Benner_House_Images_0001.pdf
PDF 15 MB Posted
- Attached to
- REHABILITATION THE JOSIAH BENNER HOUSE
- Solicitation number
- 140P4223R0002
About this file
This document outlines a federal contract opportunity for the rehabilitation of the Josiah Benner House located in Gettysburg National Military Park in Gettysburg, Pennsylvania. The project involves rehabilitating the exterior and interior of the historic house as well as the spring house and summer kitchen. The government anticipates awarding a single firm-fixed price contract between $500,000 and $1,000,000 to a women-owned small business. The contract performance period is expected to be 240 calendar days from the notice to proceed. An organized site visit has been scheduled for May 31st at 1pm and vendors must have an active SAM registration to be eligible for the contract award. Questions are due by email to the specified contracting officer by the stated deadline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P4223R0002_Amd_0002.pdf | ||
| RFI_Responses_0001.pdf | ||
| WD_PA20230117_0001.pdf | ||
| Sol_140P4223R0002_Amd_0001.pdf | ||
| A04_GETT_257363_Benner_House_Specifications_revised.pdf | ||
| B03_Wage_Determination.pdf | ||
| Experience_Questionnaire.docx | DOCX document | |
| Roadwork_Experience_Questionnaire.docx | DOCX document | |
| A06_GETT25763_Benner_House_Drawings_Revised_20DEC2022.pdf | ||
| Sol_140P4223R0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Joshua Benner House Project Gettysburg National Military Park
* All Images Reflect Preservation Work in Progress As of 11/14/2022
Scope of Project
• This Work includes installation of all interior and exterior mechanical, electrical, plumbing as well as the installation of parking and drive for the Josiah Benner House.
• Work will include fire suppression, plumbing, HVAC, electrical, safety and security system, all utilities, earthwork, and exterior improvements to better suit the NPS goal.
• Outdated Systems throughout the home will be replaced with any existing systems removed.
Replacement of all building utility service connections with conversion to municipal water, sewer, and gas service as available.
• Electrical work including replacement of wiring and devices, replacement of lighting, and replacement of the existing electrical service to meet current and potential future needs.
• HVAC replacement to provide natural gas heating and central air conditioning.
• Installation of fire suppression and alarm systems.
• Complete replacement of interior plumbing:
• Installation of new water-efficient bathroom and kitchen fixtures
• Replacement of water supply pipes with PEX
• Installation of new supply and drain piping
• Hardscape work including replacement of existing hardscape features.
Notes to Presentation
• All attached images depict restoration work in progress by NPS staff
• Restoration work will continue excluding those items included in Scope of Project
• Measurements of rooms and other interior and exterior features are not included in this presentation
• These images are to provide a visual reference of the current state of the Joshua Benner House only and represent condition of facility as of 14 November 2022 and will change as NPS restoration work continues
• Refer to Specifications, Summary of Work and other official documents accompanying the solicitation for all project details
(1 of 3)
• Refer to Gettysburg National Military Park, Rehabilitate the Josiah Benner House, Springhouse and Summer Kitchen Drawings, Revised as of 7 November 2022 for dimensions and specifications for all Mechanical, Electrical and Plumbing tasks, dimensions and details
• See Mechanical, Electrical and Plumbing drawings for materials, abbreviations and symbols relating to M.E.P. work
• See Civil and Structural Drawings for materials, abbreviations and symbols relating to structural, civil and landscape work
(2 of 3)
(3 of 3)
• Index of Drawings, Gettysburg National Military Park, Rehabilitate the Josiah Benner House, Springhouse and Summer Kitchen Drawings, Revised as of 7 November 2022:
East side / Front of J. Benner House
East side / Front of J. Benner House (Preservation in Progress)South side of J. Benner House
Northeast side of J. Benner House With Kitchen Building
East side of J. Benner House (Preservation in Progress)
Northeast side of J. Benner House Detail Between House and Summer Kitchen Building
North side of J. Benner House
Western Side Outbuilding J. Benner House (To be removed by NPS Personnel)
Northern Side Outbuilding
Western Side Outbuilding
(To be removed by NPS Personnel)
North Outbuilding Former Location Removed by NPS Personnel
Northern Side Outbuilding
Existing Driveway
Inside Front Foyer First Floor
Stairway from First Floor Leading to Basement
Basement South Side Room (Image 1 of 2)
(Image 2 of 2)
(Image 1 of 6)
Basement North Side Room (Image 2 of 6)
Access Door to Outside (Image 3 of 6)
(Image 4 of 6)
Water System (Image 5 of 6)
Electric Panel Box (Image 6 of 6)
First Floor Front Stairway Leading to Second Floor
First Floor Southeast Front Room
First Floor Northeast Room
First Floor Northwest Room
Back of House Looking to Kitchen Building
First Floor Southwest Room
First Floor Back Hallway
Interior West side Room
Second Floor Back Stairway to First Floor
Second Floor Northeast Room
Second Floor Northwest Room
Second Floor Hallway Existing Lighting
& Door to Balcony
(View #2)
Second Floor Hallway to Balcony Door East Side
Second Floor Northwest Room
Second Floor Southwest Room
Second Floor Hallway South Side
Second Floor Stairway to Attic
Attic 1 – Looking North
Attic 1 – Looking SouthAttic 1 – Looking South
Joshua Benner House Project Gettysburg National Military Park
*All Images Reflect Preservation Work in Progress As of 11/14/2022
File details come from the government source that posted it. Updated .