This document outlines a solicitation for design-build services to rehabilitate the wastewater collection system at Floyd Bennett Field within Gateway National Recreation Area. The National Park Service seeks to replace or reconstruct lift stations and sewer lines that have exceeded their useful life. The total budget for design and construction is $6.5 million. The procurement will utilize a two-phase selection process, with the initial phase evaluating offeror qualifications and technical approach, and the second phase incorporating price and more detailed design concepts. The solicitation is set aside for small businesses. Phase one proposals are due June 6th, 2022, with phase two commencing in July and an anticipated award by September 2022. The performance period is 720 days.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5/18/2022
Footer content goes here 1
NATIONAL PARK SERVICE • U.S. DEPARTMENT OF THE INTERIOR
1DENVER SERVICE CENTER • 2022 1
Rehabilitate Floyd Bennett Field Wastewater Collection System;
Gateway National Recreation Area
Solicitation 140P2022R0053
GATE 291651
Pre-solicitation Conference
May 18th, 2022
NATIONAL PARK SERVICE • U.S. DEPARTMENT OF THE INTERIOR
2DENVER SERVICE CENTER • 2022
Agenda
• Introductions
• Technical Overview of the Project
• Solicitation Information and Key Points
• Important Clauses
• Bid Information and Criteria (Overview of Sections L & M)
• Instructions for submitting questions
• Q & A
Footer content goes here 2
NATIONAL PARK SERVICE • U.S. DEPARTMENT OF THE INTERIOR
3DENVER SERVICE CENTER • 2022
Rehabilitate Floyd Bennett Field Wastewater Collection System at Jamaica Bay
• Rehabilitate Floyd Bennett Field (FBF) sanitary sewer system at the Jamaica Bay unit of Gateway National Recreation Area. Includes elimination of two lift stations and replacement or new construction of several other lift stations. The active portions of the wastewater collection systems (piping, manholes, lift stations) are beyond their expected lifecycle, and need to be replaced.
• Gateway National Recreation Area, New York
• Available budget for Design/Build effort is $6.5M.
NATIONAL PARK SERVICE • U.S. DEPARTMENT OF THE INTERIOR
4DENVER SERVICE CENTER • 2022
Rehabilitate Floyd Bennett Field Wastewater Collection System Emergency generator installation for lift stations
Demo of building and associated structures
Sewer line and associated structure repair and replacement
• Design & Construction Method
Design / Build
• Procurement Method:
Small Business Set-aside
• Schedule (Approximate):
Solicitation Date: Active
Award Date: September 2022
Period of Performance: 720 days
Footer content goes here 3
NATIONAL PARK SERVICE • U.S. DEPARTMENT OF THE INTERIOR
5DENVER SERVICE CENTER • 2022
Rehabilitate Floyd Bennett Field Wastewater Collection System Emergency generator installation for lift stations
Demo of building and associated structures
Sewer line and associated structure repair and replacement
• Performance Constraints & Other Considerations o Construction within established utilities corridors o Historic Structures o “Program of Requirements” approach o Competition stipend
NATIONAL PARK SERVICE • U.S. DEPARTMENT OF THE INTERIOR
6DENVER SERVICE CENTER • 2022
Solicitation Information/Key Points
• Total Small Business Set-aside (under NAICS Code 237110)
• Two Phase Design-Build Selection Procedure (FAR 36.3)
• Offerors are expected to design to the available budget of $6.5M
• Currently a draft Program of Requirements (65%) is posted to SAM. The final 100% POR will be given to offerors selected for Phase 2
• During Phase 2, NPS will meet with offerors to engage in individual presentations to assist with the conceptual design
• Type of Contract – Firm Fixed Price, with two line items, one for design and one for construction
Footer content goes here 4
NATIONAL PARK SERVICE • U.S. DEPARTMENT OF THE INTERIOR
7DENVER SERVICE CENTER • 2022
Solicitation Information/Key Points
• Dates/Timeline:
• Phase 1 Solicitation Posted May 10th
• Phase 1 Questions Deadline – 10 days Prior to proposal due date, May 27th
• Phase 1 Proposals Due June 6th, 2022 at 9:00am ET.
• Phase 2 Solicitation Release July 2022
• On-site pre-solicitation conference late July/early August
• Phase 2 Proposals Due August 2022
• Estimated awarded date by end of September 2022
NATIONAL PARK SERVICE • U.S. DEPARTMENT OF THE INTERIOR
8DENVER SERVICE CENTER • 2022
Key Points for Bid Submission
• Submission is by email only. The email address for receiving proposals is noted in Section L
• Include all information required by Section L when you email your proposal
• For Phase 2, please submit proposals in two separate volumes (Price & Technical)
• Please follow the page number limitations as specified in Section L
• See the file size limitations in Section L
• For Phase 2, a Proposal Guarantee is required per 52.228-1 (20% or $3M, whichever is less)
• Recommend getting confirmation from CO or CS that your proposal was received
Footer content goes here 5
NATIONAL PARK SERVICE • U.S. DEPARTMENT OF THE INTERIOR
9DENVER SERVICE CENTER • 2022
Important Clauses
Section F – 52.211-10 – Commencement, Prosecution, and Completion of Work (720 Calendar Days after Receipt of the NTP, includes design and construction)
Section F – 52.211-12 – Liquidated Damages—Construction ($1,482 per calendar day)
Section H – Special Clause 1: Key Personnel (Lead Designer, Project Manager, Superintendent, QC Manager, Safety Manager – No substitutions for 120 days)
Section H – Special Clause 2: Key Trades (Earthwork/Civil Subcontractor)
52.228-15 – Performance and Payment Bonds—Construction
NATIONAL PARK SERVICE • U.S. DEPARTMENT OF THE INTERIOR
10DENVER SERVICE CENTER • 2022
Important Clauses (Continued)
52.232-27 – Prompt Payment for Construction Contracts (14 days)
52.236-5 – Material and Workmanship
52.236-6 -- Superintendence by the Contractor
52.236-01 – Performance of Work by the Contractor
Contractor shall perform on-site and with its own organization, work equivalent to at least 15% of the total amount of work to be performed under the contract.
52.236-9 - Protection of Existing Vegetation, Structures, Equipment, Utilities and Improvements
Footer content goes here 6
NATIONAL PARK SERVICE • U.S. DEPARTMENT OF THE INTERIOR
11DENVER SERVICE CENTER • 2022
Section L: Instructions to Offerors
Phase 1 – DUE JUNE 6th
NO PRICING
• Factor 1 – Technical Qualifications – Experience Of The General Contractor and AE Firm, & Key Personnel
• Factor 2: General Technical Approach to Design‐Build
• Factor 3: Past Performance
Phase 2
Price Volume
Factor 1 – Design Concept
Factor 2 – Key Personnel
Factor 3 – Schedule
Factor 4 – Management Approach
NATIONAL PARK SERVICE • U.S. DEPARTMENT OF THE INTERIOR
12DENVER SERVICE CENTER • 2022
Section M: Evaluation Criteria
• Max of 3 offerors will be selected to move forward from Phase 1 to Phase 2
• A stipend of up to $15,000 will be given to each firm selected for Phase 2 for Concept Design preparation
• NPS will hold oral presentations prior to the Phase 2 submission
• NPS will select a winning offeror after Phase 2 using the Best Value Continuum/Tradeoff Process (FAR 15.1)
• Relative Importance of Evaluation Factors:
Phase 1: Factors 1 – 3 are of equal importance.
Phase 2: Technical Proposal: Factor 1 – 4 are of descending order of importance.
Phase 2: Price proposal: Phase 2 Evaluation factors other than price, when combined are significantly more important than price.
Footer content goes here 7
NATIONAL PARK SERVICE • U.S. DEPARTMENT OF THE INTERIOR
13DENVER SERVICE CENTER • 2022
Questions During the Solicitation Phase
• All questions must be submitted in writing (NLT 10 Days prior to proposal due date) via email to both the CO, Tony Jasper, and the CS, Michael Moffett as follows:
Tony_Jasper@nps.gov
Michael_Moffett@nps.gov
• Changes to the Solicitation document shall only be made by written amendment posted as an amendment to the solicitation document.
NATIONAL PARK SERVICE • U.S. DEPARTMENT OF THE INTERIOR
14DENVER SERVICE CENTER • 2022
Questions?
Footer content goes here 8
NATIONAL PARK SERVICE • U.S. DEPARTMENT OF THE INTERIOR
15DENVER SERVICE CENTER • 2022
Thank You For Your Interest in This Project