B09-_P1524Q0046_Amendment_Questions_and_Answers_0001.pdf

PDF 227 KB Posted

Attached to
SUNSET CRATER NATIONAL MONUMENT (SUCR) REQUIRES TH
Solicitation number
140P1524Q0046
Issued by

About this file

This document is a Q&A Amendment for Solicitation #140P1524Q0046, which is a request for construction services to replace refueling system components at Sunset Crater National Monument. The key details are:

The solicitation requires upgrading the existing tank monitor inventory probes, replacing the outdated RS232 communication cable with fiber optic cable, and potentially replacing the existing fuel site controller computer that runs on Windows 7, which the government will supply. The thermal printer requested in the bid schedule is intended to be located outside at the fuel island. There are no other changes to the solicitation clauses or dates with this amendment. The contracting officer is Taylor Jones.

View the file

Other files

File Type Posted
Sol_140P1524Q0046_Amd_0001.pdf PDF
Sol_140P1524Q0046.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

NATIONAL PARK SERVICE

CONTRACTING OPERATIONS - CENTRAL

1849 C Street

NW Washington, DC 20240

General: No other solicitation clauses or dates change with this Amendment.

Contracting Officer: Taylor Jones, Taylor_A_Jones@nps.gov, 520-780-9294

Solicitation #: 140P1524Q0046 Amendment #: 0001

Fuel Station Rehab – Sunset Crater NM (SUCR)

Questions and Government Responses listed below:

QUESTIONS:

Question # Question Answer/Response

1. Existing tank monitor inventory probes wired with non-manufacturer specification wire.

• Is the existing wire from the tank monitor in the garage to the tanks to be upgraded to meet manufacturer specifications?

YES

2. Exiting Fuel Island Terminal utilizes old school RS232 communications, approximately 430’ wire distance.

• Newer system utilizes networking (CAT 6) type connection.

• With the limitation of CAT 6 to be 100M (328’), is the intent to replace the existing RS232 cable with fiber optic cable to allow network communication for new equipment?

Yes. Replacement w/fiber would be preferable depending on cost.

mailto:Taylor_A_Jones@nps.gov

United States Department of the Interior

NATIONAL PARK SERVICE

CONTRACTING OPERATIONS - CENTRAL

1849 C Street

NW Washington, DC 20240

General: No other solicitation clauses or dates change with this Amendment.

Contracting Officer: Taylor Jones, Taylor_A_Jones@nps.gov, 520-780-9294

3. Existing Fuel Site Controller computer located inside the garage that hosts the Software appears to be outdated and running Windows 7. Newer systems require Windows 10 or better.

• Is it the intent to replace this computer?

• Is the replacement supplied by the NPS or contractor?

Replacement Comp will be supplied by NPS

4. Bid Schedule, Option A requests thermal printer with roll paper.

• Is this printer for the Fuel Site Controller (inside at computer or outside at fuel island) or the Fuel Tank Inventory Monitor?

We would like this located outside at Fuel

Island mailto:Taylor_A_Jones@nps.gov

File details come from the government source that posted it. Updated .