Attachment_3,_Project_Specifications.pdf

PDF 5 MB Posted

Attached to
SHAW MEMORIAL STABILIZATION & RESTORATIO Federal contract opportunity
Solicitation number
140P2119R0006
Issued by
Department of the Interior National Park Service

About this file

Attachment 3, Project Specifications

View the file

Other files for this federal contract opportunity

Other files attached to SHAW MEMORIAL STABILIZATION & RESTORATIO, newest first.
File Type Posted
Attachment_7,_Boston_Common_World_War_One_Memorial_Step_Design_L-1_L-2_and_Specifications.pdf PDF
Attachment_8,_RSA_Shaw_Remediation_Report.pdf PDF
Attachment_10,_Shaw_-_Elm_Tree_Ring_Recommendation_8.7.18.pdf PDF
Sol_140P2119R0006_Amd_0001.pdf PDF
Amendment_Number_1.pdf PDF
Attachment_11,_Shaw_-_Tree_Protection_Report_11.27.18.pdf PDF
Shaw_Memorial_Site_Visit_and_Pre-Propsoal_Conference_Sign-In_Sheet.pdf PDF
Attachment_6,_Photographs_of_original_McKim,_Mead_and_White_drawings.pdf PDF
Attachment_9,_Shaw_Memorial_Report_Final_red.pdf PDF
Attachment_12,_Tree_evaluation_report_cost_appraisal_attachment_1.pdf PDF
Sol_140P2119R0006_Amd_0001.pdf PDF
Attachment_11,_Shaw_-_Tree_Protection_Report_11.27.18.pdf PDF
Attachment_12,_Tree_evaluation_report_cost_appraisal_attachment_1.pdf PDF
Amendment_Number_1.pdf PDF
Shaw_Memorial_Site_Visit_and_Pre-Propsoal_Conference_Sign-In_Sheet.pdf PDF
Attachment_9,_Shaw_Memorial_Report_Final_red.pdf PDF
Attachment_10,_Shaw_-_Elm_Tree_Ring_Recommendation_8.7.18.pdf PDF
Attachment_7,_Boston_Common_World_War_One_Memorial_Step_Design_L-1_L-2_and_Specifications.pdf PDF
Attachment_6,_Photographs_of_original_McKim,_Mead_and_White_drawings.pdf PDF
Attachment_8,_RSA_Shaw_Remediation_Report.pdf PDF
Sol_140P2119R0006.pdf PDF
Attachment_2,_Past_Performance_Questionnaire.pdf PDF
Attachment_5,_Detailed_Cost_Proposal_Format.pdf PDF
Attachment_1,_General_Decision_Number_MA190001.pdf PDF
Attachment_4,_Construction_Drawings.pdf PDF
Attachment_2,_Past_Performance_Questionnaire.pdf PDF
Attachment_4,_Construction_Drawings.pdf PDF
Attachment_3,_Project_Specifications.pdf PDF
Sol_140P2119R0006.pdf PDF
Attachment_1,_General_Decision_Number_MA190001.pdf PDF
Attachment_5,_Detailed_Cost_Proposal_Format.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AFRICAN AMERICAN NATIONAL HISTORIC SITE

BOSTON, MASSACHUSETTS

THE STRUCTURAL STABILIZATION AND RESTORATION OF THE

ROBERT GOULD SHAW MEMORIAL

BOAF

PMIS NO. 242310

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

FEBRUARY 15, 2019

BOAF- 242130 TOC-1

TABLE OF CONTENTS

DIVISION 01 – GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 14 00 Work Restrictions 01 26 01 Contract Modification Procedures 01 30 00 Administrative Requirements 01 31 00 Project Management and Coordination 01 32 16 Construction Schedule 01 32 33 Photo Documentation for Historic Preservation Projects 01 33 23 Submittal Procedures 01 34 00 Landscape Protection 01 35 23 Safety Requirements 01 35 91 Historic Preservation Treatment Procedures 01 40 00 Quality Requirements 01 42 00 Reference Standards 01 50 00 Temporary Facilities and Controls 01 53 29 Temporary Shoring and Protection 01 57 19.12 Noise & Acoustics Management 01 57 23 Temporary Storm Water Pollution Prevention 01 67 00 Product Requirements 01 73 40 Execution 01 74 19 Construction Waste Management and Disposal 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data 01 81 50 System Demonstration and Training

DIVISION 03 – CONCRETE

03 30 00 Cast In Place Concrete

DIVISION 04 – MASONRY

04 55 00 Stone Conservation 04 90 00 Disassembly and Reassembly of Marble and Granite Units and Brick Pavers

DIVISION 05 – METALS

05 01 70 Conservation of the Bronze Relief 05 01 80 Conservation of the Cast Steel Grills 05 12 00 Structural Steel Framing

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 14 13 Hot Fluid-Applied Rubberized Asphalt Waterproofing

DIVISION 09 – FINISHES

09 96 00 Finishes High-Performances Coatings

BOAF- 242130 TOC-2

DIVISION 18 – CATHODIC PROTECTION

18 01 00 General Conditions for Cathodic Protection Scope 18 05 00 Concrete and Masonry Work for Cathodic Protection 18 05 50 Cathodic Protection Electrical Work 18 07 00 Cathodic Protection General Requirement 18 21 00 Submittals 18 32 50 Miscellaneous

DIVISION 26 –ELECTRICAL

26 05 00 Common Work Results for Electrical 26 05 19 Low-Voltage Electrical Power Conductors 26 05 26 Grounding and Bonding for Electrical Systems 26 05 33 Raceway and Boxes for Electrical Systems 26 05 43 Underground Ducts and Raceways for Electrical Systems 26 05 44 Sleeves and Sleeve Seals for Electrical Raceways and Cabling 26 05 53 Identification for Electrical Systems 26 24 16 Panelboards 26 27 26 Wiring Devices

BOAF - 242310 01 11 00 - 1

February 15, 2019 SUMMARY OF WORK

SECTION 01 11 00 - SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Work covered by the Contract Documents.

2. Contractor Use of Site.

3. Special Construction Requirements.

4. Reference Documents/Additional Reports.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Location: The Boston Common and Boston Public Garden, Northeast corner at the intersection of Beacon Street and Park Street, Boston, Massachusetts.

B. The Work consists of the following:

1. The work of this contract consists of the restoration, stabilization and seismic upgrade of the Robert Gould Shaw & 54th Regiment Memorial. Specific work items include:

dismantling, off-site conservation, and reinstallation of the bronze relief, deconstruction and replacement of the Memorial’s underlying brick wall with a new concrete wall, installation of stone anchorage to the backup wall, replacement of flashing, installation of new steel support frame, dismantling, conservation and reconstruction of the existing stone masonry walls, balustrade and surrounding site features, excavation of the plaza crawlspace for installation of new reinforcement plaza framing, including application of a new coating system, installation of a cathodic protection system, and installation of new, associated electrical work.

2. The project will be constructed under a single prime contract.

C. Background:

In 1863, after the Emancipation Proclamation went into effect, President Lincoln agreed to recruit African American men into the army, though in segregated regiments led by white officers. The first of these raised in the north, was the Massachusetts 54th Regiment led by Colonel Robert Gould Shaw of Boston, the son of staunch abolitionists.

In July, the regiment was sent to South Carolina where an assault was planned on Fort Wagner guarding Charleston harbor. Shaw asked to have 54th Regiment lead the attack and the chance for the men to prove themselves the equal of white soldiers. Of the 600 men in the attack that day, there were 285 casualties, and Col. Shaw was killed, but the men never wavered in the battle and demonstrated great courage and determination. As a result of their actions, other black regiments were formed, and by the end of the war 10% of the union army was made up of African Americans.

BOAF - 242310 01 11 00 - 2

The Shaw Memorial depicts Colonel Robert Gould Shaw and his men marching past the State House on their way to South Carolina, Shaw erect on his horse, the men marching alongside. On the reviewing stand, along with Governor Andrew, is Frederick Douglass who had worked tirelessly to convince President Lincoln to allow recruitment of African Americans into the army. Douglass's two sons, Lewis and Charles, were in the regiment.

1.3 CONTRACTOR USE OF SITE

A. General: The Boston Common and Boston Public Garden will remain open to the public, resulting in the Contractor having limited use of the site for construction operations.

B. Contractor shall at all times conduct their operations to ensure the least inconvenience to the public.

Walkway closures will be permitted, when required, upon specific approval of Contracting Officer in compliance with the City of Boston and Boston Parks and Recreation Department requirements.

1.4 SPECIAL CONSTRUCTION REQUIREMENTS

A. Preservation of Cultural Resources:

1. The Boston Common, including all steps, walkways, and landscape, is both a local and national historic landmark.

2. All work shall avoid, minimize, or mitigate adverse effects on Boston Common and its features.

3. Contractor to undertake and execute all work in the most sensitive manner possible using the most conservative treatment approaches.

4. All work shall comply with the Secretary of the Interior Standards for the Treatment of Historic Properties and shall follow the Guidelines for the Treatment of Cultural Landscapes and Archeological Protection.

B. Preservation of Natural Features:

1. Contractor shall protect all existing trees, lawns, and other site features designated to remain within the project construction zone and all of those existing trees, lawns and other site features within the limit of temporary construction fencing.

2. Contractor is to furnish an Arborist, certified in the Commonwealth of Massachusetts and experienced in the protection and maintenance of historic natural features. The Contractor’s Arborist will work closely with the Reviewing Arborist and the Contracting Officer to ensure the natural features are protected and maintained throughout the duration of the project, most importantly, the two historic elms located on the plaza. All work shall be conducted by qualified and trained personnel under the direct supervision of the Contractor’s arborist.

C. Salvaged Materials:

1. All salvaged materials will remain the property of the Government.

2. Contractor shall maintain property control records for material or equipment designated as salvaged in the construction documents.

BOAF - 242310 01 11 00 - 3

1.5 REFERENCE DOCUMENTS/ADDITIONAL REPORTS

A. Copies of all listed reports will be provided to the Contractor by the Contracting Officer.

1. Photographs of a partial set of the original architectural drawings prepared by McKim, Mead and White. (Note that the dimensions and other information in this compilation have not been independently verified with respect to actual existing conditions).

2. “Boston Common World War One Memorial Steps” design drawings L-1 and L-2 and specifications, Walker Kluesing Design Group, December 16, 1996 and December 19, 1996.

3. “Existing Conditions and Treatment Recommendations” report, Building Conservation Associates, August 2013.

4. “Remediation of the Robert Gould Shaw Memorial” report, Silman, February 12, 2015.

5. Compilation of documentation and discussion on historic elm trees (cover item is “Shaw

54th Memorial – Report on Elm Growth and Tree Ring Expansion”, Norm Helie, August 7, 2018)

6. “Shaw Memorial Elms – Landscape Value Appraisal”, Urban Forestry Solutions, November 29, 2018.

7. “Site-Specific Tree Protection Plan for Shaw Memorial Restoration Project”, Normand Helie, November 27, 2018.

1.6 CONFLICTS WITHIN DOCUMENTS

A. The construction documents are complementary. If there is any conflict within the documents, the Contractor shall submit in writing for a Contracting Officer decision.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 11 00

BOAF – 242310 01 14 00-1

February 15, 2019 WORK RESTRICTIONS

SECTION 01 14 00 – WORK RESTRICTIONS

PART 1 GENERAL

1.1 SUBMITTALS

A. The following shall be submitted in accordance with Section 01 33 00, “Submittals”.

1. List of Contact Personnel

2. Personnel List

3. Statement of Acknowledgement Form SF 1413 (form can be completed online and printed) http://www.gsa.gov/portal/forms/download/115794

1.2 SPECIAL SCHEDULING REQUIREMENTS

A. Permission to interrupt any activity, roads, and/or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date or interruption.

1.3 CONTRACTOR ACCESS AND USE OF PREMISIS

A. Contractor Regulations

1. Ensure that Contractor personnel employed in the Project become familiar with and obey Project regulations including safety, fire, traffic and security regulations.

2. Keep within the limits of the work and avenues of ingress and egress.

3. Wear hard hats in designated areas.

4. Do not enter any restricted areas unless required to do so and until cleared for such entry.

5. Mark Contractor equipment for identification.

B. Subcontractors and Personnel Contacts: Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

C. Personnel List: Provide a list of personnel of the Contractor and subcontractors. As changes occur, correct and change the information contained in previous lists.

D. Vehicle Access:

1. Only marked, company and government vehicles are allowed within the job site.

Vehicles must remain within the construction fence and on paved surfaces.

2. Vehicles may not exceed 5 MPH and must use hazard lights within Boston Common.

3. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions within Boston Common are identical to the state load http://www.gsa.gov/portal/forms/download/115794

BOAF – 242310 01 14 00-2

restrictions with such additional regulations as may be imposed by the Boston Parks and Recreation Department or the City of Boston. Information regarding rules and regulations for vehicular traffic may be obtained from the Boston Parks and Recreation Department. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.

E. Contractor Conduct: The Government has a zero tolerance policy on use, sale and or distribution of all forms of alcohol and drugs. The contractor shall maintain a neat and professional appearance throughout its workforce including vehicles, equipment, work site, staging areas, and employees. The carrying or possession of firearms and other dangerous weapons in Boston Common is strictly prohibited. Contractor employees shall behave with appropriate decorum, courtesy, and respect while within Boston Common. Shouting, cursing, angry outbursts, sleeping, intoxication, violence, or criminal acts of any kind will not be tolerated and is cause for immediate and permanent removal from the premises.

Criminal conduct is subject to prosecution by the Government.

F. Uniforms: Contractor and subcontractor employees shall wear appropriate attire which covers the torso, legs and feet. Shorts are not permitted.

G. No Smoking Policy: Smoking is prohibited within and outside of all buildings and within Boston Common.

H. Working Hours: Work shall be generally performed during normal business working hours of 7:00 a.m. to 6:00 p.m., Monday through Friday, excluding holidays.

I. Work Outside of Regular Hours: Work outside of regular working hours requires prior written approval of the Contracting Officer and Boston Parks. Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours.

J. Time Extensions for Unusually Severe Weather: This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the Contract Clause entitled “Default: (Fixed Price Construction).” In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:

1. The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.

2. The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.

K. Recognized Holidays and Special Events: The following holidays and special events should be recognized as no working days: New Year’s Day, Martin Luther King Jr.’s Birthday, Presidents’ Day, Swearing in of the Governor, Patriot’s Day, the extended weekend of Memorial Day, June Day, Bunker Hill Day, Independence Day, Labor Day, September 11 Memorial Event, Columbus Day, the extended weekend of Veterans’ Day, BOAF – 242310 01 14 00-3

Thanksgiving Day, City of Boston Tree Lighting, and Christmas Day. The Contractor shall be given no less than 14 days’ notice for any other events that will require the contractor to postpone their work. The Contractor shall assume an additional three (3) events yearly that may result in postponement of work. No work or staging materials shall be permitted during these dates. All areas outside the project fencing must be clear of all contractor related materials, equipment or supplies and shall be removed a minimum of 24 hours before time periods listed above.

L. Security Requirements:

1. Construction fence to be kept locked when construction is not being performed. .

1.4 CONDUCT OF OPERATIONS

A. At all times the contractor shall conduct their operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the National Park System and the Boston Parks and Recreation Department.

B. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within Boston Common unless approved by the Contracting Officer.

C. The contractor is responsible for all site cleanliness and graffiti management for the project duration.

PART 2 PRODUCTS NOT USED.

PART 3 EXECUTION NOT USED

END OF SECTION 01 14 00

BOAF - 242310 01 26 01 - 1

February 15, 2019 CONTRACT MODIFICATION PROCEDURES

SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. The work of this section consists of administrative and procedural requirements for contract modifications.

1.2 DEFINITIONS AND ALLOWANCES

A. Home Office Overhead: Those costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):

1. Rent

2. Utilities

3. Furnishings

4. Office equipment

5. Executive and management staff not exclusively assigned to the project

6. Support, accounting, and administrative staff

7. Preparation of cost proposals, estimating, and schedule analyses connected with

Modifications

8. Estimating and preconstruction services

9. Mortgage costs

10. Real estate and corporate taxes

11. Automobile maintenance and travel costs for home office personnel

12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.

13. Depreciation of equipment and other assets

14. Home office supplies (paper, staples, etc.)

15. Legal services

16. Accounting and data processing

17. Professional fees/registration

B. General Conditions: Management and administrative costs incurred on site for the designated project. Costs associated with the preparation of modifications will not be allowed. The costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:

1. Project Manager, Assistant Project Manager

2. Superintendent, Assistant Superintendent

3. Quality Control, Safety Officer, Environmental Manager, etc.

4. Engineers

5. Travel, lodging, and per diem (as established by Federal Travel Regulations)

BOAF - 242310 01 26 01 - 2

6. Scheduling

7. Contractor construction Trailer and associated temporary utilities

8. Trailer office supplies

a. Mailing and couriers

b. Reproduction costs

c. Storage

d. Phones

e. Computers

f. Copiers

9. Personal vehicles i.e. Superintendent Pickup trucks

C. General Requirements: These are costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate. The following items, if applicable, are considered allowable costs for calculating General Requirements:

1. Hoisting

2. Material handling

3. Temporary fencing

4. Port-a-lets

5. Trash removal, dumpsters

6. Barricades

7. Small tools

8. Safety supplies

9. Scaffolding

10. Daily cleaning

11. Traffic control

12. Temporary signage

13. Temporary heating and power

D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on the project site. Modification costs for salaried workers are only allowed within the structure of a 40 hour week and no overtime or holiday pay will be allowed.

1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:

a. Base Rate: This is the hourly rate paid directly to the worker

b. Labor Burden: Employer payments of all applicable burdens, this includes insurance and taxes that the business must pay on behalf of the worker to government entities and educational forums, such as:

1) Social Security

2) Medicare

3) Workers Compensation– Policy and company calculation to be made available.

4) FUTA– Cap Rate and percentage to be proportionally allocated over one year.

5) SUTA– Cap Rate and percentage to be proportionally allocated over one year.

BOAF - 242310 01 26 01 - 3

6) Union agreement costs – Other costs required under an enforceable collective bargaining agreement.

c. Fringe Benefits: Various non-wage compensations provided to employees such as:

1) Health Care Insurance Premiums

2) Cell Phone

3) Clothing

4) 401K and Pensions

5) Vehicle allowances

6) Gas allowance

7) Life insurance premiums

8) Disability insurance

9) Other Fringe Benefits required under an enforceable collective bargaining agreement

E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.

F. General Liability Insurance: An insurance policy that protects the contractor from claims resulting from bodily injury or property damage to a third party. Include this as a separate line item within all modification proposals and provide a current insurance quote upon request.

G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees that the contractor will pay the labor and material costs they have incurred. Banks and Insurance companies charge a premium for each individual project based on a sliding scale which relates to the size of the project. Include this as a separate line item in modification proposals and provide current company bonding rates upon request.

H. Builder’s Risk Insurance: This covers the contractor’s loss due to fire, high winds, or other natural forces. This is not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.

1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS

A. General:

1. Your proposal must be received in the format and within the time frame specified in the Request for Proposal letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.

2. The proposal must be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed that that they are included in the hourly rate shown, or contractor is not requesting reimbursement.

Contractor may utilize the government provided Contractor Estimate Form, or their http://en.wikipedia.org/wiki/Employee http://en.wikipedia.org/wiki/Surety_bond http://en.wikipedia.org/wiki/Insurance http://en.wikipedia.org/wiki/Bank

BOAF - 242310 01 26 01 - 4

own form, provided that it contains the same information and level of detail as the Gov’t provided form.

3. Requests for extensions of contract time as a result of this change must be justified with a Time Impact Analysis (TIA), prepared by the Contractor and submitted to the Contracting Officer for review. Refer to Division 01 Specification, “Construction Schedule”, for time impact analysis requirements. TIA and associated costs must be received by the Contracting Officer with the proposal by the date shown within the Request for Proposal letter. Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving the right for additional time and no time extension will be allowed.

4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer upon request.

5. Contractor must review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to the NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.

6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.

B. Labor:

1. Contractor shall estimate the cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing the hours required for each craft that will be directly engaged in modification work.

Any work proposed that will require overtime work or premium pay shall be itemized separately. All rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, FICA, FUTA, and other direct costs resulting from Federal, State or local laws.

2. Itemize labor costs for equipment operators separate from equipment costs.

3. The labor cost for foremen shall only be costs for related work required for the modification.

C. Materials:

1. The estimated cost for materials shall include quotes from multiple sources. Material prices must include all applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.

2. No markup shall be applied to any material provided by the NPS.

D. Equipment:

1. Equipment used for the project must be appropriately sized for the work being performed.

2. Do not include costs for “miscellaneous tools and equipment”, in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 must be broken out separately.

3. Regardless of ownership, the rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:

BOAF - 242310 01 26 01 - 5

a. U.S. Army Corps of Engineers, Ownership and Operating Expense Schedule (use latest edition and applicable region)

b. Construction Blue Book

c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.

4. The estimated equipment rates shall include the operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires & tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per FAR 31.105(d)(2)), depreciation, storage, insurance, and all incidentals.

Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.

5. Estimate the full rate for equipment only for the duration that the equipment will be utilized to accomplish the work of the modification.

6. Standby unit rates used are to be in accordance with paragraph 1.3, D, 2, above. If the US Army Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then ½ of the equipment costs minus any operating costs, major repair and overhaul will be accepted.

7. If equipment is in standby mode due solely to a documented NPS delay, the established standby rate shall apply from the first day of the delay.

8. Unused equipment should not be stored on site.

9. Equipment that is not used and on the jobsite for up to five consecutive days may be classified at standby rates, provided that the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work. Equipment that is still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.

10. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.

11. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.

E. Establishment and Application of Overhead and Profit Percentages:

1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit.

Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:

Overhead………………10% Profit…………………...10%

2. Total aggregate limit of markup (OH&P) for contractor and subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.

3. If contractors form a partnership, then the partnership may only receive home office overhead and profit in the same amount as an individual contractor (refer to part 1.3.E.1 above). It is the responsibility of the partners to decide on the division of revenue.

4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, the overhead and profit mark-ups are required on the net increases and deducted on net decreases.

BOAF - 242310 01 26 01 - 6

5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 01 26 01

BOAF - 242130

February 15, 2019

01 30 00 - 1

ADMINISTRATIVE

SECTION 01 30 00 - ADMINISTRATIVE REQUIREMENTS

PART 1 GENERAL

1.1 SUBMITTALS

A. The following shall be submitted in accordance with Section 01 33 00, “Submittals”.

1. Satisfactory Evidence of Insurance Coverage

1.2 MINIMUM INSURANCE REQUIREMENTS

1. Procure and maintain during the entire period of performance under this contract the following minimum insurance coverage: Comprehensive general liability:

$500,000 per occurrence

2. Automobile liability: $200,000 per person, $500,000 per occurrence for bodily injury, $20,000 per occurrence for property damage

3. Workmen’s compensation as required by Federal and State workers’ compensation and occupational disease laws.

4. Employer’s liability coverage of $100,000, except in States where workers compensation may not be written by private carriers.

5. Others as required by Massachusetts State law.

1.5 CONTRACTOR SPECIAL REQUIREMENTS

A. Asbestos Containing Material and Other Hazardous Materials

1. Refer to Section 05 01 80 “Conservation of Cast Steel Grills.”

B. Electronic Mail (E-Mail) Address

1. The Contractor shall establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments in Microsoft, Adobe Acrobat, and other similar formats. Within 10 days after contract award, the Contractor shall provide the Contracting Officer a single (only one) e-mail address for electronic communications from the Contracting Officer related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The Contracting Officer may also use email to notify the Contractor of Boston Common access conditions when emergency conditions warrant, such as hurricanes, terrorist threats, etc. Multiple email addresses will not be allowed.

2. It is the Contractor’s responsibility to make timely distribution of all Contracting Officer initiated e-mail with its own organization including field offices(s). The Contractor shall promptly notify the Contracting Officer, in writing, of any changes to this e-mail address.

BOAF - 242130

February 15, 2019

01 30 00 - 2

ADMINISTRATIVE

PART 2 PRODUCTS NOT USED.

PART 3 EXECUTION NOT USED.

END OF SECTION 01 30 00

BOAF - 242310 01 31 00 - 1

February 15, 2019 PROJECT MANAGEMENT AND COORDINATION

SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Definitions

2. Construction Coordination.

3. Submittals

4. Requests for Information (RFIs).

5. NPS/DSC SharePoint Project Website.

6. Project Meetings.

7. Environmental Coordination.

8. Permits

B. Related Requirements:

1. Section 01 32 16 “Construction Schedule” for preparing and submitting Contractor’s construction schedule.

2. Section 01 73 40 “Execution” for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.

3. Section 01 77 00 “Closeout Procedures” for coordinating closeout of the Contract.

1.2 DEFINITIONS

A. Agency with Jurisdiction: An Agency that has been granted legal authority over a location, action, or resource. This authority includes the ability to issue a permit or other legal permission document. These entities include, but are not limited to, the National Park Service, the City of Boston, The Boston Parks and Recreation Department, and the Friends of the Public Garden.

B. Contractor Provided Construction Permits: Permits obtained by the Contractor based on the means and methods to conduct the work.

C. Contracting Officer/CO: The NPS entity with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.

D. Reviewing Engineer/Reviewing Masonry Conservator/Reviewing Metals Conservator/Reviewing Arborist/Reviewing Corrosion Consultant: Subject Matter Experts engaged to advise the Government. See specific specification sections for project participation.

E. Contractor/Prime Contractor: Contractor responsible for the furnishing of all other contractors for the project as delegated by the Contracting Officer and responsible for the integration of all work into a unified whole meeting all of the standards that pertain to the conservation and restoration of a significant work of art/cultural property.

F. Contractor’s Arborist: Arborist, furnished by the Prime Contractor, charged with the site protection and treatment of the park’s natural features within the project limits.

G. Historic Masonry Contractor: Masonry restoration contractor, furnished by the Prime Contractor, responsible for all aspects of the disassembly and reassembly of the stone portions of the https://www.nps.gov/dscw/definitionsdc_p.htm#permit https://www.nps.gov/dscw/definitionsdc_c.htm#contractor

BOAF - 242310 01 31 00 - 2

Memorial subject to the qualifications as specified herein and approved by the Contracting Officer.

H. Stone Restoration Conservator: Stone conservator, furnished by the Prime Contractor, responsible for the preparation of submittals, mock-ups and oversite of all stone cleaning and stone conservation treatments, subject to the qualifications as specified herein and approved by the Contracting Officer.

I. Bronze Conservator: The bronze conservator, furnished by the Prime Contractor, responsible for the preparation of submittals, mock-ups and oversite of bronze conservation portions of the Memorial subject to the qualifications as specified herein and approved by the Contracting Officer.

J. Ferrous Metals Conservator: The conservator, furnished by the Prime Contractor, responsible for the conservation of the cast steel grills and subject to the qualifications as specified herein and approved by the Contracting Officer.

K. Cathodic Protection Supervisor/Manager/Specialist: The cathodic protection contactor, furnished by the Prime Contractor, subject to the qualifications as specified herein and approved by the Contracting Officer.

L. Engineer of Record: Professional engineer, licensed in the Commonwealth of Massachusetts, engaged by the Prime Contractor subject to the qualifications as specified herein and approved by the Contracting Officer. The Engineer of Record, a professional hired by the Contractor to complete delegated design work, is not the same as the Reviewing Engineer, the professional engaged by the Government who will have technical reviewing authority over the work.

M. Art Mover/Rigger: A firm specializing in the handling of works of art and their transportation.

N. Restoration: The reconstruction of the aesthetic appearance of an object or memorial, using all applicable standards including the Secretary of the Interior Standards. See Section 013591 for an expanded definition.

O. Conservation: The examination, scientific analysis, and research to determine the original structure, materials, and extent of loss or fragility of an object as well as its documentation and treatment. The term also encompasses preventive measures taken to retard future deterioration.

P. Relief: The bronze relief of the Shaw Memorial created by August Saint-Gaudens. This includes the bronze cast of the Shaw Memorial as well as the attached patinated sheet metal and hardware above the relief which fills in the gap between the relief and the stone work.”

Q. Memorial: The Shaw Memorial including the edifice, the Relief, the metal grills, the plaza, etc.

and specifically the stone work that is the subject of this project. Refer to the contract documents for scope of work.

R. Grills: All elements associated with the cast steel grills, including the frames, grills, woven wire, decorative elements, bolts and any other associated metal.

1.3 CONSTRUCTION COORDINATION

A. Coordination: Contractor shall coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work.

Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components with other Contractors to ensure maximum accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

BOAF - 242310 01 31 00 - 3

4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including mechanical and electrical, while ensuring protection of existing elements to remain.

5. Properly plan construction operations to include permit requirements. Allow enough time to execute permit provisions to maintain work schedule, site visits, inspections, and reporting deadlines.

B. Administrative Procedures: Contractor shall coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule.

2. Preparation of the Schedule of Values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Permit requirements.

7. Pre-installation conferences.

8. Project closeout activities.

9. Commissioning activities.

1.4 SUBMITTALS

A. Division 01 documents: The following items shall be submitted and approved prior to the Preconstruction Conference being scheduled.

1. Letter designating Project Superintendent.

2. A list of Subcontractors for this project (must be same as in proposal).Written statements from subcontractors certifying compliance with applicable labor standard clauses.

3. Satisfactory evidence of liability insurance coverage and workman’s compensation for the

Contactor and all subcontractors.

4. Construction Schedule.

5. A comprehensive breakdown of the Schedule of Values.

6. Copies of OSHA 510 Certification for Jobsite Superintendent and OSHA 10 Hour

Certification for all other Jobsite Personnel.

7. Accident Prevention Plan including Hazard Communication Plan.

8. Quality Control Plan.

9. Historic Preservation Treatment Plan.

10. Landscape Protection Plan

11. Fire Prevention and Protection Program

12. Waste Management Plan.

13. Under-An-Acre Pollution Prevention Plan (UPPP).

14. Comprehensive Site Plan

15. Fence Installation Plan

16. Submittal Register.

17. List of Required Construction Permits. Permits as required from the Boston Landmarks

Commission, the Boston Arts Commission, the Boston Parks and Recreation Department and any other agency having jurisdiction over the Memorial, Boston Common or site in general. Include the following information for each permit:

BOAF - 242310 01 31 00 - 4

a. Name of Permit.

b. The Agency(ies) with Jurisdiction issuing the permit.

c. Information required from the Government to complete the permit application.

18. Contractors Commissioning Plan.

1.5 REQUESTS FOR INFORMATION (RFIs)

A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI utilizing the form created on the NPS/DSC SharePoint Project website.

1. CO will not respond to RFIs submitted by other entities controlled by Contractor.

2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.

B. Content of the RFI: Contractor to include a detailed, legible description of item needing information or interpretation and the following:

1. RFI number, numbered sequentially.

2. Date.

3. RFI subject.

4. Specification Section number and title and related paragraphs, as appropriate.

5. Drawing number and detail references, as appropriate.

6. Field dimensions and conditions, as appropriate.

7. Contractor's suggested resolution. If Contractor's suggested resolution impacts the

Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

8. Contractor's signature.

9. Requested date for response.

10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.

C. RFI Form: Contractor to complete the RFI Form on the NPS/DSC SharePoint website as follows:

1. Enter the general information at the top of the form.

2. Under the “Action” section at the bottom of the form, select “Question” then select “CMR” in the drop-down of the “Send to” box.

3. Enter the details of the question and attach related documents.

4. Select “Submit Form” at the bottom of the page.

D. Contracting Officer’s Action: CO will review each RFI, determine action required, and respond.

CO will determine the critical nature of each RFI and issue a response accordingly.

1. The following are not considered to be RFIs and will receive no action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for approval of Contractor's means and methods.

BOAF - 242310 01 31 00 - 5

d. Requests for coordination information already indicated in the Contract Documents.

e. Requests for adjustments in the Contract Time or the Contract Sum.

f. Requests for interpretation of Designer of Record, Reviewing Engineer, Reviewing

Metals Conservator, Reviewing Stone Conservator, Contracting Officer’s (or any other agent having reviewing authority) actions on submittals.

g. Incomplete RFIs or inaccurately prepared RFIs.

2. CO's action may include a request for additional information, in which case time for response will date from time of receipt of additional information.

3. CO's action on RFIs may result in the need for a change to the Contract Time or the Contract Sum. All contract changes will be processed following the terms and conditions of the contract.

1.6 PROJECT WEB SITE

A. The Contactor is to use the NPS/DSC SharePoint Project website for communication throughout the contract period. The NPS/DSC SharePoint Project website will be used for the following functions:

1. Project directory.

2. Project correspondence.

3. Meeting agendas and minutes.

4. Contract modifications forms and logs.

5. RFI form and processing.

6. Task and issue management.

7. Photo documentation.

8. Baseline schedule, schedule updates and calendar management.

9. Submittal form and processing.

10. Payment coordination documentation.

11. Drawing and specification document hosting, viewing, and updating.

12. Online document collaboration.

13. Reminder and tracking functions.

14. Archiving functions.

15. Notification of submittal and RFI statuses and current responsible party.

16. Permits and addendums

B. Some documents however are not suitable to be shared using the NPS/DSC SharePoint Project website. Documents containing Personal Identifying Information (PII) (i.e. certified payrolls) shall not be shared using the NPS/DSC SharePoint Project website and shall be coordinated with the SharePoint Project team as appropriate.

C. Contractor to submit to the CO a list of all employees who will need access to the website. The users will receive an invitation to register from the Department of Interior (DOI). Once the user is registered on the DOI website, they will be given access to the NPS/DSC SharePoint Project website. For login procedures and other SharePoint information, refer to the Workflows website at http://www.nps.gov/dscw/precon_spproj.htm.

D. All users will be required to have the following software packages:

1. Internet Explorer version 7 or later.

BOAF - 242310 01 31 00 - 6

2. Adobe Acrobat Professional (Pro) version 9 or later

1.7 PROJECT MEETINGS

A. Preconstruction Conference: Before start of construction, Contracting Officer will arrange an on-site meeting with Contractor and all associated partners of the Government (Government Representatives). The meeting agenda will include the following as a minimum:

1. Roles & Responsibilities/ Lines of Authority.

2. Boston Common rules and regulations.

3. Reference Materials.

4. Jobsite Safety/Accident Prevention Program.

5. Resolution of comments on required Division 01 documents.

6. Contract time.

7. Liquidated damages.

8. Notice to Proceed.

9. Construction Schedule.

10. Permit Requirements.

11. NPS/DSC SharePoint Project website.

12. Submittal procedures.

13. Coordination of Subcontractors.

14. Display of Hotline posters.

15. Contractor Quality Control

16. Acceptance/rejection of work.

17. Environmental requirements.

18. Correspondence procedures.

19. Progress meetings.

20. Construction Progress

21. Saturday, Sunday, holiday and night work.

22. Daily Work Schedule.

23. Schedule of Values

24. Payments to Contractor.

25. Value engineering.

26. Labor law application.

27. Payroll reports.

28. Modifications.

29. NPS Final Accessibility Inspection.

30. System Demonstration and Training

31. Close-Out Requirements

32. As-constructed drawings/operation and maintenance (O&M) manuals.

33. Contractor Performance Evaluation.

B. Progress Meetings: The Contracting Officer will schedule weekly meetings with the Contractor.

1. Attendees: In addition to Government Representatives, each Contractor, Subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with the Project and authorized to conclude matters relating to the Work.

BOAF - 242310 01 31 00 - 7

2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. The meeting agenda will include the following:

a. Approval of minutes of previous meetings.

b. Safety

c. Submittal status.

d. Review of off-site fabrication and delivery schedules.

e. Requests for information (RFI) and other issues.

f. Contract Modifications.

g. Work in progress and projected.

h. Inspections of work in progress and projected (Special Inspections, Accessibility, etc.).

i. Construction Schedule update.

j. Status of Project Record Drawings and O&M manuals.

k. Other business relating to work.

l. Permit requirements.

C. Preinstallation Conferences: Contractor to conduct a preinstallation conference at Project site before each construction activity that requires coordination with other construction.

1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise CO of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:

a. Contract Documents.

b. Options.

c. Related RFIs.

d. Related Change Orders.

e. Purchases.

f. Deliveries.

g. Submittals.

h. Review of mockups.

i. Possible conflicts.

j. Compatibility requirements.

k. Time schedules.

l. Weather limitations.

m. Manufacturer's written instructions.

n. Warranty requirements.

o. Compatibility of materials.

p. Acceptability of substrates.

q. Temporary facilities and controls.

r. Space and access limitations.

s. Regulations of agency(ies) with jurisdiction.

t. Testing and inspecting requirements.

u. Installation procedures.

v. Coordination with other work.

w. Required performance results.

BOAF - 242310 01 31 00 - 8

x. Protection of adjacent work.

y. Protection of construction and personnel.

3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.

4. Reporting: Distribute minutes of the meeting to each party present and to other parties requiring information, including Reviewing Engineer and Government Representatives.

5. Do not proceed with installation if the conference cannot be successfully concluded.

Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.

1.8 ENVIRONMENTAL COORDINATION

A. Contractor shall perform project quality control in accordance with requirements specified in Related Sections, including:

1. Quality Requirements.

2. Regulatory Requirements.

3. Noise Management.

4. Temporary Storm Water Pollution Prevention Environmental Management.

5. Construction Waste Management.

B. Contractor’s Environmental Training Program: Contractor shall provide environmental training for workers performing work on the project site. Training shall include the following:

1. Overview of environmental issues related to the building industry.

2. Overview of environmental issues related to the Project.

3. Review of site specific procedures and management plans:

a. Construction Waste Management.

b. Noise & Acoustics Management.

c. Temporary Storm Water Pollution Prevention.

4. Pollution Prevention (P2) practices: Submit evidence of participation in P2 programs.

5. Compliance with environmental regulations: As specified in Regulatory Requirements.

Submit…