Attachment_5,_Detailed_Cost_Proposal_Format.pdf

PDF 130 KB Posted

Attached to
SHAW MEMORIAL STABILIZATION & RESTORATIO Federal contract opportunity
Solicitation number
140P2119R0006
Issued by
Department of the Interior National Park Service

About this file

Attachment 5, Detailed Cost Proposal Format

View the file

Other files for this federal contract opportunity

Other files attached to SHAW MEMORIAL STABILIZATION & RESTORATIO, newest first.
File Type Posted
Attachment_10,_Shaw_-_Elm_Tree_Ring_Recommendation_8.7.18.pdf PDF
Sol_140P2119R0006_Amd_0001.pdf PDF
Attachment_7,_Boston_Common_World_War_One_Memorial_Step_Design_L-1_L-2_and_Specifications.pdf PDF
Attachment_8,_RSA_Shaw_Remediation_Report.pdf PDF
Amendment_Number_1.pdf PDF
Attachment_11,_Shaw_-_Tree_Protection_Report_11.27.18.pdf PDF
Shaw_Memorial_Site_Visit_and_Pre-Propsoal_Conference_Sign-In_Sheet.pdf PDF
Attachment_6,_Photographs_of_original_McKim,_Mead_and_White_drawings.pdf PDF
Attachment_9,_Shaw_Memorial_Report_Final_red.pdf PDF
Attachment_12,_Tree_evaluation_report_cost_appraisal_attachment_1.pdf PDF
Sol_140P2119R0006_Amd_0001.pdf PDF
Attachment_11,_Shaw_-_Tree_Protection_Report_11.27.18.pdf PDF
Attachment_12,_Tree_evaluation_report_cost_appraisal_attachment_1.pdf PDF
Attachment_9,_Shaw_Memorial_Report_Final_red.pdf PDF
Attachment_10,_Shaw_-_Elm_Tree_Ring_Recommendation_8.7.18.pdf PDF
Attachment_7,_Boston_Common_World_War_One_Memorial_Step_Design_L-1_L-2_and_Specifications.pdf PDF
Attachment_6,_Photographs_of_original_McKim,_Mead_and_White_drawings.pdf PDF
Amendment_Number_1.pdf PDF
Shaw_Memorial_Site_Visit_and_Pre-Propsoal_Conference_Sign-In_Sheet.pdf PDF
Attachment_8,_RSA_Shaw_Remediation_Report.pdf PDF
Attachment_5,_Detailed_Cost_Proposal_Format.pdf PDF
Attachment_1,_General_Decision_Number_MA190001.pdf PDF
Attachment_3,_Project_Specifications.pdf PDF
Sol_140P2119R0006.pdf PDF
Attachment_2,_Past_Performance_Questionnaire.pdf PDF
Attachment_4,_Construction_Drawings.pdf PDF
Attachment_2,_Past_Performance_Questionnaire.pdf PDF
Attachment_4,_Construction_Drawings.pdf PDF
Attachment_3,_Project_Specifications.pdf PDF
Sol_140P2119R0006.pdf PDF
Attachment_1,_General_Decision_Number_MA190001.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

DETAILED COST PROPOSAL BREAKDOWN

National Park Service Solicitation Number 140P219R0006 1

BASIC REQUIREMENT Total Direct Costs OPTION 3 - Cathodic Protection Total Direct Costs

A10 Foundations $ - OPTION 3 $ - B10 Superstructure $ - Total Direct Construction Costs -$ B20 Exterior Enclosure $ - General Conditions -$

Total Direct Construction Costs -$ Subtotal NET Construction Cost -$ General Conditions -$ Bonds & Permitting & Insurance 0.00% -$

Subtotal NET Construction Cost -$ Overhead 0.00% -$ Bonds & Permitting & Insurance 0.00% -$ Profit 0.00% -$ Overhead 0.00% -$ Subtotal Bonds, Permit, O&H -$ Profit 0.00% -$ Total Cost of OPTION 3 -$

Subtotal Bonds, Permit, O&H -$

Total Cost of Basic Requirement -$ OPTION 4 Total Direct Costs

OPTION 4 $ -

Total Direct Construction Costs -$

General Conditions -$ Subtotal NET Construction Cost -$

Bonds & Permitting & Insurance 0.00% -$ Overhead 0.00% -$ Profit 0.00% -$

Subtotal Bonds, Permit, O&H -$ Total Cost of OPTION 4 -$

OPTION 1 - Plaza Brick and Tree Wells Total Direct Costs OPTION 5 - Plaza Structural Improvements Total Direct Costs OPTION 1 $ - Additive 5 $ -

Total Direct Construction Costs -$ Total Direct Construction Costs -$ General Conditions -$ General Conditions -$

Subtotal NET Construction Cost -$ Subtotal NET Construction Cost -$ Bonds & Permitting & Insurance 0.00% -$ Bonds & Permitting & Insurance 0.00% -$ Overhead 0.00% -$ Overhead 0.00% -$ Profit 0.00% -$ Profit 0.00% -$

Subtotal Bonds, Permit, O&H -$ Subtotal Bonds, Permit, O&H -$ Total Cost of OPTION 1 -$ Total Cost of OPTION 5 -$

OPTION 2 - Plaza Waterproofing Total Direct Costs OPTION 6 - Steel Grill Conservation Total Direct Costs

OPTION 2 $ - OPTION 6 $ -

Total Direct Construction Costs -$ Total Direct Construction Costs -$

General Conditions -$ General Conditions -$ Subtotal NET Construction Cost -$ Subtotal NET Construction Cost -$

Bonds & Permitting & Insurance 0.00% -$ Bonds & Permitting & Insurance 0.00% -$ Overhead 0.00% -$ Overhead 0.00% -$ Profit 0.00% -$ Profit 0.00% -$

Subtotal Bonds, Permit, O&H -$ Subtotal Bonds, Permit, O&H -$ Total Cost of OPTION 2 -$ Total Cost of OPTION 6 -$

National Park Service Solicitation Number 140P219R0006 2

Basic Requirement Description Quantity Unit Unit Price TOTALS

General Conditions

Field / Site Set-Up and Accommodation Construction Trailer -$ -$ Submittals -$ -$ Communications -$ -$ Document Printing -$ -$

Management, Supervision, and Field Engineering Project Management / Engineer -$ -$ Superintendent/Quality Control Manager/ Site Safety and Health Officer -$ -$

Safety and Protection Project Safety -$ -$ Secure Storage Containers / Areas -$ -$ Temporary Protection - Hardscape -$ -$ Temporary Protection - Trees and Vegetation -$ -$

Temporary Shoring and Bracing -$ Shoring and Bracing -$ -$ Scaffold and Shoring Towers -$ -$

Construction Aids, Equipment, and Tools Monorail, Chain Fall -$ -$ Equipment Rental -$ -$ Small Tools & Supplies -$ -$

Project Identification Project ID and Temporary Signs -$ -$ Project Scrims -$ -$ Project Banner -$ -$

Temporary Construction Limit of Disturbance Perimeter, including Access Gate -$ -$ Temporary Restroom -$ -$

Quality Control, Inspection, and Testing Construction Photos -$ -$ Construction Testing -$ -$ Inspections -$ -$

Maintenance and Housekeeping Waste (Dumpster rental and Disposal Fees) -$ -$ Waste Recycling Premium -$ -$

Other Contractual Requirements Record Drawings (red line changes during construction) -$ -$

SUMMARY: GENERAL CONDITIONS

-$ GENERAL CONDITIONS

SUBTOTAL GENERAL CONDITIONS

Quantity Unit Unit Price Total Cost

National Park Service Solicitation Number 140P219R0006 3

A10 FOUNDATIONS

Material Cost/Unit

Total Material Cost

Labor Cost/Unit

Total Labor Cost

Equipment Cost/Unit

Total Equipment

Cost

Total Cost/Unit Total Cost

STANDARD FOUNDATIONS

03 30 00 Cast-In-Place Concrete Isolated footing for new central post

$ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0

Sculpture wall support base Concrete $ - $0 $ - $0 $ - $0 $ - $0 Anchor Plate $ - $0 $ - $0 $ - $0 $ - $0 Grillage beam $ - $0 $ - $0 $ - $0 $ - $0

$ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0

07 14 13 Hot Fluid-Applied Rubberized Asphalt Waterproofing Rubberized asphalt waterproofing membrane to concrete $ - $0 $ - $0 $ - $0 $ - $0 slab $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0

STANDARD FOUNDATIONS $0 $0 $0 $0

SUMMARY: A10 FOUNDATIONS

Material Cost/Unit

Total Material Cost

Labor Cost/Unit

Total Labor Cost

Equipment Cost/Unit

Total Equipment

Cost

Total Cost/Unit Total Cost

$0 $0 $0

FOUNDATIONS $0

Option 5

Description Quantity Unit

MATERIAL

Option 2

TOTALSLABOR EQUIPMENTMATERIAL

TOTALSLABOR EQUIPMENT

UnitQuantityDescription

A10

A1010

OPTION 5

SUBTOTAL

OPTION 2

Uniformat II WBS Code

Basic Requirement

Basic Requirement / Additive #

BASIC REQUIREMENT

ATTACHMENT 5

DETAILED COST PROPOSAL

National Park Service Solicitation Number 140P219R0006 4

B10 SUPERSTRUCTURE

Material Cost/Unit

Total Material Cost

Labor Cost/Unit

Total Labor Cost

Equipment Cost/Unit

Total Equipment

Cost

Total Cost/Unit Total Cost

B1010 FLOOR CONSTRUCTION

05 12 00 Structural Steel Framing post and bearing plate $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0

Seismic Steel Framing $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0

$ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0

Tree Well Opening, det 4/A100 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0

09 96 00 High-Performance Coatings Power Tool Cleaning; White Metal, Near White Metal, Commercial, Brush-Off

$ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0

Prep surface and epoxy coating $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0

FLOOR CONSTRUCTION $0 $0 $0 $0

SUMMARY: B10 SUPERSTRUCTURE

Material Cost/Unit

Total Material Cost

Labor Cost/Unit

Total Labor Cost

Equipment Cost/Unit

Total Equipment

Cost

Total Cost/Unit Total Cost

$0 $0 $0

SUPERSTRUCTURE $0

Option 1 Option 5

B10

TOTALS

Uniformat II WBS Code Description Quantity Unit

MATERIAL LABOR EQUIPMENT

Basic Requirement

OPTION 5

OPTION 5

SUBTOTAL

OPTION 5

BASIC REQUIREMENT

LABOR EQUIPMENT TOTALS

UnitQuantityDescription

MATERIAL

Basic Requirement / Additive

OPTION 1

National Park Service Solicitation Number 140P219R0006 5

B20 EXTERIOR ENCLOSURE

Material Cost/Unit

Total Material Cost

Labor Cost/Unit

Total Labor Cost

Equipment Cost/Unit

Total Equipment

Cost

Total Cost/Unit Total Cost

B2010 EXTERIOR WALLS

04 55 00 Stone Conservation BASIC REQUIREMENT Photo documentation $ - $0 $ - $0 $ - $0 $ - $0 cleaning $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0

Reattachment of stone piece $ - $0 $ - $0 $ - $0 $ - $0 Structural reattachment of stone $ - $0 $ - $0 $ - $0 $ - $0 Grouting $ - $0 $ - $0 $ - $0 $ - $0 Patch $ - $0 $ - $0 $ - $0 $ - $0 Dutchman Repair $ - $0 $ - $0 $ - $0 $ - $0 Replace Sealant with Mortar $ - $0 $ - $0 $ - $0 $ - $0 Remove lime staining from granite Stone conservation $ - $0 $ - $0 $ - $0 $ - $0

$ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0

04 90 00 Disassembly and Reassembly of Marble and Granite Units Remove and reinstall stone steps and curb $ - $0 $ - $0 $ - $0 $ - $0

$ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0 $ - $0

Cut new pocket in brick wall, non-shrink grout, brick $ - $0 $ - $0 $ - $0 $ - $0 pocket up solid, full depth mortar joints fill hollows in wall under new bearing plate with solid $ - $0 $ - $0 $ - $0 $ - $0 mortar 2x courses

Site survey units $ - $0 $ - $0 $ - $0 $ - $0 Unique identification number system to each unit $ - $0 $ - $0 $ - $0 $ - $0 Remove bench, salvage $ - $0 $ - $0 $ - $0 $ - $0 bench pedestal $ - $0 $ - $0 $ - $0 $ - $0 balustrade $ - $0 $ - $0 $ - $0 $ - $0 urn $ - $0 $ - $0 $ - $0 $ - $0 corner post $ - $0 $ - $0 $ - $0 $ - $0 stone paver $ - $0 $ - $0 $ - $0 $ - $0

Remove Tennessee Marble coping unit, salvage $ - $0 $ - $0 $ - $0 $ - $0 column, capital, base $ - $0 $ - $0 $ - $0 $ - $0 sculpture wall panel $ - $0 $ - $0 $ - $0 $ - $0 sculpture wall watertable $ - $0 $ - $0 $ - $0 $ - $0 sculpture wall base $ - $0 $ - $0 $ - $0 $ - $0 sculpture bench $ - $0 $ - $0 $ - $0 $ - $0

Remove top course granite, salvage $ - $0 $ - $0 $ - $0 $ - $0 Cut back stone to accommodate new relief framework $ - $0 $ - $0 $ - $0 $ - $0BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

OPTION 4

BASIC REQUIREMENT

TOTALS

Basic Requirement / Additive #

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

MATERIAL

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

EQUIPMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

UnitQuantityDescription

LABOR

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

National Park Service Solicitation Number 140P219R0006 6

Repair cracked/broken stone $ - $0 $ - $0 $ - $0 $ - $0 1% Replacement of marble and granite $ - $0 $ - $0 $ - $0 $ - $0 Remove brown staining $ - $0 $ - $0 $ - $0 $ - $0 Construct new support relief wall $ - $0 $ - $0 $ - $0 $ - $0 Repair damaged backup wall to upper granite course $ - $0 $ - $0 $ - $0 $ - $0 Remove old pointing, setting mortars, sealants, caulking $ - $0 $ - $0 $ - $0 $ - incl.

and flashings Remove anchor, provide new stainless anchor, install $ - $0 $ - $0 $ - $0 $ - $0 Re-set unit, install new anchor, grout, adhesive $ - $0 $ - $0 $ - $0 $ - $0 Repoint marble with direct match of original historic $ - $0 $ - $0 $ - $0 $ - $0 mortar, clean New lead joint cover at sculpture coping stone $ - $0 $ - $0 $ - $0 $ - $0 New sealant bead at bronze/granite junction, new flashing $ - $0 $ - $0 $ - $0 $ - $0 bronze/marble $ - $0 $ - $0 $ - $0 $ - $0

05 01 70 Conservation of the Bronze Relief Rigging, removal and return of sculpture $ - $0 $ - $0 $ - $0 $ - $0 Relief $ - $0 $ - $0 $ - $0 $ - $0 examination and analysis $ - $0 $ - $0 $ - $0 $ - $0 protection and assistance $ - $0 $ - $0 $ - $0 $ - $0 conservation $ - $0 $ - $0 $ - $0 $ - $0

EXTERIOR WALLS $0 $0 $0 $0

Cost/Unit

Total Material Cost

Labor Cost/Unit

Total Labor Cost

Equipment Cost/Unit

Total Equipment

Cost

Total Cost/Unit Total Cost

B2020 EXTERIOR WINDOWS

05 01 80 Conservation of Cast Steel Grills Temporary protection at grill opening while conservation $ - $0 $ - $0 $ - $0 $ - $0 Conserve Grills $ - $0 $ - $0 $ - $0 $ - $0 secure anchoring system $ - $0 $ - $0 $ - $0 $ - $0

EXTERIOR WINDOWS $0 $0 $0 $0

SUMMARY: B20 EXTERIOR ENCLOSURE

Material Cost/Unit

Total Material Cost

Labor Cost/Unit

Total Labor Cost

Equipment Cost/Unit

Total Equipment

Cost

Total Cost/Unit Total Cost

$0 Option 4 $0

$0

Exterior Enclosure $0

TOTALSMATERIAL LABOR

OPTION 6

EQUIPMENT

SUBTOTAL

OPTION 6

LABOR TOTALSEQUIPMENT

Quantity Unit

MATERIAL

Unit

B20

Uniformat II WBS Code Description Quantity

Uniformat II WBS Code

Basic Requirement

Option 6

Description

OPTION 6

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

SUBTOTAL

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

BASIC REQUIREMENT

National Park Service Solicitation Number 140P219R0006 7

D50 ELECTRICAL

Material Cost/Unit

Total Material Cost

Labor Cost/Unit

Total Labor Cost

Equipment Cost/Unit

Total Equipment

Cost Total Cost/Unit Total Cost

D5010 ELECTRICAL SERVICE & DISTRIBUTION

Electrical

200A panelboard $ - $0 $ - $0 $ - $0 $ - $0 conductors in new conduit, earthwork $ - $0 $ - $0 $ - $0 $ - $0 conductors in existing conduit $ - $0 $ - $0 $ - $0 $ - $0 Clean and swab existing conduits $ - $0 $ - $0 $ - $0 $ - $0 Grounding $ - $0 $ - $0 $ - $0 $ - $0 Lighting

Lighting $ - $0 $ - $0 $ - $0 $ - $0 Recircuit existing pole bases incl.

Reconnect existing pole bases $ - $0 $ - $0 $ - $0 $ - $0 Lighting controls Single pole switch $ - $0 $ - $0 $ - $0 $ - $0 PSU (Installation only, provided by others) $ - $0 $ - $0 $ - $0 $ - $0

Branch devices GFI receptacle $ - $0 $ - $0 $ - $0 $ - $0 Backbox $ - $0 $ - $0 $ - $0 $ - $0

Circuitry $ - $0 $ - $0 $ - $0 $ - $0 Demolition work $ - $0 $ - $0 $ - $0 $ - $0 Fees & Permits $ - $0 $ - $0 $ - $0 $ - $0

ELECTRICAL SERVICE & DISTRIBUTION $0 $0 $0 $0

SUMMARY: D50 ELECTRICAL

Cost/Unit

Total Material Cost

Labor Cost/Unit

Total Labor Cost

Equipment Cost/Unit

Total Equipment

Cost Total Cost/Unit Total Cost

$0 Option 3 $0

$0

ELECTRICAL $0D50

TOTALSMATERIAL LABOR

Uniformat II WBS

Code Description Quantity Unit

EQUIPMENT

Basic Requirement

Option 4

SUBTOTAL

Basic Requirement / Additive #

MATERIAL

OPTION 3

OPTION 3

OPTION 3

OPTION 3

OPTION 3

OPTION 3

OPTION 3

OPTION 3

OPTION 3

OPTION 3

LABOR EQUIPMENT

OPTION 3

TOTALS

UnitQuantityDescription

OPTION 3

OPTION 3

OPTION 4

OPTION 3

National Park Service Solicitation Number 140P219R0006 8

F10 SPECIAL CONSTRUCTION

Material Cost/Unit

Total Material Cost

Labor Cost/Unit

Total Labor Cost

Equipment Cost/Unit

Total Equipment

Cost

Total Cost/Unit Total Cost

F1010 SPECIAL STRUCTURES

Cathodic Protection Engineering $ - $0 $ - $0 $ - $0 $ - $0 Site testing $ - $0 $ - $0 $ - $0 $ - $0 Concrete remove and repair work $ - $0 $ - $0 $ - $0 $ - $0 Anode system $ - $0 $ - $0 $ - $0 $ - $0 Cathode system $ - $0 $ - $0 $ - $0 $ - $0 Monitoring system $ - $0 $ - $0 $ - $0 $ - $0 Electrical system $ - $0 $ - $0 $ - $0 $ - $0 Power supply equipment $ - $0 $ - $0 $ - $0 $ - $0 Commissioning/performance monitoring $ - $0 $ - $0 $ - $0 $ - $0 Documentation, access, misc. $ - $0 $ - $0 $ - $0 $ - $0

SPECIAL STRUCTURES $0 $0 $0 $0

SUMMARY: F10 SPECIAL CONSTRUCTION

Cost/Unit

Total Material Cost

Labor Cost/Unit

Total Labor Cost

Equipment Cost/Unit

Total Equipment

Cost

Total Cost/Unit Total Cost

$0 Option 3 $0

Special Construction $0F10

TOTALSMATERIAL LABOR

Uniformat II WBS

Code Description Quantity Unit

EQUIPMENT

Basic Requirement

LABOR EQUIPMENT TOTALS

SUBTOTAL

Basic Requirement / Additive #

MATERIAL

OPTION 3

OPTION 3

UnitQuantityDescription

OPTION 3

OPTION 3

OPTION 3

OPTION 3

OPTION 3

OPTION 3

Attachment 6

National Park Service Solicitation Number 140P219R0006 9

G20 SITE IMPROVEMENTS

Material Cost/Unit

Total Material Cost

Labor Cost/Unit

Total Labor Cost

Equipment Cost/Unit

Total Equipment

Cost Total Cost/Unit Total Cost

G2030 PEDESTRIAN PAVING

32 30 00 Site Improvements Remove brick paving, salvage $ - $0 $ - $0 $ - $0 $ - $0 remove sand bedding, disposal $ - $0 $ - $0 $ - $0 $ - $0 scrape off former waterproofing $ - $0 $ - $0 $ - $0 $ - $0

Reinstall brick pavers $ - $0 $ - $0 $ - $0 $ - $0

PEDESTRIAN PAVING $0 $0 $0 $0

SUMMARY: G10 SITE PREPARATION

Material Cost/Unit

Total Material Cost

Labor Cost/Unit

Total Labor Cost

Equipment Cost/Unit

Total Equipment

Cost Total Cost/Unit Total Cost

$0 Option 1 $0

$0

Site Improvements $0

TOTALS

Unit

MATERIAL EQUIPMENT

Description Quantity Unit

MATERIAL LABOR EQUIPMENT

Description Quantity

LABOR

Basic Requirement / Additive #

G20

SUBTOTAL

OPTION 1

OPTION 1

OPTION 2

OPTION 1

Basic Requirement

Option 2

Bid Summary
General Conditions
A10 - Foundations
B10 Superstructure
B20 Exterior Enclosure
D50 Electrical
F10 Special Construction
G20 Site Improvements