This document is a set of questions and answers related to a federal contract opportunity for Shenandoah National Park (SHEN) to replace concrete pads at camper sites.
The key details are:
- The contract opportunity is for a project to replace concrete pads at camper sites in SHEN, with an estimated contract value between $25,000 and $100,000.
- Payment bonds are required, but performance bonds are not required at this dollar value.
- Contractors may utilize the designated site work area, including a graveled access road and adjacent lawn areas, for material storage and staging. Any disturbed areas must be restored.
- Additional space, if needed, can be coordinated with the Contracting Officer's Representative and subject to SHEN approval.
- The solicitation number is 140P4224Q0081.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4224Q0081_Amd_0001.pdf | ||
| B03_Attachment_3__WD_VA20240011__4Jul24.pdf | ||
| B08_Attachment_1__SOW.pdf | ||
| Sol_140P4224Q0081.pdf | ||
| B08_Attachment_2__Camper_Pad_Drawing.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q: The magnitude currently shows between $25k and 100k. If the project does not exceed $150k, can we exclude this clause as a requirement?
A: Performance bonds are not required at this dollar value, but Payment Bonds are (see FAR 28.102-1). The Clauses remain unchanged.
Q: Laydown yard area location (for rebar, stone, materials storage, etc.)?
A: Designated site work area, graveled access road (from hard surface utilized w/ adjacent housing units) including turnaround mid-point (solicitation drawing reflected) and adjacent regularly mowed lawn grass areas may be utilized. Any disturbed areas are to be restored to current or better conditions. For example, lawn/road shoulder grass - vegetation areas are to be restored with suitable lawn grass re-established. Adjacent facilities and supporting utilities access are to be maintained for SNP, Concessionaire, staff, and utilities providers use.
Site work area (generally reflected as the labeled & clouded area on the solicitation drawing) is the regularly mowed area containing the camper sites and supporting utilities.
If additional area(s) are needed, contractor may coordinate with designed COR (Contracting Officer’s Representation) and subject to SNP (Shenandoah National Park) approval.