B09_Attach_1__Lodgepole_WTP_Final_CD_Drawings21-04-23_0002.pdf

PDF 37 MB Posted

Attached to
SEKI 172423, Replace Non-Compliant Lodgepole Water Federal contract opportunity
Solicitation number
140P2022R0102
Issued by
Department of the Interior National Park Service National Office

About this file

This document provides details on a federal solicitation for replacing a non-compliant water treatment system. The solicitation number is 140P2022R0102 to replace the Lodgepole Water Treatment System for SEKI 172423. The opportunity type is a solicitation issued by the Department of the Interior National Park Service National Office. The solicitation seeks to replace the existing non-compliant water treatment system to ensure water quality standards are met at the Lodgepole facility. Interested parties should review the attached final design drawings for specifications. The response deadline and award date are not provided in this document.

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CE

NSED

ARCHITEC

STATE OF CAL I F

OR

N

IA

REN . 0 -30-

NO. 24687

L I T

GENERAL NOTES

DETAIL NUMBERING

ABBREVIATIONS

SYMBOL LEGEND

APPLICABLE BUILDING CODES

PROJECT DESCRIPTION

CE

NSED

ARCHITEC

STATE OF CAL I F

OR

N

IA

REN . 0 -30-

NO. 24687

8"W

NSED

ARCHITEC

STATE OF CAL I F

OR

N

IA

REN . 0 -30-

NO. 24687

ARCHITEC

STATE OF CAL I F

OR

N

IA

REN . 0 -30-

NO. 24687

ARCHITEC

STATE OF CAL I F

OR

N

IA

REN . 0 -30-

NO. 24687

ARCHITEC

STATE OF CAL I F

OR

N

IA

REN . 0 -30-

NO. 24687

ARCHITEC

STATE OF CAL I F

OR

N

IA

REN . 0 -30-

NO. 24687

ARCHITEC

STATE OF CAL I F

OR

N

IA

REN . 0 -30-

NO. 24687

ARCHITEC

STATE OF CAL I F

OR

N

IA

REN . 0 -30-

NO. 24687

ARCHITEC

STATE OF CAL I F

OR

N

IA

REN . 0 -30-

NO. 24687

˘ˇ ��ˆ

˙˝˛ ��ˆ

� ���� ��� ������� �������� ������� ��������� ����� ���
(� �� ������ ������ ���
�˚˚���� ��� ����� �������� ������� ��������� ����� ���
)� �� ������ ������ ��* ��� ������ ��� ������� ������ ˙�+���� ������ � &'�� ���������&�� �������� ��������� ����� ���
������� ������ � ������ ������ ��� ����� ������
�����&�� � ����� ���!��� ���������������� ��������� ����� ��� ���� ������
����˝������ �˝� � ���� ������� �˝ � ˝ ��
� ��������� ���� �� �˚ ������ ������� ����� ���
�!� ���� ������ � � �
����� ���� ���������� ������ 0 ��� ������� ������������ �
�����

˙�+ �� ��˚�������� ���1����� �� ˚� � ����˜˚�

��˚�������� ������� /�� 3�� �˚�� ����������������� �������� �
�˝�������
� ˚�������� �˚������ � ��˝�� �������
˝�� ���� ������ ��������� ��˚�������� �˝� �����˝� �˝��

� ��� �������� � � ��1������� ��������������� �˚������ � ��˝ �� ������� ˚� �������� �� ���� �� ������4����� ���� �� ���˝ ����

������� ��������
������ ��˝ �������� ������ ������� ���� � ������ �������� � ��˝ ����˚˚ ������ ��
�� 5������� �˝� � ���� ���� ���������˝ ���� ��˝�� �������� ���������� ������ �
˝��˝ ��������� �� ���˝˝��������� �˝� � ���� ������������*6 �˝ � ��� �˝�˝�7 ��� ������� ����˝�� �����
��� ���˜8* �� �������������9 �������� �� ���˝ ������� ������������� ��������� � ������
���˘ˇ ����������� �������� ��˝��� ���˚������ ������˚������� �˚� ����������� �
��������� ���� ������������ ����������� ������˚������� ���� �� �
���� �˚ ��˝� ����������� ���������� ��˝��� ���� ���˚���� �
����� ���� ��� ��˝� ���� ���� ���� ������˚�������: ����˝ ���˚��� �
�˝��� ��� �����˝� ����������� �˚ ��˝� ���� ����������� �˚˚���� �
˚� ����������
��˝�� ������� ����
������ ������ - �1�������, �����'�� � �����,

� ����˘�� �ˆ������� ���˘ˇ˙ �� � ˆ��˝��������� ���������� ���˚˚����

������� ���˚˚���� ����� ����˜ ��� ���������� ������ ��''������ ����� ��������� ����� �� �����$ "˛ �˝������! ��� ������������ ��˝���˝ �˚��� ���������� � ���� ���� ����� �
������ ����������� ���������� ��������
�������� ���˚˚���� ��1���� ����˜ ����� ��������������� � ���� �;
����˝�� �������
�˝��� ���� ���� ���� ������������� ��� ��˝������� ���� ����� �
����������� ��������� ������ ���1����� �˚˚���: �˚������: �����

$26

�������� �˚��1����� ������������ � ����� - ˜�� �� ���<�!˝����&������ ������� ��1���� ����˜�

��˚� ��� ������˜ ���������� ��˝� ���� �������� ������ ����������� �
�������� �˚� ����� ������ �� ���������� ���� ��� ����������

�������� �˚��1����� ������ � ��˝ �

������� ����������� � ����� � �"=
�!˝����&������ ������� ����� ����˜��
* ����
�� ���˝������ ��1������� �������˚������ ��� ���� 3��

�1�������

?��˚� �4̨

���� �� � & �1�������

� ��������&˚������ ��������� �
˝������'���˝�������� ��@

����� � �˚�* ˚��� ������˜��� ������˝� �˝������� ��� ��������� �� ! ����� ��9 ˚� ����������������� ' ��$

����� � ��˝ ����� ������A������ B�C5�� ˚���&�� ˜� ������� ������ �� ���˝ ��������

D� ����� � ����

�������� ������������ �E����� �����˚��� �������� �E�� ����� ������ ������� �� ���˝&�����������*6 ������ ��������
�(� �˝��� ������� �� � ˝��� �
������ ��� ��˝�
���� ����˝��� ,���,/ ������ ��˚˝� ����˜� ������� ����������˚��� �˝�� ��������
F* ���˝ �����G
* ˚��! ��������� ����� ������������ ����������� �������� �������� ������ ����� ��˝��˜ ������ ���������

3�3

�� ��� � ��� � ������������ �� ����� ���� ������� �˘˘��� �ˆ��� ����˛����� ˚���� �� �������� � �� ��������� & �

��������� ���� ���������
���� �����˜ ��������H� ��� ��� ������ ��˝��� ��� ����� �˚ ��˝���1I
�� �������� ��������� ��ˇ˜�*6
˚������������3�J
�� ��������� ���� �˚˚�����˝������
���������ˇ˜������
��˜� �KL(M()�� ˚����������� ������� ���˝� ������ H��� �˚��� ���˝* �˚��� ��ˇ �˝���/ ��������� ��������������
��1��� �������� ����˜

����H

M&()&(-(K NL��� � �KM

04/23/2021

/ Tv. // / / r i©—/\✓ A? '"lb/ / \ ./ /// // ■0 // .\ // -t- I/ /l

A<os -zz/ Il\ / I\0 / /zt" I SHEET NOTESin /I yy /y / "A\!/ IA-y/ ^ Vy ''y 'ITv///

‘/ AT / 1"—~/ 1 v./<2 / 1. PROVIDE ALL TRENCHING, BACKFILL AND SAW

CUTTING. AND RETURN ALL LANDSCAPING,

PAVEMENT, AND FLATWORK BACK TO ITS ORIGINAL

CONDITION.

/i '/\ So T' \/ z-\ v..'i\ \\ / !3 Tv / ■ I/ /\ \\,-E- / 1/ / \/ // '\ /' \/ /

, ' ....I f\ ' \ \r id/ / \ I\ / . in/I / \\\ \/ ‘/ / I\/./ v_- A /•"/ J \I / ---- - \•E- /, I /// / \// n \/ \VI // i NEW LOW PRESSURE PROPANE GAS VAPOR (LPGV)

PIPING SHOWN AS SOLID LINE MARKED "G”.

/ r \t 1' I \ 2.

■ 1 / A i i Tr\ /

/ v \ \ii i/ r I7 r 'i l i i J/ i \i r i i ' i/ \ \r7 \ i/ i i/ i i \ \\/ \i i/ ii-T" I \I/ I/ II 1 t/ 1 I \./ I I/ 1 I I I \1/ t i T\

I in/ l * \ 3. PATCH AND PAINT ANY DAMAGED SURFACES DUE

TO DEMOLITION OR NEW CONSTRUCTION TO MATCH

EXISTING CONDITIONS.

CO.. /

1/ , Si /

\/ » I 1. \/ I I \l I I/ l I \I/ It 1 >, lI Iz-' / l I \\ \/ \ \ \i *r> \s'' I 1I » \I'S''

■ \\ I \l 1I \\ I .I 1 \ - A' I I/ I 1 v \l '/ 4. CONNECT NEW GAS LINE TO BUILDING GAS INLET

ABOVE GROUND. SEE DETAIL #1 ON SHEET M5.

I » \i I !/ \ \l \/ l *9.\/ / l ' __ r/ i/ / -A I i (* to/ t \ \ I/ I/Ul I I/ \\/ \ o/ I I/ II I I \l , I •i .• 2I 1 I I/vi / -4 \ \I i/ I/ / CzOI I/\i / I I--I I \1 . \ .

II I\\ I \/

I II II I I\ I I ■I I

I I /1 I I k I I ' T ■

III

I I /l I I 1/ L

I .I I/' I I Oi i J_i, i ____ I

.i L\ I v

J/V \U.I • / z^I KEY NOTES/ o\I I \s \\ r \\i

\ / (T) 1990-GALLON ABOVE GROUND LP TANK. PROVIDE CONCRETE PAD FOR

TANK MOUNTING. LPGV LINE TO GO UNDERGROUND PAST EDGE OF

CONCRETE PAD. UNDERGROUND GAS LINE PRESSURE TO BE 10 PSI

MAXIMUM. SEE DETAIL 1/M-4 FOR MORE INFORMATION.

\i A *9.\ \ foj \x/I l/ &‘■v.. oO/i \// \i s/ V V

■v.

VzQ.

8 \

3=\

G 3/4» »\ LPGV STUB UP OUTSIDE OF BUILDING. INSTALL PRV ABOVE

GROUND AT BUILDING GAS ENTRY; SET TO 14 INCHES W.C. SEE DETAIL

1/M-5 FOR MORE INFORMATION. SEE SHEET M3 FOR LPGV LINE

CONTINUATION IN BUILDING.

ssCD J \ 5 r—"\ l- \i - SSTD ir

\ii \ir \1n l -a

/ SS "

J3 5V-sCL Ul

1 \ s \s s ---- \\ \"

\co \ /s \ is / \ \\

\ \\I< \\ \\ \\o s \N 0 \\ \Na \N

\s \ \S< N \ \X //o // I // \, \\ \\\ i i iL i i\ \LO i

\lCM \ \o i\f VCM \\\ \\X \\ \\o I \ V\\ \\\ \\ V

\■V.

in <\s

O V. \s \ \\~v V. \-v Ul

1 v■v. ' \< IV. \ \\CL '-V I \■v \•s. 'fvO \ ' \

\\ro \

CM

\'CM \ T\

i \\\

\ \ii t> 1i \ \cr) N

N. ' .\\ s \s\ 1 N \Q \ \\< w \ 71 Os w Vi

/o \ o\ UlVI / oO o//\ / o/\\u\\\ i / oD \ / / \\ /I< \ o//\\W \W \W i//\ A \\ // \z^ — NN / '/ N i\ \CO zZ-s o/t\\ \ /z^CD /in4 \zZ-Z^ \ o ,z^ o$ z"

\ I\ /Q oinh \ .*9 \

X \/ v o 1ill Ul

I \<v \O \ (II \

ID / N_____'__»»CM u Io //CM .1 . QCv. C z^. /\ /o ■ N siu \1CM \ \• / \ >\z- 10 0 10 20CD • / \ Z-'I \/ z^Q

SCALE (A)

/lo z^/ \

/ \ SCALE OF FEET\/• • \

/ FINAL CONSTRUCTION DOCUMENTSCM \/ s/O' \//

DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETCL

1021 WTPJKSMECHANICAL SITE PLANCD

134,842• ♦

SCALE: (a)M-1CM MECHANICAL

SITE PLAN

JKS PMIS

SEKI 172423CM TECH. REVIEW:O

CM MVJ SHEET

lO LODGEPOLE

SEQUOIA NATIONAL PARK

DATE:

4/23/2021 88 of1 14

M-r i

TA 1

p T rUi /-X^Xlll3© / \x—KXX3) V / /O9O

\ \X i/ /tn \ I V£ / /

ET<>

1148”x40” 3 mx xEe

TZIr i6”x15M rvp m<«<!)TO KEY NOTESirjr —iz

(T) 8”x16” VERTICAL RECTANGULAR EXHAUST DUCT, TYPICAL OF 5. INSTALL

BALANCING DAMPER IN VERTICAL DUCT FOR EASE OF ACCESS. INSTALL

12” x 12” EXHAUST GRILLE FACING INTO BUILDING INTERIOR WITH

GRILLE CENTERED AT 48” AFF FOR NORTH AND SOUTH WALL, 26” AFF

FOR ALL OTHER LOCATIONS.

<2> VERTICAL SECTION OF 24” EXHAUST DUCT RAISING MAIN HORIZONTAL

DUCT INTO ROOF PEAK.

(3) INSTALL EXHAUST TAKE OFFS SUCH THAT BRANCH DUCT FOLLOWS ROOF

PITCH.

<4) PROVIDE SEPARATED COMBUSTION CONCENTRIC VENTING AND

CONCENTRIC VENTING ADAPTER (CVA-6) CONSISTING OF 6” CATEGORY III

EXHAUST VENT AND 8” COMBUSTION AIR INTAKE. ROUTE CONCENTRIC

PIPE THROUGH ROOF FOR MAU-1. FOLLOW MANUFACTURER’S

RECOMMENDATIONS FOR INSTALLATION. FOLLOW THE IFGC FOR

TERMINATION TYPE AND MINIMUM HEIGHT ABOVE ROOF (-4 FT). LOCATE

CENTERED BETWEEN CENTER AND EAST DORMER. COORDINATE WITH

ARCHITECT.

(3) 48”X40” EXTERIOR LOUVER MOUNTED IN DORMER WINDOW FRAME. RE

ARCHITECTURAL FOR DETAILS.

(6) EQUIPMENT SUPPORTS TO BE DESIGNED BY CONTRACTOR.

(7) LOCATE SUPPLY DUCTS ABOVE LEVEL OF PROCESS EQUIPMENT AND

LIGHT FIXTURES. MOUNT SUPPLY GRILLE HORIZONTAL ON DUCTS.

(8> PROVIDE GRAVITY DAMPER DOWNSTREAM OF EF-1 SUCH THAT IF THE

w UNIT IS EVER SHUT OFF THE DAMPER IS CLOSED.

(9) REMOTE INTERFACE FOR MAU-1 CONTROLLER.

^ PROVIDE APPROXIMATELY 12 LINEAR FEET OF RAYCHEM GM-1X CABLING

IN AN ”S” CURVE WITHIN 48”X40” OSA DUCT AS SHOWN. PROVIDE WITH

AMBIENT SENSOR SUCH THAT THE CABLE IS ON ANYTIME THE OSA IS

40 DEGRESS F OR LESS. REFER TO ELEC FOR MORE INFORMATION.

(Ph PROVIDE 3/4” DRAIN LINE OUT OF 48”X40” OSA DUCT AND ROUTE TO

NEAREST FLOOR DRAIN. ROUTE IN SUCH A MANNER THAT PIPING IS

NOT A POTENTIAL TRIPPING HAZARD. REFER TO SHEET M-5 FOR MORE

INFORMATION ON DUCT CONSTRUCTION. SLOPE DUCT SLIGHTLY TOWARDS

DRAIN.

@ EXHAUST FAN VFD.

AIRFLOW MODE SWITCH.

ro tSl x s O CNIroI47 E

1 J miri l5 EJZL c > xz ADw- [ol [o vn >Jt: Dc )1S1

& 3

{ 12” 0 DI1 1 1 cxJ

)03J zn

JZI

ijijCD £ rTD

I

3 I

1CL

p< 2 1 Io mr -tc< JX < rgifio 3 ) a a co CO -'o pc

9J DICM

r1 I nEF-1 O

LD ICM MALM)6o « «CM C <DD eix R

1 M-O ro i x o IO9m ro p /co

B

1. \

<cro CNl 24” 0

J ___ Iro

J7CM

CM JZI

<J>co 2x12 <5HFt 48”x40” TO□ ____ j hi0 I <o

\ X12” 0 1o \Ln / \< s /T7

PR IV) /X------ HXICD A /£ o V .____ _ .C |_______ Io in CMo L _____ ICM

5o ACM MECHANICAL HVAC PLAN 2

SCALE (A) E

0 2 4CD

Q

SCALE: (a)o “3

SCALE OF FEET• • cxJ

FINAL CONSTRUCTION DOCUMENTSCM

Od

DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETCL

102WTPJKSCD

134,842• ♦

CM MECHANICAL

PLANM-2JKS PMIS

SEKI 172423CM TECH. REVIEW:O

CM MVJ SHEETin LODGEPOLE

SEQUOIA NATIONAL PARK

DATE:

4/23/2021 89 of1 14

1-1/2” DCW0^ TA <P~\ 0^^

T "FT °m c i / AP. P, / \ \^xx>a ffc O) 6” V—pll-/f31 ( +6O9{> 5/ / I

\ \i / /V VL>s:* > lirs:

jtlv 2i ^=y I '■ i°r2>—rrI I~nnr ---------Tfift^p ii— i ii

KEY NOTES

40= 0 FLOOR MOUNT EMERGENCY SHOWER/EYEWASH ES-1. RUN DRAIN PIPE

FROM ES-1 TO WITHIN 6” OF FLOOR DRAIN BELOW UNIT.

0 DOMESTIC WATER HEATER DWH-1. PROVIDE 1-1/4” DHW LINE TO

TMV-1 FOR EMERGENCY SHOWER.

0 1-1/2” DCW CONNECTION POINT. DCW LINE TO RUN IN TRENCH ALONG

WALL, THEN PENETRATE TRENCH GRATING VERTICALLY NEAR HOSE REAL

AND RUN OVER HEAD. SEE PROCESS PIPING DRAWINGS FOR

CONNECTION POINT INFO.

0 2” FLOOR DRAIN, TYPICAL OF 5. P-TRAPS NOT NEEDED FOR FLOOR

DRAINS FLOWING DIRECTLY INTO BACKWASH WASTE TANK.

0 NOT USED.

m FD-1 lI Wl TI afiiii« E3ZL C 1 /-v>D

9 9 OT o I E £

1 i ■M-DIc )ns..._L x;a i a9

)Q3 I ^ °-J kZ

I2<fd3 oi iXXii ©II T hI2” D ® iia> I5

0 3/4” DCW DROP FOR HOSE STATION. SEE PROCESS PIPING DRAWINGS

FOR CONTINUATION.

0 LP GAS LINE FOR MAKE UP AIR UNIT. SEE MECHANICAL DETAILS FOR

CONTINUATION. SCHEMATIC LOCATION, ADJUST IN FIELD AS NECESSARY.

0 2” INDIRECT DRAIN LINE FROM FLOOR DRAIN DISCHARGES INTO PIPE

TRENCH.

0 8” DRAIN AND 6” VTR FOR BACKWASH TANK DRAIN. HORIZONTAL

PORTION OF VENT ROUTED WITHIN BACKWASH TANK. SEE CIVIL

DRAWINGS FOR CONTINUATION OF DRAIN LINE OUTSIDE OF BUILDING.

0 RUN DRAIN LINE FROM S-1 TO WITHIN 6” OF FLOOR DRAIN BELOW

“O I 1 rtiJ5 81=3 1=3CL I

E i—rO § - S-1Lin?J X \_1 /2 »CD 7% 10 DCWWl a

CL r iro DI

I <fd3^#3i |~le

\K 9 9 c DILD "TJ e+ —i —CM «o nCM

X UNIT.o o£

CO

s

0 6” HUB DRAIN FOR PROCESS PIPING FLUSH-OUT CONNECTED TO 4”

DRAIN LINE UNDER SLAB.

r_1-1/4 »CM cn DHWi ,—i ro T

I_i_SOC 4LJ---------- 7< cT7I ocr < ES-1Io o\

It IU4 1=3 TMV-1)Iro 0CM I <fd3 \ICM

.1-1/4” TEPID

WATER TO ES-1

■sI I 2” D I 11

< ET-1I 1-1/4”yO.CO Ii i5 DCW4” D□ 4” D \ ■s o7I GE< \ /O O- I oo ac><—

I L 3 \ /

<DWH-1)z / I< — o k ^_____, ^2 I 6” V------ 2V) ou>

£ 1-1/4”Q

ML

L Ofin CM oAo sCM oo

O

CM MECHANICAL PLUMBING PLAN 2

SCALE ® P

0 2 4CO

Q SCALE: (a)o 0“3

SCALE OF FEETC9• •

cxJ

FINAL CONSTRUCTION DOCUMENTSCM

Od

DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETCL

102WTPJKSo> 134,842• ♦

CM PLUMBING

PLANM-3JKS PMIS

SEKI 172423CM TECH. REVIEW:O

CM MVJ SHEET

in LODGEPOLE

SEQUOIA NATIONAL PARK

DATE:

4/23/2021 90 of1 14

M”

<PRV-5

PRESSURE GAGE

ISOLATION

VALVE,

TYPICAL

ELEXIBLE GAS

CONNECTOR

LOCKING PROTECTIVE

DOME FOR

VALVES/GAUGES

PRESSURE RELIEF VALVELIQUID

WITHDRAWL

VALVE

LIQUID LP VAPOR

OUTLETFILL

VALVE

1990-GALLON

ABOVE GROUND

LP TANK

UNION,

TYPICAL 3/4” LPG

FEED LINE TO

BUILDING

Ju 1-1/4

4«!•TRACER WIRE FOR

UNDERGROUND PE PIPE. o\ 6 1-1/4

NSF RATED EXPANSION TANK.

CHARGE TO COLD WATER

PRESSURE WITH DRAIN OPEN

TANK SUPPORTS

(PROVIDE WITH TANK)

IHO O'

<(PWET-1o> UNDERGROUND P.E.

ANODELESS RISER.

TRANSITIONS FROM

P.E. TO STEEL PIPE

ABOVE GROUND.

■o

CO

t] CONCRETE TANK PAD, SEE 3213/S1.4 h o

DIELECTRIC COUPLING (TYP.)<o

GROUNDING LUG

DE DE<

X o

>v; :-i- <-1 y c £

.3 B B B 0 rr*.

5 *##4/ PIPE FULL SIZE

DRAIN TO FLOOR DRAIN

4.

4 •";?

.*• V-'-' <^DWHGRADE 3 GRADEI QWI Li

LD 1CM Io sCM ' ! |! ! I | ! ; a. u I jp * l !, l±±±TTu I" re I • I fp

X o v ✓ *'> 0-1

VCO 3/4” UNDERGROUND

P.E. PIPE CONTINUES

TO BUILDING: RE

SHEET M—1

o o ro

CM

M"

CM

2_^DOMESTIC WATER HEATER DETAIL

SCALE: NONE

DETAIL NOTES:

1) CONTRACTOR TO SUPPLY LP TANK AND ASSOCIATED VALVE ASSEMBLIES. TANK AND VALVES TO BE INSTALLED IN ACCORDANCE WITH NEPA 58.

2) CONTRACTOR TO PROVIDE PRESSURE GAUGE DOWNSTREAM OF PRV IF SERVICE PRESSURE GAUGE IS NOT INCLUDED IN TANK VALVE ASSEMBLY.

3) SEE STRUCTURAL SHEETS FOR CONCRETE PAD AND TANK MOUNTING DETAILS.

M-4

CO

<o o

V)u> o

1 LP. TANK PIPING DETAILID

CM M-4 SCALE: NONEo

CM

O

CM

CO

_Q O

“3

FINAL CONSTRUCTION DOCUMENTSCM

Od

DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETCL

102WTPJKSo> 134,842• ♦

CM MECHANICAL

DETAILSM-4JKS PMIS

SEKI 172423CM TECH. REVIEW:O

CM MVJ SHEET

iO LODGEPOLE

SEQUOIA NATIONAL PARK

DATE:

4/23/2021 91 of1 14

<i>m o o o o o o

I I1 1 1 1 7

VJUUUUUUUUUUUUU L-/ V-/ V-/

1” LPGV INTO

BUILDING

T s\ • < V*V■// -

24” 0•/ ^PRV-6".< • zJ2< EF-148”x40”

EXHAUST LOUVER

RE ARCHITECTURAL

FOR DETAILS

48”x40"

INTAKE LOUVER

RE ARCHITECTURAL

FOR DETAILS

t *.

/ 0 •V

/ UNION, TYPICAL

/ 24” 0

/ \ HEAT TRACE

\/ 3/4”

ANODELESS

GAS RISER

/ ISOLATION VALVE34"x30» \34x30n y \ X"PX ftRAnF

ZJ c:

a> DETAIL NOTES:

ANODELESS GAS RISER TRANSITIONS FROM

STEEL PIPE ABOVE GROUND TO HDPE

UNDERGROUND GAS PIPING.

■o 1.

GO 1

3/4” DRAIN

ROUTED TO

NEAREST FLOOR

tio < DRAINo

1 BUILDING GAS ENTRY DETAIL<

X M-5 SCALE: NONEo

12" ROUND TO 16”x8” VERTICAL

EXHAUST DUCT TRANSITION

LO

KEY NOTESi 12”x12

EXHAUST GRD

(TYP. 5)

if

LD

(T) CONCENTRIC VENT FROM MAU-1. FOLLOW MANUFACTURER’S

RECOMMENDATIONS FOR INSTALLATION. FOLLOW THE IFGC FOR

TERMINATION TYPE AND MINIMUM HEIGHT ABOVE ROOF (~4 FT).

COORDINATE WITH ARCHITECT SUCH THAT VENT REMAINS PARALLEL OR

BELOW ROOF RIDGE.

CM

O

CM

Xo uCOo o ro

[ 1CM

CM

go Oo o

(0u>

Q in CMo

CM

O

CM

CO 2 0 2 4Q

SCALE (A)o “3

SCALE OF FEET• •

FINAL CONSTRUCTION DOCUMENTSCM

Od

A MECHANICAL HVAC PLAN DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETQ_

SCALE: (A) 102M-5 WTPJKSo> 134,842• ♦

CM MECHANICAL

DETAILS

DETAIL NOTES:

SECTION VIEW FOR CONCEPTUAL PURPOSES ONLY. M-5JKS PMIS

SEKI 172423CM TECH. REVIEW:O

CM MVJ SHEET

in LODGEPOLE

SEQUOIA NATIONAL PARK

DATE:

4/23/2021 92 of1 14

KEY NOTES

0 MICROPROCESSOR CONTROLLER, FACTORY MOUNTED AND WIRED TO

MAU-1. PROVIDE AND INSTALL JUMPER BETWEEN TERMINALS ”R” AND

”G” TO ALLOW UNIT TO OPERATE STAND ALONE IN OCCUPIED MODE.

BASIS OF DESIGN, COORDINATE WITH ACTUAL UNIT PROVIDED.)

0 DUCT MOUNTED DISCHARGE TEMPERATURE SENSORS PROVIDED WITH

MAU-1. FIELD MOUNT IN SUPPLY DUCT AND WIRE TO THE

MICROPROCESSOR CONTROLLER.

0 OUTSIDE AIR TEMPERATURE SENSOR PROVIDED WITH MAU-1. FIELD

MOUNT AND WIRE TO THE MICROPROCESSOR CONTROLLER.

<( MAU-1 )

0 REMOTE INTERFACE PROVIDED WITH MAU-1. FIELD MOUNT AND WIRE

BACK TO MICROPROCESSOR CONTROLLER.

<DSPACE TEMPERATURE SENSOR PROVIDED WITH MAU-1. FIELD MOUNT

AND WIRE BACK TO MICROPROCESSOR CONTROLLER.

o<c0 <DINTERLOCK EF-1 DIGITAL INPUT POWER (24VAC) WITH EXHAUST FAN

TERMINALS AT MICROPROCESSOR CONTROLLER. EXHAUST FAN EF-1

ENERGIZES WHEN MAU-1 IS ENERGIZED. WHEN MAU-1 IS

DE-ENERGIZED EF-1 SHALL ALSO DE-ENERGIZE.o

VFDo>

0"O PROVIDE AND INSTALL A DUAL POLE DUAL THROW (DPDT) SWITCH TO

ALLOW THE USER TO SELECT BETWEEN THE LOW (3 ACH) AND HIGH

(6 ACH) AIR CHANGE RATE AT THE LOCAL SWITCH. LOCATE THE USER

SELECTION SWITCH NEAR THE REMOTE INTERFACE.

EXHAUST

230V/1

POWER BY -

DIV 26

ROOM TOEF-1AIR< AIRo'

Oo Q llllllllllllll EXH PACKAGED CONTROLS

(MICROPROCESSOR)

mill 0 CONNECT ONE POLE OF THE SWITCH TO AN INPUT AT THE MAU

MICROPROCESSOR CONTROLLER TO ALLOW THE SWITCH TO COMMAND

THE MAU TO OPERATE AT EITHER THE HIGH (6 ACH) OR LOW (3

ACH) AIR CHANGE RATE AIRFLOW.

FAN

O oO

BAROMETRIC

(GRAVITY)

DAMPER

o X

0 PROVIDE AND INSTALL A CONTROL RELAY WITH FORM C STYLE

CONTACTS. CONNECT THE NORMALLY OPEN AND NORMALLY CLOSED

CONTACTS TO THE DI2 AND DI3 INPUTS AT THE VFD. CONNECT THE

COMMON TERMINAL TO THE RETURN POWER COMING FROM THE MAU

MICROPROCESSOR CONTROLLER EXHAUST FAN TERMINALS. ENSURE

THE SWITCH POSITION OF THE USER AIR CHANGE RATE SELECTION

SWITCH CORRESPONDS TO THE SAME VFD SPEED SELECTION AT THE

co

I 0 ©LO 0CM

^[VFD-o CM NO Cx Oo

VFD.

230V/1

POWER BY

DIV 26

/n) [24Vco COORDINATE WITH THE VFD STARTUP REPRESENTATIVE TO CONFIGURE

THE VFD TO OPERATE AT THE LOW AIR CHANGE RATE AND HIGH AIR

CHANGE RATE BASED ON WHICH DIGITAL INPUT DI2 OR DI3 IS

ACTIVE. IF NEITHER DIGITAL INPUT IS ACTIVE, THE VFD SHALL

DE-ENERGIZE THE FAN.

o

TX

0< 001o

DPDT REMOTE

INTERFACE0ro SWITCHCM 0 PROVIDE CONTROL POWER FOR THE COIL OF THE RELAY. THIS

POWER MAY BE FROM A STAND ALONG TRANSFORMER, THAT IS

PROVIDED AND INSTALLED FOR THIS PURPOSE OR CONTROL POWER

FOR THE RELAY MAY BE OBTAINED FROM EITHER THE VFD OR THE

CM

MAU.GO

ALL CONTROL DEVICES (CONTROLLERS, SENSORS, SWITCHES ETC.)

SHALL BE WASH DOWN COMPATIBLE AND BE SUITABLE FOR A HIGH

MOISTURE ENVIRONMENT.

<oo < Cl

\U-6J

EXHAUST FAN EF-1 AND MAU-1 CONTROL DIAGRAMV)

U> SCALE: NONE£

O

ID

CM

O

CM

O

CM

CO

_Q O

“3

FINAL CONSTRUCTION DOCUMENTSCM

O'

DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETCL

102WTPJRBo> 134,842• ♦

CM MECHANICAL

CONTROLS DIAGRAMM-6JKS PMIS

SEKI 172423CM TECH. REVIEW:O

CM MVJ SHEET

lO LODGEPOLE

SEQUOIA NATIONAL PARK

DATE:

4/23/2021 93 of1 14

MAKE-UP AIR AND HEATING & VENTILATING UNIT SCHEDULE

TAG PURPOSE TYPE SUPPLY FAN SECTION INDIRECT GAS HEAT SECTION FILTER ELECTRICAL PHYSICAL MANUFACTURER NOTES

TOTAL

CFM

TSP

IN. W.G.

ESP RPM MAX

BHP

MOTOR DIA TYPE VFD VFD

BYPASS

CFM MBH

INPUT

MBH

OUTPUT

EDB LDB TURNDOWN FUEL GAS

PRESS, (in.w.g.)

APD

IN. W.G.

AREA

SF (MIN)

MERV CLEAN

APD

DIRTY

APD

V PH MCA MOP WEIGHT AND MODEL

IN. W.G. LBSHP Y/N °F °F A

MAU-1 PACKAGED - MAU 2,300 1.71 1.5 2630 1.1 1.5 15 DIRECT Y NO 2,300 153 123 3 65.9 16:01 10 TO 14 0.09 4.4 8 0.08 0.16 230 1 12.9 20 1200 GREENHECK IGX 1-6MAKEUP AIR LP

GENERAL NOTES APPLIES TO ALL UNITS: UNIT SPECIFIC NOTES

A. PERFORMANCE IS AT SITE CONDITIONS

B. DIRTY FILTER APD SHALL BE INCLUDED IN INTERNAL STATIC PRESSURE

C. PROVIDE UNITS WITH HIGH-PRO POLY COATING FOR CHEMICAL AND CORROSION RESISTANCE

D. ALL FANS SHALL BE TEFC TYPE, PREMIUM EFFICIENCY MOTORS.

1. DESIGN CONDITIONS ARE AT 6,500 FT UNLESS NOTED OTHERWISE.

2. PROVIDE WITH NEMA 4 RATED FACTORY CONTROLLER AND WASH DOWN COMPATIBLE TEMPERATURE SENSORS.

3. PROVIDE WITH OPTIONAL CONTROL ACCESSORIES IN ADDITION TO STANDARD PROVIDED CONTROLS - HEATING INLET AIR SENSOR DIRTY FILTER SWITCH, FURNACE CONTROLS, FREEZE PROTECTION, AUXILIARY EXHAUST STARTER CONTACTS.

4. PROVIDE UNIT WITH BASE RAIL.

5. PROVIDE WITH A SEISMIC CERTIFICATE OF COMPLIANCE AS EQUIPMENT IS CONSIDERED AN IMPORTANCE FACTOR OF 1.5. REFER TO SPECS FOR MORE INFO.

6. PROVIDE WITH SEPARATED COMBUSTION CONCENTRIC VENTING AND CONCENTRIC VENTING ADAPTOR (CVA-6).

FAN SCHEDULE

ELECTRICAL WEIGHTFANTAG SERVICE CFM ESP MOTOR CONTROLLER MANUFACTURER & MODEL NOTESTYPE DRIVERPM LBS GRILLE/REGISTER/DIFFUSER SCHEDULEHP V PH

EF-1 BUILDING EXHUAST TUBULAR CENTRIFUGAL2,300 1.50 1,610 BELT VFD NO BYPASS 1 1/2 230 3 256 GREENHECK TCB-1-16-151-4

TAG PURPOSE TYPE MOUNTING PATTERN NC ACCESSORIESMANUFACTURER

& MODEL

NOTESGENERAL NOTES: NOTES:

MAXPERFORMANCE IS AT SITE CONDITIONS

FANS MAY CONTAIN RESERVE CAPACITY, BALANCE TO PLAN CFM.

EQUIPMENT WITH 208V NAMEPLATES SHALL HAVE MOTORS SUITABLE FOR

OPERATION AT 180 VOLTS OR PROVIDED WITH 200V TO 208V TRANSFORMERS

PROVIDE FAN WITH HIGH-PRO POLY COATING FOR CHEMICAL AND CORROSION RESISTANCE

MOTORS SHALL BE TEFC TYPE WITH PREMIUM EFFICENCY RATING.

VFD AND DISCONNECT SHALL BE NEMA 4 RATED.

1. INTERLOCK EF-1 WITH MAU-1 SUCH THAT IF THE MAU WERE TO SHUT

DOWN, THE EF WOULD ALSO. REFER TO CONTROLS DIAGRAMS ON SHEET M-6.

2. PROVIDE WITH A SEISMIC CERTIFICATE OF COMPLIANCE AS EQUIPMENT

IS CONSIDERED AN IMPORTANCE FACTOR OF 1.5. REFER TO SPECS FOR MORE INFO.

3. TAB CONTRACTOR TO BALANCE FAN TO BE SLIGHTLY LESS AIRFLOWTHAN MAU-1

TO ALLOW BUILDING TO HAVE A POSITIVE PRESSURE OF APPROX. 0.03" W.C. (ADJ.)

4. VFD SHALL BE ABB ACH580 OR APPROVED EQUIVALENT. VFD SHALL BE CAPABLE OF

PROVIDING A MINIMUM OF 12 AMP INPUT FOR A SINGLE TO 3 PHASE CONVERSION

PRODUCING A MINIMUM OF 6 AMP OUTPUT.

A.

B. SUPPLY DRUM LOUVER SURFACE LOUVERED 35 PRICE HCDA

C. B EXHAUT GRILLE SURFACE LOUVERED 35 PRICE 530

GENERAL NOTES: NOTES:

D. A. ASSUMES 10dB ROOM ABSORPTION E.

F.

o>

-O cn

DOMESTIC WATER HEATER SCHEDULEX PLUMBING FIXTURE SCHEDULEo

CO

TAG DESCRIPTION ELECTRICAL NOTESSYM. DESCRIPTION CONNECTION SIZES* ELECT.

REQ'D

<o POWER AMPS V PHCW V H

DOMESTIC WATER HEATER, ELECTRIC, STATE MODEL CSB 120, 119 GALLON STORAGE, 98

GALLON PER HOUR RECOVERY AT 100°F TEMPERATURE RISE.

< ES-1 EMERGENCY SHOWER AND EYE/FACE WASH, HAWS MODEL 8309, 10-5/8" ABS PLASTIC SHOWERHEAD, STAINLESS STEEL EYEWASH RECEPTOR WITH

TWIN ABS PLASTIC EYE/FACE WASH HEADS. PULL ROD SHOWER ACTIVATION, PUSH FLAG OR FOOT TREADLE EYE/FACE WASH ACTIVATION, 1-1/4"

SCHEDULE 40 HOT-DIPPED GALVANIZED STEEL SUPPLY AND WASTE, ANSI Z358.1 COMPLIANT.

1-1/4" 1-1/4" 1-1/4" 100DWH-1 24 Kw 240 1 1Xo

DOMESTIC EXPANSION TANK, AMTROL EXTROL ST-30VC, 14 GALLON TANK VOLUME. 9 GALLON

MAXIMUM ACCEPTANCE VOLUME, 140°F MIN. DESIGN TEMP.ET-1

NOTES:

FD-1 FLOOR DRAIN (FINISHED AREAS) - JOSAM 30000-A, COATED CAST IRON FLOOR DRAIN, TWO PIECE BODY, DOUBLE DRAINAGE FLANGE, BOTTOM NO

HUB OUTLET CONNECTION, 1/2" TRAP PRIMER TAP IF REQUIRED, ADJUSTABLE SATIN BRONZE STRAINER, VANDAL PROOF SCREWS.

2I 1. SET WATER HEATER OUTLET TEMP TO MOT.

if)

CM

O CNI S-1 WALL-HUNG SINK, ELKAY MODEL CHSB1716, SINGLE COMPARTMENT, 20 GAUGE TYPE 304 STAINLESS STEEL, 16-3/4" x 15-1/2" O.D. 6" DEEP BOWL, STAINLESS STEEL GRID STRAINER. CHROME PLATED FLEXIBLE ANGLE SUPPLIES WITH KEYED STOPS. FAUCET, ELKAY MODEL LKB400, 4" CENTERS, BACKSPLASH MOUNTED FITTING, CAST SWING SPOUT, AERATOR, LEVER HANDLES, REMOVABLE CARTRIDGES. PROVIDE WITH WATTS LFUSG-B

THERMOSTATIC MIXING VALVE.

1-1/2" 1/2" 1/2" xo in TMV-1 THERMOSTATIC MIXING VALVE, SAFETY SHOWERS, HAWS 9201E, 31 GPM, REDUNDANT THERMOSTATIC ELEMENTS, FAIL SAFE TO COLD WATER

BYPASS ON ELEMENT FAILURE OR LOSS OF COLD WATER, SET POINT: 80°F.

1-1/4" 1-1/4"o

<cr o ro

CM

CM

PIPING SCHEDULE

if)

SYSTEM PIPE SIZES PIPING MATERIAL JOINING METHOD INSULATION□

< LPGV, EXTERIOR UNDERGROUND 3/4- HIGH DENSITY POLYETHELYENE FUSION BONDED NOOo

LPGV - EXPOSED 3/4", 1" ASTM A-53 GRADE B BLACK STEEL NOTHREADED

V) GENERAL NOTES:u>

£o HDPE PIPING SHALL NOT BE INSTALLED CLOSER THAN 18 INCHES BELOW GRADE.

TRACER WIRE TO BE INSTALLED ON ALL UNDERGROUND PROPANE PIPING.

A.

B.

in

CM

o

CM

O

CM

CO

PROPANE PRESSURE REDUCING VALVE SCHEDULE.a o

“3

ITEM LOCATION SERVICE PRESSURE MANUFACTURER

AND MODEL

NOTES• • CONNECTION

CAPACITY SIZEOUTLETMAX. INLET FINAL CONSTRUCTION DOCUMENTSCM

Od

1ST STAGE, PROPANE TANK TO BUILDING 250 PSIG 10PSIG 200,000 BTU/H 3/4" FNPT EMERSON / FISHER, R222H-DGJ 1,2PRV-5 LP TANK DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETPRV-6 BUILDING ENTRY 2ND STAGE, AT BUILDING 10 PSIG 11" WC 200,000 BTU/H 3/4" FNPT EMERSON/FISHER, R642-DFF 1,2Q_

102WTPJKSo> 134,842• ♦

NOTES:CM MECHANICAL

SCHEDULESM-7JKS PMIS

SEKI 172423

1. INSTALL PRESSURE REDUCING VALVES IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS AND NFPA 58.

PRVs INSTALLED OUTSIDE MUST BE PROTECTED FROM SNOW/ICE ACCUMULATION.

CM TECH. REVIEW:O 2.CM MVJ SHEET

in LODGEPOLE

SEQUOIA NATIONAL PARK

DATE:

4/23/2021 94 of1 14

INSTRUMENTATION DRAWINGS LIST GENERAL NOTES (APPLY TO ALL SHEETS)

SEISMIC INSTALLATION: PROVIDE VIBRATION ISOLATORS, SEISMIC RESTRAINTS, AND OTHER

HARDWARE NECESSARY FOR INSTRUMENTS, HANGER ASSEMBLIES AND FOR SECURING

COMPONENTS, ENCLOSURES AND CONDUITS. PROVIDE STRUCTURAL SUPPORT, DESIGNED FOR

THE SEISMIC REQUIREMENTS FOR THE SITE, BY A PROFESSIONAL SEISMIC ENGINEER

LICENSED IN THE STATE OF CALIFORNIA.

-1 WTP INSTRUMENTATION

INSTRUMENTATION

INSTRUMENTATION NETWORK DIAGRAM

INSTRUMENTATION SITE PLAN

INSTRUMENTATION EXISTING WTP-PLAN

INSTRUMENTATION PLAN

CONDUIT SCHEDULE

INSTRUMENTATION SECTION

INSTRUMENTATION SECTION

INSTRUMENTATION SECTION

INSTRUMENTATION SECTION

INSTRUMENTATION DETAILS

LEGEND

LEGEND-2 WTP

— 3 WTP

-4 WTP

-5 WTP

-6 WTP

-7 WTP

-8 WTP

-9 WTP

-10 WTP

-11 WTP

-12 WTP

GENERAL ELECTRICAL NOTES AND SPECIFICATIONS

CONSTRUCTION SHALL BE REPAIRED AT NO ADDITIONAL COST TO THE OWNER.

OPENINGS IN WALLS OR ENCLOSURES LEFT AS A RESULT OF ’’REMOVAL”

WORK SHALL BE PATCHED, PLUGGED OR PROVIDED WITH A BLANKING PLATE.

ROOF PENETRATIONS SHALL BE REPAIRED AND RE-SEALED IN ACCORDANCE

WITH THE ROOF MEMBRANE MANUFACTURERS INSTRUCTIONS.

1. ELECTRICAL WORK UNDER THIS CONTRACT IS SHOWN ON THE ACCOMPANYING

DRAWINGS.

2. PROVIDE ALL LABOR AND ALL MATERIALS REQUIRED TO COMPLETE THE

PROJECT.

10. ALL ELECTRICAL CONTROL DEVICES SHALL BE FURNISHED WITH FUSES AND

OVERLOAD DEVICES SO THAT IT IS IN A ’’READY FOR START-UP” CONDITION.3. ELECTRICAL AND INSTRUMENTATION COMPONENTS, MATERIALS AND

INSTALLATION SHALL BE SELECTED AND INSTALLED ACCORDING THE

REQUIREMENTS OF THE DIVISION 26 SPECIFICATIONS. NOTHING IN THESE

DOCUMENTS ALLOWS MATERIALS AND INSTALLATIONS THAT ARE CONTRARY TO

THE REQUIREMENTS OF THE DIVISION 26 SPECIFICATIONS.

11. GROUNDING BUSHINGS SHALL BE INSTALLED AT ALL CONDUIT TERMINATIONS

EXCEPT WHERE TERMINATED AT ENCLOSURES PROVIDED WITH A GROUND BUS

OR GROUND LUG. GROUND LUGS SHALL BE PROVIDED IN RACEWAY JUNCTION

BOXES AND PULL BOXES.

4. RACEWAYS SHALL BE PVC COATED GRC, NO SUBSTITUTES WILL BE

ACCEPTED. 12. GROUND WIRE TERMINATIONS TO BOXES AND PANELS SHALL HAVE TWO STAR

WASHERS AND BE TIGHTLY SECURED. ALL GROUNDING SURFACES SHALL HAVE

PAINT OR FINISH REMOVED DOWN TO BARE METAL.5. SPLICING OF CONDUCTORS IS NOT ALLOWED. ALL TERMINATIONS SHALL BE

MADE AT TERMINAL STRIPS EXCEPT THAT FULLY INSULATED TOOL CRIMPED

BUTT SPLICES SHALL BE UTILIZED WITH COMPONENTS EQUIPPED WITH

PIGTAILS.

13. WHERE CONDUCTORS TERMINATE AT CONNECTORS UNSUITABLE FOR STRANDED

WIRE, RING OR FLANGED SPADE TERMINALS SHALL BE USED WHERE

POSSIBLE. ALL TERMINALS SHALL BE SELF INSULATING TYPE.

o>

"O 6. UNIONS OR OTHER MEANS SHALL BE UTILIZED IN CONDUIT ADJACENT TO

SOLENOIDS, INSTRUMENTS, LIMIT SWITCHES, ETC., TO FACILITATE REMOVAL

FOR MAINTENANCE.

o o

7. PROVIDE AND INSTALL ALL NECESSARY UNISTRUT BRACKETS, STAND-OFFS,

SUPPORT STRUCTURES, ETC., SO AS TO SECURELY SUPPORT PANELS, LIMIT

SWITCHES, PRESSURE SWITCHES, DISCONNECTS, CONDUIT RUNS, ETC.

O

8. THE DRAWINGS SHOW INTENDED CONDUIT AND CABLE TRAY ARRANGEMENT.

THEY ARE NOT INTENDED TO SHOW EXACT LOCATIONS. THE CONTRACTOR

SHALL CAREFULLY INSPECT THE EQUIPMENT AND SUPPORT STRUCTURES AND

CAREFULLY LAYOUT THEIR WORK IN COORDINATION WITH OTHER TRADES SO

THAT IT PRESENTS A NEAT AND WORKMAN-LIKE FINISHED APPEARANCE, AND

PRESENTS MINIMUM INTERFERENCE TO MAINTENANCE AND REPAIR. ANY

INSTALLED RACEWAYS NOT MEETING THE OWNERS APPROVAL SHALL BE

REPLACED AT CONTRACTORS EXPENSE.

oc

I

LO

CM

O

CM 9. DAMAGE TO BUILDING WALLS OR STRUCTURES OCCURRING AS A RESULT OF

(/)o

<cro ro

CM

CM

GO

<oo o

(0u> £o in CMo

CM

O

CM

CO

_Q O

“3

FINAL CONSTRUCTION DOCUMENTSCM

Od

DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETCL

102WTPAJS00

134,842• ♦

CM INSTRUMENTATION

LEGEND1AJS PMIS

SEKI 172423CM TECH. REVIEW:O

CM MDB SHEETin LODGEPOLE

SEQUOIA NATIONAL PARK

DATE:

4/23/2021 103 of1 14

BASIC

PROCESS

CONTROL

PLC

FUNCTION

COMPUTER

SYSTEM AND

SOFTWARE

SCADA

FUNCTION

FIELD

INSTRUMENT

OR DEVICE

INSTRUMENTATION AND CONTROL LEGEND ABBR. DESCRIPTION ABBR. DESCRIPTION

SYMBOL DESCRIPTIONSYMBOI DESCRIPTION

-ABBREVIATIONS-ELECTRICAL SCHEMATICS LEGEND -GRAPHIC SYMBOLS-

© KEY NOTE AE ANALYZER ELEMENT

ABOVE FINISHED FLOOR

ACCESS PANEL

ANALYSIS TRANSMITTER (pH, CONDUCTIVITY, 02)

AMERICAN WIRE GAUGE

BLOWER

BELOW FINISHED FLOOR

BALANCING VALVE

CONDUIT WITH AC POWER

CONDUIT DC SIGNAL

CENTERLINE

CONTRACTING OFFICER REPRESENTATIVE

CONTROL PANEL

DIFFERENTIAL PRESSURE

ELECTRICAL EQUIPMENT DISCONNECT

EXISTING

ELECTRIC METALLIC TUBING

ELECTRIC VALVE

FILTRATE

FAIL CLOSED

FLOW CONTROL VALVE

FLOW ELEMENT

FLOW INDICATOR

FLOW INDICATION TRANSMITTER, SIGNAL

FLUME

THE PHYSICAL FLOW METER

FAIL OPEN

FILTER RECEIVER

FLOAT SWITCH HIGH, NOT AN ISA TAG

FLOAT SWITCH LOW, NOT AN ISA TAG

FLOW TRANSMITTER

FLEX CONNECTION

GALVANIZED RIGID CONDUIT

HAND VALVE

INSIDE DIAMETER

CURRENT TRANSFORMER

JUNCTION BOX

LEVEL ELEMENT

LEVEL INDICATION TRANSMITTER

LEVEL SWITCH HIGH

LEVEL SWITCH LOW

LEVEL TRANSMITTER

MAGNETIC

MIXER

NORMALLY CLOSED

NORMALLY OPEN

NOT IN CONTRACT

NOT TO SCALECD A.F.FFEEDER NOTE

AP (N) NEW

❖ EQUIPMENT NOTE

AT ORP DISSOLVED OXYGEN WATER

FIBER OPTIC CABLE MECHANICAL EQUIPMENT NOTE AWG P PUMPo O- ETHERNET CABLE

B PB PULLBOX

PRESSURE CONTROL VALVE

DIFFERENTIAL PRESSURE SWITCH HIGH

PRESSURE INDICATOR TRANSMITTER

PANEL

PRESSURE SAFETY ELEMENT

PRESSURE SWITCH HIGH

PRESSURE SWITHC LOW

PRESSURE SAFETY VALVE

PRESSURE TRANSMITTER

PROCESS WASTE WATER

PROCESS WASTE WATER VENT

RECEPTACLE

REFERENCE

REMOTE INPUT/OUTPUT

RESISTANCE TEMPERATURE DETECTOR

CONDUIT WITH NET PORT

SUPERVISORY CONTROL & DATA ACQUISITION

TERMINAL BLOCK

TEMPERATURE ELEMENT

THERMOPLASTIC HEAT/WATER RESISTANT

TEMPERATURE SWITCH HIGH

TEMPERATURE SWITCH LOW

TEMPERATURE TRANSMITTER

TYPICAL

TWISTED SHIELDED PAIR

UNINTERRUPTIBLE POWER SUPPLY

ULTRASONIC

VARIABLE FREQUENCY DRIVE

VARIABLE SPEED DRIVE

VIBRATION TRANSMITTER

WATER TREATMENT PLANT

WASTE WATER TREATMENT PLANT

START SIGNAL

CONTROL VALVE WITH SOLENOID

LIMIT SWITCH OPEN

LIMIT SWITCH CLOSED

HATCHING INDICATES ITEM(S) TO BE REMOVED

INSTRUMENT AND CONTROL CABLE 33 B.E.F. PCVNORTH ARROW

LEASED PHONE LINES BV PDSH

CA PIDETAIL BUBBLE1SMART MOTOR CONTROL CENTER (MCC)

CD PNL141 DETAIL NUMBER

SHEET NUMBER - WHERE DETAIL IS SHOWN CL PSE0 SCADA SERVER CONNECTION TO PROCESS

CONTROL AND PARK NETWORKS ELECTRICAL RACEWAYS

-----[I- CABLE TRAY

COR PSH

CP PSLSCADA TERMINAL AND PARK DESKTOP

DP PSV

CONDUIT EMT OR GRC

DSC PTINSTRUMENT AND CONTROL CABLE□ © (E) PWWKEY NOTE SYMBOL

PROGRAMMABLE LOGIC CONTROLLER PWWVEMT(PLC)

RCPTEV

ETHERNET SWITCH FOR FIBER AND CAT

ETHERNET NETWORK

DIRECTIONAL ANNTENNA

REF

RIOECHi'

ECV RTD

FE SOMNI-DIRECTIONAL ANTENNA ELECTRICAL SCHEMATICS LEGENDQ El SCADA o /o /o

FIT TBDISCONNECT SWITCH (3PH)

FLM TE

°V^ CIRCUIT BREAKER (3PH)

O' O' O'

FM THWN

FOo> TSH£ PRESSURE SWITCH

FLOW SWITCH

g PRESSURE DIFFERENTIAL SWITCH

@ FLOW TRANSMITTER

@ PRESSURE TRANSMITTER

LEVEL SWITCH

@ LEVEL TRANSMITTER

@ PRESSURE DIFFERENTIAL TRANSMITTER

(0) MOTOR

PRESSURE SWITCH

0 TEMPERATURE SWITCH OR METER

0 DENSITY METER

0 MAGNETIC FLOW METER

CZ> CONDUIT CALL-OUT

© CEILING MOUNTED JUNCTION BOX

WALL MOUNTED JUNCTION BOX

© SPEED CONTROL

FLOW CONTROL

PS

"O FR TSLCIRCUIT BREAKER (1PH)o oo

FSH TTDISCONNECT SWITCH (1PH)O FSL TYP

OVERLOAD PROTECTION FT TWSHD

FXo UPSPUSH-TO-TEST PILOT LIGHT

(COLOR R=RED, G=GREEN, A=AMBER)

FUSE

LS GRC< USo HV VFDn I.D. VSDPILOT LIGHT a: IT VTCONTACT (NORMALLY OPEN)(/)

JB WTP

7^ CONTACT (NORMALLY CLOSED) LE WWTPCM

rTi i LIT XSRTRANSFORMER

LO LSH XVCM

O SOLENOID LSLCM ZSH

LTOFF ZSL(/> JAND AUTOq> MAG£ HAND-OFF-AUTO SWITH(/) MXo °X00o

NCSTOP PUSHBUTTONo I o NO< 1cr SPEED SENSING ELEMENT START PUSHBUTTONO o o

SPEED TRANSMITTER

TB TERMINAL BOX

PULL BOX □ PUSHBUTTON

[hJ] POSITION SWITCH - LINEAR DISPLACEMENT HORN

0 TRANSFORMER

o CONDUIT DOWN

Lro

GROUNDCM

CM

TEMPERATURE SWITCH (NORMALLY CLOSED)

TEMPERATURE SWITCH (NORMALLY OPEN)

GO

LIMIT SWITCH (NORMALLY OPEN)□ LOCATED IN THE FIELD

NOT PANEL, CABINET, OR

CONSOLE MOUNTED.

VISIBLE AT FIELD LOCATION.

NORMALLY OPERATOR

ACCESSIBLE.

O LIMIT SWITCH (NORMALLY CLOSED)O=0CT TAG ID

TAG NO.

' TAG ID N

TAG NO,

TAG ID

TAG NO

o

CONDUIT UPOo LIMIT SWITCH (NORMALLY OPEN - HELD CLOSED)< O^jCL

SEAL—OFF

(0

0^0u> LIMIT SWITCH (NORMALLY CLOSED - HELD OPEN)£ O

LOCATED FRONT MAIN PANEL

VISIBLE ON FRONT OF PANEL

OPERATOR ACCESSIBLE

FLOAT SWITCH (NORMALLY OPEN) TAG ID TAG ID TAG ID

CONDUITID TAG NO. TAG NO, TAG NOFLOAT SWITCH (NORMALLY CLOSED)TTCM CABLEO

CM INTRINSICALLY SAFE CIRCUITIS

PRESSURE SWITCH (NORMALLY OPEN) LOCATED AT REAR OF MAIN PANEL

NOT OPERATOR ACCESSIBLE

O CM CONTROL CIRCUITc

CO TAGJD

TAG© NO

TAGJD

TAG© NO

' TAG ID N

TAG_ NO

JO PRESSURE SWITCH (NORMALLY CLOSED)*7?POWER CIRCUITPO

“3

13 TERMINALS FOR FIELD WIRING

FIT11 (2 PR 16 AWG TWSHD)

FLOW SWITCH (NORMALLY OPEN)

LOCATED ON FRONT OF

SECONDARY PANEL

VISIBLE ON FRONT OF PANEL

OPERATOR ACCESSIBLE

FINAL CONSTRUCTION DOCUMENTSCM

O' FLOW SWITCH (NORMALLY CLOSED)°T\ lCABLE TYPE

LCABLE TAG

TSH11 [100,102(2 x 14 AWG BLU TWHN)]

TAG ID TAG ID TAG ID DESIGNED: DRAWING NO.0 SUB SHEET NO. TITLE OF SHEETQ_ TAG NO.TIMING RELAY .TAG NO, TAG NO 102WTPAJSoo (con) 134,842• ♦

CONTACTORCM LOCATED AT REAR OF

SECONDARY PANEL

NOT OPERATOR ACCESSIBLE

INSTRUMENTATION

LEGEND2AJS PMIS

SEKI 1724230/ / 1— WIRE SIZE

/ ^NUMBER OF WIRES

^-WIRE NUMBERS

DEVICE TAG

CM TAG ID ' TAG_ID N

TAG- NO

TAG_ ID.

TAG- NO

CONTROL RELAY TECH. REVIEW:O

CM MDBTAG NO.© SHEET

lO MOTOR LODGEPOLE

SEQUOIA NATIONAL PARK

4/23/2021 104 of1 14

ANTENNA

O

ANTENNA(N) ETHERNET

RS-232 RS-232RADIO

408.075J J-I 111 RADIO

408.075 MHz

> 0MHzml PLANT

CONTROL ■

(E) ETHERNET SWITCHOMNI ANTENNA

PLANT

CONTROL -rro □ □ □ □

1 z Il234gd I I 11234561 I I

(N) ETHERNETHd o H ©□□□□□□□□□□□□□□□□

□□□□□□□□SCADA SCADA

RS-232 RS-232

WONDERWARE

CENTRAL COMPUTER

SYSTEM

WONDERWARE

CENTRAL COMPUTER

SYSTEM

□□□□□□□□* = V —

■>> <PHOTOVOLTAIC MODULES

3 - 50W PANELS

>(y

RTU-3

(T-37815)

RTU-6

(T-37815) (T-37815)(T-8431X1) r 7RTU CABINET

2 3CLOVER CREEK WATER TREATMENT PUVNT WOLVERTON WATER TREATMENT PUVNT

l—3 l—312VDC POWER SCALE: NONE SCALE: NONEssRADIO

408.075 MHz CHARGE

REG.

k 1 i i ll234S6l I I WUKSACHI RESERVOIRS - RTU-5 0□□□□□□□□ i 312/28V

DC-DC

CONVERTER

i CLOVER CREEK

PIU-3BATTERY CABINET (NEMA-3R VENTED) I

(T-37815)

CD

£ LODGEPOLE FILTER

(NEW)

36*36,23.5"N 118,43’42.4”Wr TWUKSACHI DOSING

STATION - RTU-10

(EXISTING)

□□□□□□□□XJ ,2^500.00-1

ar =

0 --------—FT.»

< 3ANTENNA OMNIANTENNA ______ *---------RTU-5 L2000O

-------------------------■« —L J ANTENNA / \

X/cr Co RADIO 408.075

RADIO

408.075

RADIO

408.075

/ s \ LODGEPOLE

LIFT STATION - RTU-7

Qn\ 36'36’16.0”N 118'44’02.7”W

YN

4—20mA t /MHz MHzMHz4—20mA

/RED EIR SPRAY/LEACH

FIELD - RTU-1

it it i i /O /

/w

/ WOLVERTON

TREATMENT PLANT -

36'36’21.4”N 118'45’01.4”W

11234561 I I 11234561 I I 11234561 I I / ^ fU, RTU-6

□□□□□□□□ METERED FLOW □□□□□□□□ / e>C£

| * FIBER OPTIC

3 CONVERTER

o/ o'CO LEVEL DATA /AP□□□□ □□□□□□□□ w = w = •r =RTU-1

(T-37815)

RTU-4

(T-37815)

RTU-7

(T-37815)

/175000 GALLON 175000 GALLONro /

LEVEL

TRANSMITTER

72-501

LEVEL

TRANSMITTER

72-501 aI /

/fLO

/LEACH FIELD/

SPRAY FIELD

CM ao /CM

/1 GIANT FOREST RESERVOIRSWUKSACHI VILLAGE RESERVOIRS /at/> (PINEWOOD) LODGEPOLE LIFT STATIONRED EIR SPRAY FIELD /l—3 SCALE: NONE /

if) Ia p

/a /<cr /o SHEET NOTES aro FD -------- FH0 ANTENNACM ANTENNA (PINEWOOD) GIANT FOREST

RESERVOIR - RTU-4 (E)

1. CLOUDED AREAS DEFINE EQUIPMENT THAT WILL BE MODIFIED IN THE SCOPE OF

THIS PROJECT. LIGHT COLORED ITEMS ARE EXISTING, BOLD BLACK ITEMS

ARE IN THE SCOPE OF WORK.

PINEWOOD WELL HOUSE

- RTU-9 (NEW)

CM a

RADIO

408.075

RADIO

408.075

FIBER OPTIC

CONVERTER

a 0lif) FD -------- FD --------- FD MHz o KEY NOTES Ti t i t 4 COMMUNICATIONS LAYOUT<oo l—3 SCALE: NONE00 CLOVER CREEK CENTRAL NO CHANGE TO EXISTING.<

'' nnV) 0 □ □WOLVERTON CENTRAL NO CHANGE TO EXISTING.u> a□□□□□□□□□□□□□□□□

$ □□□□ _n □□□□ j

□□□□ LL □□□□

□□□Q □□□■□□□□ NEW FILTER0 BID OPTION 1 SCADA UPGRADE INCLUDES AN UPGRADE EXISTING CLOVER CREEK WWTP

SCADA SERVER, INSTALLATION OF RADIO TRANSCEIVER AND ANTENNA ON LODGEPOLE

WTP. THE SCADA SERVER UPGRADES SHALL PROVIDE THE REMOTE ACCESS INCLUDING

NEW GRAPHICAL DISPLAYS PROVIDING SYSTEM STATUS, REMOTE ALARMING, AND

RECORDING OF PROCESS VALUES. SERVER SHALL POLL DATA FROM THE DATA LOGGER

INSTALLED IN THE LODGEPOLE PLC CABINET. SHALL PROVIDE REQUIRED MATERIALS,

PROGRAMING, AND COMMISION REQUIRED TO PERFORM THE INSTALLATION. INSTALL

SHALL BE COORDINATED WITH THE NATIONAL PARK SERVICE.

PLC□□□□□□□□

QQQQRTU-10in RTU-9 RTU-11CMo

CM

WUKSACHI - CHLORINE EXISTING LODGEPOLE WTPLODGEPOLE WTP (NEW)PINEWOOD WELL HOUSEo

DOSING STATIONCM

to O

“3

5 COMMUNICATIONS LAYOUT• •

0 A RADIO SURVEY MEASURED A STRONG RADIO PATH BETWEEN CLOVER CREEK WWTP

AND THE PROPOSED SITE OF THE NEW LODGEPOLE WTP. THE TEST WAS PERFORMED

WITH AN YAGI LAIRD Y4063 3 ELEMENT MOUNTED AT A HEIGHT OF 20 FEET ABOVE

GROUND. SURVEY MEASURED AN RSI OF -70/-72 AND AN SNR OF 27. SEE KEY

NOTES 3 AND 5 FOR INSTALLATION REQUIREMENTS.

(E\ PROVIDE GE MDS MDS4B TRANSCEIVER OPERATING IN 408.075 MHz., YAGI ANTENNA w LAIRD Y4063 WITH 3 ELEMENTS, AND POLYPHASER IS-50NX-C2-MA LIGHTING

ARRESTER.

I-3 SCALE: NONE FINAL CONSTRUCTION DOCUMENTSCM

Od

CORDINATE THE INSTALLATION OF ETHERNET NETWORK WITH TESCO, THE EQUIPMENT

W MANUFACTURE, AND THE NPS. IF THE SYSTEM REQUIRED SUPPORT OF TCP/IP OVER

ETHERNET PROVIDE AND INSTALL A UNMANAGED NETWORK SWITCH IN THE IN THE SAME

CABINET AS THE RADIO TRANCEIVE IS INSTALLED. PROVIDE AND INSTALL A CAT5e

CABLE BETWEEN THE RADIO TRANSEIVER AND THE CLOVER CREEK SCADA SERVER.

DRAWINGS OF THIS INSTALLATION ARE NOT PROVIDED, FIELD VERIFY THIS INSTALLATION

IF REQUIRED.

DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETQ_

102WTPAJSoo 134,842• ♦

CM INSTRUMENTATION

NEWTWORK DIAGRAM3AJS PMIS

SEKI 172423CM TECH. REVIEW:O

CM MDB SHEET

in LODGEPOLE

SEQUOIA NATIONAL PARK

DATE:

4/23/2021 105 of1 14

6” WIDE YELLOW PLASTIC

MARKER TAPES "DANGER

ELECTRIC UTILITY”

RESTORE TO ORIGINAL

CONDITION, LANDSCAPE,

BLACKTOP OR CONCRETE

FINISH GRADE, LANDSCAPE, NATURAL SOIL,

BLACKTOP OR CONCRETE PAVEMENT AS FIELD

VERIFIED GENERAL NOTES:

1. DRAWING SHOWS APPROXIMATE LOCATION AND

SIZE OF ALL EQUIPMENT. FIELD VERIFY ALL

EQUIPMENT LOCATIONS.

COMPACTED ORIGINAL SOIL

BACKFILLk

2”*--- ~ .3

WIDTH AS REQUIRED FOR ONE CONDUIT DUCT. 2. CONFIRM EXACT MOUNTING LOCATION OF

PROCESS EQUIPMENT WITH THE WWTP

INSTALLER PRIOR TO ROUGH-IN.

-if-Hr 3. REFER TO THE CABLE AND CONDUIT TABLE ON

SHEET I5 FOR ADDITIONAL INFORMATION.PVC CONDUIT WITH

MULTI-CONDUCTOR

CABLE AND PULL

STRING

■if* ^ ■if

4. DRAWINGS ARE DIAGRAMMATIC AND ARE

PROVIDED TO SHOW INSTRUMENT LAYOUTS,

PROVIDE A PROOF OF CONTRACTIBILITY.

CONTRACTOR IS RESPONSIBLE FOR INSTALL

EQUIPMENT PER MANUFACTURE REQUIREMENTS.

6 6if

23-01

2 SINGLE DUCT DETAIL 5. CONTRACTOR SHALL REPORT ANY DISCREPANCY

BETWEEN THE EXISTING INSTALLATION AND

CONTRACT DOCUMENTS TO THE NPS PROJECT

MANGER.

I-4 SCALE: NONE

O 213 )

KEY NOTES:

4 33’-3

(7) INSTALL CABLE 213 FROM THE PLC IN THE NEW

WTP TO EXISTING WTP. CABLE WILL EXTEND THE

ANALOG SIGNAL FROM THE LEVEL TRANSMITTER

INSTALLED IN THE LODGPOLE WATER STORAGE

TANK TO THE NEW WTP. RACEWAY BETWEEN THE

TWO BUILDING SHALL BE INSTALLED WITHIN THE

SAME TRENCH USED FOR THE WATER PIPELINE

REFER TO CIVIL DRAWINGS FOR TRENCH DETAILS.

32-03

02—01CD

|i H

■3 oo

B 2 rO

B

02-01 27—01 a £ 32-0105 i m02-01

& 01-03 f 02-01

Cm i 01-07

23-0101-06

1Io S' 01 -04 je<

PT

16 8 0 16 32

SCALE ©

SCALE OF FEET

i FINAL CONSTRUCTION DOCUMENTS

DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETQ.

102WTPAJSto 1 INSTRUMENTATION SITE PLAN 134,842t t

CM

SCALE: (7) INSTRUMENTATION

SITE PLAN

I-4 4AJS PMIS

SEKI 172423CM TECH. REVIEW:O

CM MDB SHEETin LODGEPOLE

SEQUOIA NATIONAL PARK

4/23/2021 106 of1 14

(N)d 0^T'

GENERAL NOTES:

1. DRAWING SHOWS APPROXIMATE LOCATION AND SIZE

OF ALL EQUIPMENT. FIELD VERIFY ALL EQUIPMENT

LOCATIONS.00 EX PRESSURE

— FILTERS LWT-19 2. CONFIRM EXACT MOUNTING LOCATION OF PROCESS

EQUIPMENT WITH THE WWTP INSTALLER PRIOR TO

ROUGH-IN.

H EQUIPMENT \

LWT-1

\OLWT-1,3 3. REFER TO THE CABLE AND CONDUIT TABLE ON

SHEET I5 FOR ADDITIONAL INFORMATION.\

PT-01> \

f. 4. DRAWINGS ARE DIAGRAMMATIC AND ARE PROVIDED

TO SHOW INSTRUMENT LAYOUTS, PROVIDE A PROOF

OF CONTRACTILITY. CONTRACTOR IS RESPONSIBLE

FOR INSTALL EQUIPMENT PER MANUFACTURE

REQUIREMENTS.

I

\(E) PAN EL

LP-LPT

(E)UTILITY

METER

I I eV \ CONTRACTOR SHALL REPORT ANY DISCREPANCY

BETWEEN THE EXISTING INSTALLATION AND CONTRACT

DOCUMENTS TO THE NPS PROJECT MANGER.

5.A u u \£5 l---------

XJ l I / 4^3 \ 3 E X1/

LWT—40-Q_ 7X-J At AO FT^2>(E) IQ

FT-OI^E)/

KEY NOTES:LxJ

(E) <FE-02)-------------

(FLOW SENSOR-TYP) 0 INSTRUMENTATION CONDUIT FROM THE NEW LODGEPOLE

WTP TO RTU-11 CABINET.

o_ O \

0LWT-14 PROVIDE AND INSTALL NEW 4-20mA ANALOG SIGNAL

SPLITTER IN RTU-11 CONTROL CABINET. SIGNAL

SPLITTER WILL BE USED TO EXTEND THE ANALOG

SIGNAL OF THE EXITING LODGEPOLE STORAGE TANK

LEVEL TRANSMITTER TO THE NEW WTP AND MAINTAIN

THE OPERATION OF THE EXISTING PLANT. POWER FOR

THE SPLITTER SHALL BE PROVIDED BY A 24VDC CIRCUIT

ORIGINATING IN THE NEW LODGEPOLE WTP PLC.

COORDINATE EXACT CIRCUIT FOR THE SIGNAL SPLITTER

POWER WITH THE EQUIPMENT MANUFACTURERS

DOCUMENTATION.

<BPH

<BP=2

CO

X

\0 LWT-6,8 W±2>•(E) PAN EL LP-LWTO

LWT-9(E)<frru-1 LWT-11

(E) <FE-01^

I a:

o83Bco

■^<FS0<LWT-10

LWT-17in

LWT-13I

3in OCM O

(E) VALVECM

LCP Sco

LWT-2,4 EX EXHAUST FAN10

UH0

CO So

<cr o

EX 4” CONCRETE

SIDEWALK

ro

CM

CM

CO

Oo o

1 EXISTING LODGEPOLE WTP - PLAN(0u> SCALE: (A)£ l—5

Q

Clin CMo

CM

O

CM

CO 2 0 2 4Q

SCALE (A)o “3

SCALE OF FEET• •

FINAL CONSTRUCTION DOCUMENTSCM

Od

DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETCL

102WTPAJS00

134,842• ♦

CM INSTRUMENTATION

EXISTING WTP - PLAN5AJS PMIS

SEKI 172423CM TECH. REVIEW:O

CM MDB SHEETm LODGEPOLE

SEQUOIA NATIONAL PARK

4/23/2021 107 of1 14

0 215)INSTRUMENT RACKFSLYFSMYFSI

3 1 3 A3 4> e><0MI— TOAIT AIT AIT Ain A TIT CP25RP25 iH 188 ) 0EXISTING8 7 9 1 1 200 )189 ) 135B )SV-6J WTP RE: l—4

2T0 )( 199 )-( 187TB-3 GENERAL NOTES:o0 Kp.'GFIr rX 1. DRAWING SHOWS APPROXIMATE LOCATION AND

SIZE OF ALL EQUIPMENT. FIELD VERIFY ALL

EQUIPMENT LOCATIONS.

\\\n^L I / \^—EXX3t I!( 193

□s 6j

206 ) P-6im

<FR>

\2. /PIT 139 ) V^v5PIT L<7 2. CONFIRM EXACT MOUNTING LOCATION OF

PROCESS EQUIPMENT WITH THE WWTP

INSTALLER PRIOR TO ROUGH-IN.

^V-1> V [e}——

1 2CLEARWELL

HATCH 50 <£E§( 135

( 135C MP— t

( 204 ^ ( 203 JXX2e

( 129 ( 130 ) ( 132 ) ( 135A )

3. REFER TO THE CABLE AND CONDUIT TABLE ON

SHEET I5 FOR ADDITIONAL INFORMATION.

4£ ▲( 142 ( 138 )-^

<FWP-1> 205 )

4. ALL EQUIPMENT LOCATED IN THE WATER

TREATMENT ROOM SHALL BE NEMA 4X, WET

LOCATION AND CORROSIVE RATED. CONDUIT

AND JUNCTION BOXES IN THE WATER

TREATMENT ROOM SHALL BE WET LOCATION AND

CORROSION RATED.

145'O ____Qi„c <|y3> <^> ( 151 ( 150 )<Ei>122 ) ( 143 K

( 144 ) N So—l jkiX-CEi?( 120 ) KEY NOTES:123 ) < 159 )2J L ■V

0\pEi> WALL MOUNT ANALYZER INSTRUMENT REFER TO SHEET I8 FOR MOUNTING DETAILS.[fe c i ^ Ei/LE c B

< 146 ) < 147 )

IT3 330 0FSL SFM—1

cv-r

INSTALL TURBIDITY METERS ON THE FILTRATION

TANKS CONSULT FILTER MANUFACTURER'S

MANUAL FOR MOUNTING DETAILS.

1 A 1 Zs □ 7 ( 101_8X

EV—7

EV—8

2s~~^1B 0,10CJ97 □31 i,7 LT

< 196 )

195 )

PROVIDE COAXIAL CABLE FROM CP01 TO

ANTENNA. LIMIT CABLE LENGTH TO 50 FEET OR

LESS. REFER TO SPECIFICATION FOR CABLE

REQUIREMENTS.

1!ln ( 148 ) ( 149 )

GEffHS 51?82 znMrS>riTXt 165 :

-05660

■Tn-^ 164 )

5<DSC3

<DSCf

<DSC2

io>

< CP01>

RADIO

RANSCEIVER

CONTROL

PANEL

LIT5

<ANT01> ^4^TURBIDITY NPTC 169 ) INSTALL PLC CONTROL PANEL FOR THE

FILTRATION SYSTEM AND AUXILIARY SYSTEM.

REFER TO SPECIFICATION 406700 CONTROL

SYSTEM EQUIPMENT PANEL AND RACKS.

-o 3 JJD l ♦3 3X70

•-DSC5

0SC6

CL

(„, 168 >1<DSC4kO ( 162 )\ 116 )

TT5 )

o 0( 165 ) ■TURBIDITY NPT 0ax" M INSTALL MOTOR CONTROL PANEL. REFER TO

SPECIFICATION SECTION 406700 CONTROL

SYSTEM EQUIPMENT PANEL AND RACKS.

JJ#K

< yrri I ee?:tt hflJn 2T12 )-i Tf9 )J

( m PC fNQ

IT = B 0CL PROVIDE RAW WATER METERING PUMP CONTROL

PANEL CP25 AND FINISHED WATER METERING

PUMP CONTROL PANEL CP110. CONTROL PANELS

SHALL BE MOUNTED ABOVE THE CHEMICAL FEED

CONTAINER PROVIDING CLEARANCE FOR EASE

REMOVAL OF THE CHEMICAL TOTES. REFER TO

SPECIFICATION 406700 CONTROL SYSTEM

EQUIPMENT PANEL AND RACKS FOR FABRICATION

REQUIREMENTS.

( 1614 O

<DSC7> ( 157 )

< 158 )

C/) I I nFSLYFSIX-W )CD 2 2FV-2> [jjj

FM—Z

( 124I £=i 128 )c j_y

Fn ■CT ClLO ECM

O L -9.CM

« O I ^Ri-) 5( 152 > ( 153 ) c/) d a I 121 )------<Ei> V<ED 0( 160 H

1------ S

CD

—<EV-5>

( 154 )

RADIO TRANSCEIVER CONTROL PANEL SHALL BE

PROVIDED WITH BID OPTION 1 IF BID OPTION IS

IMPLEMENTED. PANEL SHALL BE POWERED WITH

24VDC ORIGINATING IN THE PLC CABINET. PANEL,

COAXIAL CABLE, AND ANTENNA SHALL BE

PROVIDED. REFER TO ARCHITECTURAL DRAWINGS

FOR ANTENNA MOUNTING DETAILS. REFER TO

SPECIFICATION SECTION 406646 POINT-TO-POINT

RADIO EQUIPMENT FOR INSTALLATION

REQUIREMENTS.

BACKWASH

TANK HATCH

O

< Acr o TB-4AIT SS BAIT 206 ) ( 167ro 6CjM

( W\

4 A 4CM 4M"

0CM

( 182 y-

( 183 X

2G ( 125^ / I ▼1-11

170 )P- P-184CD

0-1 12 MOUNT TERMINAL BOX TB-4 AND TB-3 ON THE

LIP OF THE HATCH OPPOSITE THE HINGES FOR

THE HATCH SO THE TERMINAL BOX IS

ACCESSIBLE TO THE OPERATOR. PROVIDE

HARDWARE FOR SUPPORTING THE FLOAT

SWITCHES MOUNTED IN THE CLEARWELL AND

BACKWASH TANK. REFER TO SPECIFICATION

SECTION 407276.

o \ /Gf 0< 11 0 /O oo icxiiicx) AT PANEL LPAi cmC~m w< 6* MCP;l.WP?,GF o V OOOOPLC »V)u> $ m3> ( iM4> ( 102Q

Cl4 186 ) 4 185 )

ID ^pTT ( 177C

P11CM A ?3>o 2T4~Z( 171 (174 ( 172 ) ( 175 ) ( 173 ) ( 176 ) ( 177A ) ( 177B )

CM

O WOLVERTON

INTERCONNECT

CM

(0 2 0 2 4Q 1 SCALE (A)INSTRUMENTATION PLAN CXJo

“3

SCALE: (A) no SCALE OF FEETl—6• •

KEY NOTES (CONTINUED);

FINAL CONSTRUCTION DOCUMENTSCM

(u) PROVIDE DEDICATED DOUBLE DUPLEX NEMA

GFCI RECEPTACLE FOR EACH METERING

PUMP. THE RECEPTACLE POWER SHALL BE

USED TO AS THE COMMON POWER FOR THE

CONTROL RELAY INSTALLED IN CP25 AND

CP110, THESE CIRCUIT WILL CONTROL THE

SOLENOID RELAYS. EQUIPMENT

MANUFACTURER’S SUBMITTALS FOR

TERMINATING 120VAC AND NEUTRAL JUMPERS

IN CONTROL PANELS CP25 AND CP110.

(9) PROVIDE A CLEARWELL LEVEL TRANSMITTER,

w LT—3, ON 3/4” NPT PIPE INSTALLED IN THE

CONCRETE. REFER TO SPECIFICATION SECTION

40 72 33 CAPACITANCE TYPE LEVEL METERS.

0 0Od PROVIDE 6 INCH CABLE CHANNEL AND

COVER MOUNTED APPROXIMATELY 10 FEET

OFF OF FINISHED FLOOR. PROVIDE

SUPPORTS UNDER THE CABLE CHANNEL TO

SUPPORT CONDUITS

115, 116, AND 117.

PLC CABINET WILL PROVIDE MARSHALLING

FOR POWER CIRCUITS FEEDING THE FLOW

METERS AND ELECTRICALLY ACTUATED

VALVES. INSTALL FEEDER CIRCUITS FOR ALL

FLOW METERS, FM-1 THROUGH FM-5, AND

ELECTRICALLY ACTUATED VALVES EV-1

THROUGH EV-17, IN PLC CABINET. PROVIDE

TERMINAL BLOCK WITH INTEGRATED

DISCONNECT ON EACH WIRE FEEDING LINE

POWER TO THE DEVICE.

DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETQ_

102WTPAJS00

134,842• ♦

111, 112, 113, 114,CM INSTRUMENTATION

PLAN

0 6AJSINSTALL A CONTROL STATION FOR THE

FILTERED WATER PUMPS. FILTERED WATER

PUMP #1 AND #2 HAND-OFF-AUTO CONTROL

STATION SHALL BE MOUNTED 4.5 FEET ABOVE

FINISHED FLOOR.

PMIS

SEKI 172423CM TECH. REVIEW:O

CM MDB SHEET

iO LODGEPOLE

SEQUOIA NATIONAL PARK

4/23/2021 108 of1 14

NO. WIRE/CABLE CNDT.

SIZE in2 % FILL TO FROM NOTES

100 1 - #14 AWG BLU THWN, 1-#14 AWG WHT/BLU, #14 GND, CAT 5e 3/4" 0.07 25% CP-01 PLC

101 LMR-400, LESS THAN 50 FEET LENGTH 1-1/4" 0.41 47% CP-01 ANT-01

24 PR - #16 AWG TWISTED SHIELDED PAIR (VFD CNTRL.)

6 - #14 AWG BLU THWN (HS-82) 2" 1.10 33% MCP PLC

1-#14 AWG BLK, 1-#12 AWG WHT, 1-#12 GND (LPA CIR. 14)

1-#14 AWG BLK, 1-#12 AWG WHT (LPA CIR. 16)

1-#14 AWG BLK, 1-#12 AWG WHT (LPA CIR. 18)

1-#14 AWG BLK, 1-#12 AWG WHT (LPA CIR. 20)

1-#14 AWG BLK, 1-#12 AWG WHT (LPA CIR. 22)

1-#12 AWG BLK, 1-#12 AWG WHT (LPA CIR. 24)

3/4" 0.12 22% PLC LPA

104-110 NOT USED N/A N/A N/A N/A N/A

BELDEN #29522C #12AWG BASIC VFD CABLE, OR

EQUAL(MIX-2)

1 PR - #16 AWG TWISTED SHIELDED PAIR

3/4" 0.22 40% DSC-1 MCP

BELDEN #29522C #12AWG BASIC VFD CABLE, OR EQUAL

(MIX-3)

1 PR - #16 AWG TWISTED SHIELDED PAIR (DISC. AUX)

3/4" 0.22 40% DSC-2 MCP

113 BELDEN #29522C #12AWG BASIC VFD CABLE, OR EQUAL (M-1)

1 PR - #16 AWG TWISTED SHIELDED PAIR 600V (DISC. AUX) 3/4" 0.22 40% DSC-3 MCP

BELDEN #29522C #12AWG BASIC VFD CABLE, OR EQUAL (M-1)

1 PR - #16 AWG TWISTED SHIELDED PAIR 600V (DISC. AUX) 3/4" 0.22 40% DSC-4 MCP

BELDEN #29524C #8AWG BASIC VFD CABLE, OR EQUAL

(FWP-1)

1 PR - #16 AWG TWISTED SHIELDED PAIR 600V (DISC. AUX)

1" 0.38 44% DSC-5 MCP

BELDEN #29524C #8AWG BASIC VFD CABLE, OR EQUAL

(FWP-2)

1 PR - #16 AWG TWISTED SHIELDED PAIR 600V (DISC. AUX)

1" 0.38 44% DSC-6 MCP

BELDEN #29522C #12AWG BASIC VFD CABLE, OR EQUAL (B-1)

1 PR - #16 AWG TWISTED SHIELDED PAIR 600V (DISC. AUX) 1" 0.22 25% DSC-7 MCP

BELDEN #29522C #12AWG BASIC VFD CABLE, OR EQUAL

(MIX-2) 3/4" 0.17 31% MIX-2 DSC-1

BELDEN #29522C #12AWG BASIC VFD CABLE, OR EQUAL

(MIX-3) 3/4" 0.17 31% MIX-3 DSC-2

120 BELDEN #29522C #12AWG BASIC VFD CABLE, OR EQUAL (M-1) 3/4" 0.17 31% M-1 DSC-3 121 BELDEN #29522C #12AWG BASIC VFD CABLE, OR EQUAL (M-2) 3/4" 0.17 31% M-2 DSC-4

BELDEN #29523C #8AWG BASIC VFD CABLE, OR EQUAL

(FWP-1) 3/4" 0.33 62% FWP-1 DSC-5

BELDEN #29524C #8AWG BASIC VFD CABLE, OR EQUAL

(FWP-2) 3/4" 0.33 62% FWP-2 DSC-6

124 BELDEN #29522C #12AWG BASIC VFD CABLE, OR EQUAL (B-1) 3/4" 0.17 32% B-1 DSC-7

125 4 - #14 AWG RED THWN, 1 #14 GND 3/4" 0.05 18% TB-4 PLC

126 INSTRUMENT CABLE (NOT SHOWN) N/A N/A N/A FSM-4 TB-4 I8

127 INSTRUMENT CABLE (NOT SHOWN) N/A N/A N/A FSH-4 TB-4 I8

128 24 PR-#18 AWG TWISTED SHIELDED PAIR (BELDEN 1471A) 1-1/2" 0.68 33% CP-25 PLC

129 LMI FACTORY CABLE M6 CONNECTORS N/A N/A N/A MP-1 CP-25 PLUG J1

130 LMI FACTORY CABLE M6 CONNECTORS N/A N/A N/A MP-1 CP-25 PLUG J2

131 LMI FACTORY CABLE M6 CONNECTORS N/A N/A N/A MP-1 CP-25 PLUG J4

132-135 NOT USED N/A N/A N/A N/A N/A

135 1 - #12 AWG BLK THWN, 1- #12 AWG WHT THWN, 1- #12 GND N/A N/A N/A CP-25 RP-25 RE.

ELECTRICAL

135A 1-SO CABLE #12 AWG 3 WIRE (BELDEN 19206) - - - SV-01 CP-25

135B 1-SO CABLE #12 AWG 3 WIRE (BELDEN 19206) - - - SV-05 CP-25

135C 1-SO CABLE #12 AWG 3 WIRE (BELDEN 19206) - - - SV-06 CP-25

136-137 NOT USED N/A N/A N/A N/A N/A

1-#12 AWG BLK, 1-#12 AWG WHT, 1-#12 GND (FM-3)

1-#12 AWG BLK, 1-#12 AWG WHT, 1-#12 GND (EV-12)

1-#12 AWG BLK, 1-#12 AWG WHT, 1-#12 GND (EV-11)

4 - #14 AWG RED THWN (EV-11, EV-12)

3/4" 0.09 17% JB-01 PLC

139 1-#12 AWG BLK, 1-#12 AWG WHT, 1-#12 GND (EV-11)

2 - #14 AWG RED THWN 3/4" 0.07 14% EV-11 JB-01

140 1-#12 AWG BLK, 1-#12 AWG WHT, 1-#12 GND (EV-12)

2 - #14 AWG RED THWN 3/4" 0.07 14% EV-12 JB-01

1-#12 AWG BLK, 1-#12 AWG WHT, 1-#12 GND (FM-3)

1-#12 AWG BLK, 1-#12 AWG WHT, 1-#12 GND (EV-12)

1-#12 AWG BLK, 1-#12 AWG WHT, 1-#12 GND (EV-11)

4 - #14 AWG RED THWN (EV-11, EV-12)

3/4" 0.12 22% FM-3 JB-01

142 2 PR - #16 AWG TWISTED SHIELDED PAIR 3/4" 0.16 30% FM-3 PLC

143 2 PR.- #16 AWG TWISTED SHIELDED PAIR 3/4" 0.16 30% TB-5 PLC

144 4 - #12 AWG BLK, 4-#12 AWG WHT, 1-#12 AWG GND

6 - #14 AWG RED 3/4" 0.11 21% TB-5 PLC

145 1 - #12 AWG BLK THWN, 1- #12 AWG WHT THWN, 1- #12 GND

2 - #14 AWG RED THWN 3/4" 0.05 9% EV-3 TB-5

146 1 - #12 AWG BLK, 1-#12 AWG WHT, 1-#12 AWG GND 3/4" 0.03 5% EV-7 TB-5

147 1 PR.- #16 AWG TWISTED SHIELDED PAIR 3/4" 0.05 10% EV-7 TB-5

148 1 - #12 AWG BLK, 1-#12 AWG WHT, 1-#12 AWG GND 3/4" 0.03 5% EV-8 TB-5

149 1 PR.- #16 AWG TWISTED SHIELDED PAIR 3/4" 0.05 10% EV-8 TB-5

150 1 - #12 AWG BLK, 1-#12 AWG WHT,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .