Proposal_Price_Sheet_0005.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 140P2022Q0011
About this file
This document is a price schedule template for a National Park Service solicitation to rehabilitate the Little Round Top visitor area and conduct vegetation restoration at Gettysburg National Military Park. The template includes 15 contract line items for the base project and various option items. Line item 1 is for overall improvements and vegetation restoration across 6.2 acres at a lump sum price. Options 2 through 15 relate to additional work elements such as stormwater management, erosion control, plug planting, topsoil importation, work in the 20th Maine area, trail work, invasive species removal, selective planting, and vegetation maintenance. Offerors are required to provide lump sum pricing for each line item. The solicitation number is PARK - PMIS: GETT 250272 for the Gettysburg National Military Park rehabilitation work.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule Template | ||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | ||||
| Solicitation Number: | ||||
| PARK - PMIS: | GETT 250272 | |||
| (Project Management Information System) | ||||
| Developed Area: | Gettysburg National Military Park | |||
| Project Title: | Rehabilitate Little Round Top Visitor Area - Vegetation | |||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | ||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | ||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | ||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | ||||
| govern. Round totals and extended prices to whole dollars. | ||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Estimated Quantities for Bidding Purposes Only | Unit of Measure | Total Price |
| 1 | Gettysburg Little Round Top Improvements, Vegetation Restoration | 6.2 AC | LS | |
| TOTAL BASE PRICE (Contract Line Item Numbers 1) ------------------------------------------------------------------------------------------ | ||||
| 2 | Bid Option A: Stormwater Management and Erosion Control, Vegetation Restoration | 6.2 AC | LS | |
| 3 | Bid Option B: Plug, Vegetation Restoration | 27200 EA | LS | |
| 4 | Bid Option C: Import of Topsoil, Vegetation Restoration | 1 CY | LS | |
| 5 | Bid Option D: 20th Maine Area Improvements, Vegetation Restoration | 0.7 AC | LS | |
| 6 | Bid Otion E: 20th Maine Area Improvements, Vegetation Restoration, Plugs | 7320 EA | LS | |
| 7 | Bid Otion F: Trail, Northern Segment near Wheatfield Road, Vegetation Restoration | 0.14 AC | LS | |
| 8 | Bid Option G: Pre-Construction Removal of Invasive Species | 14.4 AC | LS | |
| 9 | Bid Option H: Post-Construction Removal of Invasive Species Selective Removals | 2.84 AC | LS | |
| 10 | Bid Option I: Post-Construction Removal of Invasive Species Removals - High Priority Invaives | 2.84 AC | LS | |
| 11 | Bid Option J: Vegetation Restoration Selective Planting | 2.84 AC | LS | |
| 12 | Bid Option K: Vegetation Maintenance, Inspection and Final Acceptance for the Base Bid Project Area | 6.2 AC | LS | |
| 13 | Bid Option L: Vegetation Maintenance, Inspection and Final Acceptance for the 20th Maine Area Improvements | 0.7 AC | LS | |
| 14 | Bid Option M: Vegetation Maintenance, Inspection and Final Acceptance for Trail, Northern Segment near Wheatfield Road | 0.14 AC | LS | |
| 15 | Bid Option N: Removal of Tree-Stabilization Materials | 14.4 AC | LS | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 2-15) | LS | $ | ||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 15) | $ | |||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |