This document is a Questions and Answers (Q&A) file related to a federal contract opportunity for the FY24 VAFO Lower Lot Lighting project. The solicitation is for the removal and replacement of parking lot lighting at a National Park Service facility.

The key details include:

  • The contract will replace 12 existing light poles, each with one fixture, with new poles that will have two fixtures installed on the side for a total of 24 new fixtures.
  • There are no light schedules provided, but the government references that the RAB 360 or equivalent lighting fixture should be used.
  • All questions related to the solicitation must be submitted by June 14, 2024 to the Contract Specialist.
  • This Q&A document provides responses to several contractor questions, but does not contain the full Statement of Work or other contract details.

View the file

Other files

File Type Posted
B08_Attachment_4_-_Q_A_Document_0003.xlsx XLSX spreadsheet
Sol_140P4224Q0058_Amd_0003.pdf PDF
Sol_140P4224Q0058_Amd_0002.pdf PDF
aled360_datasheet_0002.pdf PDF
Sol_140P4224Q0058_Amd_0001.pdf PDF
VAFO_Parking_lights_0001.docx DOCX document
B03_Wage_Determination_PA20240099_1.pdf PDF
X_Lower_Lot_Revised_SOW.docx DOCX document
B08_Attachment_3_-_Q_A_Document_2.xlsx XLSX spreadsheet
Sol_140P4224Q0058.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Questions & Answers Document
#Contractor QuestionReferenceGovernment ResponseReference
Example: The specifications state that wiring is to be used inside of the conduit. What type of wiring is to be used?SOW 1.7.12, Drawings pg2Example: Wiring is to be copper AWG 12. SOW has been updated.SOW 1.7.12
1[First Question Here][Document Reference]
2How many lights will be changed?There are 12 poles with one fixture on the top of the pole. These will be removed and two fixtures will be installed on the side of the pole over vehicular/walking path for a total of 24 new fixturesSOW I. Scope of work
3Is there a light schedule?Refer to attached specifications
4Is there a preferred light?RAB 360 or equivalentCut sheet attached
5Has an acceptable model number for the lighting fixture been established?See above
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

File details come from the government source that posted it. Updated .