This document is a Survey Request from the National Park Service (NPS) seeking feedback from potential contractors and subcontractors for a multi-year construction project at Grand Canyon National Park. The survey focuses on several key project components: Housing (South Rim Waste Water Treatment Facility), North Rim Utilities, and SCADA Integration, with a survey response deadline of August 11, 2025. The survey seeks contractor input on critical project aspects including RV site utilization, expected staffing levels, borehole construction scheduling, contracting approach preferences, construction schedule considerations, and potential coordination with a government-furnished Process Control System Integrator (PCSI).
The project involves developing 12 RV sites on the South Rim, implementing utility infrastructure on the North Rim, and integrating complex SCADA systems, with an anticipated four-year construction timeline that includes winter work periods. Contractors are invited to provide detailed feedback on technical specifications, project scheduling, and logistical challenges. The NPS is planning a follow-up industry day site visit during the week of August 25th and is collecting comprehensive input to refine project requirements before formal solicitation. Responses will be treated as confidential and used exclusively by the NPS and Design Team.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SURVEY REQUEST
This survey is to obtain feedback from contractors and subcontractors who are interested in the project, as a follow-up to the Industry Day event that was held on June 10, 2025 at Grand Canyon National Park, which provided an opportunity to visit the site and provide input for the development of the project requirements.
The DEADLINE FOR SURVEY RESPONSE IS: August 11, 2025.
FEEDBACK provided to NPS will be considered confidential, and not shared outside of the NPS & DSC Design Team.
NPS is requesting feedback from potential contractors and subcontractors on the subject project:
· Housing (SR WWTF)
· North Rim Utilities
· SCADA Integration (SR WWTF)
· Construction Partnering
· Industry Day Feedback Please return your survey response to the following Points of Contact
| · Contracting Officer: | Tim Burger (Timothy_burger@nps.gov) |
| · Contracting Specialist: | Kristin Tauber (Kristin_Tauber@nps.gov) |
Housing (SR WWTF) 12 RV Sites are currently planned on the South Rim (located near the helibase) with power, water and sewer connections for the construction contractor use during the period of performance.
Q2 - How would you utilize RV sites to meet project workload needs?
· CONTRACTOR RESPONSE:
Q3 - Please provide the maximum range of staff you’d expect to be on site at one time.
· CONTRACTOR RESPONSE:
North Rim Utilities Project scope and potential Contracting Approach (Option A or Option B) are identified in the Industry Day presentation. Handouts have also been provided with proposed/draft CLIN schedules for the boring construction.
Borehole Construction: Is the CLIN schedule acceptable for this type of work?
· CONTRACTOR RESPONSE:
Borehole Construction: What information is needed to develop a bid for the Volume 2 work? How would you like to see the geophysical information?
· CONTRACTOR RESPONSE:
Contracting Approach: Provide feedback and preference on the contracting approach: Borehole as separate contract, or bid as a single larger project (Option A or Option B)?
· CONTRACTOR RESPONSE:
August Industry Day: NPS is planning for an on-site visit the week of August 25th for the next industry day. What would you like to see?
· CONTRACTOR RESPONSE:
Construction Schedule: What are your thoughts and/or concerns with regard to working through the winter and an overall construction schedule of four years?
· CONTRACTOR RESPONSE:
SCADA Integration (SR WWTF) Referencing the provided draft specification section 01 11 00-1.4, the intent is for the construction contractor to provide all other aspects of the contract except what is listed here. Timely and thoughtful coordination will be required between the construction contractor and the government furnished Process Control System Integrator (PCSI). The construction contractor will be required to implement and provide all other network communication scope, physical hardware, Program Instrumentation and Control (PIC), and all other aspects of the project.
The intent of specification section 01 11 00-1.4 is to identify what will be provided by the third party (government furnished PCSI). Also, refer to other provided draft specifications:
· 26 05 10 - Network Communication System
· 40 90 00 – Instrumentation and Control for Process Systems
| SCADA |
| CONTRACTOR RESPONSE |
| 1 |
| Please provide feedback on the draft specifications and government furnished Process Control System Integrator (PCSI) |
· CONTRACTOR RESPONSE:
Industry Day Feedback (June 10th, 2025 @ South Rim)
| INDUSTRY DAY FEEDBACK |
| CONTRACTOR RESPONSE |
| XX |
| Please let us know the value/benefit of Industry Day? |
| XX |
| Please let us know what could be improved. |
| XX |