULLY ADHERED PVC MEMBRANE ROOF SYSTEM.
ROOF DRAIN AND
OVERFLOW DRAIN
DESIGNATED AREA
OF ROOF REPLACEMENT
ROOF DRAIN
AND
OVERFLOW
DRAIN
A GROUNDING CABLE FOR THE
LIGHTNING PROTECTION ASSEMBLY
PENETRATES THE INTEGRAL
GUTTER
SLO
PE
1/4
1' -0"
SLOPE
1/4" / 1'-0"
320561
JD/VJ
VJ
JD
05.11.2023 09
R. ANGIE GAEBLER
RA016339
09.22.2023 09.22.2023
KEY PLAN
1 LOWER ROOF PLAN
Al. 2 SCALE: 1/4" = 1'-o•
PROVIDE DUST AND PAINT
PROTECTION TO SEPARATE BELL
CHAMBER AREA.
BELL CHAMBER
QUEUING
VESTIBULE
PROVIDE DUST AND PAINT
PROTECTION AT QUEUING
DURING GYPSUM BOARD CEILING
REPAIR AND PAINTING, PROTECT
ALL ADJACENT FINISHES.
PROVIDE FINAL CLEANING AT END
OF CONSTRUCTION
SCISSOR LIFT OR OTHER EQUIPMENT
REQUIRED FOR GYPSUM BOARD CEILING
REPAIRS AND PAINTING SHALL BE LESS
THAN 6000LBS. EQUIPMENT USE AND
PATHWAY WITHIN BUILDING MUST BE
COORDINATED WITH NPS / CONTRACTING
OFFICER. PROTECTIVE MATS ARE TO BE
PROVIDED BY THE CONTRACTOR FOR
SCISSOR LIFT USE TO PROTECT FLOORING
FROM PATH OF ENTRY AND THROUGHOUT
WORK AREA AT ALL TIMES.
CONTRACTOR SHALL NOTIFY NPS /
CONTRACTING OFFICER'S REPRESENTATIVE
THREE (3) WORK DAYS PRIOR TO BEGINNING
INTERIOR WORK TO ALLOW NPS CURATORS TO
PROVIDE ADDITIONAL PROTECTIONS TO BELL.
REPLACE EXISTING ACCESS
PANEL WITH NEW GYPSUM
BOARD AND SKIM COAT TO
MATCH ADJACENT SURROUNDING
CEILING FOR SEAMLESS
APPEARANCE. PRIME AND PAINT.
SHADED PORTION INDICATES EXISTING GYPSUM
BOARD CEILING TO BE PRIMED AND PAINTED.
COORDINATE PAINT TYPE, SHEEN, AND COLOR WITH
NPS / CONTRACTING OFFICER. PATCH AND REPAIR
THE EXISTING CEILING PRIOR TO
PAINTING FOR A SEAMLESS APPEARANCE.
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OFINDEPENDENCE NATIONAL HISTORICAL PARK
179591
320561
JT
JT
TF
0905.11.2023
LIBERTY BELL CENTER ROOF
CYCLIC REPLACEMENT OF LIBERTY BELL
CENTER ROOF
A/E FIRMS
PRIME/ARCH:
STRATA
ARCHITECTURE INC.
1701 OAK STREET,
SUITE 100
KANSAS CITY, MO
T: 816.474.0900
ENLARGED REFLECTED
CEILING PLANA1.10
A1.10
PARTIAL REFLECTED CEILING PLAN
SCALE: 1/4" = 1'-0"
A1.10
LOWER CEILING DAMAGE NEAR EXIT VESTIBULE
N.T.S.
A1.10
LOWER CEILING LOOKING WEST
N.T.S
KEY PLAN
SCALE OF FEET
1/4"=1'-0"
REMOVE DEBRIS, CLEAN, AND
REPAIR GYPSUM BOARD AT
CONCEALED COVE LIGHTING
AREA PRIOR TO REPAINTING.
PATCH AND REPAIR GYPSUM
BOARD CEILING ABOVE EXIT AT
VESTIBULE 113 ON INTERIOR SIDE
OF BUILDING PRIOR TO PAINTING.
REPLACE EXISTING ACCESS
PANEL WITH NEW GYPSUM
BOARD AND SKIM COAT TO
MATCH ADJACENT SURROUNDING
CEILING FOR SEAMLESS
APPEARANCE. PRIME AND PAINT.
(NOT SHOWN IN PHOTOGRAPH)
SHADED PORTION INDICATES AREA OF
SCOPE OF WORK
R. ANGIE GAEBLER
RA016339
09.22.2023 09.22.2023
0 0 0
0 0 0 0
. N
-0
@ 0
- - - - ""al I I
~ I I
• I I \ I
-- \ - ~:~-~-~-~-=-=-~----------~---_-_-_-_-_-_-_-_-_--_-_-_-_-_-_-_-_-_-_-_-_:~~-1-
(i(J.\0 ~ ® (® I -~- L I
I -- 0 I I --- c:::, -- 0 ! I ----- I -t- . --t- . ---t
TWO (2) NEW LAYERS OF
2.6-INCH INSULATION FULLY
ADHERED TO CONCRETE DECK
NEW WOOD BLOCKING
NEW FULLY ADHERED PVC
MEMBRANE TO WRAP UP
AND OVER CURB
1/4 INCH PER FOOT
TAPERED INSULATION
NEW METAL ERA ANCHOR
TITE RADIUS EDGE METAL
WITH 9-INCH FACE
MATCH EXISTING METAL
COLOR AND FINISH
VAPOR RETARDER
1/2 INCH HD COVER BOARD
TWO (2) NEW LAYERS OF
2.6-INCH INSULATION ADHERED
TO CONCRETE DECK
NEW FULLY ADHERED PVC
MEMBRANE
1/4 INCH PER FOOT
TAPERED INSULATION
NEW SINGLE PLY MEMBRANE WITH
TERMINATION BAR COUNTER
FLASHING WITH .032 ALUMINUM
TUCKED UNDER EXISTING
ALUMINUM SILL FLASHING
EXISTING ROOF DRAIN WILL BE REPLACED
WITH 8.5-INCH WIDE ROOF DRAIN
ADJACENT ROOF DRAIN WILL BE
CONVERTED WITH 2-INCH WATER DAM
VAPOR RETARDER
1/2 INCH HD COVER BOARD
ZEE CLOSURE SET BELOW EXISTING EXPOSED FASTENERS
SET ZEE CLOSURE IN BUTYL CAULK.
SEAL INTERIOR SIDE (UNDER CAP) OF ZEE CLOSURE TO PANEL
STANDING SEAM WITH BUTYL CAULK
TURN PANEL ENDS UP TO PROVIDE
ADDITIONAL MOISTURE PROTECTION SEAL
TIGHT WITH BUTYL CAULK
FABRICATE NEW COPPER HIP
AND RIDGE CAPS PER SMACNA
NON RIDGE CAP DETAIL
TWO (2) 2.6 INCH NEW
LAYERS OF INSULATION
ADHERED TO
CONCRETE DECK
NEW FULLY ADHERED PVC
MEMBRANE BASE
1/4 INCH PER FOOT
TAPERED INSULATION
NEW SINGLE PLY MEMBRANE WITH
TERMINATION BAR COUNTER
FLASHING WITH .032 ALUMINUM
TUCKED UNDER EXISTING
ALUMINUM SILL FLASHING
VAPOR
RETARDER
1/2 INCH HD
COVER BOARD
EXISTING
CONCRETE
DECK
TWO (2) NEW LAYERS OF 2.6-INCH
INSULATION ADHERED TO CONCRETE DECK
NEW FULLY ADHERED PVC
MEMBRANE
1/4 INCH PER FOOT
TAPERED INSULATION
EXISTING CONCRETE DECK
VAPOR RETARDER
1/2 INCH HD COVER BOARD
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OFINDEPENDENCE NATIONAL HISTORICAL PARK
179591
LIBERTY BELL CENTER ROOF
CYCLIC REPLACEMENT OF LIBERTY BELL
CENTER ROOF
A/E FIRMS
PRIME/ARCH:
STRATA
ARCHITECTURE INC.
1701 OAK STREET,
SUITE 100
KANSAS CITY, MO
T: 816.474.0900
NEW ROOF DETAILSA5.0
320561
JD/VJ
VJ
JD
05.11.2023
R. ANGIE GAEBLER
RA016339
09.22.2023 09.22.2023
. ' ,..JS; I I I I
I I I I
I . -:
' II
I J>'I> ,. • p,
• I). I). . ,. .. m ,. ,.
~ r-r-d ..
. JI'
I •• l/
, r 1 " SECTION THROUGH ROOF EDGE & GUTTER AT NORTH, EAST & WEST WALL OF CHAMBER '.. .. AS. O ~ SCALE: 1 1 /2" = 1'-o•
4. 4
RIDGE CLOSURE DETAIL
SCALE: 3" = 1'-0"
<I . 4 jr 4 ". TYPICAL SECTION THROUGH ROOF DECK
\.A:_:0./ SCALE: 1 1/2" = 1·-0·
r 2 "', SECTION THROUGH CURB AT NORTH WALL OF CHAMBER "-A__: 0 ... ' scALE: 1 1 /2" = 1 '-o·
4 ◄ <I
DETAIL AT SOFFIT OVERHANG-EAST AND WEST ELEVATIONS
SCALE: 1 1/2" = 1'-o• r 6 " RISING WALL TO EXHIBIT AREA
'-AS.O~ SCALE: 1 1/2" = 1'-0"
.,d . 4
<I
•◄ . 8"
M
IN
REMOVE EXISTING STONE BALLAST, DISABLE EXISTING EPDM MEMBRANE
AND INSTALL NEW ADHERED FLEECED BACKED EPDM MEMBRANE.
NEW FLEECE BACK EPDM MEMBRANE ATTACHED
TO EXISTING SURFACE WITH TERMINATION BAR
JUST UNDER EXISTING COPPER EAVE METAL.
NEW COPPER SKIRT METAL COUNTERFLASHING
EXTENDED TO SLIDE UNDERNEATH THE
EXISTING COPPER EAVE.
EXISTING ROOF SYSTEM:
COPPER ROOFING SYSTEM AND TRIM
ROSIN COATED BUILDING PAPER AND #30
FELT, ICE/WATER MEMBRANE
UNDERLAYMENT AT EAVES, 3-1/2" NAIL BASE
INSULATION ON EXTERIOR GRADE 5/8"
PLYWOOD, AND COLD FORMED METAL
FRAMING @ 24" O.C.
DEMOLISH EXISTING EPDM MEMBRANE
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OFINDEPENDENCE NATIONAL HISTORICAL PARK
179591
320561
EJPA
EJPA
WRD
09 09.22.2023
LIBERTY BELL CENTER ROOF
CYCLIC REPLACEMENT OF LIBERTY BELL
CENTER ROOF
A/E FIRMS
PRIME/ARCH:
STRATA ARCHITECTURE
1701 OAK STREET,
SUITE 100
KANSAS CITY, MO
T: 816.474.0900
FALL PROTECTION
PLANS1.1
GENERAL
CONTRACTOR TO
FURNISH AND
INSTALL NEW FALL
PROTECTION ROOF
ANCHOR, TYP.
S2.1 r---7 l_[Q] _JL------+---- -r
2S2.1
3S2.1
, ~I
L
I -I
I I I
---,-I I I I
I I I
I I I I
1-1
I
I
I I I -, I I
I I
I I
_JI
I I I
---, I I I I_
I I I
I I - I
I I
I
I I
I I I
'I
I
I I I I I\ I
I I
I
'.1 I
I I
I I I\
I
'1 I_J
I '1 '1
I I
I
I I c1 I I I
I\ I\ 'I
I
I I
I I I
I I_ a
I
I I
I I I I
I \ I
I I I
I\ I
I I I I
I 1 r
I _\ I I
I
I
I I
L1 I
I
I I I I
I I I
I I I I
I
I
I\ I
I I I
I I I
I I I I
I I I
I I I
I I I I
I I I I
I
'1 \
I
I \ I
I '1_ '. I \ I \ I
I I I I
I '1 I I i+
I I I I
I I I I '1
1, I\ I\ 'I
I I I
I I I I
I I I I
I I I
\11 I
11 I I
I
,1 i' I I I
I I i' i'
I
I
\ i i \ \ I
,Ii'
I I
,I I
I i
I
-L
I I I I
I I I I
I I
I I I I
I
I ,1
I --,..-
L f c c i \
I
I I
I
I I
I I
I I '1 1, I I I I I I '1 I\ I
I '1 '1 I I I 'I
I I I
I I I '1 I I
I I\ 'I
I ' I I
,' I
,'1 I
Ill 1, ,' I
I I I I
,'1 I
1\1_1, I I I J
I
I I
I I
I I I
I I I I
I ', I I
I
11 I I I I
I
I I I I
111 111 II\ I I I I I 111
\\ I 111 \11 I I I I I l\1 I 111 I I I I I I 11 Ii\ I -\ ;\ I I I I I 111 I 11 I I I I I I \ i
I
I
I I
I I
I
- Ii' 11 1 11I 11/ I I I 1 I 111 11; 1' I I I I I Ii' 11 1 1 11 I I I I I I 111 I 11 I I I I
I
,1 i'
I I
I I
I I i' i'
I I
I i \ I I
\ i i \ -, I I
I
I I i \ I i \ \
I
I i' i' \ I ii' I I
I I
,1 i'
I
I I
I i \ I I
I I
I
,1 i'
I
I I
I
11\
I ,1
I I
,f
, t1-----, I
I I
I
111 I
I I
I
I I I i \ I \ I
I
I I
\ i i \ I I
I I \ i i \ I
I
\ i I I I I
I I
I I I I
I I I I
I I I I
I \
I
I
I
I
I I
I I ' ' I
I
I I
I I
I
I
I i' ,1
I I I
I I
I I
I I
I ' I I ;
I
I I
I
I I I
I_ ,I I I I I I i \ \ I
I
_1_,l,1 I
I I I I
I I I I
I I I I I I
I I I I
I I I I
I I I I
I I I I
I
I I
I
I
I I I I
I I I I
I I I
I I I I
I I
I I I ,I;--/
I
I
I I
I
I
I I I 'I
I
I I I
I I
I
I I I I
I I I I
I I I i \ \ I
I
I
I
I i'
I
I I _I
I
I
I ,Ii'
I I
I
I
1--i-+ i' i'
I
I I
I
I
I
I
I
I
I
I
I
I
I I I i' i'
I I
I
I
C
I
I
I _/_ !._
I I
I
I
I I I_
I -f -I I I L
I I i' 1'
J
I I
I
I
I
I
I
I I I I
I I I I
I I I I
I I I I
I I I
I I I I I I I
GENERAL
CONTRACTOR TO
FURNISH AND
INSTALL NEW FALL
PROTECTION ROOF
ANCHORS AND
HORIZONTAL
LIFELINES, TYP.
Scale: 1/4"=1'-0" LOWER ROOF PLAN20----Scale: 1/4"=1'-0"
UPPER ROOF PLAN1ol------
(4) HORIZONTAL LIFELINE
(8) HORIZONTAL LIFELINE ANCHOR
(6) ROOF MOUNT ANCHOR
LEGEND
NOTE:
AT THE UPPER ROOF, THE INSTALLATION OF NEW ROOF FALL
PROTECTION ANCHORS WILL REQUIRE NEW PENETRATIONS
THROUGH THE EXISTING STANDING SEAM COPPER ROOFING
AND ACCESS TO THE STRUCTURAL STEEL FRAMING BELOW
WHICH WILL REQUIRE COORDINATION AND TEMPORARY
REMOVAL/REINSTALLATION OF EXISTING CEILING BAFFLES AT
THE INTERIOR. ANY WORK AROUND THE LIBERTY BELL WILL
REQUIRE TEMPORARY PROTECTION BE INSTALLED AND
ADVANCED NOTICE PROVIDED TO NPS / THE CONTRACTING
OFFICER.
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OFINDEPENDENCE NATIONAL HISTORICAL PARK
179591
320561
EJPA
EJPA
WRD
09 09.22.2023
LIBERTY BELL CENTER ROOF
CYCLIC REPLACEMENT OF LIBERTY BELL
CENTER ROOF
A/E FIRMS
PRIME/ARCH:
STRATA ARCHITECTURE
1701 OAK STREET,
SUITE 100
KANSAS CITY, MO
T: 816.474.0900
FALL PROTECTIONS2.1
ANCHOR TO EXTEND 6" TO 8"
ABOVE HEIGHT OF COPPER PANEL
PROVIDE LATERAL REINFORCEMENT.
SECURE ANCHOR PIPE TO CONCRETE
DECK, WHERE APPLICABLE.
PROVIDE LATERAL REINFORCEMENT.
SECURE ANCHOR PIPE TO
COLD FORMED METAL
FRAMING, WHERE APPLICABLE.
2"
4"CONTRACTOR TO CONFIRM ANCHOR HEIGHT.
ANCHOR HEIGHT TO BE COORDINATED WITH
ARCHITECTURAL AND WATERPROOFING REQUIREMENTS
ANCHOR TO EXTEND 6" TO 8"
ABOVE HEIGHT OF COPPER PANEL
PROVIDE LATERAL REINFORCEMENT.
SECURE ANCHOR PIPE TO
COLD FORMED METAL
FRAMING, WHERE APPLICABLE.
PROVIDE LATERAL REINFORCEMENT.
SECURE ANCHOR PIPE TO CONCRETE
DECK, WHERE APPLICABLE.
HILTI KWIK BOLT WEDGE ANCHOR
OR SIMPSON STRONG-TIE
OR EQUIVALENT ANCHOR
TO BE INSTALLED FROM THE
TOP-SIDE OF THE ROOF
3" NORMAL WEIGHT CONCRETE OVER 3"
COMPOSITE GALVANIZED METAL FLOOR
DECK. REINFORCED WITH #3 TOP &
BOTTOM IN EACH DECK FLUTE IN SPAN
DIRECTION, & #3 @ 12" TOP IN
TRANSVERSE DIRECTION. TOTAL SLAB
DEPTH = 6".
PROVIDE NUTS, WASHERS, WASHER
PLATES, AND THREADED ROD.
HSS 3X3X3/16 42" LENGTH (x2)
Pu
ANY DIRECTION
Mu
STAINLESS STEEL U-BAR WELDED TO ROUND HSS
WELDED TO BASE PLATE.
ENTIRE ANCHOR HOT-DIP GALVANIZED
3" NORMAL WEIGHT CONCRETE OVER 3"
COMPOSITE GALVANIZED METAL FLOOR
DECK. REINFORCED WITH #3 TOP &
BOTTOM IN EACH DECK FLUTE IN SPAN
DIRECTION, & #3 @ 12" TOP IN
TRANSVERSE DIRECTION. TOTAL SLAB
DEPTH = 6".
CONTRACTOR TO CONFIRM ANCHOR HEIGHT.
ANCHOR HEIGHT TO BE COORDINATED
WITH ARCHITECTURAL AND WATERPROOFING
REQUIREMENTS
Scale: 1/2"=1'-0"
UPPER ROOF DETAIL3
Scale: 1"=1'-0" UPPER ROOF ANCHOR DETAIL2Scale: 1"=1'-0"
LOWER ROOF ANCHOR DETAIL1
of------- of-------
H ~;---r= ,7- ' T "g, 11 i" •
-:_ --__J__- ~ i- '·
-----=9--------~1
1 .• ,.. l -, j_ '
I 'r-----of-------
GENERAL NOTES
1. COORDINATE ALL LOCATIONS WITH THE ARCHITECTURAL AND STRUCTURAL PLANS.
2. VERIFY ALL DIMENSIONS WITH THE ARCHITECTURAL AND STRUCTURAL PLANS.
3. COORDINATE ALL FLASHING OF THE EQUIPMENT WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
4. ONLY USE DIMENSIONS SHOWN ON THE DRAWINGS. DO NOT SCALE THE DRAWINGS.
5. NOTIFY THECONTRACTING OFFICER'S REPRESENTATIVE OF ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND
THOSE SHOWN ON THE DRAWINGS.
6. NO DEVIATION FROM THIS DRAWING SHALL BE ALLOWED WITHOUT PRIOR WRITTEN APPROVAL.
DESIGN NOTES
1. THESE PLANS HAVE BEEN DESIGNED IN ACCORDANCE WITH OSHA 29 CFR 1910.140 AND ANSI/ASSP Z359.
2. ALL EQUIPMENT PROVIDED SHALL BE COMPLIANT WITH OSHA 29 CFR 1910.140 AND ANSI/ASSP Z359.
3. ALL LOADS AND ATTACHMENT METHODS TO BUILDING STRUCTURE TO BE REVIEWED BY THE STRUCTURAL ENGINEER OF RECORD, TO VERIFY ADEQUATE SUPPORT IS PROVIDED BY THE BUILDING STRUCTURE. UPON COMPLETION OF REVIEW, THE STRUCTURAL ENGINEER OF RECORD SHALL SUBMIT A LETTER TO THE FALL PROTECTION CONSULTANT DOCUMENTING THAT THE BUILDING STRUCTURE AND REINFORCEMENT IS ADEQUATE FOR THE IMPOSED LOADS AS APPLICABLE TO THE LOAD COMBINATIONS AS DEFINED BY THE CURRENT BUILDING
CODE FOR WHICH THE STRUCTURE IS DESIGNED.
4. ALL STEEL COMPONENTS EXPOSED TO THE EXTERIOR OF THE BUILDING SHALL BE STAINLESS STEEL (SS316) OR HOT DIPPED GALVANIZED (HDG) FOR CORROSION RESISTANCE. HOT DIPPED GALVANIZING SHALL BE A MINIMUM G75 COATING IN ACCORDANCE TO ASTM A123/A123M FOR STEEL SHAPES OR A153/A153M FOR BOLTS, THREADED ROD, AND SIMILAR HARDWARE.
5. UNLESS NOTED OTHERWISE (U.N.O.), ALL STEEL SHAPES, PLATES AND THREADED RODS SHOWN SHALL BE GRADE A36 (Fy=36ksi) MATERIAL OR BETTER.
6. SHOP DRAWINGS FOR STEEL COMPONENTS AND HARDWARE INCLUDING MANUFACTURER'S PRODUCT AND SPECIFICATION SHEET FOR ANCHOR TYPE SHALL BE SUBMITTED FOR REVIEW AND APPROVAL PER THE PROJECT
SPECIFICATIONS.
7. ALL THREADED FASTENERS SHALL BE PROVIDED WITH LOCKING NUTS, COTTER PINS, MECHANICAL DISABLING/DEFORMING THREADS, OR TACK WELDING AS A MEANS TO LOCK THE FASTENER AND PREVENT
LOOSENING.
INSTALLATION NOTES
1. ALL WORK SHALL BE PERFORMED BY LICENSED, QUALIFIED CONTRACTORS HAVING EXPERIENCE WITH SIMILAR
WORK AND PROJECTS.
2. UPON COMPLETION OF THE FINAL INSTALLATION, ALL EQUIPMENT SHALL BE TESTED AND CERTIFIED FOR USE IN ACCORDANCE WITH OSHA 29 CFR 1910.140 AND ANSI/ASSP Z359. LOAD TESTING AND CERTIFICATION SHALL BE
PERFORMED UNDER THE DIRECT SUPERVISION OF A REGISTERED PROFESSIONAL ENGINEER.
USAGE NOTES
1. PRIOR TO THE RECOMMENDED INSPECTION DATE, THE EQUIPMENT SHALL BE INSPECTED IN ACCORDANCE WITH 29 CFR OSHA 1910.140 AND ANSI/ASSP Z359 BY A COMPETENT OR QUALIFIED PERSON UNDER THE SUPERVISION OF A
REGISTERED PROFESSIONAL ENGINEER OR BY AN OTHERWISE QUALIFIED PROFESSIONAL.
2. ACTIVE FALL PROTECTION SYSTEMS (I.E. HORIZONTAL LIFELINES) SHALL BE THOROUGHLY REVIEWED BY A REGISTERED PROFESSIONAL ENGINEER AT A FREQUENCY TO BE DETERMINED BY REVIEW OF THE ORIGINAL DESIGN OR AS OTHERWISE DIRECTED, BUT NOT TO EXCEED FIVE YEARS IN ACCORDANCE WITH ANSI/ASSP Z359 FALL
PROTECTION CODE.
3. EMPLOYERS SHALL DEVELOP AND IMPLEMENT A POLICY STATEMENT THAT PROVIDES GENERAL GOALS AND GUIDANCE FOR A MANAGED FALL PROTECTION PROGRAM AND EMPHASIZES MANAGEMENT'S COMMITMENT TO
PROVIDING A SAFE WORKPLACE FOR EMPLOYEES EXPOSED TO FALL HAZARDS.
4. FALL PROTECTION EQUIPMENT SHALL BE THOROUGHLY INSPECTED BEFORE EACH USE AND AT LEAST ANNUALLY BY
A COMPETENT PERSON.
5. EQUIPMENT SUBJECTED TO IMPACT LOADING (I.E. A FALL) OR A LOAD OF MAGNITUDE GREATER THAN THE RATED LOAD SHALL BE IMMEDIATELY REMOVED FROM SERVICE AND SHALL NOT BE USED AGAIN UNLESS INSPECTED AND DETERMINED BY A REGISTERED PROFESSIONAL ENGINEER TO BE UNDAMAGED AND SUITABLE FOR CONTINUED
USE.
6. ALL ROOFING AND ASSOCIATED FLASHINGS SHOULD BE PROTECTED FROM ROPES AND APPURTENANCES TO
PREVENT DAMAGE.
7. EMPLOYERS SHALL INFORM EACH AUTHORIZED PERSON ABOUT ANY FORESEEABLE FALL HAZARD BEFORE THE
AUTHORIZED PERSON IS EXPOSED TO THE FALL HAZARD.
8. EMPLOYERS SHALL PROVIDE AUTHORIZED PERSONS WITH THE KNOWLEDGE AND TRAINING NECESSARY TO
OPERATE ANY ACTIVE FALL PROTECTION SYSTEM USED BY THAT AUTHORIZED PERSON.
9. EMPLOYERS SHALL PROVIDE COMPETENT PERSONS TO SUPERVISE AUTHORIZED PERSONS WHO ARE EXPOSED TO
FALL HAZARDS.
10. WRITTEN RESCUE PROCEDURES SHALL BE PREPARED AND MAINTAINED BY THE COMPETENT PERSON FOR ALL INSTANCES WHERE AUTHORIZED PERSONS WORK AT HEIGHTS. SUCH PROCEDURES SHALL CONTAIN PROVISIONS
FOR THE PROMPT RESCUE AND SELF-RESCUE OF ANY AUTHORIZED PERSON WHO FALLS.
11. THE COMPETENT PERSON SHALL PREPARE, UPDATE, REVIEW, AND APPROVE WRITTEN FALL PROTECTION PROCEDURES AS DIRECTED BY THE PROGRAM ADMINISTRATOR. THE COMPETENT PERSON SHALL REVIEW THE PROCEDURES AS WORKPLACE ACTIVITIES CHANGE TO DETERMINE IF ADDITIONAL PRACTICES, PROCEDURES, OR TRAINING NEED TO BE IMPLEMENTED BEFORE WORKPLACE ACTIVITIES CONTINUE. THE COMPETENT PERSON SHALL
ENSURE A WRITTEN RESCUE PLAN HAS BEEN DEVELOPED.
12. ALL WORKERS WHO USE THE CERTIFIED EQUIPMENT SHOULD PRODUCE AND PRESENT A SITE SPECIFIC WORK PLAN DETAILING THE INTENDED USE OF THE EQUIPMENT IN COMPLIANCE WITH 29 CFR 1910.140 PERSONAL FALL PROTECTION SYSTEMS AND ANSI/ASSP Z359 - FALL PROTECTION CODE AND BE TRAINED IN ACCORDANCE WITH 29
CFR OSHA 1910.30.
NOTE:
AT THE UPPER ROOF, THE INSTALLATION OF NEW ROOF FALL
PROTECTION ANCHORS WILL REQUIRE NEW PENETRATIONS
THROUGH THE EXISTING STANDING SEAM COPPER ROOFING
AND ACCESS TO THE STRUCTURAL STEEL FRAMING BELOW
WHICH WILL REQUIRE COORDINATION AND TEMPORARY
REMOVAL/REINSTALLATION OF EXISTING CEILING BAFFLES AT
THE INTERIOR. ANY WORK AROUND THE LIBERTY BELL WILL
REQUIRE TEMPORARY PROTECTION BE INSTALLED AND
ADVANCED NOTICE PROVIDED TO NPS / THE CONTRACTING
OFFICER.
GENERAL INFO. & DETAILS
FALL PROTECTION EQUIPMENT SCHEDULES
(6) ROOF MOUNT ANCHOR
(4) HORIZONTAL LIFELINE
(6) HORIZONTAL LIFELINE ANCHOR-
GROUNDING CABLE
PENETRATION
REPLACE EXISTING LIGHTNING
PROTECTION CABLE
EXISTING AIR TERMINAL, REMOVE ALL
ASSOCIATED CABLING TO DOWNLEADS.
PROTECT DOWNLEADS FOR REUSE.
EXISTING AIR TERMINAL, REMOVE
ALL ASSOCIATED CABLING TO
DOWNLEADS. PROTECT
DOWNLEADS FOR REUSE.
REPLACE EXISTING LIGHTNING
PROTECTION CABLE
GENERAL CONTRACTOR IS TO
TRIM TREE BACK FROM
OVERHANGING THE ROOF
EDGE OF PARAPET. MAINTAIN
A 18" CLEARANCE BACK FROM
EDGE OF OVERHANG
GROUNDING CABLE
PENETRATION
1. FURNISH AND INSTALL SURGE SUPPRESSION ON EXISTING
ELECTRICAL SERVICE ENTRANCE PANEL AS REQUIRED.
2. FURNISH AND INSTALL LIGHTNING PROTECTION ON ROOF
AREAS WHERE NEW WORK OCCURS.
3. RECONNECT NEW ROOF LIGHTNING PROTECTION
ELEMENTS TO EXISTING DOWNLEADS AS REQUIRED.
4. COMPLETED LIGHTNING PROTECTION SYSTEM SHALL BE
CERTIFIED AT THE END OF CONSTRUCTION.
LIGHTNING PROTECTION NOTES:
LIGHTNING PROTECTION
PLANE1.1
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OFINDEPENDENCE NATIONAL HISTORICAL PARK
179591
320561
PP
JT
TF
05.11.2023
LIBERTY BELL CENTER ROOF
CYCLIC REPLACEMENT OF LIBERTY BELL
CENTER ROOF
A/E FIRMS
PRIME/ARCH:
STRATA
ARCHITECTURE INC.
1701 OAK STREET,
SUITE 100
KANSAS CITY, MO
T: 816.474.0900
0910.11.2023 09.22.2023
½a l[j .
r
V
LOWER ROOF LIGHTNING PROTECTION PLAN
SCALE: 1/4" = 1'-o•
0 4 8 -------- SCALE OF FEET 1 /4"=1 '-o"
0.5 \
2 UPPER ROOF LIGHTNING PROTECTION PLAN
E1•1 SCALE: 1/4" = 1'-o•
4 0 4 8 -------- SCALE OF FEET 1/4"=1'-o"
| Sheets and Views |
| NPS - INDE - Liberty Bell Roofing Cover-Layout1 |
| NPS - INDE - Liberty Bell Roofing_A1.0 Site Plan |
| NPS - INDE - Liberty Bell Roofing_A1.0 - Overall Site Plan-A0.1 ARCHITECTURAL SITE PLAN |
| NPS - INDE - Liberty Bell Roofing_A1.1 Upper Roof |
| NPS - INDE - LIBERTY BELL - NEW WORD DETAILS_5.1.2023-A1.1 |
| NPS - INDE - Liberty Bell Roofing_A1.2 Lower Roof |
| NPS - INDE - LIBERTY BELL - NEW WORD DETAILS_5.1.2023-A1.2 |
| NPS - INDE - Liberty Bell Roofing_A1.10 Enlarged RCP |
| NPS - INDE - Liberty Bell Roofing_A1.10 - Enlarged RCP-Layout1 |
| NPS - INDE - Liberty Bell Roofing_A5.0 Roof Details |
| NPS - INDE - LIBERTY BELL - NEW WORD DETAILS_5.1.2023-A5.0 |
| NPS - INDE - Liberty Bell Roofing_S0.1 Gen Info |
| S0.1 - Cover Page |
| Sheets and Views |
| Layout1 |
| S1.1 - Lower Roof |
| S1.2 - Upper Roof |
| S2.1 - Details |
| NPS - INDE - Liberty Bell Roofing_S1.1 Fall Protection_Lower |
| S0.1 - Cover Page |
| S1.1 - Lower Roof |
| Sheets and Views |
| Layout1 |
| S1.2 - Upper Roof |
| S2.1 - Details |
| NPS - INDE - Liberty Bell Roofing_S1.2 Fall Protection_Upper |
| S0.1 - Cover Page |
| S1.1 - Lower Roof |
| S1.2 - Upper Roof |
| Sheets and Views |
| Layout1 |
S2.1 - Details
| NPS - INDE - Liberty Bell Roofing_S2.1 Fall Protection_Details |
| S0.1 - Cover Page |
| S1.1 - Lower Roof |
| S1.2 - Upper Roof |
| S2.1 - Details |
| Sheets and Views |
| Layout1 |
| NPS - INDE - Liberty Bell Roofing_S0.1 Gen Info |
| NPS - INDE - Liberty Bell Roofing_S1.1 Fall Protection_Lower |
| NPS - INDE - Liberty Bell Roofing_S1.2 Fall Protection_Upper |
| NPS - INDE - Liberty Bell Roofing_S2.1 Fall Protection_Details |
| NPS - INDE - Liberty Bell Roofing_E1.1 Lightning Protection |
| NPS - INDE - Liberty Bell Roofing_E1.1 - Lightning Protection-E1.1 |
File details come from the government source that posted it. Updated .