Attachment_5,_Detailed_Cost_Proposal_Format.pdf
PDF 130 KB Posted
- Attached to
- SHAW MEMORIAL STABILIZATION & RESTORATIO Federal contract opportunity
- Solicitation number
- 140P2119R0006
About this file
Attachment 5, Detailed Cost Proposal Format
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5
DETAILED COST PROPOSAL BREAKDOWN
National Park Service Solicitation Number 140P219R0006 1
BASIC REQUIREMENT Total Direct Costs OPTION 3 - Cathodic Protection Total Direct Costs
A10 Foundations $ - OPTION 3 $ - B10 Superstructure $ - Total Direct Construction Costs -$ B20 Exterior Enclosure $ - General Conditions -$
Total Direct Construction Costs -$ Subtotal NET Construction Cost -$ General Conditions -$ Bonds & Permitting & Insurance 0.00% -$
Subtotal NET Construction Cost -$ Overhead 0.00% -$ Bonds & Permitting & Insurance 0.00% -$ Profit 0.00% -$ Overhead 0.00% -$ Subtotal Bonds, Permit, O&H -$ Profit 0.00% -$ Total Cost of OPTION 3 -$
Subtotal Bonds, Permit, O&H -$
Total Cost of Basic Requirement -$ OPTION 4 Total Direct Costs
OPTION 4 $ -
Total Direct Construction Costs -$
General Conditions -$ Subtotal NET Construction Cost -$
Bonds & Permitting & Insurance 0.00% -$ Overhead 0.00% -$ Profit 0.00% -$
Subtotal Bonds, Permit, O&H -$ Total Cost of OPTION 4 -$
OPTION 1 - Plaza Brick and Tree Wells Total Direct Costs OPTION 5 - Plaza Structural Improvements Total Direct Costs OPTION 1 $ - Additive 5 $ -
Total Direct Construction Costs -$ Total Direct Construction Costs -$ General Conditions -$ General Conditions -$
Subtotal NET Construction Cost -$ Subtotal NET Construction Cost -$ Bonds & Permitting & Insurance 0.00% -$ Bonds & Permitting & Insurance 0.00% -$ Overhead 0.00% -$ Overhead 0.00% -$ Profit 0.00% -$ Profit 0.00% -$
Subtotal Bonds, Permit, O&H -$ Subtotal Bonds, Permit, O&H -$ Total Cost of OPTION 1 -$ Total Cost of OPTION 5 -$
OPTION 2 - Plaza Waterproofing Total Direct Costs OPTION 6 - Steel Grill Conservation Total Direct Costs
OPTION 2 $ - OPTION 6 $ -
Total Direct Construction Costs -$ Total Direct Construction Costs -$
General Conditions -$ General Conditions -$ Subtotal NET Construction Cost -$ Subtotal NET Construction Cost -$
Bonds & Permitting & Insurance 0.00% -$ Bonds & Permitting & Insurance 0.00% -$ Overhead 0.00% -$ Overhead 0.00% -$ Profit 0.00% -$ Profit 0.00% -$
Subtotal Bonds, Permit, O&H -$ Subtotal Bonds, Permit, O&H -$ Total Cost of OPTION 2 -$ Total Cost of OPTION 6 -$
National Park Service Solicitation Number 140P219R0006 2
Basic Requirement Description Quantity Unit Unit Price TOTALS
General Conditions
Field / Site Set-Up and Accommodation Construction Trailer -$ -$ Submittals -$ -$ Communications -$ -$ Document Printing -$ -$
Management, Supervision, and Field Engineering Project Management / Engineer -$ -$ Superintendent/Quality Control Manager/ Site Safety and Health Officer -$ -$
Safety and Protection Project Safety -$ -$ Secure Storage Containers / Areas -$ -$ Temporary Protection - Hardscape -$ -$ Temporary Protection - Trees and Vegetation -$ -$
Temporary Shoring and Bracing -$ Shoring and Bracing -$ -$ Scaffold and Shoring Towers -$ -$
Construction Aids, Equipment, and Tools Monorail, Chain Fall -$ -$ Equipment Rental -$ -$ Small Tools & Supplies -$ -$
Project Identification Project ID and Temporary Signs -$ -$ Project Scrims -$ -$ Project Banner -$ -$
Temporary Construction Limit of Disturbance Perimeter, including Access Gate -$ -$ Temporary Restroom -$ -$
Quality Control, Inspection, and Testing Construction Photos -$ -$ Construction Testing -$ -$ Inspections -$ -$
Maintenance and Housekeeping Waste (Dumpster rental and Disposal Fees) -$ -$ Waste Recycling Premium -$ -$
Other Contractual Requirements Record Drawings (red line changes during construction) -$ -$
SUMMARY: GENERAL CONDITIONS
-$ GENERAL CONDITIONS
SUBTOTAL GENERAL CONDITIONS
Quantity Unit Unit Price Total Cost
National Park Service Solicitation Number 140P219R0006 3
A10 FOUNDATIONS
Material Cost/Unit
Total Material Cost
Labor Cost/Unit
Total Labor Cost
Equipment Cost/Unit
Total Equipment
Cost
Total Cost/Unit Total Cost
STANDARD FOUNDATIONS
03 30 00 Cast-In-Place Concrete Isolated footing for new central post
$ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0
Sculpture wall support base Concrete $ - $0 $ - $0 $ - $0 $ - $0 Anchor Plate $ - $0 $ - $0 $ - $0 $ - $0 Grillage beam $ - $0 $ - $0 $ - $0 $ - $0
$ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0
07 14 13 Hot Fluid-Applied Rubberized Asphalt Waterproofing Rubberized asphalt waterproofing membrane to concrete $ - $0 $ - $0 $ - $0 $ - $0 slab $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0
STANDARD FOUNDATIONS $0 $0 $0 $0
SUMMARY: A10 FOUNDATIONS
Material Cost/Unit
Total Material Cost
Labor Cost/Unit
Total Labor Cost
Equipment Cost/Unit
Total Equipment
Cost
Total Cost/Unit Total Cost
$0 $0 $0
FOUNDATIONS $0
Option 5
Description Quantity Unit
MATERIAL
Option 2
TOTALSLABOR EQUIPMENTMATERIAL
TOTALSLABOR EQUIPMENT
UnitQuantityDescription
A10
A1010
OPTION 5
SUBTOTAL
OPTION 2
Uniformat II WBS Code
Basic Requirement
Basic Requirement / Additive #
BASIC REQUIREMENT
ATTACHMENT 5
DETAILED COST PROPOSAL
National Park Service Solicitation Number 140P219R0006 4
B10 SUPERSTRUCTURE
Material Cost/Unit
Total Material Cost
Labor Cost/Unit
Total Labor Cost
Equipment Cost/Unit
Total Equipment
Cost
Total Cost/Unit Total Cost
B1010 FLOOR CONSTRUCTION
05 12 00 Structural Steel Framing post and bearing plate $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0
Seismic Steel Framing $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0
$ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0
Tree Well Opening, det 4/A100 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0
09 96 00 High-Performance Coatings Power Tool Cleaning; White Metal, Near White Metal, Commercial, Brush-Off
$ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0
Prep surface and epoxy coating $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0
FLOOR CONSTRUCTION $0 $0 $0 $0
SUMMARY: B10 SUPERSTRUCTURE
Material Cost/Unit
Total Material Cost
Labor Cost/Unit
Total Labor Cost
Equipment Cost/Unit
Total Equipment
Cost
Total Cost/Unit Total Cost
$0 $0 $0
SUPERSTRUCTURE $0
Option 1 Option 5
B10
TOTALS
Uniformat II WBS Code Description Quantity Unit
MATERIAL LABOR EQUIPMENT
Basic Requirement
OPTION 5
OPTION 5
SUBTOTAL
OPTION 5
BASIC REQUIREMENT
LABOR EQUIPMENT TOTALS
UnitQuantityDescription
MATERIAL
Basic Requirement / Additive
OPTION 1
National Park Service Solicitation Number 140P219R0006 5
B20 EXTERIOR ENCLOSURE
Material Cost/Unit
Total Material Cost
Labor Cost/Unit
Total Labor Cost
Equipment Cost/Unit
Total Equipment
Cost
Total Cost/Unit Total Cost
B2010 EXTERIOR WALLS
04 55 00 Stone Conservation BASIC REQUIREMENT Photo documentation $ - $0 $ - $0 $ - $0 $ - $0 cleaning $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0
Reattachment of stone piece $ - $0 $ - $0 $ - $0 $ - $0 Structural reattachment of stone $ - $0 $ - $0 $ - $0 $ - $0 Grouting $ - $0 $ - $0 $ - $0 $ - $0 Patch $ - $0 $ - $0 $ - $0 $ - $0 Dutchman Repair $ - $0 $ - $0 $ - $0 $ - $0 Replace Sealant with Mortar $ - $0 $ - $0 $ - $0 $ - $0 Remove lime staining from granite Stone conservation $ - $0 $ - $0 $ - $0 $ - $0
$ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0
04 90 00 Disassembly and Reassembly of Marble and Granite Units Remove and reinstall stone steps and curb $ - $0 $ - $0 $ - $0 $ - $0
$ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0
Cut new pocket in brick wall, non-shrink grout, brick $ - $0 $ - $0 $ - $0 $ - $0 pocket up solid, full depth mortar joints fill hollows in wall under new bearing plate with solid $ - $0 $ - $0 $ - $0 $ - $0 mortar 2x courses
Site survey units $ - $0 $ - $0 $ - $0 $ - $0 Unique identification number system to each unit $ - $0 $ - $0 $ - $0 $ - $0 Remove bench, salvage $ - $0 $ - $0 $ - $0 $ - $0 bench pedestal $ - $0 $ - $0 $ - $0 $ - $0 balustrade $ - $0 $ - $0 $ - $0 $ - $0 urn $ - $0 $ - $0 $ - $0 $ - $0 corner post $ - $0 $ - $0 $ - $0 $ - $0 stone paver $ - $0 $ - $0 $ - $0 $ - $0
Remove Tennessee Marble coping unit, salvage $ - $0 $ - $0 $ - $0 $ - $0 column, capital, base $ - $0 $ - $0 $ - $0 $ - $0 sculpture wall panel $ - $0 $ - $0 $ - $0 $ - $0 sculpture wall watertable $ - $0 $ - $0 $ - $0 $ - $0 sculpture wall base $ - $0 $ - $0 $ - $0 $ - $0 sculpture bench $ - $0 $ - $0 $ - $0 $ - $0
Remove top course granite, salvage $ - $0 $ - $0 $ - $0 $ - $0 Cut back stone to accommodate new relief framework $ - $0 $ - $0 $ - $0 $ - $0BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
OPTION 4
BASIC REQUIREMENT
TOTALS
Basic Requirement / Additive #
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
MATERIAL
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
EQUIPMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
UnitQuantityDescription
LABOR
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
National Park Service Solicitation Number 140P219R0006 6
Repair cracked/broken stone $ - $0 $ - $0 $ - $0 $ - $0 1% Replacement of marble and granite $ - $0 $ - $0 $ - $0 $ - $0 Remove brown staining $ - $0 $ - $0 $ - $0 $ - $0 Construct new support relief wall $ - $0 $ - $0 $ - $0 $ - $0 Repair damaged backup wall to upper granite course $ - $0 $ - $0 $ - $0 $ - $0 Remove old pointing, setting mortars, sealants, caulking $ - $0 $ - $0 $ - $0 $ - incl.
and flashings Remove anchor, provide new stainless anchor, install $ - $0 $ - $0 $ - $0 $ - $0 Re-set unit, install new anchor, grout, adhesive $ - $0 $ - $0 $ - $0 $ - $0 Repoint marble with direct match of original historic $ - $0 $ - $0 $ - $0 $ - $0 mortar, clean New lead joint cover at sculpture coping stone $ - $0 $ - $0 $ - $0 $ - $0 New sealant bead at bronze/granite junction, new flashing $ - $0 $ - $0 $ - $0 $ - $0 bronze/marble $ - $0 $ - $0 $ - $0 $ - $0
05 01 70 Conservation of the Bronze Relief Rigging, removal and return of sculpture $ - $0 $ - $0 $ - $0 $ - $0 Relief $ - $0 $ - $0 $ - $0 $ - $0 examination and analysis $ - $0 $ - $0 $ - $0 $ - $0 protection and assistance $ - $0 $ - $0 $ - $0 $ - $0 conservation $ - $0 $ - $0 $ - $0 $ - $0
EXTERIOR WALLS $0 $0 $0 $0
Cost/Unit
Total Material Cost
Labor Cost/Unit
Total Labor Cost
Equipment Cost/Unit
Total Equipment
Cost
Total Cost/Unit Total Cost
B2020 EXTERIOR WINDOWS
05 01 80 Conservation of Cast Steel Grills Temporary protection at grill opening while conservation $ - $0 $ - $0 $ - $0 $ - $0 Conserve Grills $ - $0 $ - $0 $ - $0 $ - $0 secure anchoring system $ - $0 $ - $0 $ - $0 $ - $0
EXTERIOR WINDOWS $0 $0 $0 $0
SUMMARY: B20 EXTERIOR ENCLOSURE
Material Cost/Unit
Total Material Cost
Labor Cost/Unit
Total Labor Cost
Equipment Cost/Unit
Total Equipment
Cost
Total Cost/Unit Total Cost
$0 Option 4 $0
$0
Exterior Enclosure $0
TOTALSMATERIAL LABOR
OPTION 6
EQUIPMENT
SUBTOTAL
OPTION 6
LABOR TOTALSEQUIPMENT
Quantity Unit
MATERIAL
Unit
B20
Uniformat II WBS Code Description Quantity
Uniformat II WBS Code
Basic Requirement
Option 6
Description
OPTION 6
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
SUBTOTAL
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
BASIC REQUIREMENT
National Park Service Solicitation Number 140P219R0006 7
D50 ELECTRICAL
Material Cost/Unit
Total Material Cost
Labor Cost/Unit
Total Labor Cost
Equipment Cost/Unit
Total Equipment
Cost Total Cost/Unit Total Cost
D5010 ELECTRICAL SERVICE & DISTRIBUTION
Electrical
200A panelboard $ - $0 $ - $0 $ - $0 $ - $0 conductors in new conduit, earthwork $ - $0 $ - $0 $ - $0 $ - $0 conductors in existing conduit $ - $0 $ - $0 $ - $0 $ - $0 Clean and swab existing conduits $ - $0 $ - $0 $ - $0 $ - $0 Grounding $ - $0 $ - $0 $ - $0 $ - $0 Lighting
Lighting $ - $0 $ - $0 $ - $0 $ - $0 Recircuit existing pole bases incl.
Reconnect existing pole bases $ - $0 $ - $0 $ - $0 $ - $0 Lighting controls Single pole switch $ - $0 $ - $0 $ - $0 $ - $0 PSU (Installation only, provided by others) $ - $0 $ - $0 $ - $0 $ - $0
Branch devices GFI receptacle $ - $0 $ - $0 $ - $0 $ - $0 Backbox $ - $0 $ - $0 $ - $0 $ - $0
Circuitry $ - $0 $ - $0 $ - $0 $ - $0 Demolition work $ - $0 $ - $0 $ - $0 $ - $0 Fees & Permits $ - $0 $ - $0 $ - $0 $ - $0
ELECTRICAL SERVICE & DISTRIBUTION $0 $0 $0 $0
SUMMARY: D50 ELECTRICAL
Cost/Unit
Total Material Cost
Labor Cost/Unit
Total Labor Cost
Equipment Cost/Unit
Total Equipment
Cost Total Cost/Unit Total Cost
$0 Option 3 $0
$0
ELECTRICAL $0D50
TOTALSMATERIAL LABOR
Uniformat II WBS
Code Description Quantity Unit
EQUIPMENT
Basic Requirement
Option 4
SUBTOTAL
Basic Requirement / Additive #
MATERIAL
OPTION 3
OPTION 3
OPTION 3
OPTION 3
OPTION 3
OPTION 3
OPTION 3
OPTION 3
OPTION 3
OPTION 3
LABOR EQUIPMENT
OPTION 3
TOTALS
UnitQuantityDescription
OPTION 3
OPTION 3
OPTION 4
OPTION 3
National Park Service Solicitation Number 140P219R0006 8
F10 SPECIAL CONSTRUCTION
Material Cost/Unit
Total Material Cost
Labor Cost/Unit
Total Labor Cost
Equipment Cost/Unit
Total Equipment
Cost
Total Cost/Unit Total Cost
F1010 SPECIAL STRUCTURES
Cathodic Protection Engineering $ - $0 $ - $0 $ - $0 $ - $0 Site testing $ - $0 $ - $0 $ - $0 $ - $0 Concrete remove and repair work $ - $0 $ - $0 $ - $0 $ - $0 Anode system $ - $0 $ - $0 $ - $0 $ - $0 Cathode system $ - $0 $ - $0 $ - $0 $ - $0 Monitoring system $ - $0 $ - $0 $ - $0 $ - $0 Electrical system $ - $0 $ - $0 $ - $0 $ - $0 Power supply equipment $ - $0 $ - $0 $ - $0 $ - $0 Commissioning/performance monitoring $ - $0 $ - $0 $ - $0 $ - $0 Documentation, access, misc. $ - $0 $ - $0 $ - $0 $ - $0
SPECIAL STRUCTURES $0 $0 $0 $0
SUMMARY: F10 SPECIAL CONSTRUCTION
Cost/Unit
Total Material Cost
Labor Cost/Unit
Total Labor Cost
Equipment Cost/Unit
Total Equipment
Cost
Total Cost/Unit Total Cost
$0 Option 3 $0
Special Construction $0F10
TOTALSMATERIAL LABOR
Uniformat II WBS
Code Description Quantity Unit
EQUIPMENT
Basic Requirement
LABOR EQUIPMENT TOTALS
SUBTOTAL
Basic Requirement / Additive #
MATERIAL
OPTION 3
OPTION 3
UnitQuantityDescription
OPTION 3
OPTION 3
OPTION 3
OPTION 3
OPTION 3
OPTION 3
Attachment 6
National Park Service Solicitation Number 140P219R0006 9
G20 SITE IMPROVEMENTS
Material Cost/Unit
Total Material Cost
Labor Cost/Unit
Total Labor Cost
Equipment Cost/Unit
Total Equipment
Cost Total Cost/Unit Total Cost
G2030 PEDESTRIAN PAVING
32 30 00 Site Improvements Remove brick paving, salvage $ - $0 $ - $0 $ - $0 $ - $0 remove sand bedding, disposal $ - $0 $ - $0 $ - $0 $ - $0 scrape off former waterproofing $ - $0 $ - $0 $ - $0 $ - $0
Reinstall brick pavers $ - $0 $ - $0 $ - $0 $ - $0
PEDESTRIAN PAVING $0 $0 $0 $0
SUMMARY: G10 SITE PREPARATION
Material Cost/Unit
Total Material Cost
Labor Cost/Unit
Total Labor Cost
Equipment Cost/Unit
Total Equipment
Cost Total Cost/Unit Total Cost
$0 Option 1 $0
$0
Site Improvements $0
TOTALS
Unit
MATERIAL EQUIPMENT
Description Quantity Unit
MATERIAL LABOR EQUIPMENT
Description Quantity
LABOR
Basic Requirement / Additive #
G20
SUBTOTAL
OPTION 1
OPTION 1
OPTION 2
OPTION 1
Basic Requirement
Option 2
| Bid Summary |
| General Conditions |
| A10 - Foundations |
| B10 Superstructure |
| B20 Exterior Enclosure |
| D50 Electrical |
| F10 Special Construction |
| G20 Site Improvements |
File details come from the government source that posted it.