This Statement of Work (SOW) details a contract for crosswalk and roadway line striping services at the National Mall and Memorial Parks in Washington, DC. The project involves applying thermoplastic markings to various areas including Ohio Drive SW, West Basin Drive SW, Henry Bacon Drive, 23rd Street NW, and multiple parking lots, encompassing approximately 5,800 linear feet of lines, multiple crosswalks, arrows, stop bars, handicap symbols, and parking space markings. The contractor must use federally approved thermoplastic materials that meet MUTCD and ADA compliance standards, perform surface preparation, apply markings during non-peak hours (between 8 PM and 5 AM), and complete all work within 180 days of contract award. The National Park Service requires comprehensive documentation of products, traffic control plans, and adherence to specific federal highway and transportation marking specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF SERVICES

Crosswalk Striping & Roadway Markings

BACKGROUND:

Crosswalks and roadway markings are striped throughout the Parks roads and over time become faded and worn due to weather and traffic. This makes them nonfunctional for what they are intended, which is to make crossings and parking areas both convenient and safe at locations with adequate visibility.

1. PURPOSE:

The purpose of this contract is to apply an approved Thermoplastic to the listed crosswalks and roadway areas throughout the park so that they are visible to pedestrians, motorists and cyclists.

Ensure that crosswalk and road markings are visible to motorists, particularly at night and adhere to the Manual on Uniform Traffic Control Devices (MUTCD and ADA compliance). Crosswalks should not be slippery, create tripping hazards, or be difficult to traverse by those with diminished mobility or visual capabilities. Crosswalk materials must be installed to meet ADA compliance.

2. LOCATION:

All work is located at The National Mall and Memorial Park, Washington DC 20242. All quantities should be field verified for accuracy.

MAP-A

Ohio Drive SW (Riverside) 4000 LF double yellow line 2000 LF of white skip line 4 crosswalks 4 arrows 1 stop bar East Potomac Parking Lot. 104 parking spaces, including 6 accessible spots with symbols and three hatched van access areas.

East Potomac Park Tennis center (Small Lot)- 17 parking spaces, including 2 accessible spaces with symbols, and 1 hatched van access area.

MAP-B

West Basin Drive SW, (Area of Martin Luther King Memorial) 1-Crosswalk 6-Handicap Symbols with painted Island 4-Arrows 2ea-8’ “ONLY” markings 200 LF Center Line

MAP-C

Henry Bacon Drive, NW 700 LF Double yellow line 1400 LF Double white skip line 10-Arrows 2-Stop bars

2-8’ “ONLY”

1-Crosswalk

MAP-D

23rd Street NW 1100 LF Solid Yellow Line 600 LF Solid white line 12- LF White skip line 8-Arrows

2-8’ “ONLY”

2-Crosswalks

14 Handicap Parking Symbols Park wide

3. SCOPE OF WORK:

Independently, and not as an agent of the government, the contractor must provide the National Park Service, with all labor, supplies, materials, traffic control, and equipment and travel, necessary to perform the work described in this contract for the National Mall and Memorial Parks.

The work must include but is not limited to the following:

Using the attached Thermoplastic Federally Approved specifications as a guide, the contractor must supply a product that meets or exceeds Federal Highway standards. And aerial picture documents; perform the necessary work to apply Thermoplastic to the designated crosswalks and roadway areas. This will include removing old markings as needed to ensure adherence to road surfaces.

All work and signage will conform to the MUTCD.

Pavement marking paint must comply with AASHTO M-248, Type "F", or waterborne pavement markings from the Federal Highway Administration, Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 2014, USDOT, FHWA, section 718,718.10, Waterborne Traffic Paint.

Centerlines will be yellow paint unless otherwise specified by task orders. Edge lines, stop bars, arrows, crosswalks and lane delineations will be white paint unless otherwise specified.

Contractor shall provide a paint submittal. Reflective glass beads, complying with AASHTO M-247, Type 1, shall be used for all paint applied under this contract.

WATERBORNE TRAFFIC PAINT (FHWA, SSCRBFHP, FP-14, 2014)

Provide all necessary traffic control, safety and road signage needed to perform the work in this contract. (Per MUTCD, you are responsible for your own traffic control, you must submit a traffic control plan to the COR for approval before any work can begin)

Perform work during time when it will impact traffic the least. Work schedule will be coordinated with the contracting officers representative (COR). Between 8p and 5a.

Outside rush hour traffic hours.

Only apply markings in weather conditions that conform to manufacturer standards.

Remove all waste, debris, equipment and signage once work is done.

Some areas of pavement are uneven, pitted and rough, Contractor will block, tape or stencil areas of concern to minimize Thermoplastic run out.

Contractor will discuss areas of concern with the COR before that area is refurbished.

During your inspection of ALL areas please make notes to areas that need swept, cleaned, scraped, pressure washed, and dried or any means necessary to insure a good clean bond.

Contractor must submit for approval documentation of products that will be used in this project.

Crosswalk materials must meet ADA compliance.

4. GOVERNMENT FURNISHED PROPERTY:

There will be no property furnished by the government under this Order. Access to site will be given for inspection and when work is scheduled.

5. CONTRACTING OFFICER'S REPRESENTATIVE: (COR)

The COR will be announced at the time of award. The COR is responsible for: (1) monitoring the contractor's technical progress including the surveillance and assessment of performance and recommending to the Contracting Officer changes in requirements; (2) interpreting the Scope of Work; (3) performing technical evaluation as required; (4) performing technical inspections and acceptances required by this task order; and (5) assisting the Contracting Officer in the resolution of technical problems encountered during performance.

THE CONTRACTING OFFICER IS RESPONSIBLE AND HAS THE SOLE AUTHORITY FOR

DIRECTING AND/OR NEGOTIATING ANY CHANGES IN THE TERMS, CONDITIONS, OR

AMOUNTS CITED ON THE AWARD. INCREASES IN THE SCOPE OF WORK MUST BE

APPROVED ONLY BY THE CONTRACTING OFFICER

For guidance from the COR to the contractor to be considered valid, it must: (1) be consistent with the description of work set forth in this contract; (2) not constitute new assignment of work or change to the expressed terms, conditions, or specifications. incorporated into this contract; (3) not constitute a basis for an extension to the period of performance or contract delivery schedule;

and (4) not constitute a basis for any increase in the total contract value.

6. TIME FOR COMPLETION:

All work specified must be accomplished within 180 days of award.

7. COORDINATION AND SCHEDULING OF WORK:

All work is to be scheduled and coordinated through the Contracting Officers Representative.

Work shall be scheduled 48 hours in advance so that proper access to the area can be provided and the least amount of traffic interrupted as possible.

8. GENERAL LIABILITY INURANCE:

The contractor shall be responsible for securing general liability insurance which will protect the government from any claims, or litigation connected with any injury or damage resulting from his/her (and all subcontractors) actions while working under this contract, and further agrees to save and hold harmless the government, its agents and employees, from any and all claims, damages, suits at law or equity of whatever kind of nature from damages to or loss of property or injury or death to persons resulting directly or indirectly from attributable to the contractor in connection with this task order.

9. TRAVEL:

The contractor shall be responsible for all travel necessary to complete the work described in the Scope of Work.

10. LOSS OR DAMAGE:

If due to fault, neglect, dishonesty of the contractor, his agency or employees, loss or damage to government property is incurred during the performance of this task order, the contractor shall be responsible for the same. The government, at its option, in lieu of repayment, may require the contractor to replace at his own expense, all property as directed by the Contracting Officer.

11. SAFETY:

The work area shall be always maintained in a clean and safe condition. The contractor shall, with the use of barricades, ropes, signs, or audible signals, take all necessary precautions for the protection of the work and safety of the public. Any accident or incident, in regard to the work under this award, must be reported immediately, in writing, to the Contracting Officer in accordance with FAR 52.236-13 Accident Prevention (NOV 1991).

12. UTILITY SERVICE:

The Government will not furnish any utility services.

13. INVOICE REQUIREMENTS:

Acceptance will be given by the COR after an inspection and verification of the work performed as defined in the contract specifications.

The Contractor must submit all invoices through www.ipp.gov within 30 days of completion of the work. Failure of the contractor to attach the invoice through IPP.gov will result in the invoice being rejected. Invoices must be itemized with the location of work on them.

Note:

The National Park Service will review and consider any product with equal specifications and that meets or exceeds Federal Highway Standards. The contractor may quote the products specified in the solicitation however, product literature in the solicitation package is for reference only and will be used to compare if the quoted product meets or exceeds these standards. If quoting a different product, please include specifications within your proposal.