DSC_NPS_Projected_Projects.pdf

PDF 137 KB Posted

Attached to
Nationwide Architect and Engineering IDIQ Federal contract opportunity
Solicitation number
140P2019R0051
Issued by
Department of the Interior National Park Service National Office

About this file

This solicitation requests statements of qualifications from engineering firms for an indefinite delivery indefinite quantity contract to provide nationwide architectural and engineering services to the National Park Service. Key details include:

  • The contract ceiling is $30 million over five years to be issued across multiple awards. Task orders will not exceed $3 million each.

  • Required services include design, planning, permitting, construction administration and specialized services for projects such as buildings, transportation and utility infrastructure, cultural and natural resource management, and facility maintenance.

  • Statements are due November 25, 2019. The government will evaluate firms on experience, qualifications, past performance, capacity, knowledge of locations, and small business participation plans.

  • The incumbent contractors are Louis Berger Group, HDR Engineering, Vanasse Hangen Brustlin, and CH2M Hill. Award is expected in early 2020.

View the file

Other files for this federal contract opportunity

Other files attached to Nationwide Architect and Engineering IDIQ, newest first.
File Type Posted
NW_A-W_IDIQ_Q-A's-Amd_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proposed FY20 recast/FY21 Plan Region Park Project Title

2021 AKR KATM Relocate NPS Brooks Camp Administrative Structures

2020 AKR KATM Replace South Side Accessible Trail and Access Ramp to

Mitigate Human vs Bear Conflict

2021 AKR WRST Replace deficient VC/HQ Water Treatment System

2021 IMR GLAC Replace Utilities Along Lake McDonald

2021 IMR GRTE Replace the Colter Bay Main Wastewater Lift Station

2021 MWR CUVA Stabilize Riverbank at High Priority Areas along Towpath

Trail and Valley Railway

2021 NCR CHOH Repair Canal Inlet Lock 1 and Lift Locks 1,2 and 5

2020 NER STLI Rehabilitate Main Immigration Building Fire-Life Safety

2020 NER BOST Perform Critical Repairs to Exterior Structure and Facade of

Easton Building

2020 NER BOST Rehabilitate and Replace Easton Building Heat and

Distribution System

2020 NER EDIS Replace Slate Roofs In-Kind and Sheet Metal Flashings at

Edison’s 1880 Home, Glenmont

2021 NER FIIS Replace Failing Breakwater to Protect Entrance to Watch

Hill Marina

2021 PWR NOCA Relocate Obsolete Houisng Units from Stehekin River Flood

Plain, Replace with New Houisng Unit

2021 PWR GOGA Stabilize 1939 Concrete Wharf AL211, Alcatraz Island

2021 PWR CRLA Mitigate Cleetwood Trail Rockfall Hazards and Rehabilitate

Failing Trail & Marina for Visitor Safety

2022 SER CAHA Replace Obsolete Hatteras Island Trailers with Multiplex

Housing Unit

2020 SER TUIN Preserve Carver Museum

2021 SER CAHA Replace Obsolete Trailers with a Multiplex Unit in Hatteras

Island District

2020 SER CALO Repair Cape Lookout Lighthouse

2020 SER CONG Replace Wilderness Boardwalk Sections BDF&G

2021 SER CALO Replace Obsolete Trailers with Multiplex Housing Unit at

Harkers Island

2022 SER GRSM Rehabilitate Sugarlands Water and Wastewater Systems

2022 NCR MONO Rehabilitate Historic Worthington House for Visitor Use

2022 PWR YOSE Replace Obsolete Tuolumne Meadows Wastewater

Treatment Plant

2022 SER CAHA Replace Fort Raleigh and Frisco Water Systems

2022 NER GATE Repair Jacob Riis Seawall on Beach Channel Drive

2022 IMR YELL Rehabilitate Non-Compliant Norris Campground Wastewater

System

2022 NER MAVA Replace Temporary Visitor Contact and Support Center

2022 IMR VALL Replace Cabin District Water System

2022 IMR MEVE Rehabilitate Chapin Mesa Historic Buildings and National

Historic Landmark District

2022 NER INDE Replace Critical Chiller Components

2022 NER GATE Rehabilitate Water Well Number 4 at Sandy Hook

2022 NER GATE Replace Officers Row Seawall at Sandy Hook

2022 IMR ORPI Replace Failing Well and Deteriorating Water System

Components

2023 PWR PUHO Remove Deteriorated Maintenance Facility From

Archaeological Site & Provide Safe Working Conditions

2023 PWR SEKI Replace Non-Compliant Ash Mountain Water Treatment

System

2023 NER BOST Repair and Replace Storm Drain System at Charlestown

Navy Yard

2023 PWR SEKI Rehabilitate Cedar Grove Water System

2023 SER GRSM Rehabilitate Cosby Area Water and Waste Water Systems

2022 SER MACA Rehabilitate Cave Trails New Entrance to Frozen Niagrara

2022 IMR CHIC Replace Buckhorn Water Treatment Plant and Address

Critical Water System Deficiencies

2022 NCR ROCR Rehabilitate Thompson's Boating Center Seawall

2022 SER EVER Rehabilitate Three Marina Bulkheads at Flamingo

2022 SER GRSM Rehabilitate Laurel Falls Trail

2022 MWR MORU Expand and Rehabilitate Wastewater Treatment Plant

2023 PWR SEKI Rehabilitate Grant Grove Water Distribution System

2023 NER STLI Rehabilitate Terreplein inside Historic Fort Wood on Liberty

Island - Construction

2023 NER COLO Repair Jones Mill Pond Dam

2023 IMR COLM Rehabilitate Saddlehorn Water System

2023 PWR NOCA Expand Utility Infrastructure for Stehekin Wildland Fire

Facility and Dorm

2023 AKR WRST Kennecott - Leach Plant Foundation Replacement

2023 PWR NOCA Replace Obsolete, Code Deficient and Deteriorated Stehekin

Wastewater Treatment Plant

2022 IMR GLCA Replace Deteriorating Wahweap Government Dock

2020 PWR OLYM Restoration of Elwha, Continuing Project

File details come from the government source that posted it. Updated .