5 Thomas Jefferson Memorial CYARK Field Report

View the file

Other files

File Type Posted
Attachment_1_Solicitation_Questions_and_Answers_Amendment_03.pdf PDF
Attachment_2_NAMA_Park_Standard_Fence_Details.pdf PDF
140P2018R0037_Amendment_03_SF30.pdf PDF
Attachment_2_North_Portico_Steel_Beam_Replacement_As_Constructed_Drawings_2003.pdf PDF
140P2018R0037_Amendment_02_SF30.pdf PDF
Attachment_4_Historic_American_Buildings_Survey_Drawings_1994.pdf PDF
Attachment_3_Roofing_System_Replacement_Drawings_1994.pdf PDF
Attachment_1_Solicitation_Questions_and_Answers_Amendment_2.pdf PDF
6_Laser_Cleaning_Test_Photos.pdf PDF
1_Preproposal_Conference_Slides_080218.ppt PPT presentation
7_Wage_Determination_DC180002_080318.pdf PDF
2_Preproposal_Conference_Sign_In_Sheets.pdf PDF
4_Record_of_Treatment_Report_111717.pdf PDF
140P2018R0037_Amendment_01_SF30.pdf PDF
3_Questions_and_Answers_Amenment_01.pdf PDF
B08_Attachment_3_-_Wage_Determination_DC180002_070618.pdf PDF
B08_Attachment_4_-_Justification_for_Brand_Name_-_PumpX53i_Rev_070218.pdf PDF
B08_Attachment_2_-_SPECIFICATIONS.pdf PDF
B08_Attachment_1_-_DRAWINGS.pdf PDF
B08_Attachment_5_-_Pre-Proposal_Site_Visit_Map.pdf PDF
B08_Attachment_6_-_Proposal_Submission_Package.pdf PDF
B08_Attachment_7_-_Bid_Bond_Form_SF24.pdf PDF
B08_Solicitation_140P2018R0037.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Field Work Summary

Project Dates July 8th - July 14th

Collaboration between CyArk and NPS Funded provided by CyArk board members Five days of field work.

● 692GB of total data

● 371GB of photogrammetry data 5678 Images

● 37GB of LiDAR data 183 Scans

● 14 panorama locations

Helicopter photography instead of drone photography

● Support from US Park Police

Terrestrial Photogrammetry Multiple concentric rings of Phase One with 35mm, Nikon 15mm & 24mm for colonnades and monument interior.

70-200 used for column tops and pediment area detail photos. Roof photos shot with Phase One with 35mm, Nikon 15mm & 24mm

1 2

Dome 35mmRoof Wall 35mm

Phase One

200mm Pediment Detail 105mm Column Capitals

Nikon

Aerial Photogrammetry

Aerial photos were captured from a helicopter with Nikon 70-200mm and Phase One 35mm and 80mm. Phase one was stabilized with Kenyon Gyro and Nikon was a VR lens. Multiple concentric rings at various altitudes

200mm200mm

Nikon

80mm35mm

Phase One

Laser Scanning (LiDAR)

Scans cover the both levels of the roof and dome area. Interior of monument, colonnade, front steps, surround levels, first tier and perimeter walkway. Two scanners were used in an alternating pattern

Panoramas

● 14 Nodal Panoramas

● Nodal Ninja Sony A6300 Samyang 7.5mm

● Virtual tour and Skybox

● Orange location on portico roof

Locations

Initial Results - Rendering of 3D Model

Conservation Deliverables for NPS

• 3D site model

• 3D detail model of pediment figures

• E57 scans (registered, registered and clean)

• JPEG photogrammetry data

• Architectural Drawing Set

• Site plan and contour map

• Roof plan

• Floor plan

• Reflected ceiling plan

• 4 exterior elevations

• 4 sections

• 4 interior detail elevations

• 4 statue detail elevations

• Project report and data drive