This document is an amendment to a solicitation for culvert replacements along Cadillac Mountain Road at Acadia National Park. The solicitation requires contractors to replace existing culverts and repair associated pavement and drainage structures. A bid bond and payment and performance bonds are required. Proposals are due by 3:00pm MT on May 13, 2022 and must be submitted electronically to the addresses provided. The contract period is 215 calendar days. The contractor will be responsible for field verifying culvert lengths, end treatments, wall thicknesses, crack sealing quantities, and protecting any underground utilities during replacement work. Only existing headwalls and header pipes will be rebuilt after replacement; no new structures will be constructed for culverts currently lacking them.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
NPS, DSC Contracting Services Div 12795 W. Alameda Pkwy P.O. Box 25287 Denver CO 80225-0287
140P2022R0047
ACAD 31834905/10/2022
04/13/2022
JEREMIAH
ROGERS
Digitally signed by JEREMIAH
ROGERS
Date: 2022.05.10 15:36:21 -06'00'
Q&A for ACAD 318349 5/3/2022 & 5/6/2022
1) On the Solicitation, Offer, and Award sheet section 13. B. it indicates that An Offer Guarantee is not required. In the Proposal Submission Package (PSP) there is a Bid Bond form. Please clarify if a Bid Bond will be required for this contract.
a. Be sure you use B08_Solit_140P2022R0047_ACAD_318349.pdf solicitation.
i. That form correctly states in 13.B. that a Offer Guarantee is required.
ii. That form also correctly states in 12.a. that Payment and Performance Bonds are required.
2) Bid submission date is shown as 5/13/2022 1500 local time. Is this for Denver, CO (MST)(GMT-6) or is this Bar Harbor, ME (ET)(GMT-4)?
a. Be sure you use B08_Solit_140P2022R0047_ACAD_318349.pdf solicitation.
i. That form correctly states in 13.a. that proposals are due at 3:00pm MT
Denver (local) time.
1) Is there an option to submit this bid via electronic submission or is it required to be submitted as a hard copy?
a. Be sure you use B08_Solit_140P2022R0047_ACAD_318349.pdf solicitation.
i. Page 50 of 58, D. Submission Requirements details that proposals should be submitted via email with requirements for size and addresses, in that section.
2) Sect F of the Solicitation states contract time is 180 calendar days and the SF1442 has 215?
a. 215 is correct. Section F will be corrected in an amendment.
3) Is there a culvert schedule showing culvert lengths and end treatments for headwalls or do they need to be field measured?
a. Contractor is responsible to field verify information shown on plans and replace in-kind to what is shown in the field where specified.
4) Specifications show three wall thickness’ for the class III concrete pipe, which one should we apply?
a. A minimum Class III wall thickness A is required for pipe replacements.
5) For bidding purposes please provide crack seal quantity for CLIN’s 1, 4 & 5
a. The contractor is responsible to field verify the crack seal quantities for bidding.
6) Will Aggregate Topsoil Course be required to back up pavement edge at thin overlay areas (.75”), typical pavement overlay detail note 1 requires it but shoulder restoration detail note 1 shows only using where drop off is greater than 2”?
a. Aggregate Topsoil Course is to be applied where the drop off is greater than 2”.
If the thin overlay addition produces a depth exceeding 2” the pavement edge would require the aggregate topsoil fill to meet requirements.
7) Some existing culvert inverts are 10’ to 20’ deep at the outlets, will the excavation/pavement removal limits still be required to be at a 6 to 1 slope as shown on the typical cross culvert detail? Is there a maximum pavement removal width?
a. Contractor may suggest alternative trenching methods that would avoid extensive pavement removal and sides slopes of 6:1. Open cut will still follow requirements of having an open lane at all times and to be open to traffic by the end of each day.
8) There is an electric hand hold/vault at the edge of the pavement near core #14 on sheet C4G where there is a culvert replacement, is there underground electric lines here or at other areas where new or replacement culverts are proposed?
a. Electric lines run on the north side of Cadillac Mountain Road for the entire length (the left side of the roadway as you approach the summit). Contractor is responsible for calling Miss Utility and protecting utilities during the culvert replacements.
9) Are only existing headwalls and existing header pipes required to be rebuilt? What is required for culverts without headwalls/headers and outlets that cannot be found to inspect or seen from roadway?
a. Existing headwalls will be re-pointed or re-built after culvert replacement. No new structures will be constructed on culverts without existing structures.