This document is an amendment to Solicitation Number 140P2124R0055 for Wayside Exhibit Planning, Design, and Fabrication Services for Katmai National Park and Preserve. The purpose of this amendment is to respond to questions received by the specified due date.
Key details include:
- The solicitation is for the planning, design, and fabrication of 10-15 wayside exhibits, but does not include installation.
- The production budget range is $48,000 - $54,000, which covers custom elements, wayside hardware, and audio description script. Planning and design costs are not included in this budget.
- Double-sided, direct-printed aluminum panels are required, and alternate materials will not be accepted. Powder coat finish in NPS brown is also required for the wayside bases.
- The proposal due date is July 8, 2024. The contracting agency is the Department of the Interior, National Park Service.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2124R0055 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PHF
Harpers Ferry WV 25425 IDC Building 67 Mather Place DOI, NPS, HFC - Acquisition Managem
PWA
Denver CO 80225 P.O.Box 25287 MS WCP NPS, WASO - WCP Contracting
06/17/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/31/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Katmai National Park and Preserve
Firm-Fixed Price Contract
PROPOSAL DUE DATE - JULY 8, 2024
The purpose of this amendment is to respond to questions, received by the date and time specified in the solicitation, in the attached Description of Amendment, consisting of four
(4) pages.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Sheila Spring
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation 140P2124R00055 Amendment 0001
Description of Amendment/Modification Wayside Exhibit Planning, Design, Fabrication
Services for Katmai National Park and Preserve
The purpose of this amendment is to respond to questions received by the date and time specified in Solicitation Number 140P2124R0055 – Wayside Exhibit Planning, Design, Fabrication Services for Katmai National Park and Preserve. The government response is provided below each question.
1. Section 2.0 General Requirements
This solicitation is for the planning, design, and fabrication of 10-15 waysides. Just confirming that you are not looking for the offeror to do any installation work. Will installation be done by the park?
Response: Installation is not part of the contract.
2. Section 2.5 Meetings, Travel, and Presentations
a. Audio Describer is not included on the Required Contractor Attendees list for the site visit.
We feel it would be necessary for them to be there especially given the remote location and accessibility. Can they be added to the site visit travel portion?
Response: Contractor may propose additional attendees with justification for government to review.
b. The budget for travel is not part of the production budget, correct?
Response:
Travel is not included in the production budget. The production budget includes:
1) All custom elements, including custom graphics, graphic acquisitions, illustrations, audio programs, and tactile models
2) All wayside exhibit hardware (panel, base, and ancillaries)
3) Audio description script
3. Section 2.81 Use Rights
You say “the contractor shall budget 3.5% of the overall planning and design budget for acquisition and use rights and production quality images…” is the “planning and design budget” the same as the “production budget” listed below in section 2.8.2? Or is it something different? If it is different, what is that budget?
Response: Contractor to determine planning and design budget based on the work outlined in the Scope of Work
4. Section 2.8.2 Production Budget
a. Is the production budget range of $48,000 - $54,000 the entirety of the budget? Or are there additional budgets that make up a total budget? If so, what is the total budget?
Response: Contractor to determine total costs to complete the requirements in the solicitation. The production budget includes:
1) All custom elements, including custom graphics, graphic acquisitions, illustrations, audio programs, and tactile models
2) All wayside exhibit hardware (panel, base, and ancillaries)
3) Audio description script
b. $21,100 for custom elements is almost half of the budget you can’t use for design/develop/fabrication of the frames and panels. That is a lot to take out without knowing what to expect as far as custom elements go. Do you have an idea of how many tactiles/illustrations you are looking at and the complexity of those items?
Response: Contractor and government to determine specific custom elements during planning and design phases.
c. Just speaking in general terms, if $21,000 is removed from the production budget, leaving a maximum of $33,000, that will allow for three waysides, maybe four, to be planned and built, start to finish. Not the 10-15 scoped and hoped for.
Response: As stated, the $33,000 would not include planning and design costs as they are not included in the production budget.
d. It is noted that Porcelain panels are not included in this budget but doesn’t say anywhere that porcelain panels have been spec’d for this job. Are you looking for porcelain panels to be produced, is this supposed to say aluminum panels, or is this just a cautionary exclusion?
Response: Porcelain panels shall not be included. Panel type shall be double-sided, direct-print aluminum panels.
e. Language translation is also listed under this exclusion but is not noted anywhere else for the job, is that an expectation of this job that should be included when producing a quote/submission? If so, where would the money be coming for that if not the production budget?
Response: Language translation shall not be included.
5. Section 4.2.2 Panel Fabrication
a. Double-sided direct printed aluminum panels are spec’d in this section. Can the offeror suggest a material of equal quality?
Response: Alternate materials will not be accepted. The panels shall be fabricated as double-sided, direct-printed aluminum panels for outdoor use.
b. We are assuming the purpose of doubled sided panels is to flip the panel over as the one side wears down over time. If this is the case, can we propose an alternative of single sided panels with duplicates? Even though a double-sided panel has the back masked and facing into the frame, it can get dirty/scratched/worn out over time and a fresh set may be a better route.
Response: Alternate materials will not be accepted. The panels shall be fabricated as double-sided, direct-printed aluminum panels for outdoor use.
6. Section 4.3 Production of Wayside Exhibit Bases
a. The solicitation specifies bases to be “painted NPS brown with a powder coat finish.”
Those are two different applications. We would like to propose a powder coated finish, as this is an NPS approved coating method.
Response: Color shall by NPS brown. Finish shall be powder coat. Contractor to paint aluminum structures as outlined in Attachment A, National Park Service Wayside Exhibit Planning, Design, Fabrication, and Installation Specifications.
7. Can you confirm if the park team does the installation of the waysides?
Response:
Installation is not part of the contract.