This document provides details on a federal solicitation for replacing a non-compliant water treatment system. The solicitation number is 140P2022R0102 to replace the Lodgepole Water Treatment System for SEKI 172423. The opportunity type is a solicitation issued by the Department of the Interior National Park Service National Office. The solicitation seeks to replace the existing non-compliant water treatment system to ensure water quality standards are met at the Lodgepole facility. Interested parties should review the attached final design drawings for specifications. The response deadline and award date are not provided in this document.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CE
NSED
ARCHITEC
STATE OF CAL I F
OR
N
IA
REN . 0 -30-
NO. 24687
L I T
GENERAL NOTES
DETAIL NUMBERING
ABBREVIATIONS
SYMBOL LEGEND
APPLICABLE BUILDING CODES
PROJECT DESCRIPTION
CE
NSED
ARCHITEC
STATE OF CAL I F
OR
N
IA
REN . 0 -30-
NO. 24687
8"W
NSED
ARCHITEC
STATE OF CAL I F
OR
N
IA
REN . 0 -30-
NO. 24687
ARCHITEC
STATE OF CAL I F
OR
N
IA
REN . 0 -30-
NO. 24687
ARCHITEC
STATE OF CAL I F
OR
N
IA
REN . 0 -30-
NO. 24687
ARCHITEC
STATE OF CAL I F
OR
N
IA
REN . 0 -30-
NO. 24687
ARCHITEC
STATE OF CAL I F
OR
N
IA
REN . 0 -30-
NO. 24687
ARCHITEC
STATE OF CAL I F
OR
N
IA
REN . 0 -30-
NO. 24687
ARCHITEC
STATE OF CAL I F
OR
N
IA
REN . 0 -30-
NO. 24687
ARCHITEC
STATE OF CAL I F
OR
N
IA
REN . 0 -30-
NO. 24687
˘ˇ ��ˆ
˙˝˛ ��ˆ
| � ���� �� | � ������� �������� � | ������ ��������� ����� ��� |
| (� �� �� | ��� | � ������ ��� |
| �˚˚ | ���� ��� ���� | � �������� � | ������ ��������� ����� �� | � | ||||
| )� �� �� | ��� | � ������ � | �* ��� � | ����� ��� ������� � | ����� ˙�+���� ����� | � � &' | �� ����� | ����&�� �������� ��������� ����� ��� |
| ������� ������ � ������ � | ����� �� | � ���� | � � | ����� |
| �����&�� � ���� | � �� | � | !��� ������� | ��������� ��������� ����� �� | � ���� ������ |
| ����˝������ �˝ | � � ���� ������� �˝ � ˝ �� |
| � ��������� ���� �� � | ˚ ������ ���� | ��� ����� �� | � | |
| �!� �� | �� ������ � � � |
| � | ���� �� | �� ���������� ������ 0 ��� �� | ����� ������������ � | |
| ���� | � |
˙�+ �� ��˚�������� ���1����� �� ˚� � ����˜˚�
| ��˚�������� ������ | � /�� 3�� � | ˚� | � ����������������� �� | ������ � |
| �˝��� | ���� |
| � ˚� | �� | ����� �˚������ � ��˝ | �� ������� |
| ˝ | �� ���� ������ ��������� ��˚�������� �˝ | � �����˝� �˝�� |
� ��� �������� � � ��1������� ��������������� �˚������ � ��˝ �� ������� ˚� �������� �� ���� �� ������4����� ���� �� ���˝ ����
| �� | ����� ������ | �� | |||
| ����� | � ��˝ �������� ������ � | ������ �� | �� � ������ �������� � ��˝ ��� | � | ˚˚ ������ �� |
| �� 5� | ������ �˝ | � � ���� � | ��� ������ | ���˝ ��� | � ��˝ | �� �������� ������ | ���� ������ � |
| ˝��˝ ��������� �� ���˝˝��� | ������ �˝ | � � ���� ������������*6 �˝ � ��� �˝�˝�7 � | �� ������� ���� | ˝ | �� ����� |
| ��� �� | �˜8* �� ������ | �������9 �������� �� ���˝ ������� ������ | � | ������ ��������� � ������ | ||
| ���˘ˇ ����������� � | ������ | � ��˝��� ���˚������ ������˚����� | �� �˚ | � �� | �������� | � � |
| ��������� ���� ����������� | � ��� | �������� ������˚����� | �� ���� �� � | |||
| ���� � | ˚ ��˝� �� | �������� | � �� | �������� ��˝ | ��� ���� �� | �˚���� � |
| ����� ���� ��� ��˝� ���� ���� ���� ������˚����� | ��: ����˝ �� | �˚��� � | ||||
| �˝��� ��� ��� | ��˝� �� | �������� | � � | ˚ ��˝� ���� �� | ��������� � | ˚˚���� � |
| ˚ | � ���� | ���� | �� |
| ��˝ | �� ������� ���� | |||
| � | ��� | �� ������ - �1�������, ��� | ��'�� � �����, |
� ����˘�� �ˆ������� ���˘ˇ˙ �� � ˆ��˝��������� ���������� ���˚˚����
| ������� ���˚˚���� �� | ��� ����˜ � | � | � ���������� � | ��� | �� �� | ''������ ����� ��������� ����� �� �����$ "˛ �˝��� | ���! ��� ���������� | �� ��˝� | ��˝ �˚��� ��������� | � � ���� ���� �� | ��� � |
| ������ �� | ��������� ��������� | � �������� |
| �������� ���˚˚���� ��1���� ����˜ � | ��� | � ��������������� � ���� �; |
| ����˝�� ����� | �� |
| �˝��� ���� ���� ���� ������������� ��� ��˝������� ���� �� | �� | � � |
| ����������� ��������� ������ ���1����� � | ˚˚���: �˚������: ����� |
$26
�������� �˚��1����� ������������ � ����� - ˜�� �� ���<�!˝����&������ ������� ��1���� ����˜�
| ��˚� ��� ����� | �˜ �������� | �� ��˝ | � ���� ������� | � ������ �������� | ��� � |
| ��� | ����� �˚ | � ����� ������ � | � ��������� | � ���� �� | � ���������� |
�������� �˚��1����� ������ � ��˝ �
| ������ | � ����������� � ����� � �"= |
| �!˝����&������ ������� �� | ��� ����˜�� |
| * ��� | � | ||||
| �� ���˝������ ��1������� ���� | ���˚� | ��� | �� ��� �� | �� 3 | �� |
�1�������
?��˚� �4̨
���� �� � & �1�������
| � ����� | ���&˚������ �������� | � � |
| ˝������' | ���˝��� | ����� ��@ |
����� � �˚�* ˚��� ������˜��� ������˝� �˝������� ��� ��������� �� ! ����� ��9 ˚� ����������������� ' ��$
����� � ��˝ ����� ������A������ B�C5�� ˚���&�� ˜� ������� ������ �� ���˝ ��������
D� ����� � ����
| �������� ������������ �E����� �� | ���˚��� ������� | � �E�� ����� ������ ������� �� ���˝&�����������*6 ����� | � �������� |
| � | (� �˝��� ������� �� � ˝��� � |
| ����� | � ��� ��˝ | � | ||
| ���� ����˝ | ��� ,���,/ ������ ��˚˝� ���� | ˜� ������� ��������� | �˚��� �˝ | �� �������� |
| F* � | ��˝ ���� | �G | ||||
| * ˚��! �� | ������ | � � | ��� | � ������������ �� | ��������� �������� �������� ������ � | ���� ��˝��˜ ������ ��������� |
3�3
�� ��� � ��� � ������������ �� ����� ���� ������� �˘˘��� �ˆ��� ����˛����� ˚���� �� �������� � �� ��������� & �
| ��������� ��� | � ��������� | ||
| ���� �����˜ ��������H� ��� ��� �� | ���� ��˝��� �� | � ����� � | ˚ ��˝���1I |
| �� �������� �� | ��� | ���� ��ˇ˜�*6 |
| ˚� | ���� | �������3�J |
| �� ��������� �� | �� � | ˚˚�� | ���˝������ |
| ���������ˇ˜�� | ���� |
| ��˜� �KL(M()�� ˚� | ���������� ������ | � ���˝� ������ H��� �˚� | �� ���˝* �˚��� ��ˇ �˝���/ ��������� ������� | � | ���� | �� |
| ��1� | �� ����� | ��� ����˜ |
����H
M&()&(-(K NL��� � �KM
04/23/2021
/ Tv. // / / r i©—/\✓ A? '"lb/ / \ ./ /// // ■0 // .\ // -t- I/ /l
A<os -zz/ Il\ / I\0 / /zt" I SHEET NOTESin /I yy /y / "A\!/ IA-y/ ^ Vy ''y 'ITv///
‘/ AT / 1"—~/ 1 v./<2 / 1. PROVIDE ALL TRENCHING, BACKFILL AND SAW
CUTTING. AND RETURN ALL LANDSCAPING,
PAVEMENT, AND FLATWORK BACK TO ITS ORIGINAL
CONDITION.
/i '/\ So T' \/ z-\ v..'i\ \\ / !3 Tv / ■ I/ /\ \\,-E- / 1/ / \/ // '\ /' \/ /
, ' ....I f\ ' \ \r id/ / \ I\ / . in/I / \\\ \/ ‘/ / I\/./ v_- A /•"/ J \I / ---- - \•E- /, I /// / \// n \/ \VI // i NEW LOW PRESSURE PROPANE GAS VAPOR (LPGV)
PIPING SHOWN AS SOLID LINE MARKED "G”.
/ r \t 1' I \ 2.
■ 1 / A i i Tr\ /
/ v \ \ii i/ r I7 r 'i l i i J/ i \i r i i ' i/ \ \r7 \ i/ i i/ i i \ \\/ \i i/ ii-T" I \I/ I/ II 1 t/ 1 I \./ I I/ 1 I I I \1/ t i T\
I in/ l * \ 3. PATCH AND PAINT ANY DAMAGED SURFACES DUE
TO DEMOLITION OR NEW CONSTRUCTION TO MATCH
EXISTING CONDITIONS.
CO.. /
1/ , Si /
\/ » I 1. \/ I I \l I I/ l I \I/ It 1 >, lI Iz-' / l I \\ \/ \ \ \i *r> \s'' I 1I » \I'S''
■ \\ I \l 1I \\ I .I 1 \ - A' I I/ I 1 v \l '/ 4. CONNECT NEW GAS LINE TO BUILDING GAS INLET
ABOVE GROUND. SEE DETAIL #1 ON SHEET M5.
I » \i I !/ \ \l \/ l *9.\/ / l ' __ r/ i/ / -A I i (* to/ t \ \ I/ I/Ul I I/ \\/ \ o/ I I/ II I I \l , I •i .• 2I 1 I I/vi / -4 \ \I i/ I/ / CzOI I/\i / I I--I I \1 . \ .
II I\\ I \/
I II II I I\ I I ■I I
I I /1 I I k I I ' T ■
III
I I /l I I 1/ L
I .I I/' I I Oi i J_i, i ____ I
.i L\ I v
J/V \U.I • / z^I KEY NOTES/ o\I I \s \\ r \\i
\ / (T) 1990-GALLON ABOVE GROUND LP TANK. PROVIDE CONCRETE PAD FOR
TANK MOUNTING. LPGV LINE TO GO UNDERGROUND PAST EDGE OF
CONCRETE PAD. UNDERGROUND GAS LINE PRESSURE TO BE 10 PSI
MAXIMUM. SEE DETAIL 1/M-4 FOR MORE INFORMATION.
\i A *9.\ \ foj \x/I l/ &‘■v.. oO/i \// \i s/ V V
■v.
VzQ.
8 \
3=\
G 3/4» »\ LPGV STUB UP OUTSIDE OF BUILDING. INSTALL PRV ABOVE
GROUND AT BUILDING GAS ENTRY; SET TO 14 INCHES W.C. SEE DETAIL
1/M-5 FOR MORE INFORMATION. SEE SHEET M3 FOR LPGV LINE
CONTINUATION IN BUILDING.
ssCD J \ 5 r—"\ l- \i - SSTD ir
\ii \ir \1n l -a
/ SS "
J3 5V-sCL Ul
1 \ s \s s ---- \\ \"
\co \ /s \ is / \ \\
\ \\I< \\ \\ \\o s \N 0 \\ \Na \N
\s \ \S< N \ \X //o // I // \, \\ \\\ i i iL i i\ \LO i
\lCM \ \o i\f VCM \\\ \\X \\ \\o I \ V\\ \\\ \\ V
\■V.
in <\s
O V. \s \ \\~v V. \-v Ul
1 v■v. ' \< IV. \ \\CL '-V I \■v \•s. 'fvO \ ' \
\\ro \
CM
\'CM \ T\
i \\\
\ \ii t> 1i \ \cr) N
N. ' .\\ s \s\ 1 N \Q \ \\< w \ 71 Os w Vi
/o \ o\ UlVI / oO o//\ / o/\\u\\\ i / oD \ / / \\ /I< \ o//\\W \W \W i//\ A \\ // \z^ — NN / '/ N i\ \CO zZ-s o/t\\ \ /z^CD /in4 \zZ-Z^ \ o ,z^ o$ z"
\ I\ /Q oinh \ .*9 \
X \/ v o 1ill Ul
I \<v \O \ (II \
ID / N_____'__»»CM u Io //CM .1 . QCv. C z^. /\ /o ■ N siu \1CM \ \• / \ >\z- 10 0 10 20CD • / \ Z-'I \/ z^Q
SCALE (A)
/lo z^/ \
/ \ SCALE OF FEET\/• • \
/ FINAL CONSTRUCTION DOCUMENTSCM \/ s/O' \//
DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETCL
1021 WTPJKSMECHANICAL SITE PLANCD
134,842• ♦
SCALE: (a)M-1CM MECHANICAL
SITE PLAN
JKS PMIS
SEKI 172423CM TECH. REVIEW:O
CM MVJ SHEET
lO LODGEPOLE
SEQUOIA NATIONAL PARK
DATE:
4/23/2021 88 of1 14
M-r i
TA 1
p T rUi /-X^Xlll3© / \x—KXX3) V / /O9O
\ \X i/ /tn \ I V£ / /
ET<>
1148”x40” 3 mx xEe
TZIr i6”x15M rvp m<«<!)TO KEY NOTESirjr —iz
(T) 8”x16” VERTICAL RECTANGULAR EXHAUST DUCT, TYPICAL OF 5. INSTALL
BALANCING DAMPER IN VERTICAL DUCT FOR EASE OF ACCESS. INSTALL
12” x 12” EXHAUST GRILLE FACING INTO BUILDING INTERIOR WITH
GRILLE CENTERED AT 48” AFF FOR NORTH AND SOUTH WALL, 26” AFF
FOR ALL OTHER LOCATIONS.
<2> VERTICAL SECTION OF 24” EXHAUST DUCT RAISING MAIN HORIZONTAL
DUCT INTO ROOF PEAK.
(3) INSTALL EXHAUST TAKE OFFS SUCH THAT BRANCH DUCT FOLLOWS ROOF
PITCH.
<4) PROVIDE SEPARATED COMBUSTION CONCENTRIC VENTING AND
CONCENTRIC VENTING ADAPTER (CVA-6) CONSISTING OF 6” CATEGORY III
EXHAUST VENT AND 8” COMBUSTION AIR INTAKE. ROUTE CONCENTRIC
PIPE THROUGH ROOF FOR MAU-1. FOLLOW MANUFACTURER’S
RECOMMENDATIONS FOR INSTALLATION. FOLLOW THE IFGC FOR
TERMINATION TYPE AND MINIMUM HEIGHT ABOVE ROOF (-4 FT). LOCATE
CENTERED BETWEEN CENTER AND EAST DORMER. COORDINATE WITH
ARCHITECT.
(3) 48”X40” EXTERIOR LOUVER MOUNTED IN DORMER WINDOW FRAME. RE
ARCHITECTURAL FOR DETAILS.
(6) EQUIPMENT SUPPORTS TO BE DESIGNED BY CONTRACTOR.
(7) LOCATE SUPPLY DUCTS ABOVE LEVEL OF PROCESS EQUIPMENT AND
LIGHT FIXTURES. MOUNT SUPPLY GRILLE HORIZONTAL ON DUCTS.
(8> PROVIDE GRAVITY DAMPER DOWNSTREAM OF EF-1 SUCH THAT IF THE
w UNIT IS EVER SHUT OFF THE DAMPER IS CLOSED.
(9) REMOTE INTERFACE FOR MAU-1 CONTROLLER.
^ PROVIDE APPROXIMATELY 12 LINEAR FEET OF RAYCHEM GM-1X CABLING
IN AN ”S” CURVE WITHIN 48”X40” OSA DUCT AS SHOWN. PROVIDE WITH
AMBIENT SENSOR SUCH THAT THE CABLE IS ON ANYTIME THE OSA IS
40 DEGRESS F OR LESS. REFER TO ELEC FOR MORE INFORMATION.
(Ph PROVIDE 3/4” DRAIN LINE OUT OF 48”X40” OSA DUCT AND ROUTE TO
NEAREST FLOOR DRAIN. ROUTE IN SUCH A MANNER THAT PIPING IS
NOT A POTENTIAL TRIPPING HAZARD. REFER TO SHEET M-5 FOR MORE
INFORMATION ON DUCT CONSTRUCTION. SLOPE DUCT SLIGHTLY TOWARDS
DRAIN.
@ EXHAUST FAN VFD.
AIRFLOW MODE SWITCH.
ro tSl x s O CNIroI47 E
1 J miri l5 EJZL c > xz ADw- [ol [o vn >Jt: Dc )1S1
& 3
{ 12” 0 DI1 1 1 cxJ
)03J zn
JZI
ijijCD £ rTD
I
3 I
1CL
p< 2 1 Io mr -tc< JX < rgifio 3 ) a a co CO -'o pc
9J DICM
r1 I nEF-1 O
LD ICM MALM)6o « «CM C <DD eix R
1 M-O ro i x o IO9m ro p /co
B
1. \
<cro CNl 24” 0
J ___ Iro
J7CM
CM JZI
<J>co 2x12 <5HFt 48”x40” TO□ ____ j hi0 I <o
\ X12” 0 1o \Ln / \< s /T7
PR IV) /X------ HXICD A /£ o V .____ _ .C |_______ Io in CMo L _____ ICM
5o ACM MECHANICAL HVAC PLAN 2
SCALE (A) E
0 2 4CD
Q
SCALE: (a)o “3
SCALE OF FEET• • cxJ
FINAL CONSTRUCTION DOCUMENTSCM
Od
DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETCL
102WTPJKSCD
134,842• ♦
CM MECHANICAL
PLANM-2JKS PMIS
SEKI 172423CM TECH. REVIEW:O
CM MVJ SHEETin LODGEPOLE
SEQUOIA NATIONAL PARK
DATE:
4/23/2021 89 of1 14
1-1/2” DCW0^ TA <P~\ 0^^
T "FT °m c i / AP. P, / \ \^xx>a ffc O) 6” V—pll-/f31 ( +6O9{> 5/ / I
\ \i / /V VL>s:* > lirs:
jtlv 2i ^=y I '■ i°r2>—rrI I~nnr ---------Tfift^p ii— i ii
KEY NOTES
40= 0 FLOOR MOUNT EMERGENCY SHOWER/EYEWASH ES-1. RUN DRAIN PIPE
FROM ES-1 TO WITHIN 6” OF FLOOR DRAIN BELOW UNIT.
0 DOMESTIC WATER HEATER DWH-1. PROVIDE 1-1/4” DHW LINE TO
TMV-1 FOR EMERGENCY SHOWER.
0 1-1/2” DCW CONNECTION POINT. DCW LINE TO RUN IN TRENCH ALONG
WALL, THEN PENETRATE TRENCH GRATING VERTICALLY NEAR HOSE REAL
AND RUN OVER HEAD. SEE PROCESS PIPING DRAWINGS FOR
CONNECTION POINT INFO.
0 2” FLOOR DRAIN, TYPICAL OF 5. P-TRAPS NOT NEEDED FOR FLOOR
DRAINS FLOWING DIRECTLY INTO BACKWASH WASTE TANK.
0 NOT USED.
m FD-1 lI Wl TI afiiii« E3ZL C 1 /-v>D
9 9 OT o I E £
1 i ■M-DIc )ns..._L x;a i a9
)Q3 I ^ °-J kZ
I2<fd3 oi iXXii ©II T hI2” D ® iia> I5
0 3/4” DCW DROP FOR HOSE STATION. SEE PROCESS PIPING DRAWINGS
FOR CONTINUATION.
0 LP GAS LINE FOR MAKE UP AIR UNIT. SEE MECHANICAL DETAILS FOR
CONTINUATION. SCHEMATIC LOCATION, ADJUST IN FIELD AS NECESSARY.
0 2” INDIRECT DRAIN LINE FROM FLOOR DRAIN DISCHARGES INTO PIPE
TRENCH.
0 8” DRAIN AND 6” VTR FOR BACKWASH TANK DRAIN. HORIZONTAL
PORTION OF VENT ROUTED WITHIN BACKWASH TANK. SEE CIVIL
DRAWINGS FOR CONTINUATION OF DRAIN LINE OUTSIDE OF BUILDING.
0 RUN DRAIN LINE FROM S-1 TO WITHIN 6” OF FLOOR DRAIN BELOW
“O I 1 rtiJ5 81=3 1=3CL I
E i—rO § - S-1Lin?J X \_1 /2 »CD 7% 10 DCWWl a
CL r iro DI
I <fd3^#3i |~le
\K 9 9 c DILD "TJ e+ —i —CM «o nCM
X UNIT.o o£
CO
s
0 6” HUB DRAIN FOR PROCESS PIPING FLUSH-OUT CONNECTED TO 4”
DRAIN LINE UNDER SLAB.
r_1-1/4 »CM cn DHWi ,—i ro T
I_i_SOC 4LJ---------- 7< cT7I ocr < ES-1Io o\
It IU4 1=3 TMV-1)Iro 0CM I <fd3 \ICM
.1-1/4” TEPID
WATER TO ES-1
■sI I 2” D I 11
< ET-1I 1-1/4”yO.CO Ii i5 DCW4” D□ 4” D \ ■s o7I GE< \ /O O- I oo ac><—
I L 3 \ /
<DWH-1)z / I< — o k ^_____, ^2 I 6” V------ 2V) ou>
£ 1-1/4”Q
ML
L Ofin CM oAo sCM oo
O
CM MECHANICAL PLUMBING PLAN 2
SCALE ® P
0 2 4CO
Q SCALE: (a)o 0“3
SCALE OF FEETC9• •
cxJ
FINAL CONSTRUCTION DOCUMENTSCM
Od
DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETCL
102WTPJKSo> 134,842• ♦
CM PLUMBING
PLANM-3JKS PMIS
SEKI 172423CM TECH. REVIEW:O
CM MVJ SHEET
in LODGEPOLE
SEQUOIA NATIONAL PARK
DATE:
4/23/2021 90 of1 14
M”
<PRV-5
PRESSURE GAGE
ISOLATION
VALVE,
TYPICAL
ELEXIBLE GAS
CONNECTOR
LOCKING PROTECTIVE
DOME FOR
VALVES/GAUGES
PRESSURE RELIEF VALVELIQUID
WITHDRAWL
VALVE
LIQUID LP VAPOR
OUTLETFILL
VALVE
1990-GALLON
ABOVE GROUND
LP TANK
UNION,
TYPICAL 3/4” LPG
FEED LINE TO
BUILDING
Ju 1-1/4
4«!•TRACER WIRE FOR
UNDERGROUND PE PIPE. o\ 6 1-1/4
NSF RATED EXPANSION TANK.
CHARGE TO COLD WATER
PRESSURE WITH DRAIN OPEN
TANK SUPPORTS
(PROVIDE WITH TANK)
IHO O'
<(PWET-1o> UNDERGROUND P.E.
ANODELESS RISER.
TRANSITIONS FROM
P.E. TO STEEL PIPE
ABOVE GROUND.
■o
CO
t] CONCRETE TANK PAD, SEE 3213/S1.4 h o
DIELECTRIC COUPLING (TYP.)<o
GROUNDING LUG
DE DE<
X o
>v; :-i- <-1 y c £
.3 B B B 0 rr*.
5 *##4/ PIPE FULL SIZE
DRAIN TO FLOOR DRAIN
4.
4 •";?
.*• V-'-' <^DWHGRADE 3 GRADEI QWI Li
LD 1CM Io sCM ' ! |! ! I | ! ; a. u I jp * l !, l±±±TTu I" re I • I fp
X o v ✓ *'> 0-1
VCO 3/4” UNDERGROUND
P.E. PIPE CONTINUES
TO BUILDING: RE
SHEET M—1
o o ro
CM
M"
CM
2_^DOMESTIC WATER HEATER DETAIL
SCALE: NONE
DETAIL NOTES:
1) CONTRACTOR TO SUPPLY LP TANK AND ASSOCIATED VALVE ASSEMBLIES. TANK AND VALVES TO BE INSTALLED IN ACCORDANCE WITH NEPA 58.
2) CONTRACTOR TO PROVIDE PRESSURE GAUGE DOWNSTREAM OF PRV IF SERVICE PRESSURE GAUGE IS NOT INCLUDED IN TANK VALVE ASSEMBLY.
3) SEE STRUCTURAL SHEETS FOR CONCRETE PAD AND TANK MOUNTING DETAILS.
M-4
CO
<o o
V)u> o
1 LP. TANK PIPING DETAILID
CM M-4 SCALE: NONEo
CM
O
CM
CO
_Q O
“3
FINAL CONSTRUCTION DOCUMENTSCM
Od
DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETCL
102WTPJKSo> 134,842• ♦
CM MECHANICAL
DETAILSM-4JKS PMIS
SEKI 172423CM TECH. REVIEW:O
CM MVJ SHEET
iO LODGEPOLE
SEQUOIA NATIONAL PARK
DATE:
4/23/2021 91 of1 14
<i>m o o o o o o
I I1 1 1 1 7
VJUUUUUUUUUUUUU L-/ V-/ V-/
1” LPGV INTO
BUILDING
T s\ • < V*V■// -
24” 0•/ ^PRV-6".< • zJ2< EF-148”x40”
EXHAUST LOUVER
RE ARCHITECTURAL
FOR DETAILS
48”x40"
INTAKE LOUVER
RE ARCHITECTURAL
FOR DETAILS
t *.
/ 0 •V
/ UNION, TYPICAL
/ 24” 0
/ \ HEAT TRACE
\/ 3/4”
ANODELESS
GAS RISER
/ ISOLATION VALVE34"x30» \34x30n y \ X"PX ftRAnF
ZJ c:
a> DETAIL NOTES:
ANODELESS GAS RISER TRANSITIONS FROM
STEEL PIPE ABOVE GROUND TO HDPE
UNDERGROUND GAS PIPING.
■o 1.
GO 1
3/4” DRAIN
ROUTED TO
NEAREST FLOOR
tio < DRAINo
1 BUILDING GAS ENTRY DETAIL<
X M-5 SCALE: NONEo
12" ROUND TO 16”x8” VERTICAL
EXHAUST DUCT TRANSITION
LO
KEY NOTESi 12”x12
EXHAUST GRD
(TYP. 5)
if
LD
(T) CONCENTRIC VENT FROM MAU-1. FOLLOW MANUFACTURER’S
RECOMMENDATIONS FOR INSTALLATION. FOLLOW THE IFGC FOR
TERMINATION TYPE AND MINIMUM HEIGHT ABOVE ROOF (~4 FT).
COORDINATE WITH ARCHITECT SUCH THAT VENT REMAINS PARALLEL OR
BELOW ROOF RIDGE.
CM
O
CM
Xo uCOo o ro
[ 1CM
CM
go Oo o
(0u>
Q in CMo
CM
O
CM
CO 2 0 2 4Q
SCALE (A)o “3
SCALE OF FEET• •
FINAL CONSTRUCTION DOCUMENTSCM
Od
A MECHANICAL HVAC PLAN DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETQ_
SCALE: (A) 102M-5 WTPJKSo> 134,842• ♦
CM MECHANICAL
DETAILS
DETAIL NOTES:
SECTION VIEW FOR CONCEPTUAL PURPOSES ONLY. M-5JKS PMIS
SEKI 172423CM TECH. REVIEW:O
CM MVJ SHEET
in LODGEPOLE
SEQUOIA NATIONAL PARK
DATE:
4/23/2021 92 of1 14
KEY NOTES
0 MICROPROCESSOR CONTROLLER, FACTORY MOUNTED AND WIRED TO
MAU-1. PROVIDE AND INSTALL JUMPER BETWEEN TERMINALS ”R” AND
”G” TO ALLOW UNIT TO OPERATE STAND ALONE IN OCCUPIED MODE.
BASIS OF DESIGN, COORDINATE WITH ACTUAL UNIT PROVIDED.)
0 DUCT MOUNTED DISCHARGE TEMPERATURE SENSORS PROVIDED WITH
MAU-1. FIELD MOUNT IN SUPPLY DUCT AND WIRE TO THE
MICROPROCESSOR CONTROLLER.
0 OUTSIDE AIR TEMPERATURE SENSOR PROVIDED WITH MAU-1. FIELD
MOUNT AND WIRE TO THE MICROPROCESSOR CONTROLLER.
<( MAU-1 )
0 REMOTE INTERFACE PROVIDED WITH MAU-1. FIELD MOUNT AND WIRE
BACK TO MICROPROCESSOR CONTROLLER.
<DSPACE TEMPERATURE SENSOR PROVIDED WITH MAU-1. FIELD MOUNT
AND WIRE BACK TO MICROPROCESSOR CONTROLLER.
o<c0 <DINTERLOCK EF-1 DIGITAL INPUT POWER (24VAC) WITH EXHAUST FAN
TERMINALS AT MICROPROCESSOR CONTROLLER. EXHAUST FAN EF-1
ENERGIZES WHEN MAU-1 IS ENERGIZED. WHEN MAU-1 IS
DE-ENERGIZED EF-1 SHALL ALSO DE-ENERGIZE.o
VFDo>
0"O PROVIDE AND INSTALL A DUAL POLE DUAL THROW (DPDT) SWITCH TO
ALLOW THE USER TO SELECT BETWEEN THE LOW (3 ACH) AND HIGH
(6 ACH) AIR CHANGE RATE AT THE LOCAL SWITCH. LOCATE THE USER
SELECTION SWITCH NEAR THE REMOTE INTERFACE.
EXHAUST
230V/1
POWER BY -
DIV 26
ROOM TOEF-1AIR< AIRo'
Oo Q llllllllllllll EXH PACKAGED CONTROLS
(MICROPROCESSOR)
mill 0 CONNECT ONE POLE OF THE SWITCH TO AN INPUT AT THE MAU
MICROPROCESSOR CONTROLLER TO ALLOW THE SWITCH TO COMMAND
THE MAU TO OPERATE AT EITHER THE HIGH (6 ACH) OR LOW (3
ACH) AIR CHANGE RATE AIRFLOW.
FAN
O oO
BAROMETRIC
(GRAVITY)
DAMPER
o X
0 PROVIDE AND INSTALL A CONTROL RELAY WITH FORM C STYLE
CONTACTS. CONNECT THE NORMALLY OPEN AND NORMALLY CLOSED
CONTACTS TO THE DI2 AND DI3 INPUTS AT THE VFD. CONNECT THE
COMMON TERMINAL TO THE RETURN POWER COMING FROM THE MAU
MICROPROCESSOR CONTROLLER EXHAUST FAN TERMINALS. ENSURE
THE SWITCH POSITION OF THE USER AIR CHANGE RATE SELECTION
SWITCH CORRESPONDS TO THE SAME VFD SPEED SELECTION AT THE
co
I 0 ©LO 0CM
^[VFD-o CM NO Cx Oo
VFD.
230V/1
POWER BY
DIV 26
/n) [24Vco COORDINATE WITH THE VFD STARTUP REPRESENTATIVE TO CONFIGURE
THE VFD TO OPERATE AT THE LOW AIR CHANGE RATE AND HIGH AIR
CHANGE RATE BASED ON WHICH DIGITAL INPUT DI2 OR DI3 IS
ACTIVE. IF NEITHER DIGITAL INPUT IS ACTIVE, THE VFD SHALL
DE-ENERGIZE THE FAN.
o
TX
0< 001o
DPDT REMOTE
INTERFACE0ro SWITCHCM 0 PROVIDE CONTROL POWER FOR THE COIL OF THE RELAY. THIS
POWER MAY BE FROM A STAND ALONG TRANSFORMER, THAT IS
PROVIDED AND INSTALLED FOR THIS PURPOSE OR CONTROL POWER
FOR THE RELAY MAY BE OBTAINED FROM EITHER THE VFD OR THE
CM
MAU.GO
ALL CONTROL DEVICES (CONTROLLERS, SENSORS, SWITCHES ETC.)
SHALL BE WASH DOWN COMPATIBLE AND BE SUITABLE FOR A HIGH
MOISTURE ENVIRONMENT.
<oo < Cl
\U-6J
EXHAUST FAN EF-1 AND MAU-1 CONTROL DIAGRAMV)
U> SCALE: NONE£
O
ID
CM
O
CM
O
CM
CO
_Q O
“3
FINAL CONSTRUCTION DOCUMENTSCM
O'
DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETCL
102WTPJRBo> 134,842• ♦
CM MECHANICAL
CONTROLS DIAGRAMM-6JKS PMIS
SEKI 172423CM TECH. REVIEW:O
CM MVJ SHEET
lO LODGEPOLE
SEQUOIA NATIONAL PARK
DATE:
4/23/2021 93 of1 14
MAKE-UP AIR AND HEATING & VENTILATING UNIT SCHEDULE
TAG PURPOSE TYPE SUPPLY FAN SECTION INDIRECT GAS HEAT SECTION FILTER ELECTRICAL PHYSICAL MANUFACTURER NOTES
TOTAL
CFM
TSP
IN. W.G.
ESP RPM MAX
BHP
MOTOR DIA TYPE VFD VFD
BYPASS
CFM MBH
INPUT
MBH
OUTPUT
EDB LDB TURNDOWN FUEL GAS
PRESS, (in.w.g.)
APD
IN. W.G.
AREA
SF (MIN)
MERV CLEAN
APD
DIRTY
APD
V PH MCA MOP WEIGHT AND MODEL
IN. W.G. LBSHP Y/N °F °F A
MAU-1 PACKAGED - MAU 2,300 1.71 1.5 2630 1.1 1.5 15 DIRECT Y NO 2,300 153 123 3 65.9 16:01 10 TO 14 0.09 4.4 8 0.08 0.16 230 1 12.9 20 1200 GREENHECK IGX 1-6MAKEUP AIR LP
GENERAL NOTES APPLIES TO ALL UNITS: UNIT SPECIFIC NOTES
A. PERFORMANCE IS AT SITE CONDITIONS
B. DIRTY FILTER APD SHALL BE INCLUDED IN INTERNAL STATIC PRESSURE
C. PROVIDE UNITS WITH HIGH-PRO POLY COATING FOR CHEMICAL AND CORROSION RESISTANCE
D. ALL FANS SHALL BE TEFC TYPE, PREMIUM EFFICIENCY MOTORS.
1. DESIGN CONDITIONS ARE AT 6,500 FT UNLESS NOTED OTHERWISE.
2. PROVIDE WITH NEMA 4 RATED FACTORY CONTROLLER AND WASH DOWN COMPATIBLE TEMPERATURE SENSORS.
3. PROVIDE WITH OPTIONAL CONTROL ACCESSORIES IN ADDITION TO STANDARD PROVIDED CONTROLS - HEATING INLET AIR SENSOR DIRTY FILTER SWITCH, FURNACE CONTROLS, FREEZE PROTECTION, AUXILIARY EXHAUST STARTER CONTACTS.
4. PROVIDE UNIT WITH BASE RAIL.
5. PROVIDE WITH A SEISMIC CERTIFICATE OF COMPLIANCE AS EQUIPMENT IS CONSIDERED AN IMPORTANCE FACTOR OF 1.5. REFER TO SPECS FOR MORE INFO.
6. PROVIDE WITH SEPARATED COMBUSTION CONCENTRIC VENTING AND CONCENTRIC VENTING ADAPTOR (CVA-6).
FAN SCHEDULE
ELECTRICAL WEIGHTFANTAG SERVICE CFM ESP MOTOR CONTROLLER MANUFACTURER & MODEL NOTESTYPE DRIVERPM LBS GRILLE/REGISTER/DIFFUSER SCHEDULEHP V PH
EF-1 BUILDING EXHUAST TUBULAR CENTRIFUGAL2,300 1.50 1,610 BELT VFD NO BYPASS 1 1/2 230 3 256 GREENHECK TCB-1-16-151-4
TAG PURPOSE TYPE MOUNTING PATTERN NC ACCESSORIESMANUFACTURER
& MODEL
NOTESGENERAL NOTES: NOTES:
MAXPERFORMANCE IS AT SITE CONDITIONS
FANS MAY CONTAIN RESERVE CAPACITY, BALANCE TO PLAN CFM.
EQUIPMENT WITH 208V NAMEPLATES SHALL HAVE MOTORS SUITABLE FOR
OPERATION AT 180 VOLTS OR PROVIDED WITH 200V TO 208V TRANSFORMERS
PROVIDE FAN WITH HIGH-PRO POLY COATING FOR CHEMICAL AND CORROSION RESISTANCE
MOTORS SHALL BE TEFC TYPE WITH PREMIUM EFFICENCY RATING.
VFD AND DISCONNECT SHALL BE NEMA 4 RATED.
1. INTERLOCK EF-1 WITH MAU-1 SUCH THAT IF THE MAU WERE TO SHUT
DOWN, THE EF WOULD ALSO. REFER TO CONTROLS DIAGRAMS ON SHEET M-6.
2. PROVIDE WITH A SEISMIC CERTIFICATE OF COMPLIANCE AS EQUIPMENT
IS CONSIDERED AN IMPORTANCE FACTOR OF 1.5. REFER TO SPECS FOR MORE INFO.
3. TAB CONTRACTOR TO BALANCE FAN TO BE SLIGHTLY LESS AIRFLOWTHAN MAU-1
TO ALLOW BUILDING TO HAVE A POSITIVE PRESSURE OF APPROX. 0.03" W.C. (ADJ.)
4. VFD SHALL BE ABB ACH580 OR APPROVED EQUIVALENT. VFD SHALL BE CAPABLE OF
PROVIDING A MINIMUM OF 12 AMP INPUT FOR A SINGLE TO 3 PHASE CONVERSION
PRODUCING A MINIMUM OF 6 AMP OUTPUT.
A.
B. SUPPLY DRUM LOUVER SURFACE LOUVERED 35 PRICE HCDA
C. B EXHAUT GRILLE SURFACE LOUVERED 35 PRICE 530
GENERAL NOTES: NOTES:
D. A. ASSUMES 10dB ROOM ABSORPTION E.
F.
o>
-O cn
DOMESTIC WATER HEATER SCHEDULEX PLUMBING FIXTURE SCHEDULEo
CO
TAG DESCRIPTION ELECTRICAL NOTESSYM. DESCRIPTION CONNECTION SIZES* ELECT.
REQ'D
<o POWER AMPS V PHCW V H
DOMESTIC WATER HEATER, ELECTRIC, STATE MODEL CSB 120, 119 GALLON STORAGE, 98
GALLON PER HOUR RECOVERY AT 100°F TEMPERATURE RISE.
< ES-1 EMERGENCY SHOWER AND EYE/FACE WASH, HAWS MODEL 8309, 10-5/8" ABS PLASTIC SHOWERHEAD, STAINLESS STEEL EYEWASH RECEPTOR WITH
TWIN ABS PLASTIC EYE/FACE WASH HEADS. PULL ROD SHOWER ACTIVATION, PUSH FLAG OR FOOT TREADLE EYE/FACE WASH ACTIVATION, 1-1/4"
SCHEDULE 40 HOT-DIPPED GALVANIZED STEEL SUPPLY AND WASTE, ANSI Z358.1 COMPLIANT.
1-1/4" 1-1/4" 1-1/4" 100DWH-1 24 Kw 240 1 1Xo
DOMESTIC EXPANSION TANK, AMTROL EXTROL ST-30VC, 14 GALLON TANK VOLUME. 9 GALLON
MAXIMUM ACCEPTANCE VOLUME, 140°F MIN. DESIGN TEMP.ET-1
NOTES:
FD-1 FLOOR DRAIN (FINISHED AREAS) - JOSAM 30000-A, COATED CAST IRON FLOOR DRAIN, TWO PIECE BODY, DOUBLE DRAINAGE FLANGE, BOTTOM NO
HUB OUTLET CONNECTION, 1/2" TRAP PRIMER TAP IF REQUIRED, ADJUSTABLE SATIN BRONZE STRAINER, VANDAL PROOF SCREWS.
2I 1. SET WATER HEATER OUTLET TEMP TO MOT.
if)
CM
O CNI S-1 WALL-HUNG SINK, ELKAY MODEL CHSB1716, SINGLE COMPARTMENT, 20 GAUGE TYPE 304 STAINLESS STEEL, 16-3/4" x 15-1/2" O.D. 6" DEEP BOWL, STAINLESS STEEL GRID STRAINER. CHROME PLATED FLEXIBLE ANGLE SUPPLIES WITH KEYED STOPS. FAUCET, ELKAY MODEL LKB400, 4" CENTERS, BACKSPLASH MOUNTED FITTING, CAST SWING SPOUT, AERATOR, LEVER HANDLES, REMOVABLE CARTRIDGES. PROVIDE WITH WATTS LFUSG-B
THERMOSTATIC MIXING VALVE.
1-1/2" 1/2" 1/2" xo in TMV-1 THERMOSTATIC MIXING VALVE, SAFETY SHOWERS, HAWS 9201E, 31 GPM, REDUNDANT THERMOSTATIC ELEMENTS, FAIL SAFE TO COLD WATER
BYPASS ON ELEMENT FAILURE OR LOSS OF COLD WATER, SET POINT: 80°F.
1-1/4" 1-1/4"o
<cr o ro
CM
CM
PIPING SCHEDULE
if)
SYSTEM PIPE SIZES PIPING MATERIAL JOINING METHOD INSULATION□
< LPGV, EXTERIOR UNDERGROUND 3/4- HIGH DENSITY POLYETHELYENE FUSION BONDED NOOo
LPGV - EXPOSED 3/4", 1" ASTM A-53 GRADE B BLACK STEEL NOTHREADED
V) GENERAL NOTES:u>
£o HDPE PIPING SHALL NOT BE INSTALLED CLOSER THAN 18 INCHES BELOW GRADE.
TRACER WIRE TO BE INSTALLED ON ALL UNDERGROUND PROPANE PIPING.
A.
B.
in
CM
o
CM
O
CM
CO
PROPANE PRESSURE REDUCING VALVE SCHEDULE.a o
“3
ITEM LOCATION SERVICE PRESSURE MANUFACTURER
AND MODEL
NOTES• • CONNECTION
CAPACITY SIZEOUTLETMAX. INLET FINAL CONSTRUCTION DOCUMENTSCM
Od
1ST STAGE, PROPANE TANK TO BUILDING 250 PSIG 10PSIG 200,000 BTU/H 3/4" FNPT EMERSON / FISHER, R222H-DGJ 1,2PRV-5 LP TANK DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETPRV-6 BUILDING ENTRY 2ND STAGE, AT BUILDING 10 PSIG 11" WC 200,000 BTU/H 3/4" FNPT EMERSON/FISHER, R642-DFF 1,2Q_
102WTPJKSo> 134,842• ♦
NOTES:CM MECHANICAL
SCHEDULESM-7JKS PMIS
SEKI 172423
1. INSTALL PRESSURE REDUCING VALVES IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS AND NFPA 58.
PRVs INSTALLED OUTSIDE MUST BE PROTECTED FROM SNOW/ICE ACCUMULATION.
CM TECH. REVIEW:O 2.CM MVJ SHEET
in LODGEPOLE
SEQUOIA NATIONAL PARK
DATE:
4/23/2021 94 of1 14
INSTRUMENTATION DRAWINGS LIST GENERAL NOTES (APPLY TO ALL SHEETS)
SEISMIC INSTALLATION: PROVIDE VIBRATION ISOLATORS, SEISMIC RESTRAINTS, AND OTHER
HARDWARE NECESSARY FOR INSTRUMENTS, HANGER ASSEMBLIES AND FOR SECURING
COMPONENTS, ENCLOSURES AND CONDUITS. PROVIDE STRUCTURAL SUPPORT, DESIGNED FOR
THE SEISMIC REQUIREMENTS FOR THE SITE, BY A PROFESSIONAL SEISMIC ENGINEER
LICENSED IN THE STATE OF CALIFORNIA.
-1 WTP INSTRUMENTATION
INSTRUMENTATION
INSTRUMENTATION NETWORK DIAGRAM
INSTRUMENTATION SITE PLAN
INSTRUMENTATION EXISTING WTP-PLAN
INSTRUMENTATION PLAN
CONDUIT SCHEDULE
INSTRUMENTATION SECTION
INSTRUMENTATION SECTION
INSTRUMENTATION SECTION
INSTRUMENTATION SECTION
INSTRUMENTATION DETAILS
LEGEND
LEGEND-2 WTP
— 3 WTP
-4 WTP
-5 WTP
-6 WTP
-7 WTP
-8 WTP
-9 WTP
-10 WTP
-11 WTP
-12 WTP
GENERAL ELECTRICAL NOTES AND SPECIFICATIONS
CONSTRUCTION SHALL BE REPAIRED AT NO ADDITIONAL COST TO THE OWNER.
OPENINGS IN WALLS OR ENCLOSURES LEFT AS A RESULT OF ’’REMOVAL”
WORK SHALL BE PATCHED, PLUGGED OR PROVIDED WITH A BLANKING PLATE.
ROOF PENETRATIONS SHALL BE REPAIRED AND RE-SEALED IN ACCORDANCE
WITH THE ROOF MEMBRANE MANUFACTURERS INSTRUCTIONS.
1. ELECTRICAL WORK UNDER THIS CONTRACT IS SHOWN ON THE ACCOMPANYING
DRAWINGS.
2. PROVIDE ALL LABOR AND ALL MATERIALS REQUIRED TO COMPLETE THE
PROJECT.
10. ALL ELECTRICAL CONTROL DEVICES SHALL BE FURNISHED WITH FUSES AND
OVERLOAD DEVICES SO THAT IT IS IN A ’’READY FOR START-UP” CONDITION.3. ELECTRICAL AND INSTRUMENTATION COMPONENTS, MATERIALS AND
INSTALLATION SHALL BE SELECTED AND INSTALLED ACCORDING THE
REQUIREMENTS OF THE DIVISION 26 SPECIFICATIONS. NOTHING IN THESE
DOCUMENTS ALLOWS MATERIALS AND INSTALLATIONS THAT ARE CONTRARY TO
THE REQUIREMENTS OF THE DIVISION 26 SPECIFICATIONS.
11. GROUNDING BUSHINGS SHALL BE INSTALLED AT ALL CONDUIT TERMINATIONS
EXCEPT WHERE TERMINATED AT ENCLOSURES PROVIDED WITH A GROUND BUS
OR GROUND LUG. GROUND LUGS SHALL BE PROVIDED IN RACEWAY JUNCTION
BOXES AND PULL BOXES.
4. RACEWAYS SHALL BE PVC COATED GRC, NO SUBSTITUTES WILL BE
ACCEPTED. 12. GROUND WIRE TERMINATIONS TO BOXES AND PANELS SHALL HAVE TWO STAR
WASHERS AND BE TIGHTLY SECURED. ALL GROUNDING SURFACES SHALL HAVE
PAINT OR FINISH REMOVED DOWN TO BARE METAL.5. SPLICING OF CONDUCTORS IS NOT ALLOWED. ALL TERMINATIONS SHALL BE
MADE AT TERMINAL STRIPS EXCEPT THAT FULLY INSULATED TOOL CRIMPED
BUTT SPLICES SHALL BE UTILIZED WITH COMPONENTS EQUIPPED WITH
PIGTAILS.
13. WHERE CONDUCTORS TERMINATE AT CONNECTORS UNSUITABLE FOR STRANDED
WIRE, RING OR FLANGED SPADE TERMINALS SHALL BE USED WHERE
POSSIBLE. ALL TERMINALS SHALL BE SELF INSULATING TYPE.
o>
"O 6. UNIONS OR OTHER MEANS SHALL BE UTILIZED IN CONDUIT ADJACENT TO
SOLENOIDS, INSTRUMENTS, LIMIT SWITCHES, ETC., TO FACILITATE REMOVAL
FOR MAINTENANCE.
o o
7. PROVIDE AND INSTALL ALL NECESSARY UNISTRUT BRACKETS, STAND-OFFS,
SUPPORT STRUCTURES, ETC., SO AS TO SECURELY SUPPORT PANELS, LIMIT
SWITCHES, PRESSURE SWITCHES, DISCONNECTS, CONDUIT RUNS, ETC.
O
8. THE DRAWINGS SHOW INTENDED CONDUIT AND CABLE TRAY ARRANGEMENT.
THEY ARE NOT INTENDED TO SHOW EXACT LOCATIONS. THE CONTRACTOR
SHALL CAREFULLY INSPECT THE EQUIPMENT AND SUPPORT STRUCTURES AND
CAREFULLY LAYOUT THEIR WORK IN COORDINATION WITH OTHER TRADES SO
THAT IT PRESENTS A NEAT AND WORKMAN-LIKE FINISHED APPEARANCE, AND
PRESENTS MINIMUM INTERFERENCE TO MAINTENANCE AND REPAIR. ANY
INSTALLED RACEWAYS NOT MEETING THE OWNERS APPROVAL SHALL BE
REPLACED AT CONTRACTORS EXPENSE.
oc
I
LO
CM
O
CM 9. DAMAGE TO BUILDING WALLS OR STRUCTURES OCCURRING AS A RESULT OF
(/)o
<cro ro
CM
CM
GO
<oo o
(0u> £o in CMo
CM
O
CM
CO
_Q O
“3
FINAL CONSTRUCTION DOCUMENTSCM
Od
DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETCL
102WTPAJS00
134,842• ♦
CM INSTRUMENTATION
LEGEND1AJS PMIS
SEKI 172423CM TECH. REVIEW:O
CM MDB SHEETin LODGEPOLE
SEQUOIA NATIONAL PARK
DATE:
4/23/2021 103 of1 14
BASIC
PROCESS
CONTROL
PLC
FUNCTION
COMPUTER
SYSTEM AND
SOFTWARE
SCADA
FUNCTION
FIELD
INSTRUMENT
OR DEVICE
INSTRUMENTATION AND CONTROL LEGEND ABBR. DESCRIPTION ABBR. DESCRIPTION
SYMBOL DESCRIPTIONSYMBOI DESCRIPTION
-ABBREVIATIONS-ELECTRICAL SCHEMATICS LEGEND -GRAPHIC SYMBOLS-
© KEY NOTE AE ANALYZER ELEMENT
ABOVE FINISHED FLOOR
ACCESS PANEL
ANALYSIS TRANSMITTER (pH, CONDUCTIVITY, 02)
AMERICAN WIRE GAUGE
BLOWER
BELOW FINISHED FLOOR
BALANCING VALVE
CONDUIT WITH AC POWER
CONDUIT DC SIGNAL
CENTERLINE
CONTRACTING OFFICER REPRESENTATIVE
CONTROL PANEL
DIFFERENTIAL PRESSURE
ELECTRICAL EQUIPMENT DISCONNECT
EXISTING
ELECTRIC METALLIC TUBING
ELECTRIC VALVE
FILTRATE
FAIL CLOSED
FLOW CONTROL VALVE
FLOW ELEMENT
FLOW INDICATOR
FLOW INDICATION TRANSMITTER, SIGNAL
FLUME
THE PHYSICAL FLOW METER
FAIL OPEN
FILTER RECEIVER
FLOAT SWITCH HIGH, NOT AN ISA TAG
FLOAT SWITCH LOW, NOT AN ISA TAG
FLOW TRANSMITTER
FLEX CONNECTION
GALVANIZED RIGID CONDUIT
HAND VALVE
INSIDE DIAMETER
CURRENT TRANSFORMER
JUNCTION BOX
LEVEL ELEMENT
LEVEL INDICATION TRANSMITTER
LEVEL SWITCH HIGH
LEVEL SWITCH LOW
LEVEL TRANSMITTER
MAGNETIC
MIXER
NORMALLY CLOSED
NORMALLY OPEN
NOT IN CONTRACT
NOT TO SCALECD A.F.FFEEDER NOTE
AP (N) NEW
❖ EQUIPMENT NOTE
AT ORP DISSOLVED OXYGEN WATER
FIBER OPTIC CABLE MECHANICAL EQUIPMENT NOTE AWG P PUMPo O- ETHERNET CABLE
B PB PULLBOX
PRESSURE CONTROL VALVE
DIFFERENTIAL PRESSURE SWITCH HIGH
PRESSURE INDICATOR TRANSMITTER
PANEL
PRESSURE SAFETY ELEMENT
PRESSURE SWITCH HIGH
PRESSURE SWITHC LOW
PRESSURE SAFETY VALVE
PRESSURE TRANSMITTER
PROCESS WASTE WATER
PROCESS WASTE WATER VENT
RECEPTACLE
REFERENCE
REMOTE INPUT/OUTPUT
RESISTANCE TEMPERATURE DETECTOR
CONDUIT WITH NET PORT
SUPERVISORY CONTROL & DATA ACQUISITION
TERMINAL BLOCK
TEMPERATURE ELEMENT
THERMOPLASTIC HEAT/WATER RESISTANT
TEMPERATURE SWITCH HIGH
TEMPERATURE SWITCH LOW
TEMPERATURE TRANSMITTER
TYPICAL
TWISTED SHIELDED PAIR
UNINTERRUPTIBLE POWER SUPPLY
ULTRASONIC
VARIABLE FREQUENCY DRIVE
VARIABLE SPEED DRIVE
VIBRATION TRANSMITTER
WATER TREATMENT PLANT
WASTE WATER TREATMENT PLANT
START SIGNAL
CONTROL VALVE WITH SOLENOID
LIMIT SWITCH OPEN
LIMIT SWITCH CLOSED
HATCHING INDICATES ITEM(S) TO BE REMOVED
INSTRUMENT AND CONTROL CABLE 33 B.E.F. PCVNORTH ARROW
LEASED PHONE LINES BV PDSH
CA PIDETAIL BUBBLE1SMART MOTOR CONTROL CENTER (MCC)
CD PNL141 DETAIL NUMBER
SHEET NUMBER - WHERE DETAIL IS SHOWN CL PSE0 SCADA SERVER CONNECTION TO PROCESS
CONTROL AND PARK NETWORKS ELECTRICAL RACEWAYS
-----[I- CABLE TRAY
COR PSH
CP PSLSCADA TERMINAL AND PARK DESKTOP
DP PSV
CONDUIT EMT OR GRC
DSC PTINSTRUMENT AND CONTROL CABLE□ © (E) PWWKEY NOTE SYMBOL
PROGRAMMABLE LOGIC CONTROLLER PWWVEMT(PLC)
RCPTEV
ETHERNET SWITCH FOR FIBER AND CAT
ETHERNET NETWORK
DIRECTIONAL ANNTENNA
REF
RIOECHi'
ECV RTD
FE SOMNI-DIRECTIONAL ANTENNA ELECTRICAL SCHEMATICS LEGENDQ El SCADA o /o /o
FIT TBDISCONNECT SWITCH (3PH)
FLM TE
°V^ CIRCUIT BREAKER (3PH)
O' O' O'
FM THWN
FOo> TSH£ PRESSURE SWITCH
FLOW SWITCH
g PRESSURE DIFFERENTIAL SWITCH
@ FLOW TRANSMITTER
@ PRESSURE TRANSMITTER
LEVEL SWITCH
@ LEVEL TRANSMITTER
@ PRESSURE DIFFERENTIAL TRANSMITTER
(0) MOTOR
PRESSURE SWITCH
0 TEMPERATURE SWITCH OR METER
0 DENSITY METER
0 MAGNETIC FLOW METER
CZ> CONDUIT CALL-OUT
© CEILING MOUNTED JUNCTION BOX
WALL MOUNTED JUNCTION BOX
© SPEED CONTROL
FLOW CONTROL
PS
"O FR TSLCIRCUIT BREAKER (1PH)o oo
FSH TTDISCONNECT SWITCH (1PH)O FSL TYP
OVERLOAD PROTECTION FT TWSHD
FXo UPSPUSH-TO-TEST PILOT LIGHT
(COLOR R=RED, G=GREEN, A=AMBER)
FUSE
LS GRC< USo HV VFDn I.D. VSDPILOT LIGHT a: IT VTCONTACT (NORMALLY OPEN)(/)
JB WTP
7^ CONTACT (NORMALLY CLOSED) LE WWTPCM
rTi i LIT XSRTRANSFORMER
LO LSH XVCM
O SOLENOID LSLCM ZSH
LTOFF ZSL(/> JAND AUTOq> MAG£ HAND-OFF-AUTO SWITH(/) MXo °X00o
NCSTOP PUSHBUTTONo I o NO< 1cr SPEED SENSING ELEMENT START PUSHBUTTONO o o
SPEED TRANSMITTER
TB TERMINAL BOX
PULL BOX □ PUSHBUTTON
[hJ] POSITION SWITCH - LINEAR DISPLACEMENT HORN
0 TRANSFORMER
o CONDUIT DOWN
Lro
GROUNDCM
CM
TEMPERATURE SWITCH (NORMALLY CLOSED)
TEMPERATURE SWITCH (NORMALLY OPEN)
GO
LIMIT SWITCH (NORMALLY OPEN)□ LOCATED IN THE FIELD
NOT PANEL, CABINET, OR
CONSOLE MOUNTED.
VISIBLE AT FIELD LOCATION.
NORMALLY OPERATOR
ACCESSIBLE.
O LIMIT SWITCH (NORMALLY CLOSED)O=0CT TAG ID
TAG NO.
' TAG ID N
TAG NO,
TAG ID
TAG NO
o
CONDUIT UPOo LIMIT SWITCH (NORMALLY OPEN - HELD CLOSED)< O^jCL
SEAL—OFF
(0
0^0u> LIMIT SWITCH (NORMALLY CLOSED - HELD OPEN)£ O
LOCATED FRONT MAIN PANEL
VISIBLE ON FRONT OF PANEL
OPERATOR ACCESSIBLE
FLOAT SWITCH (NORMALLY OPEN) TAG ID TAG ID TAG ID
CONDUITID TAG NO. TAG NO, TAG NOFLOAT SWITCH (NORMALLY CLOSED)TTCM CABLEO
CM INTRINSICALLY SAFE CIRCUITIS
PRESSURE SWITCH (NORMALLY OPEN) LOCATED AT REAR OF MAIN PANEL
NOT OPERATOR ACCESSIBLE
O CM CONTROL CIRCUITc
CO TAGJD
TAG© NO
TAGJD
TAG© NO
' TAG ID N
TAG_ NO
JO PRESSURE SWITCH (NORMALLY CLOSED)*7?POWER CIRCUITPO
“3
13 TERMINALS FOR FIELD WIRING
FIT11 (2 PR 16 AWG TWSHD)
FLOW SWITCH (NORMALLY OPEN)
LOCATED ON FRONT OF
SECONDARY PANEL
VISIBLE ON FRONT OF PANEL
OPERATOR ACCESSIBLE
FINAL CONSTRUCTION DOCUMENTSCM
O' FLOW SWITCH (NORMALLY CLOSED)°T\ lCABLE TYPE
LCABLE TAG
TSH11 [100,102(2 x 14 AWG BLU TWHN)]
TAG ID TAG ID TAG ID DESIGNED: DRAWING NO.0 SUB SHEET NO. TITLE OF SHEETQ_ TAG NO.TIMING RELAY .TAG NO, TAG NO 102WTPAJSoo (con) 134,842• ♦
CONTACTORCM LOCATED AT REAR OF
SECONDARY PANEL
NOT OPERATOR ACCESSIBLE
INSTRUMENTATION
LEGEND2AJS PMIS
SEKI 1724230/ / 1— WIRE SIZE
/ ^NUMBER OF WIRES
^-WIRE NUMBERS
DEVICE TAG
CM TAG ID ' TAG_ID N
TAG- NO
TAG_ ID.
TAG- NO
CONTROL RELAY TECH. REVIEW:O
CM MDBTAG NO.© SHEET
lO MOTOR LODGEPOLE
SEQUOIA NATIONAL PARK
4/23/2021 104 of1 14
ANTENNA
O
ANTENNA(N) ETHERNET
RS-232 RS-232RADIO
408.075J J-I 111 RADIO
408.075 MHz
> 0MHzml PLANT
CONTROL ■
(E) ETHERNET SWITCHOMNI ANTENNA
PLANT
CONTROL -rro □ □ □ □
1 z Il234gd I I 11234561 I I
(N) ETHERNETHd o H ©□□□□□□□□□□□□□□□□
□□□□□□□□SCADA SCADA
RS-232 RS-232
WONDERWARE
CENTRAL COMPUTER
SYSTEM
WONDERWARE
CENTRAL COMPUTER
SYSTEM
□□□□□□□□* = V —
■>> <PHOTOVOLTAIC MODULES
3 - 50W PANELS
>(y
RTU-3
(T-37815)
RTU-6
(T-37815) (T-37815)(T-8431X1) r 7RTU CABINET
2 3CLOVER CREEK WATER TREATMENT PUVNT WOLVERTON WATER TREATMENT PUVNT
l—3 l—312VDC POWER SCALE: NONE SCALE: NONEssRADIO
408.075 MHz CHARGE
REG.
k 1 i i ll234S6l I I WUKSACHI RESERVOIRS - RTU-5 0□□□□□□□□ i 312/28V
DC-DC
CONVERTER
i CLOVER CREEK
PIU-3BATTERY CABINET (NEMA-3R VENTED) I
(T-37815)
CD
£ LODGEPOLE FILTER
(NEW)
36*36,23.5"N 118,43’42.4”Wr TWUKSACHI DOSING
STATION - RTU-10
(EXISTING)
□□□□□□□□XJ ,2^500.00-1
ar =
0 --------—FT.»
< 3ANTENNA OMNIANTENNA ______ *---------RTU-5 L2000O
-------------------------■« —L J ANTENNA / \
X/cr Co RADIO 408.075
RADIO
408.075
RADIO
408.075
/ s \ LODGEPOLE
LIFT STATION - RTU-7
Qn\ 36'36’16.0”N 118'44’02.7”W
YN
4—20mA t /MHz MHzMHz4—20mA
/RED EIR SPRAY/LEACH
FIELD - RTU-1
it it i i /O /
/w
/ WOLVERTON
TREATMENT PLANT -
36'36’21.4”N 118'45’01.4”W
11234561 I I 11234561 I I 11234561 I I / ^ fU, RTU-6
□□□□□□□□ METERED FLOW □□□□□□□□ / e>C£
| * FIBER OPTIC
3 CONVERTER
o/ o'CO LEVEL DATA /AP□□□□ □□□□□□□□ w = w = •r =RTU-1
(T-37815)
RTU-4
(T-37815)
RTU-7
(T-37815)
/175000 GALLON 175000 GALLONro /
LEVEL
TRANSMITTER
72-501
LEVEL
TRANSMITTER
72-501 aI /
/fLO
/LEACH FIELD/
SPRAY FIELD
CM ao /CM
/1 GIANT FOREST RESERVOIRSWUKSACHI VILLAGE RESERVOIRS /at/> (PINEWOOD) LODGEPOLE LIFT STATIONRED EIR SPRAY FIELD /l—3 SCALE: NONE /
if) Ia p
/a /<cr /o SHEET NOTES aro FD -------- FH0 ANTENNACM ANTENNA (PINEWOOD) GIANT FOREST
RESERVOIR - RTU-4 (E)
1. CLOUDED AREAS DEFINE EQUIPMENT THAT WILL BE MODIFIED IN THE SCOPE OF
THIS PROJECT. LIGHT COLORED ITEMS ARE EXISTING, BOLD BLACK ITEMS
ARE IN THE SCOPE OF WORK.
PINEWOOD WELL HOUSE
- RTU-9 (NEW)
CM a
RADIO
408.075
RADIO
408.075
FIBER OPTIC
CONVERTER
a 0lif) FD -------- FD --------- FD MHz o KEY NOTES Ti t i t 4 COMMUNICATIONS LAYOUT<oo l—3 SCALE: NONE00 CLOVER CREEK CENTRAL NO CHANGE TO EXISTING.<
'' nnV) 0 □ □WOLVERTON CENTRAL NO CHANGE TO EXISTING.u> a□□□□□□□□□□□□□□□□
$ □□□□ _n □□□□ j
□□□□ LL □□□□
□□□Q □□□■□□□□ NEW FILTER0 BID OPTION 1 SCADA UPGRADE INCLUDES AN UPGRADE EXISTING CLOVER CREEK WWTP
SCADA SERVER, INSTALLATION OF RADIO TRANSCEIVER AND ANTENNA ON LODGEPOLE
WTP. THE SCADA SERVER UPGRADES SHALL PROVIDE THE REMOTE ACCESS INCLUDING
NEW GRAPHICAL DISPLAYS PROVIDING SYSTEM STATUS, REMOTE ALARMING, AND
RECORDING OF PROCESS VALUES. SERVER SHALL POLL DATA FROM THE DATA LOGGER
INSTALLED IN THE LODGEPOLE PLC CABINET. SHALL PROVIDE REQUIRED MATERIALS,
PROGRAMING, AND COMMISION REQUIRED TO PERFORM THE INSTALLATION. INSTALL
SHALL BE COORDINATED WITH THE NATIONAL PARK SERVICE.
PLC□□□□□□□□
QQQQRTU-10in RTU-9 RTU-11CMo
CM
WUKSACHI - CHLORINE EXISTING LODGEPOLE WTPLODGEPOLE WTP (NEW)PINEWOOD WELL HOUSEo
DOSING STATIONCM
to O
“3
5 COMMUNICATIONS LAYOUT• •
0 A RADIO SURVEY MEASURED A STRONG RADIO PATH BETWEEN CLOVER CREEK WWTP
AND THE PROPOSED SITE OF THE NEW LODGEPOLE WTP. THE TEST WAS PERFORMED
WITH AN YAGI LAIRD Y4063 3 ELEMENT MOUNTED AT A HEIGHT OF 20 FEET ABOVE
GROUND. SURVEY MEASURED AN RSI OF -70/-72 AND AN SNR OF 27. SEE KEY
NOTES 3 AND 5 FOR INSTALLATION REQUIREMENTS.
(E\ PROVIDE GE MDS MDS4B TRANSCEIVER OPERATING IN 408.075 MHz., YAGI ANTENNA w LAIRD Y4063 WITH 3 ELEMENTS, AND POLYPHASER IS-50NX-C2-MA LIGHTING
ARRESTER.
I-3 SCALE: NONE FINAL CONSTRUCTION DOCUMENTSCM
Od
CORDINATE THE INSTALLATION OF ETHERNET NETWORK WITH TESCO, THE EQUIPMENT
W MANUFACTURE, AND THE NPS. IF THE SYSTEM REQUIRED SUPPORT OF TCP/IP OVER
ETHERNET PROVIDE AND INSTALL A UNMANAGED NETWORK SWITCH IN THE IN THE SAME
CABINET AS THE RADIO TRANCEIVE IS INSTALLED. PROVIDE AND INSTALL A CAT5e
CABLE BETWEEN THE RADIO TRANSEIVER AND THE CLOVER CREEK SCADA SERVER.
DRAWINGS OF THIS INSTALLATION ARE NOT PROVIDED, FIELD VERIFY THIS INSTALLATION
IF REQUIRED.
DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETQ_
102WTPAJSoo 134,842• ♦
CM INSTRUMENTATION
NEWTWORK DIAGRAM3AJS PMIS
SEKI 172423CM TECH. REVIEW:O
CM MDB SHEET
in LODGEPOLE
SEQUOIA NATIONAL PARK
DATE:
4/23/2021 105 of1 14
6” WIDE YELLOW PLASTIC
MARKER TAPES "DANGER
ELECTRIC UTILITY”
RESTORE TO ORIGINAL
CONDITION, LANDSCAPE,
BLACKTOP OR CONCRETE
FINISH GRADE, LANDSCAPE, NATURAL SOIL,
BLACKTOP OR CONCRETE PAVEMENT AS FIELD
VERIFIED GENERAL NOTES:
1. DRAWING SHOWS APPROXIMATE LOCATION AND
SIZE OF ALL EQUIPMENT. FIELD VERIFY ALL
EQUIPMENT LOCATIONS.
COMPACTED ORIGINAL SOIL
BACKFILLk
2”*--- ~ .3
WIDTH AS REQUIRED FOR ONE CONDUIT DUCT. 2. CONFIRM EXACT MOUNTING LOCATION OF
PROCESS EQUIPMENT WITH THE WWTP
INSTALLER PRIOR TO ROUGH-IN.
-if-Hr 3. REFER TO THE CABLE AND CONDUIT TABLE ON
SHEET I5 FOR ADDITIONAL INFORMATION.PVC CONDUIT WITH
MULTI-CONDUCTOR
CABLE AND PULL
STRING
■if* ^ ■if
4. DRAWINGS ARE DIAGRAMMATIC AND ARE
PROVIDED TO SHOW INSTRUMENT LAYOUTS,
PROVIDE A PROOF OF CONTRACTIBILITY.
CONTRACTOR IS RESPONSIBLE FOR INSTALL
EQUIPMENT PER MANUFACTURE REQUIREMENTS.
6 6if
23-01
2 SINGLE DUCT DETAIL 5. CONTRACTOR SHALL REPORT ANY DISCREPANCY
BETWEEN THE EXISTING INSTALLATION AND
CONTRACT DOCUMENTS TO THE NPS PROJECT
MANGER.
I-4 SCALE: NONE
O 213 )
KEY NOTES:
4 33’-3
(7) INSTALL CABLE 213 FROM THE PLC IN THE NEW
WTP TO EXISTING WTP. CABLE WILL EXTEND THE
ANALOG SIGNAL FROM THE LEVEL TRANSMITTER
INSTALLED IN THE LODGPOLE WATER STORAGE
TANK TO THE NEW WTP. RACEWAY BETWEEN THE
TWO BUILDING SHALL BE INSTALLED WITHIN THE
SAME TRENCH USED FOR THE WATER PIPELINE
REFER TO CIVIL DRAWINGS FOR TRENCH DETAILS.
32-03
02—01CD
|i H
■3 oo
B 2 rO
B
02-01 27—01 a £ 32-0105 i m02-01
& 01-03 f 02-01
Cm i 01-07
23-0101-06
1Io S' 01 -04 je<
PT
16 8 0 16 32
SCALE ©
SCALE OF FEET
i FINAL CONSTRUCTION DOCUMENTS
DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETQ.
102WTPAJSto 1 INSTRUMENTATION SITE PLAN 134,842t t
CM
SCALE: (7) INSTRUMENTATION
SITE PLAN
I-4 4AJS PMIS
SEKI 172423CM TECH. REVIEW:O
CM MDB SHEETin LODGEPOLE
SEQUOIA NATIONAL PARK
4/23/2021 106 of1 14
(N)d 0^T'
GENERAL NOTES:
1. DRAWING SHOWS APPROXIMATE LOCATION AND SIZE
OF ALL EQUIPMENT. FIELD VERIFY ALL EQUIPMENT
LOCATIONS.00 EX PRESSURE
— FILTERS LWT-19 2. CONFIRM EXACT MOUNTING LOCATION OF PROCESS
EQUIPMENT WITH THE WWTP INSTALLER PRIOR TO
ROUGH-IN.
H EQUIPMENT \
LWT-1
\OLWT-1,3 3. REFER TO THE CABLE AND CONDUIT TABLE ON
SHEET I5 FOR ADDITIONAL INFORMATION.\
PT-01> \
f. 4. DRAWINGS ARE DIAGRAMMATIC AND ARE PROVIDED
TO SHOW INSTRUMENT LAYOUTS, PROVIDE A PROOF
OF CONTRACTILITY. CONTRACTOR IS RESPONSIBLE
FOR INSTALL EQUIPMENT PER MANUFACTURE
REQUIREMENTS.
I
\(E) PAN EL
LP-LPT
(E)UTILITY
METER
I I eV \ CONTRACTOR SHALL REPORT ANY DISCREPANCY
BETWEEN THE EXISTING INSTALLATION AND CONTRACT
DOCUMENTS TO THE NPS PROJECT MANGER.
5.A u u \£5 l---------
XJ l I / 4^3 \ 3 E X1/
LWT—40-Q_ 7X-J At AO FT^2>(E) IQ
FT-OI^E)/
KEY NOTES:LxJ
(E) <FE-02)-------------
(FLOW SENSOR-TYP) 0 INSTRUMENTATION CONDUIT FROM THE NEW LODGEPOLE
WTP TO RTU-11 CABINET.
o_ O \
0LWT-14 PROVIDE AND INSTALL NEW 4-20mA ANALOG SIGNAL
SPLITTER IN RTU-11 CONTROL CABINET. SIGNAL
SPLITTER WILL BE USED TO EXTEND THE ANALOG
SIGNAL OF THE EXITING LODGEPOLE STORAGE TANK
LEVEL TRANSMITTER TO THE NEW WTP AND MAINTAIN
THE OPERATION OF THE EXISTING PLANT. POWER FOR
THE SPLITTER SHALL BE PROVIDED BY A 24VDC CIRCUIT
ORIGINATING IN THE NEW LODGEPOLE WTP PLC.
COORDINATE EXACT CIRCUIT FOR THE SIGNAL SPLITTER
POWER WITH THE EQUIPMENT MANUFACTURERS
DOCUMENTATION.
<BPH
<BP=2
CO
X
\0 LWT-6,8 W±2>•(E) PAN EL LP-LWTO
LWT-9(E)<frru-1 LWT-11
(E) <FE-01^
I a:
o83Bco
■^<FS0<LWT-10
LWT-17in
LWT-13I
3in OCM O
(E) VALVECM
LCP Sco
LWT-2,4 EX EXHAUST FAN10
UH0
CO So
<cr o
EX 4” CONCRETE
SIDEWALK
ro
CM
CM
CO
Oo o
1 EXISTING LODGEPOLE WTP - PLAN(0u> SCALE: (A)£ l—5
Q
Clin CMo
CM
O
CM
CO 2 0 2 4Q
SCALE (A)o “3
SCALE OF FEET• •
FINAL CONSTRUCTION DOCUMENTSCM
Od
DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETCL
102WTPAJS00
134,842• ♦
CM INSTRUMENTATION
EXISTING WTP - PLAN5AJS PMIS
SEKI 172423CM TECH. REVIEW:O
CM MDB SHEETm LODGEPOLE
SEQUOIA NATIONAL PARK
4/23/2021 107 of1 14
0 215)INSTRUMENT RACKFSLYFSMYFSI
3 1 3 A3 4> e><0MI— TOAIT AIT AIT Ain A TIT CP25RP25 iH 188 ) 0EXISTING8 7 9 1 1 200 )189 ) 135B )SV-6J WTP RE: l—4
2T0 )( 199 )-( 187TB-3 GENERAL NOTES:o0 Kp.'GFIr rX 1. DRAWING SHOWS APPROXIMATE LOCATION AND
SIZE OF ALL EQUIPMENT. FIELD VERIFY ALL
EQUIPMENT LOCATIONS.
\\\n^L I / \^—EXX3t I!( 193
□s 6j
206 ) P-6im
<FR>
\2. /PIT 139 ) V^v5PIT L<7 2. CONFIRM EXACT MOUNTING LOCATION OF
PROCESS EQUIPMENT WITH THE WWTP
INSTALLER PRIOR TO ROUGH-IN.
^V-1> V [e}——
1 2CLEARWELL
HATCH 50 <£E§( 135
( 135C MP— t
( 204 ^ ( 203 JXX2e
( 129 ( 130 ) ( 132 ) ( 135A )
3. REFER TO THE CABLE AND CONDUIT TABLE ON
SHEET I5 FOR ADDITIONAL INFORMATION.
4£ ▲( 142 ( 138 )-^
<FWP-1> 205 )
4. ALL EQUIPMENT LOCATED IN THE WATER
TREATMENT ROOM SHALL BE NEMA 4X, WET
LOCATION AND CORROSIVE RATED. CONDUIT
AND JUNCTION BOXES IN THE WATER
TREATMENT ROOM SHALL BE WET LOCATION AND
CORROSION RATED.
145'O ____Qi„c <|y3> <^> ( 151 ( 150 )<Ei>122 ) ( 143 K
( 144 ) N So—l jkiX-CEi?( 120 ) KEY NOTES:123 ) < 159 )2J L ■V
0\pEi> WALL MOUNT ANALYZER INSTRUMENT REFER TO SHEET I8 FOR MOUNTING DETAILS.[fe c i ^ Ei/LE c B
< 146 ) < 147 )
IT3 330 0FSL SFM—1
cv-r
INSTALL TURBIDITY METERS ON THE FILTRATION
TANKS CONSULT FILTER MANUFACTURER'S
MANUAL FOR MOUNTING DETAILS.
1 A 1 Zs □ 7 ( 101_8X
EV—7
EV—8
2s~~^1B 0,10CJ97 □31 i,7 LT
< 196 )
195 )
PROVIDE COAXIAL CABLE FROM CP01 TO
ANTENNA. LIMIT CABLE LENGTH TO 50 FEET OR
LESS. REFER TO SPECIFICATION FOR CABLE
REQUIREMENTS.
1!ln ( 148 ) ( 149 )
GEffHS 51?82 znMrS>riTXt 165 :
-05660
■Tn-^ 164 )
5<DSC3
<DSCf
<DSC2
io>
< CP01>
RADIO
RANSCEIVER
CONTROL
PANEL
LIT5
<ANT01> ^4^TURBIDITY NPTC 169 ) INSTALL PLC CONTROL PANEL FOR THE
FILTRATION SYSTEM AND AUXILIARY SYSTEM.
REFER TO SPECIFICATION 406700 CONTROL
SYSTEM EQUIPMENT PANEL AND RACKS.
-o 3 JJD l ♦3 3X70
•-DSC5
0SC6
CL
(„, 168 >1<DSC4kO ( 162 )\ 116 )
TT5 )
o 0( 165 ) ■TURBIDITY NPT 0ax" M INSTALL MOTOR CONTROL PANEL. REFER TO
SPECIFICATION SECTION 406700 CONTROL
SYSTEM EQUIPMENT PANEL AND RACKS.
JJ#K
< yrri I ee?:tt hflJn 2T12 )-i Tf9 )J
( m PC fNQ
IT = B 0CL PROVIDE RAW WATER METERING PUMP CONTROL
PANEL CP25 AND FINISHED WATER METERING
PUMP CONTROL PANEL CP110. CONTROL PANELS
SHALL BE MOUNTED ABOVE THE CHEMICAL FEED
CONTAINER PROVIDING CLEARANCE FOR EASE
REMOVAL OF THE CHEMICAL TOTES. REFER TO
SPECIFICATION 406700 CONTROL SYSTEM
EQUIPMENT PANEL AND RACKS FOR FABRICATION
REQUIREMENTS.
( 1614 O
<DSC7> ( 157 )
< 158 )
C/) I I nFSLYFSIX-W )CD 2 2FV-2> [jjj
FM—Z
( 124I £=i 128 )c j_y
Fn ■CT ClLO ECM
O L -9.CM
« O I ^Ri-) 5( 152 > ( 153 ) c/) d a I 121 )------<Ei> V<ED 0( 160 H
1------ S
CD
—<EV-5>
( 154 )
RADIO TRANSCEIVER CONTROL PANEL SHALL BE
PROVIDED WITH BID OPTION 1 IF BID OPTION IS
IMPLEMENTED. PANEL SHALL BE POWERED WITH
24VDC ORIGINATING IN THE PLC CABINET. PANEL,
COAXIAL CABLE, AND ANTENNA SHALL BE
PROVIDED. REFER TO ARCHITECTURAL DRAWINGS
FOR ANTENNA MOUNTING DETAILS. REFER TO
SPECIFICATION SECTION 406646 POINT-TO-POINT
RADIO EQUIPMENT FOR INSTALLATION
REQUIREMENTS.
BACKWASH
TANK HATCH
O
< Acr o TB-4AIT SS BAIT 206 ) ( 167ro 6CjM
( W\
4 A 4CM 4M"
0CM
( 182 y-
( 183 X
2G ( 125^ / I ▼1-11
170 )P- P-184CD
0-1 12 MOUNT TERMINAL BOX TB-4 AND TB-3 ON THE
LIP OF THE HATCH OPPOSITE THE HINGES FOR
THE HATCH SO THE TERMINAL BOX IS
ACCESSIBLE TO THE OPERATOR. PROVIDE
HARDWARE FOR SUPPORTING THE FLOAT
SWITCHES MOUNTED IN THE CLEARWELL AND
BACKWASH TANK. REFER TO SPECIFICATION
SECTION 407276.
o \ /Gf 0< 11 0 /O oo icxiiicx) AT PANEL LPAi cmC~m w< 6* MCP;l.WP?,GF o V OOOOPLC »V)u> $ m3> ( iM4> ( 102Q
Cl4 186 ) 4 185 )
ID ^pTT ( 177C
P11CM A ?3>o 2T4~Z( 171 (174 ( 172 ) ( 175 ) ( 173 ) ( 176 ) ( 177A ) ( 177B )
CM
O WOLVERTON
INTERCONNECT
CM
(0 2 0 2 4Q 1 SCALE (A)INSTRUMENTATION PLAN CXJo
“3
SCALE: (A) no SCALE OF FEETl—6• •
KEY NOTES (CONTINUED);
FINAL CONSTRUCTION DOCUMENTSCM
(u) PROVIDE DEDICATED DOUBLE DUPLEX NEMA
GFCI RECEPTACLE FOR EACH METERING
PUMP. THE RECEPTACLE POWER SHALL BE
USED TO AS THE COMMON POWER FOR THE
CONTROL RELAY INSTALLED IN CP25 AND
CP110, THESE CIRCUIT WILL CONTROL THE
SOLENOID RELAYS. EQUIPMENT
MANUFACTURER’S SUBMITTALS FOR
TERMINATING 120VAC AND NEUTRAL JUMPERS
IN CONTROL PANELS CP25 AND CP110.
(9) PROVIDE A CLEARWELL LEVEL TRANSMITTER,
w LT—3, ON 3/4” NPT PIPE INSTALLED IN THE
CONCRETE. REFER TO SPECIFICATION SECTION
40 72 33 CAPACITANCE TYPE LEVEL METERS.
0 0Od PROVIDE 6 INCH CABLE CHANNEL AND
COVER MOUNTED APPROXIMATELY 10 FEET
OFF OF FINISHED FLOOR. PROVIDE
SUPPORTS UNDER THE CABLE CHANNEL TO
SUPPORT CONDUITS
115, 116, AND 117.
PLC CABINET WILL PROVIDE MARSHALLING
FOR POWER CIRCUITS FEEDING THE FLOW
METERS AND ELECTRICALLY ACTUATED
VALVES. INSTALL FEEDER CIRCUITS FOR ALL
FLOW METERS, FM-1 THROUGH FM-5, AND
ELECTRICALLY ACTUATED VALVES EV-1
THROUGH EV-17, IN PLC CABINET. PROVIDE
TERMINAL BLOCK WITH INTEGRATED
DISCONNECT ON EACH WIRE FEEDING LINE
POWER TO THE DEVICE.
DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETQ_
102WTPAJS00
134,842• ♦
111, 112, 113, 114,CM INSTRUMENTATION
PLAN
0 6AJSINSTALL A CONTROL STATION FOR THE
FILTERED WATER PUMPS. FILTERED WATER
PUMP #1 AND #2 HAND-OFF-AUTO CONTROL
STATION SHALL BE MOUNTED 4.5 FEET ABOVE
FINISHED FLOOR.
PMIS
SEKI 172423CM TECH. REVIEW:O
CM MDB SHEET
iO LODGEPOLE
SEQUOIA NATIONAL PARK
4/23/2021 108 of1 14
NO. WIRE/CABLE CNDT.
SIZE in2 % FILL TO FROM NOTES
100 1 - #14 AWG BLU THWN, 1-#14 AWG WHT/BLU, #14 GND, CAT 5e 3/4" 0.07 25% CP-01 PLC
101 LMR-400, LESS THAN 50 FEET LENGTH 1-1/4" 0.41 47% CP-01 ANT-01
24 PR - #16 AWG TWISTED SHIELDED PAIR (VFD CNTRL.)
6 - #14 AWG BLU THWN (HS-82) 2" 1.10 33% MCP PLC
1-#14 AWG BLK, 1-#12 AWG WHT, 1-#12 GND (LPA CIR. 14)
1-#14 AWG BLK, 1-#12 AWG WHT (LPA CIR. 16)
1-#14 AWG BLK, 1-#12 AWG WHT (LPA CIR. 18)
1-#14 AWG BLK, 1-#12 AWG WHT (LPA CIR. 20)
1-#14 AWG BLK, 1-#12 AWG WHT (LPA CIR. 22)
1-#12 AWG BLK, 1-#12 AWG WHT (LPA CIR. 24)
3/4" 0.12 22% PLC LPA
104-110 NOT USED N/A N/A N/A N/A N/A
BELDEN #29522C #12AWG BASIC VFD CABLE, OR
EQUAL(MIX-2)
1 PR - #16 AWG TWISTED SHIELDED PAIR
3/4" 0.22 40% DSC-1 MCP
BELDEN #29522C #12AWG BASIC VFD CABLE, OR EQUAL
(MIX-3)
1 PR - #16 AWG TWISTED SHIELDED PAIR (DISC. AUX)
3/4" 0.22 40% DSC-2 MCP
113 BELDEN #29522C #12AWG BASIC VFD CABLE, OR EQUAL (M-1)
1 PR - #16 AWG TWISTED SHIELDED PAIR 600V (DISC. AUX) 3/4" 0.22 40% DSC-3 MCP
BELDEN #29522C #12AWG BASIC VFD CABLE, OR EQUAL (M-1)
1 PR - #16 AWG TWISTED SHIELDED PAIR 600V (DISC. AUX) 3/4" 0.22 40% DSC-4 MCP
BELDEN #29524C #8AWG BASIC VFD CABLE, OR EQUAL
(FWP-1)
1 PR - #16 AWG TWISTED SHIELDED PAIR 600V (DISC. AUX)
1" 0.38 44% DSC-5 MCP
BELDEN #29524C #8AWG BASIC VFD CABLE, OR EQUAL
(FWP-2)
1 PR - #16 AWG TWISTED SHIELDED PAIR 600V (DISC. AUX)
1" 0.38 44% DSC-6 MCP
BELDEN #29522C #12AWG BASIC VFD CABLE, OR EQUAL (B-1)
1 PR - #16 AWG TWISTED SHIELDED PAIR 600V (DISC. AUX) 1" 0.22 25% DSC-7 MCP
BELDEN #29522C #12AWG BASIC VFD CABLE, OR EQUAL
(MIX-2) 3/4" 0.17 31% MIX-2 DSC-1
BELDEN #29522C #12AWG BASIC VFD CABLE, OR EQUAL
(MIX-3) 3/4" 0.17 31% MIX-3 DSC-2
120 BELDEN #29522C #12AWG BASIC VFD CABLE, OR EQUAL (M-1) 3/4" 0.17 31% M-1 DSC-3 121 BELDEN #29522C #12AWG BASIC VFD CABLE, OR EQUAL (M-2) 3/4" 0.17 31% M-2 DSC-4
BELDEN #29523C #8AWG BASIC VFD CABLE, OR EQUAL
(FWP-1) 3/4" 0.33 62% FWP-1 DSC-5
BELDEN #29524C #8AWG BASIC VFD CABLE, OR EQUAL
(FWP-2) 3/4" 0.33 62% FWP-2 DSC-6
124 BELDEN #29522C #12AWG BASIC VFD CABLE, OR EQUAL (B-1) 3/4" 0.17 32% B-1 DSC-7
125 4 - #14 AWG RED THWN, 1 #14 GND 3/4" 0.05 18% TB-4 PLC
126 INSTRUMENT CABLE (NOT SHOWN) N/A N/A N/A FSM-4 TB-4 I8
127 INSTRUMENT CABLE (NOT SHOWN) N/A N/A N/A FSH-4 TB-4 I8
128 24 PR-#18 AWG TWISTED SHIELDED PAIR (BELDEN 1471A) 1-1/2" 0.68 33% CP-25 PLC
129 LMI FACTORY CABLE M6 CONNECTORS N/A N/A N/A MP-1 CP-25 PLUG J1
130 LMI FACTORY CABLE M6 CONNECTORS N/A N/A N/A MP-1 CP-25 PLUG J2
131 LMI FACTORY CABLE M6 CONNECTORS N/A N/A N/A MP-1 CP-25 PLUG J4
132-135 NOT USED N/A N/A N/A N/A N/A
135 1 - #12 AWG BLK THWN, 1- #12 AWG WHT THWN, 1- #12 GND N/A N/A N/A CP-25 RP-25 RE.
ELECTRICAL
135A 1-SO CABLE #12 AWG 3 WIRE (BELDEN 19206) - - - SV-01 CP-25
135B 1-SO CABLE #12 AWG 3 WIRE (BELDEN 19206) - - - SV-05 CP-25
135C 1-SO CABLE #12 AWG 3 WIRE (BELDEN 19206) - - - SV-06 CP-25
136-137 NOT USED N/A N/A N/A N/A N/A
1-#12 AWG BLK, 1-#12 AWG WHT, 1-#12 GND (FM-3)
1-#12 AWG BLK, 1-#12 AWG WHT, 1-#12 GND (EV-12)
1-#12 AWG BLK, 1-#12 AWG WHT, 1-#12 GND (EV-11)
4 - #14 AWG RED THWN (EV-11, EV-12)
3/4" 0.09 17% JB-01 PLC
139 1-#12 AWG BLK, 1-#12 AWG WHT, 1-#12 GND (EV-11)
2 - #14 AWG RED THWN 3/4" 0.07 14% EV-11 JB-01
140 1-#12 AWG BLK, 1-#12 AWG WHT, 1-#12 GND (EV-12)
2 - #14 AWG RED THWN 3/4" 0.07 14% EV-12 JB-01
1-#12 AWG BLK, 1-#12 AWG WHT, 1-#12 GND (FM-3)
1-#12 AWG BLK, 1-#12 AWG WHT, 1-#12 GND (EV-12)
1-#12 AWG BLK, 1-#12 AWG WHT, 1-#12 GND (EV-11)
4 - #14 AWG RED THWN (EV-11, EV-12)
3/4" 0.12 22% FM-3 JB-01
142 2 PR - #16 AWG TWISTED SHIELDED PAIR 3/4" 0.16 30% FM-3 PLC
143 2 PR.- #16 AWG TWISTED SHIELDED PAIR 3/4" 0.16 30% TB-5 PLC
144 4 - #12 AWG BLK, 4-#12 AWG WHT, 1-#12 AWG GND
6 - #14 AWG RED 3/4" 0.11 21% TB-5 PLC
145 1 - #12 AWG BLK THWN, 1- #12 AWG WHT THWN, 1- #12 GND
2 - #14 AWG RED THWN 3/4" 0.05 9% EV-3 TB-5
146 1 - #12 AWG BLK, 1-#12 AWG WHT, 1-#12 AWG GND 3/4" 0.03 5% EV-7 TB-5
147 1 PR.- #16 AWG TWISTED SHIELDED PAIR 3/4" 0.05 10% EV-7 TB-5
148 1 - #12 AWG BLK, 1-#12 AWG WHT, 1-#12 AWG GND 3/4" 0.03 5% EV-8 TB-5
149 1 PR.- #16 AWG TWISTED SHIELDED PAIR 3/4" 0.05 10% EV-8 TB-5
150 1 - #12 AWG BLK, 1-#12 AWG WHT,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .