About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to manufacture 52 interior mounted, removable compression storm windows for the Ironmaster's House at Hopewell Furnace National Historic Site.
The SOW provides background on the historic site, the purpose of the project to protect objects on display and improve energy efficiency, and the scope of work. The contractor will be responsible for the design, fabrication, and delivery of the storm windows, which must meet specific material and quality requirements. The work will be completed in two phases, with the first phase involving the manufacture of 4 test windows for evaluation before proceeding with the remaining 48 windows. The contractor must provide a one-year warranty on the storm windows and submit detailed operation and maintenance instructions. The related federal contract opportunity has an ID of 45f07f9800354d87a430c72d176399f8 and a solicitation number of 140P4224Q0107, with the Department of the Interior National Park Service Northeast Region as the procuring agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4224Q0107_Amd_0001.pdf | ||
| Q_A_0001.pdf | ||
| Sol_140P4224Q0107.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6/18/2024
Hopewell Furnace National Historic Site Ironmaster’s House Furnishings Plan
Storm Window Manufacture Statement of Work
Project Description: Contractor is responsible for all labor, materials, and transport costs for the manufacturing of 52 interior mounted, removable compression storm windows for the Ironmaster’s House located at Hopewell Furnace National Historic Site (NHS). This work will involve on-site delivery to 2 Mark Bird Lane, Elverson, PA 19520.
A. Background:
Hopewell Furnace NHS encompasses 848.06 acres of land associated with the iron-making operation begun by Mark Bird in 1771 in southeastern Pennsylvania. The furnace and surrounding acreage were sold several times in the eighteenth century before being purchased by the Buckley and Brooke families in 1800. These families retained ownership of the property until the Federal government purchased it in 1935. The furnace reached its peak of production and prosperity during the 1830s. By the middle of the nineteenth century, however, new technologies began to supersede the method of production employed at Hopewell. The Civil War and the expansion of American railroads provided a market for Hopewell’s pig iron for some decades after this time, but technological advances eventually made the furnace unprofitable, forcing its closure. The furnace went out of blast for the final time in 1883. The enabling legislation for the park (8/3/1938) declared the site to be of national significance due to its “relationship to the colonial history of the United States”.
B. Purpose:
The purpose of this scope of work is to solicit proposals for all labor, materials, and transport costs for manufacturing of interior mounted removable compression storm windows for the Ironmaster’s House at Hopewell Furnace NHS.
Vendors sought will have extensive experience in the specialized construction of these specific types of storm windows designed for installation into historic structures with no adverse effects on the historical fabric. The goal is to protect the objects on display from UV light, improve energy conservation, reduce condensation, and noise reduction and by using this type of storm window.
C. Scope of Work:
The contractor will provide components for the design and production of 52 interior mounted removable compression storm windows.
The contractor will warrant the storm windows against defects in materials and workmanship for a period of one year from date of acceptance by the National Park Service (NPS) Contracting Officer and their representative in the park. The contractor will submit a draft copy of the proposed warranty for review by the NPS. The contractor will provide a final written warranty, executed by Contractor, Installer, and Manufacturer, agreeing to repair or replace units which fail in materials or workmanship within the established warranty period. This warranty will be in addition to, and not a limitation of, other rights the National Park Service, Hopewell Furnace National Historic Site may have under the general conditions and provisions of the contract documents.
The contractor will coordinate the fabrication and delivery to ensure there is no delay in progress of the work.
Phases:
The work will be completed in two phases.
During the first phase of the contract, upon NPS review and approval of the design, the contractor will prepare 4 compression storm windows based upon agreed window specifications and locations for test installation (see highlighted windows below), by park staff, prior to proceeding with the manufacture of the remaining storm windows outlined within the contract. The contractor will verify all dimensions before fabrication of the storm windows. The contractor will coordinate fabrication and delivery of all parts.
The second phase of the contract will consist of fabrication and delivery of the remaining 48 (52 total) compression storm windows as per the approved design finalized during the first phase. NPS staff will inspect final deliverables for proper measurements and any other visual manufacture defects such as chipped, scratched, or otherwise damaged materials which do not match adjoining work.
The contractor will provide the park Curatorial and Maintenance staff with printed and electronic instruction, maintenance specifications and user manuals for the compression storm windows will and will be in a form suitable for inclusion in the National Park Service required Housekeeping Manual for collection storage areas. It will include operating and manufacturer’s maintenance instructions and procedures, parts inventory listing, purchase source listing, emergency instructions, and related information for all work including the method and frequency of actions recommended for maintaining optimum condition of the storm windows. It will also include precautions of materials and techniques that will be detrimental to the finishes and performance of the windows.
Materials and General Specifications:
The contractor will provide storm windows with a glazing of at least l/8" double strength, Low E glass. The compression interior storm windows will be made with frame formed from vinyl and weather-stripped all around perimeter. Mullions will be vinyl covered wood with concealed fastenings. Vinyl frame will be dark brown or white as specified based upon installation location. Color samples will be provided to the park for selection.
The compression windows will not require separately installed track or attachment hardware to either sides or bottom of existing openings. Frame will be capable of self-adjusting to any irregularity or out of square condition in existing openings. Frame will be constructed to provide a positive force on existing opening to affect a compression seal. Corners shall be securely fastened.
The spreadsheet below outlines dimensions for storm windows to be produced with an opening measurement of 5/8” for mounting. The contractor will provide materials and quality of workmanship which meet or exceed established industry standards for the product specified. Material thicknesses or gauges are manufacturer’s option unless indicated otherwise.
Window # Location Measurements (In Inches)
Top Bottom Left Right
W003 Room 004, south wall 35 3/4 35 3/32 77 3/16 76 5/8
W005 Room 005, south wall 35 31/32 35 19/32 77 15/32 77 1/8
W007 Room 004, south wall 27 7/16 27 9/32 45 13/32 45 15/32
W008 Room 004, north wall 27 15/32 27 1/4 45 13/32 45 1/4
W009 Room 005, north wall 33 31/32 33 1/32 68 29/32 69 1/16
W009 (2) Room 005, south wall 27 3/32 27 3/8 54 3/32 45 5/16
W010 Room 005, east wall 27 1/32 26 13/16 44 7/8 44 27/32
W011 Room 005, north wall 27 9/32 27 1/8 45 45 11/16`
W012 Room 005, north wall 27 3/8 27 3/8 45 9/16 45 17/32
W101 Room 101, west wall 33 7/8 33 29/32 92 13/16 92 27/32
W102 Room 101, west wall 33 7/8 33 29/32 92 17/32 92 9/16
W103 Room 101, south wall 35 29/32 35 7/16 67 21/32 67 5/8
W104 Room 101, south wall 36 5/32 35 7/8 67 21/32 67 7/16
W105 Room 103, west wall 32 3/8 32 13/32 91 5/32 91 7/32
W106 Room 103, west wall 32 11/32 32 5/16 91 1/4 91 5/32
W107 Room 103, north wall 32 15/32 32 13/32 67 9/32 67 1/2
W108 Room 103, north wall 32 15/32 32 11/32 67 7/16 67 15/32
W109 Room 104, north wall 33 11/16 33 13/16 65 1/16 65 7/16
W110 Room 104, south wall 33 15/32 33 17/32 65 7/16 65 9/16
W111 Room 105, south wall 32 13/16 33 7/16 65 11/32 65 7/32
W112 Room 105, south wall 34 3/8 34 1/2 65 11/32 65 13/32
W113 Room 105, north wall 33 7/32 33 13/16 65 5/16 65 3/8
W114 Room 105, north wall 33 3/8 33 3/8 65 7/32 65 9/32
W201 Room 203, west wall 34 3/16 33 5/8 54 1/8 54 3/32
W202 Room 201, west wall 34 3/16 33 5/8 54 1/8 54 3/32
W203 Room 201, south wall 34 19/32 33 15/16 54 3/8 54 13/32
W204 Room 201, south wall 34 3/8 34 1/8 53 13/16 53 5/16
W205 Room 205, east wall 34 5/32 33 31/32 54 7/32 54 5/32
W206 Room 202, east wall 34 7/16 34 1/2 54 3/16 54 7/16
W207 Room 204, west wall 33 27/32 33 29/32 53 5/8 53 15/32
W208 Room 205, west wall 33 17/32 33 3/4 53 19/32 53 17/32
W209 Room 205, west wall 34 3/32 33 17/32 53 21/32 53 1/2
W210 Room 205, north wall 33 27/32 33 13/16 53 1/4 53 5/16
W211 Room 206, north wall 34 1/8 34 9/32 53 1/2 53 9/16
W212 Room 207, north wall 32 1/2 32 15/32 52 9/32 52 3/16
W213 Room 208, north wall 27 9/32 27 15/16 45 15/16 45 31/32
W214 Room 208, south wall 27 19/32 27 13/32 46 1/32 45 3/4
W215 Room 208, south wall 27 17/32 27 3/32 46 1/32 46
W216 Room 209, south wall 27 15/32 27 9/16 45 23/32 45 23/32
W217 Room 209, south wall 27 5/8 27 11/16 45 15/16 45 13/16
W218 Room 209, east wall 27 5/16 26 31/32 36 1/8 35 5/32
W219 Room 209, east wall N/A N/A N/A N/A
W220 Room 209, north wall 28 28 1/16 45 31/32 46 1/16
W221 Room 209, north wall 28 1/8 28 11/32 45 29/32 45 7/8
W301 Room 301, south wall 24 3/8 24 9/32 43 29/32 44 25/32
W302 Room 301, south wall 24 24 3/16 43 5/8 43 7/32
W303 Room 302, north wall 31 19/32 32 33 13/32 33 7/8
W304 Room 302, north wall 31 1/8 31 31/32 33 25/32 33 3/16
W305 Room 303, north wall 27 31/32 28 7/32 43 15/32 43 9/16
W306 Room 304, north wall 27 31/32 28 1/32 43 7/16 43 9/32
W307 Room 304, east wall 19 13/16 19 7/8 35 15/32 35 13/32
W308 Room 304, east wall 19 7/16 19 11/16 35 11/32 35 5/32