This is Amendment 1 to a federal solicitation for maintenance of water supply facilities at Glen Canyon National Recreation Area. The National Park Service (NPS), Contracting Operations - Central, issued this amendment on June 17, 2026, to Solicitation 140P1526Q0068. The amendment extends the proposal due date to July 22, 2026, and incorporates five questions and answers regarding project execution.
The contract covers replacement of the water tank fill line at Lee's Ferry under Item 00010, GLCA Lee's Ferry Replace Water Tank Fill Line, with a firm-fixed price contract type. The period of performance runs from September 1, 2026, to November 30, 2026. The product/service code is Z1NE (Maintenance of Water Supply Facilities), and the requisition number is 0044036915. Key clarifications in the Q&A address: (1) optional use of stainless steel pipe with bolt flanges instead of welded steel pipe, which NPS approved but cautioned may increase costs; (2) NPS confirmation that primary electrical power for the temporary booster pump will be provided by a proximate Federal building, with contractor providing backup power; (3) NPS approval for using a mobile crane with OSHA-rated personnel platform for worker access instead of full-height scaffolding; (4) requirement that the prime contractor obtain Arizona Registrar of Contractors (ROC) licensing and bonding, as the project exceeds the minor-work exemption threshold; and (5) confirmation that no tribal licensing or permitting applies to this federal land location. No additional questions will be accepted after this amendment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P1526Q0068_Amd_0002.pdf | ||
| Sol_140P1526Q0068.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Jessica Owens
See continuation page
NPS, IMR - Arizona MABO 1824 S Thompson St, Ste 200 Flagstaff AZ 86001-2694
PIA
140P1526Q0068
06/17/2026
06/17/2026
1 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140P1526Q0068/0001
The purpose of amendment 1 is to:
1. Incorporate questions and answers.
2. Extend the proposal due date to 7/22/2026.
No additional questions will be accepted at this time. All other terms and conditions remain unchanged.
00010 GLCA Lee's Ferry Replace Water Tank Fill Line in accordance with solicitation documents
Firm-Fixed Price
Product/Service Code: Z1NE
Product/Service Description: MAINTENANCE OF
WATER
SUPPLY FACILITIES
Requisition No: 0044036915
Period of Performance: 09/01/2026 to
11/30/2026
United States Department of the Interior
NATIONAL PARK SERVICE
CONTRACTING OPERATIONS - CENTRAL
1849 C Street
NW Washington, DC 20240
July 16, 2026
Questions and Answers
GLCA LF Water Tank Fill Line Replacement
Solicitation 140P1526Q0068
1 On the 3-inch fill line, is there an option to use a 3-inch stainless steel pipe with four bolt flanges instead of what is called out for the fill line pipe. Instead of one continuous welded pipe, we could install 20 ft or 30 ft long stainless-steel pipe which would last longer, and if there are ever issues in the future, you wouldn't have to remove the entire fill line for repairs or maintenance issues that may come up in the future? It would also last much longer than the steel pipe.
NPS – Open to the option. Note **It would be an expensive option and could likely result in a bid bust.
2 Electrical power for the temporary booster pump. The specification requires the temporary water system to maintain a minimum 45 psi outflow via a booster pump, with backup power provided by the Contractor. Please confirm whether NPS will provide primary electrical power for the booster pump at the temporary-system location. XE will provide backup power per the specification; this question concerns the primary power source only.
NPS – We do have a Federal building in proximity that can provide power to the temporary water system.
3 Access method — crane with personnel backet. Because the fill line extends to approximately 100 ft on the elevated tank, XE intends to use a mobile crane with a manufactured, OSHA-rated personnel platform as the primary means of access for the removal and installation work, in lieu of full-height scaffolding. XE will provide the required
OSHA 29 CFR 1926.1431 justification and testing. Please confirm that NPS has no objection to crane-based personnel access as the Contractor's means and methods on this site.
NPS – No objection
4 Because the work is performed on National Park Service federal land at Glen Canyon
National Recreation Area, please confirm whether an Arizona Registrar of Contractors
(ROC) license is required of the prime contractor and/or subcontractors for this scope, or whether the federal-land location exempts the work from Arizona ROC licensing.
NPS – This project does not meet Arizona’s minor-work exemption, which is for minor work under $1,000.00. We would require the Prime (GC) to be licensed/bonded.
5 Please also confirm whether any tribal (e.g., Navajo Nation) licensing or permitting applies to the specific site location.
NPS – No Tribal land licensing applies to this project.
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .