This document contains questions and responses related to amendment 0005 of solicitation 140P2021R0073 for the visitor center rehabilitation at Fort Donelson in Dover, Tennessee. The National Park Service is seeking a lump sum contract to complete both base bid items 1 and 2. Optional additions may also be awarded at the time of contract award or through future modifications. Key personnel roles like superintendent and quality control manager cannot be filled by the same individual. A job trailer is required rather than using interior building space. No previously approved submittals will be provided to expedite the schedule. The contractor will be responsible for defects from prior work. Discovery of archaeological artifacts could impact schedule completion according to specification 01 35 13.22. If funded, contract award is targeted before September 24, 2021. The authority having jurisdiction is the NPS Regional Structural Fire Manager rather than the State Fire Marshal's office.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0005
| Question Set | Set Number | Question | Response | |
| A - | ||||
| Amendment 0005 | 1 | DOOR SCHEDULE [A8.1]: OPENING # - ‘009, 010, 011 & 012 CALL FOR A TYPE “F” DOOR WHICH IS A FLUSH DOOR. IT ALSO CALLS FOR GLAZING TYPE [GL-2]. SHOULD THESE DOORS BE “TYPE “FG” or “FG2?” WHICH IS IT? | Doors 009, 010, 011 & 012 are to be Type "F" doors as called out on the Door Schedule. The Glazing Type GL-2, called out on the Door Schedule for those four door openings is for the transom, above the doors, called out in the Frame Type F3. | |
| 2 | Under Section B - Bid Schedule - Are items # 1 & 2 are to be bid as Base Bid as individual and/or combined “LUMP SUM CONTRACT” and items # 3, 4, & 5 are to be "ADD ALTERNATES"? Is it the Govt’s intent to select and award either Item # 1 or Items # 1 & 2 and then select from either Options A, B, or C? | Award shall consist of both Base Bid Items #1 and #2, combined as a "lump sum contract" amount; and may or may not include Options A, B, and/or C to be funded/exercised at the time of award and/or at a later date via contract modification. | ||
| 3 | Under Section H - Special Contract Requirements - Special Clause 3: Key Personnel - Will On-Site positions (Super, QC, & Safety) be required as individual positions for a project of this scope and size? | Some of the Key Personnel positions may be performed by the same individual; however, Superintendent and Quality Control Manager roles/responsibilities may not overlap. | ||
| 4 | Under Temporary Facilities: Can a space inside the building be used in lieu of providing a “Job Trailer” for project meetings and Job Office if temporary toilet facilities are provided? | No. Provide what is specified. | ||
| 5 | Will previously approved submittals be made available (i.e. Elevator, rebar, fire sprinkler, etc.) for expediting the contract/schedule? | No. | ||
| 6 | Will GC be held responsible for removing and replacing defective (if any) work found from previous Contractor? | Yes. | ||
| 7 | What impact will unearthing archeological &/or civil war artifacts from exterior excavations have on the completion/construction schedule of the project? | See Spec Section 01 35 13.22 - Archeological Protection, and specifically paragraph 3.5. | ||
| 8 | If the project is funded, what is the anticipated schedule for award of the contract? | If funded, contract award shall be made prior to September 24, 2021. | ||
| 9 | Do you know if this project will be submitted to the State Fire Marshall’s office in Nashville for approval or not? | No, this project is not required to be submitted to the State Fire Marshal's office for approval. The AHJ for this project is the NPS Regional Structural Fire Manager (RSFM). |