VAFO_5_Building_Roof_and_Exterior_Questions_and_Answers_0001.pdf
PDF 136 KB Posted
- Attached to
- FY21 VAFO 5 BUILDING ROOF AND EXTERIOR
- Solicitation number
- 140P4221R0026
About this file
This document includes a request for proposal and questions and answers related to a federal contract opportunity. The National Park Service Northeast Region is soliciting proposals for FY21 VAFO 5 BUILDING ROOF AND EXTERIOR to provide construction services including removal of existing roofing materials, preparation and repair of decking and sheathing, installation of new roofing materials and flashing, and exterior work at five building locations. The estimated value is between $250,000 and $500,000. The contract will be awarded using Lowest Price Technically Acceptable procedures to a small business. The period of performance is 90 calendar days from notice to proceed. A site visit will be held on August 5, 2021 and proposals are due by August 27, 2021.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P4221R0026_Amd_0002.pdf | ||
| POSA_ROOF_0002.docx | DOCX document | |
| sign_in_roof_replacment_0001.pdf | ||
| Sol_140P4221R0026_Amd_0001.pdf | ||
| Wage_Determination-Montgomery_County-PA.pdf | ||
| A04_5_Building_Roof_and_Exterior_project_SOW.pdf | ||
| Form_A.docx | DOCX document | |
| Wage_Determination-Chester_County-PA.pdf | ||
| Bid_Guarantee_SF24-16d.pdf | ||
| 5_building_site_visit.pdf | ||
| Form_B.docx | DOCX document | |
| References_Worksheet.doc | DOC document | |
| Sol_140P4221R0026.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment
Document No.
140P4221R0026
Document Title VAFO 5 Building Roof and Exterior
Questions and Answers
Q1. Please verify there are no fire retardancy specifications associated with the 24” Western Red Cedar.
A1. Only specifications required is what is stated in scope
Q2. Found no specific reference to drip edge in SOW, only to the type of metal to be used. Does the building get new drip edge? It is recommended.
A2. No drip edge.
Q3. Please confirm the copper ridge flashings, as well as the 3” continuous strip of copper are to be 16oz copper vs the prescribed metal.
A3. Must use materials stated in the scope.
Q4. Specs call for 4d copper nails. 316 stainless nails are the proper fastener to use? It is recommended by the CSSB. Please advise.
A4. Must use materials stated in the scope.
Q5. Specs call for replacing the roof on the POSA Building. Please clarify if the flat roof section is to be included or if it’s just the cedar shingle.
A5. Flat roof is included.
Q6. POSA building maintains an electrical conduit at the front gable. Not sure if this is up to code and certainly represents a potential hazard. Please advise.
A6. Electrical hazard will be evaluated after award. If electrical work is required a modification will be added.
Q7. Horseshoe South is in very rough shape, SOW shows only roofing to be performed. Please advise on the demo associated potentially with both porches, specifically, the one to the east as it is without question a liability for all.
A7. No plans to remove deck now. Options can be discussed after award.
Q8. Horseshoe South neglects to include masonry repair at all chimneys and walls. Without this repair the roofing effort really cannot be guaranteed as the masonry walls and chimneys will definitely leak. It is strongly encouraged to include masonry repair into the SOW for this building. Please advise.
Amendment
Document No.
140P4221R0026
Document Title VAFO 5 Building Roof and Exterior
A8. If masonry work is found to be required, a modification to the contract can be made once details emerge.
Q9. IFO Barn: Does this get a new garage door
A9. Garage door to be repaired if less then 40% damaged or replaced in kind.
Q10. IFO Barn: Really need the NPS to remove the shrubs to SW corner of the Building
A10. Shrubs will remain.
Q11. IFO Barn: Are we putting Circle Vents in the soffit of the barn. Is there consideration for installing some form of crown at the soffit/wall junction.
A11. Match current vents currently in soffit. Possibility of crown at soffit/wall junction can be discussed after award
Q12. Workizer: Need to have the tree/shrubbery removed from perimeter of building to facilitate masonry. Horseshoe South: Will the deck be getting demo’d as it is a serious safety concern.
A12. The bushes will be trimmed away from house.