Sol_140P2019R0098_Amd_0002.pdf
PDF 81 KB Posted
- Solicitation number
- 140P2019R0098
About this file
This notice provides details for a solicitation seeking proposals to restore and stabilize Hoover Creek for flood mitigation at Herbert Hoover National Historic Site. The scope of work includes channel grading for increased flood conveyance, replacement of the Downey Street Bridge, and construction of an off-line detention basin. Additional elements involve relocating utilities and preserving a historic wall. The project aims to comply with LEED sustainability standards and will be constructed under a single prime contract anticipated to be a negotiated firm-fixed price contract valued between $5-10 million. The period of performance is estimated from January 2020 through November 2022. The solicitation is expected to issue on or around November 4, 2019, and a pre-proposal meeting may be scheduled with location and date in the solicitation. The notice encourages small businesses, veteran-owned small businesses, small disadvantaged businesses, and women-owned small businesses to participate as either prime contractors or subcontractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P2019R0098_Amd_0004.pdf | ||
| Construction Schedule Milestones 12.09.19_0004.docx | DOCX document | |
| HEHO RFP Q and A 12.09.19_0004.xlsx | XLSX spreadsheet | |
| Sol_140P2019R0098_Amd_0003.pdf | ||
| E09_PPT Pre-Proposal.ppt | PPT presentation | |
| HEHO 160186 Pre-proposal Mtg Notes 11.13.19.pdf | ||
| Preproposal Sign-In.pdf | ||
| Questions-Answers-1.pdf | ||
| Amendment__1,_140P2019R0098.pdf | ||
| 4-B08_VOL_II_11-04-2019.pdf | ||
| 5-B08_Final_CPS_-_fillable.xlsx | XLSX spreadsheet | |
| 8-B08_General_Decision_Number,_11-04-19.pdf | ||
| 9-B08_Solit_PSP_Vol_II_SBSubKCalc.xlsx | XLSX spreadsheet | |
| 6-B08_SF24-16,_Bid_Bond.pdf | ||
| 2-B08_PLANS_HEHO_160186_8.21.19_reduced_19meg.pdf | ||
| 7-B08_Final_Geotech_Report_HEHO_160186_12.10.18.pdf | ||
| 3-B08_VOL_1_combined.pdf | ||
| B08_SF1442_and_Clauses.pdf | ||
| 1-B08_HEHO_160186_Final_Specifications_10.17.19.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2019R0098 x x
4 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
11/25/20190002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11/04/2019
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
HEHO-160186 - Restore and Stabilize Hoover Creek for Flood Mitigation, Herbert Hoover
National Historic Site, West Branch, IA
The purpose of this Amendment No. 2 is to provide the Pre-bid sign-in sheet, power point slides, meeting notes and questions/answers from the pre-bid meeting.
Legacy Doc #: NPS
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
David E. Thomas
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
File details come from the government source that posted it. Updated .