STATEMENT OF WORK

I. INTRODUCTION

The National Park Service’s National Center for Preservation Technology and Training (NPS/NCPTT) solicits interested and qualified private and commercial vendors to submit proposals for entering into agreement for the purpose of performing all tasks as specified under this scope of work.

The contract that will be awarded by this solicitation is intended to provide for the preparation and installation of an elastomeric coating on all roof surfaces mentioned in this SOW. All areas must be restored to their original condition at the end of the project. The contractor shall provide all labor, materials, tools, supplies, consumables, equipment, transportation, and supervision necessary to accomplish the requirements of this SOW.

II. DEFINITIONS

Acceptance - The act of an authorized representative of the Authority by which the Authority assumes for itself, or as an agent of another, ownership of existing and identified supplies, or approves specific services, as partial or complete performance of the contract.

Authority - National Park Service

Business Hours - 8:00 A.M.. through 5:00 P.M. CST/CDT, Monday through Friday, excluding weekends and holidays.

COR – Contracting Officer’s Representative

OSHA - U.S. Occupational Safety and Health Administration. The Federal Government agency responsible for providing the rules and regulations on safety and health requirements in the work place.

Quality Control - A method used by the contractor to assure that quality services are provided to satisfy the requirements of the contract.

Quality Assurance - A means by which the Authority is able to confirm that the quantity and quality of services received conformed to contract requirements. These methods/procedures are not intended to aid the contractor in the performance of the contract requirements and shall not be a substitute for the contract quality control.

SOW - Statement of Work/Scope of Work

UAIB - Upper Air Inflation Building

RRS - Radiosonde Replacement System

III. TASKS (Appendix A)

1) Lee H. Nelson Hall, NCPTT’s headquarters on the campus of Northwestern State University of

Louisiana, is a 1920s 3-story building with approximately 15,000 square feet of floor space. A rehab of the building was completed in 2001, when a heat-seamed, granular modified bitumen roof was installed.

The entire roof is drained through scuppers in parapet walls. The roof is a mixture of relatively flat roof surfaces and more steeply sloped surfaces. The modified bitumen roof covers parapet walls. It is estimated that the modified bitumen roof covers less than 10,000 square feet, including walls.

An elastomeric coating for this existing roof is needed. There are many types of elastomeric systems, which ever system is used must be put on in accordance with manufactures recommendations, and industry best practices. Below are our requirements for this installation.

1) All loose granules must be removed before coating.

2) A satellite dish on the flat roof must be removed and disposed.

3) All loose existing roofing will be re-attached before coating. Special attention must be paid to re-attach any loose roofing in and around the scuppers, as the roof has leaked in those locations before.

4) Seams will be taped before coating, unless that procedure is not recommended by the manufacturer of the elastomeric coating.

5) Any areas of the roof that require cleaning will be cleaned prior to coating.

6) Coatings will cover all of the flat and sloped roofing. Parapet walls will be covered as much as needed but at least 18 inches, with the exception of the roofing on the wall above the south side of the front flat roof, which will be completely covered with elastomeric coating. This is the wall where the gutter is attached, and can be seen in one of the photos.

7) Color of elastomeric coating will be white.

8) Coating must cover all roofing even where it enters scuppers.

9) Coating will cover all flashed roof penetrations.

10) There is one gutter above the flat roof that has a detached downspout. Reattach that downspout and make any necessary repairs to the gutter or other downspouts.

11) Particular care must be shown around the rear scuppers to make sure that water can’t enter the building there.

12). All trash produced by this project will be removed by the contractor.

13) Contractor is responsible for any permits or inspections.

14) This elastomeric roof coating must have at least a 10-year warranty.

2) GENERAL

1) The contractor’s equipment shall not impede the normal operation of the NPS/NCPTT. No scaffolding, ladders, lifts or other equipment used for the project will be allowed to remain erect or standing in the work area outside the normal work hours unless prior written approval has been granted by the COR.

2) The contractor shall perform each task according to a detailed written job schedule and plan which is prepared by the contractor and approved by the COR at least seven (7) days prior to beginning work. These milestones shall include the dates the work is to be initiated and completed as well as the amount of work projected to be completed daily. The job plan shall identify the hours when the contractor will perform the work.

3) The contractor shall submit manufacturer’s literature and color sample to the COR for approval prior to commencing coating. Other materials incorporated into the work shall also be approved by the COR prior to use.

4) The contractor shall provide all ladders, lifts, drop cloths, scaffolding, brushes, rollers, barricades, signs, spray equipment, pressure washers, and all other equipment incidental to and necessary for the performance of the elastomeric services described in this Statement of Work. The unit prices provided in the quote shall be fully loaded and shall include all labor, supplies, equipment, tools, and incidentals necessary to accomplish that line item of work. Contractor shall notify the COR immediately (in writing) of all damages and/or discrepancies that they identify at the job site prior to the start of work as well as any personal injury or property damage that occurs while performing this SOW.

5) The Contractor shall submit cut-sheets for all equipment and materials installed in this project and shall not order or install them until government approves it in writing. Submit all documents to POC listed in this

SOW.

6) The Contractor shall be responsible for restoring work site to original condition.

3) GENERAL REQUIREMENTS

A. CONTRACTOR FURNISHED PROPERTY

The contractor shall furnish all resources (i.e. supervision, labor, materials, supplies, and equipment) that are necessary to fulfill all the requirements described in this Statement of Work in a safe, orderly, timely, efficient, satisfactory and workmanlike manner.

1) Electrical Equipment: All electrical extension cords shall be properly sized for the equipment load and placed away from vehicular or pedestrian traffic. All connections between the extension cords and relayed equipment (e.g., tools, machine, or additional extension cords) shall be tightly fastened with no exposed electrical contacts. All extension cords shall have and use, a proper electrical grounding plug. Power tools and/or extension cords used in damp areas shall be plugged into a Ground Fault Circuit Interrupter (GFCI) switches to immediately shutdown when a short to ground is detected.

2) Ladders: Protection pads shall be used by the contractor to prevent ladders from marring building surfaces.

The contractor shall assure that all ladders comply with all current and applicable safety requirements and regulations.

3) Man lifts: All lifts shall be equipped with a flashing yellow beacon light and fire extinguisher and must be approved by the COR. The contractor shall assure that the use, safe operation and/or servicing of the lifts are in compliance with all applicable requirements including but not limited to ASNI/SIA A.92.6-1999 Standard for Supported Elevating Work Platforms, effective 01/02/2000. In the event of a lift failure and/or malfunction, the contractor shall provide a replacement lift within one (1) working day so as not to delay scheduled completion of task. All lifts shall have signage attached that indicates the contractor’s name and phone number. The contractor shall provide at least one ground person at all times that lifts are used to act as a safety spotter.

4) Scaffolding: The contractor shall assure that all scaffolding are in compliance with ANSI 10.8-2001, and 29

CFR 1910.28.

5) Documentation: The contractor shall provide pictures (via e-mail) of the work performed each day to the

COR.

B. SAFETY

The contractor and each of its employees shall comply with all applicable local, state, federal, and Authority rules, regulations, and practices.

The contractor shall perform all its activities pursuant to this contract in a safe manner. The contractor shall assume responsibility on the job site for the actions of all its personnel and subcontractor(s) who are associated with performance on this contract. The contractor shall take adequate measures to prevent injury to the public or Authority property on the job site.

The contractor shall provide all barricades, warning signs, and other safety and protective equipment required to isolate or restrict public access to the work site and/or to protect NWS/NHC employees and the general public from personal injury due to materials, equipment or operations at the site. All barricades, warning signs, etc. shall be in accordance with Federal, State and Local codes.

The contractor shall provide and ensure that all its personnel at the job site properly wear all applicable safety devices and apparel, including but not limited to fall protection and hard hats. These devices and apparel shall be provided at no cost to the Authority.

The Authority shall have the right to inspect all areas for safety violations at its discretion, direct the contractor to make immediate improvement of conditions and/or procedures, and/or stop the work if other hazards are deemed to exist.

The operation of the contractor’s vehicles or private vehicles by the contractor’s employees on or about the property shall conform to regulations and safe driving practices.

It shall be the responsibility of the contractor to immediately notify the COR if the job site is visited by an official authorized to enforce any regulatory requirements including but not limited to OSHA.

The contractor shall inspect all powered equipment daily before operations for signs of wear as well as potential safety hazards. The contractor shall immediately remove from service on the job sites all equipment including extension cords which are potentially unsafe, damaged, inoperable and/or do not meet the manufacturers operational specifications.

The contractor shall never leave power equipment unattended without disconnecting them from their power source.

C. FIRE PREVENTION

The contractor shall be knowledgeable and train all its employees on the procedures and means of egress as well as the methods of reporting fires on the job sites.

D. SMOKE FREE ENVIRONMENT

The Authority’s facilities are smoke free. The contractor and its employees shall adhere to all applicable rules and regulations regarding maintenance of a smoke free environment on the job sites.

E. PERMITS, ROYALTIES, AND LICENSES

The contractor shall, without additional an expense to the Authority, be responsible for obtaining all licenses, certifications and permits which are necessary to fulfill the requirements of the Statement of Work.

F. DELIVERY OF SUPPLIES AND EQUIPMENT

The contractor shall (as directed by the COR) schedule its supply and equipment deliveries and the supply and equipment deliveries of its vendors and subcontractors during times and locations that cause minimum disruption and inconvenience to the Authority’s operations. The contractor shall notify the COR in writing and in person of all deliveries 24 hrs prior to the scheduled delivery. No deliveries shall be made on weekends, or holidays unless given prior consent by the COR.

G. TIMELY PERFORMANCE

The contractor shall adhere to and fulfill all the time and frequency requirements described herein.

H. ACCIDENT REPORT

The contractor shall immediately notify in turn the Authority’s Security Personnel and the COR both verbally and in writing of any accident on the job site that is related to the performance of this SOW that involve bodily injury or damage to property. The COR will provide information necessary, concerning whom to contact and the specific form of the follow-up written notice.

Any damages caused by the contractor or its employees to the Authority’s property shall be properly repaired or replaced by the contractor, to the satisfaction of the COR, at the contractor’s expense.

I. PERFORMING OTHER WORK AT THE JOB SITE

The contractor shall immediately advise the COR when the contractor is scheduled to perform any work on the job site, which is outside of the work described in this SOW. The contractor shall advise the COR of the scope, location, and period of performance of this work as well as who requested and/or contracted them to perform it and the entity for whom it is being performed.

J. CONTRACT DUTY HOURS

All work shall be performed between the hours of 8:00 A.M. and 5:00 P.M. Monday thru Friday, other work times must be approved by the COR with at least 48 hour notice.

K. REPORTING

The contractor shall provide daily reports (including pictures) describing the progress of the previous day work, along with any problems or potential problems that may arise.

L. PUNCH LIST PROCEDURES

Upon completion of the job the COR or a representative of the Authority will inspect the work for deficiencies and/or discrepancies. All deficiencies and/or discrepancies identified will constitute the official punch list which will be provided to the contractor. The contractor shall correct all items on the list within the provided timeline in the notice.

4) SPECIAL REQUIREMENTS

A. REGULATORY AND ENVIRONMENTAL PROVISIONS

1) General

The contractor (including it’s on the job site employees and subcontractors) shall comply with all applicable federal, state, local, and Authority regulatory, code, and procedural requirements.

The contractor shall provide the COR with Material Safety Data Sheets (MSDS) for all materials used and/or stored on the job site by the contractor.

All regulatory infractions, which are incurred by the contractor while fulfilling the requirements of this SOW, shall be immediately reported by the contractor to the Authority and appropriate regulatory agencies.

a) Air Quality: The contractor shall use, on the job site, only chemicals and products which are effective to fulfill the requirements described herein, have the least adverse impact on the environment, do not exceed the volatile organic chemical (VOC) limitations rule(s) published by the U.S. Environmental Protection Agency (EPA), and comply with all applicable regulatory requirements.

b) Contractor Provided Hazardous Materials

1) Compliance with Laws: The contractor shall comply with all laws relating to hazardous materials on the job sites or related to the contractor’s activities at the job sites. The contractor shall not manage, use or store hazardous materials at the job sites except as reasonably necessary to accomplish the SOW. The contractor shall not dispose or treat any hazardous materials on the job sites or surrounding lands or water. The contractor shall immediately provide the COR a written list of hazardous materials, which are used or stored, or intended to be used or stored, at the job site and the approximate quantities to be used or stored prior to entering into the contract.

2) Other: All hazardous and/or carcinogenic materials transported or generated onto either job site by the contractor must be properly disposed off the site by the contractor in accordance with applicable federal, state, and local laws and regulations and at no cost to the Authority.

The contractor shall immediately provide the COR with complete, legible copies of all regulatory notices, violations notices, citations, etc. received by the contractor which pertain directly or indirectly to its fulfillment of this SOW.

The contractor shall provide the COR with documentation on hazardous materials or wastes that are accumulated, handled, generated, or disposed of by the contractor’s operations. The documentation shall demonstrate the adequacy of the handling and disposal operations used by the contractor and will demonstrate that the contractor’s activities will not result in contamination of NWS property. This documentation shall be provided upon request during periodic environmental inspections of the contractor’s premises by the Authority. The contractor shall immediately provide copies of all such correspondence to the COR on all correspondence with regulatory agencies concerning the contractor’s compliance with environmental regulations.

If the contractor generates hazardous waste in an amount that makes it subject to state and federal hazardous waste requirements, the contractor shall apply for a Hazardous Waste Generator Identification Number. Hazardous waste shall be transported off the facility using the contractor’s Hazardous Waste Generator Identification Number documented on a complete and properly signed Uniform Hazardous Waste Manifest. The contractor shall be responsible for developing a Resource and Conservation Act

Contingency (RCRA) Plan if the amount of hazardous waste generated places it into a category that requires a plan.

3) Spill Contingency Plan: Neither domestic drains nor storm drains on the job sites shall be used to dispose of gasoline, paint, thinners, hydraulic fluid, solvents, concentrated cleaning agents, or other hazardous material.

5) PERSONNEL

A. CONTRACTOR’S PERSONNEL

1) Conduct: At all times while on the job site, whether on or off duty, the contractor’s employees shall conduct themselves in an orderly and safe manner. Fighting, being under the influence of alcohol and/or drugs or bringing and/or consuming alcohol and/or drugs, gambling, soliciting, stealing, and any immoral or otherwise undesirable conduct shall not be permitted on the job site and shall result in immediate and permanent removal from the job site for any employee engaging in such conduct from work.

B. RESPONSIBLE CONTRACTOR OFFICIALS

The contractor shall provide the CO or the COR with a list of names and telephone numbers of personnel who shall be responsible to respond to emergency calls. Failure to be able to contact any of the persons on the list or their refusal to respond in an emergency situation shall constitute a failure to perform and shall be subject to deduction for damages caused and costs incurred by the Authority to obtain alternative response and remedy to the emergency.

6) PERIOD OF PERFORMANCE

Provide a fully functional and operational system 90 days from issuance of the Notice to Proceed.

7) PROJECT WARRANTY

Contractor shall provide a written warranty for the workmanship for a period of (1) one for year from the date of acceptance unless otherwise specified.

8) POINTS OF CONTACT:

Contract Specialist: Richard_burns@nps.gov Contract Officer: Paula_johnson@nsp.gov COR POC and on site POC: Kevin_ammons@nps.gov, 318-356-7444

9) APPENDICES

APPENDIX A

mailto:Richard_burns@nps.gov mailto:Paula_johnson@nsp.gov mailto:Kevin_ammons@nps.gov

PRODUCTS AND EXECUTION

PRODUCTS

Elastomeric Coating

SureCoat Roof System (or approved equal); color as approved by the COR.

SURFACE PREPARATION

Surface must be clean, dry, and in sound condition. Remove all oil, dust, grease, dirt, loose granules, and other foreign material to ensure adequate adhesion. Power wash surfaces if necessary.

APPLICATION

General - Apply paint according to manufacturer’s directions. Use applicators and techniques best suited for substrate and type of material being applied. All workmanship shall be of high quality, and all materials evenly spread and smoothly flowed on. Follow manufacturer’s directions.

CLEANING

Cleanup - At the end of each workday the contractor shall remove all equipment, empty cans, rags, rubbish, and other discarded materials from the site. All trash and debris will be disposed of by the contractor, off site in accordance with all applicable Federal, State, Local laws and regulations.

Clean elastomeric coating from brick or any material other than the existing roof coating or flashings.

PROTECTION

Protect all surfaces that are not to be coated, pursuant to this SOW. There shall be no excess coating on brick or other masonry structures., and if so the contractor shall completely remove the excess elastomeric without damage or discoloration to the surface.

End of Statement of Work