GRCASO_1_0001.DOC

DOC document 5 MB Posted

Attached to
GRCA 2024 BACKFLOW TESTING Federal contract opportunity
Solicitation number
140P1524Q0068
Issued by
Department of the Interior National Park Service Intermountain Region

About this file

This document is a Scope of Work for the Backflow Prevention Assemblies Testing, Repair, Replacement and New Installation at Grand Canyon National Park. The Contractor shall be responsible for acquainting themselves with the National Park Service, Grand Canyon Backflow and Cross-Connection Control Program, including evaluating the Grand Canyon Backflow Prevention Assemblies Master List and recommending how and when annual testing, repair, replacement, new installations, and final testing would be accomplished. The Scope of Work lists 18 devices on the North Rim that need replacement or testing, as well as 1 device that needs testing. The related federal contract opportunity is Solicitation Number 140P1524Q0068, "GRCA 2024 BACKFLOW TESTING", issued by the Department of the Interior National Park Service Intermountain Region.

View the file

Other files for this federal contract opportunity

Other files attached to GRCA 2024 BACKFLOW TESTING, newest first.
File Type Posted
Sol_140P1524Q0068_Amd_0002.pdf PDF
Sol_140P1524Q0068_Amd_0001.pdf PDF
GRCA_Master_2024_Backflow_Inventory.xlsx XLSX spreadsheet
Sol_140P1524Q0068.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Park Service U.S. Department of the Interior

Grand Canyon National Park Intermountain Region, R-8

Division of Facility Management, and Engineering P.O. Box 129, 1575 Shuttle Bus Road, Grand Canyon, AZ 86023

Scope of Work, Backflow Prevention Assemblies Testing, Repair, Replacement and New Installation Grand Canyon National Park Parkwide, May 29, 2024

Project Summary: Addendum to Scope of Work

4.0 Tasks, Design Objectives

Contractor shall perform the following task.

1. The Contractor shall be responsible for acquainting themselves with the National Park Service, Grand Canyon Backflow and Cross-Connection Control Program; including evaluating the Grand Canyon Backflow Prevention Assemblies Master List and recommend how and when annual testing, repair, replacement, new installations, and final testing would be accomplished. The Grand Canyon Backflow Prevention Assemblies Master List, is provided, see (SOW - 13 NPS-GRCA-Water Utility Branch, Master FY-2024 Backflow Prevention Assmblies Inventory / Testing Log Report).

The following devices need to be added in addition to the master FY – 2024 backflow prevention assembly inventory/testing log report. All of the listed devices are located on the North Rim of the Grand Canyon.

The following are the devices that need Replacement / Testing:

1. NR - 1504 Administrative Loop Road - Boiler System / Utility Room, P/D / FMD - Housing / Residential

2. NR - 1503 Administrative Loop Road - Boiler System / Utility Room, P/D / FMD - Housing / Residential

3. NR - 1502 Administrative Loop Road - Boiler System / Utility Room, P/D / FMD - Housing / Residential

4. NR - 1545-A Administrative Loop Road - Boiler System / Utility Room, P/D / FMD - Housing / Residential

5. NR - 1545-B Administrative Loop Road - Boiler System / Utility Room, P/D / FMD - Housing / Residential

6. NR - 1546-A Administrative Loop Road - Boiler System / Utility Room, P/D / FMD - Housing / Residential

7. NR - 1546-B Administrative Loop Road - Boiler System / Utility Room, P/D / FMD - Housing / Residential

8. NR - 1546-C Administrative Loop Road - Boiler System / Utility Room, P/D / FMD - Housing / Residential

9. NR - 1546-D Administrative Loop Road - Boiler System / Utility Room, P/D / FMD - Housing / Residential

10. NR - 1547-A Administrative Loop Road - Boiler System / Utility Room, P/D / FMD - Housing / Residential

11. NR - 1547-B Administrative Loop Road - Boiler System / Utility Room, P/D / FMD - Housing / Residential

12. NR - 1547-C Administrative Loop Road - Boiler System / Utility Room, P/D / FMD - Housing / Residential

13. NR - 1547-D Administrative Loop Road - Boiler System / Utility Room, P/D / FMD - Housing / Residential

14. NR - 1547-E Administrative Loop Road - Boiler System / Utility Room, P/D / FMD - Housing / Residential

15. NR - 1547-F Administrative Loop Road - Boiler System / Utility Room, P/D / FMD - Housing / Residential

16. NR - 1547-G Administrative Loop Road - Boiler System / Utility Room, P/D / FMD - Housing / Residential

17. NR - 1547-H Administrative Loop Road - Boiler System / Utility Room, P/D / FMD - Housing / Residential

18. NR - 6223 AZ Highway 67 - North Rim Visitor Center and Restroom Facilities, - Boiler System / Utility Room, P/D / FMD – Buildings

The following device that needs Testing:

1. NR - 6219 AZ Highway 67 - North Rim Fire Station #3, - Boiler System / Utility Room, P/D / FMD - Buildings, NOTE: the last time this device was tested with a passing score was 07/19/2009. Device Information: RP, 1", Watts 009-M2-QT, s/n: A02582

Experience Your America Page 1 The National Park Service cares for special places saved by the American people so that all may experience our heritage.

image1.png image2.png

File details come from the government source that posted it. Updated .