Sol_140P4223R0013_Amd_0001.pdf

PDF 206 KB Posted

Attached to
INDE - POE HOUSE FIRE SYSTEMS Federal contract opportunity
Solicitation number
140P4223R0013
Issued by
Department of the Interior National Park Service Northeast Region

About this file

This document contains answers to questions from contractors regarding solicitation number 140P4223R0013 from the Department of the Interior National Park Service Northeast Region. The solicitation seeks bids to remove, replace, and install life safety systems at the Poe House in Philadelphia, Pennsylvania, with a period of performance from December 15, 2023 to March 13, 2024. Key requirements include connecting a sprinkler system to the city water main and submitting associated paperwork, using sleeves for penetrations of plaster walls, and securing and attaching fire suppression piping as shown on drawings. The National Park Service will not require permits from the City of Philadelphia due to the property being federal land. Contractors should follow NFPA codes for labeling, sound requirements, and programming the alarm monitoring system to communicate with Park Dispatch. Asbestos has not been reported but would be handled according to applicable laws if encountered. The contractor is responsible for barricades, safety signage, waste removal, and protecting existing property during work. Patching and painting requirements reference other specification sections.

View the file

Other files for this federal contract opportunity

Other files attached to INDE - POE HOUSE FIRE SYSTEMS, newest first.
File Type Posted
Attachment_8_Bidder_Site_Walkthrough_For_Poe_House_Fire_Alarm_Sign_In_Sheet_0001.pdf PDF
Attachment_2_-_Drawings_2023-07-13.pdf PDF
Attachment_7_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_6_-_Construction_Contraction_Administration.docx DOCX document
Attachment_5_-_Report_on_Limitation_on_Subcontracting.xlsx XLSX spreadsheet
Attachment_4_-_Project_Experience.docx DOCX document
Attachment_3_-_DBA_PA20230003.pdf PDF
Attachment_1_-_Specifications_2023-07-13.pdf PDF
Sol_140P4223R0013.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P4223R0013 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Philadelphia PA 19107 1234 Market Street, 20th Floor

PNC

South/Philadelphia MABO Northeast Regional Contracting National Park Service

DOI, NPS, NERO & NER SOUTH MABO

09/26/20230001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

09/26/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Solicitation is amended as follows:

1. Provide answers to questions received.

2. The solicitation closing date is extended, and proposals are due on Monday November 13, 2023 at 10:00 AM.

3. Site Visit signing sheet is added as attachment 8.

Period of Performance: 12/15/2023 to 03/13/2024

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Wendy De Leon

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation No.

140P4223R0013

Document Title PARK PMIS 225446 – Remove, Replace, And Install Life Safety Systems EDAL

1. Since this building is owned by the National Park Service, do we need to get a City of

Philadelphia sprinkler/alarm permits and submit drawings to Philadelphia L & I? If not, who do we send the plans for approval?

Permits will be needed to connect the sprinkler system to the city water main. Back flow preventer paperwork will also need to be submitted to PWD via Charlotte Apointe at CCC.BLS@phila.gov. We have not submitted paperwork to L&I in the past and do not except to now due to be federal property.

2. Is the project tax exempt?

3. Pipe insulation is noted a couple of times throughout the fire protection specification, please verify that insulation is only required in the attic as part of option #1 and used in conjunction with heat tracing only?

Where insulation is not specifically called out on contract drawings it is not required.

4. Commissioning of fire pump, dry pipe systems and nitrogen systems are noted a couple times in the commissioning sections of the fire protection specs. Please verify that neither a fire pump, dry pipe systems nor nitrogen systems are part of this project.

These systems were tested during design and found to be in compliance and alterations should not be necessary.

5. Specs mention using sleeves for sprinkler system piping penetrating interior plaster walls.

Typically, fire stopping material is simply put around the sprinkler piping. Please verify that using pipe sleeves is required since this is not industry standard.

Sleeves are required due the historical nature of the building.

6. Can toggle type pipe hangers be used in plaster and metal lathe ceilings for sprinkler pipe sizes 1 ½” diameter and smaller as per NFPA 13?

This is acceptable.

7. Fire protection plans permit the use of schedule 10 steel piping in sizes 2 ½” diameter and larger, but the specs are rather vague as to its use. Can schedule 10 piping be used on this project?

This is acceptable.

8. Since “B” is the seismic design category, seismic bracing is not required on the sprinkler piping. Can I assume that vibration control is also not required on any fire protection piping?

Correct, vibration control is not required on fire protection piping.

9. Can I assume that pipe labels are only required on sprinkler main piping – and not on branch line piping feeding sprinkler heads?

Label should be performed in accordance with NFPA codes.

Document Title PARK PMIS 225446 – Remove, Replace, And Install Life Safety

10. Fire Suppression Installation drawings A2.0 through A2.4 show the proposed piping layout. Is it the intent that this piping be secured and attached to the walls?

Yes. Piping should be secured and attached to walls and/or ceiling as indicated.

11. The Fire Alarm System specification lists the Honeywell Gamewell-FCI E3 as the only Fire

Alarm System to be provided, which includes the SWIFT Wireless components. Are you open to the suggestion of using the Notifier N16 Intelligent Fire Alarm System with SWIFT Wireless components, also manufactured by Honeywell, as it meets/exceeds the Project’s design criteria and the features of the specified Gamewell-FCI E3 Fire Alarm System.

Any substitution notifier must be compatible with Honeywell Gamewell FCI system and Park Command Dispatch phone receiver.

12. Are there any liquidated damages involved with this project?

No

13. Moving into the winter months, will an extension be granted due to weather delays?

If the project is delayed due to weather an extension would be granted however the project scope is located indoors and should be largely unaffected by weather.

14. Are the funds currently available now for this project, including the option for heat tracing?

Funding is available.

15. Will a dumpster be provided for us or should we factor a dumpster into our bid?

The contractor is responsible for all removal of waste material resulting from the project and any associated costs.

16. Specs don’t list brand name or part numbers for emergency lighting. Is there a preferred brand?

There is no preferred brand. Contractor shall submit lighting for approval that meets all salient characteristics listed in specifications.

17. Is a System printer required?

Printer is not required.

18. Per the drawing, it is missing notification strobes in restrooms 107&210, bedrooms 205 & 304.

Is this correct?

Strobes in those rooms are required for this project and should be accounted for (as well as any required wiring or tie in) in contractor’s bidding price.

19. Are low frequency sounders are NOT required in living areas?

Contractor shall follow NFPA code in regards for sound requirements for all areas.

20. Is a Gamewell Graphic Display required?

Document Title PARK PMIS 225446 – Remove, Replace, And Install Life Safety

Graphic Display is no longer required in this scope of work. This should be accounted for in final bid pricing.

21. Who is responsible to program MOSCAD system?

Moscad system is no longer part of scope of work. Contractor shall install system capable of dialing and communicating with Park Dispatch phone system.

22. Are the space heaters and associated temp sensors part of fire alarm installation?

These items are not part of the scope of work of this project.

23. Will a fire alarm permit be required from Philadelphia L&I?

No permit is required from L&I, Poe house is federal land and has its own JHA.

Reference earlier RFI about back flow permitting for additional

24. Will phone lines or cellular be used for remote monitoring?

Park Dispatch utilizes phone lines.

25. Who will be monitoring alarm signals.

Park Dispatch personnel will monitor signals.

26. There is furniture & equipment within the home. Will the National Park Services employees be moving these items or is it expected that we perform these tasks?

Park Service employees will be removing a number of items and potentially some furniture. It is the responsibility of the contractor to protect any remaining Park furniture and equipment during construction.

27. With regards to safety, has an asbestos report been performed on this home?

No asbestos report has been performed on the site. If contractor encounters asbestos, it shall be handled and removed in accordance with local state, and federal laws as indicated in Part 1.3.B of specification 01 74 19. This will be addressed as an unforeseen site condition.

28. Is it expected of us to provide barricades and signage on both the front and back of the home for the work we will be performing?

Contractor shall provide any barricades and/or safety notification as required to ensure active working areas are not disturbed by the public and site materials and equipment are secure.

29. What are the requirements for patching and painting for any areas of the walls/ceilings that are cut into? If they need to be patched and painted, please provide a spec for the paint.

Reference specification sections 01 35 91 and 01 73 29. Contractor shall use materials identical to in-place materials unless said materials cannot be used. In that case materials used shall match the visual and functional performance of in place materials

Document Title PARK PMIS 225446 – Remove, Replace, And Install Life Safety

(Part 2.1.B of specification section 01 73 29). Contractor shall have a qualified person shall submit a historic preservation treatment plan for approval as well as a cutting and patch plan prepared by qualified individual for approval. These documents shall document contractor’s proposed methods of patching and painting. NPS may be able to assist in identifying paint color during the submittal process if contractor is unable to find fitting match.