1-Amd_0001_Rev_Bid_Sched___SOW_0002.pdf
PDF 2 MB Posted
- Attached to
- GRCA-HAZARD TREE EVALUATION SERVICES - Amd 0003
- Solicitation number
- 140P1522Q0032
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P1522Q0032_Amd_0003.pdf | ||
| Sol_140P1522Q0032_Amd_0002.pdf | ||
| Sol_140P1522Q0032_Amd_0001.pdf | ||
| Sol_140P1522Q0032.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule Amd_00001_Revision 0001_ 3/30/2022
Bid Item Description Unit Cost
Inner Canyon Havasupai Garden, Phantom Ranch, Cottonwood Campground, Roaring Springs.
South Rim South Rim Village, Entrance Station, Hermit Road (including Greenway trail and all viewpoints), East Rim Drive viewpoints and parking areas
Desert View Entire Area
4 North Rim – North Rim developed area, Scenic Road viewpoints and parking areas
Combined Total
HAZARD TREE EVALUATION
GRAND CANYON NATIONAL PARK
STATEMENT OF WORK – Revision 0001 - 3/30/2022
1. GENERAL:
The National Park Service (NPS) and Grand Canyon National Park (GRCA) have a responsibility to manage hazardous trees (HZT) in the park’s developed areas to provide for visitor, resident, and employee safety. The HZT program is programmatic in nature, is implemented in accordance with the park-wide Hazard Tree Management Plan 2022-2026 and associated compliance documents and is guided by NPS Management Policies (2006) and NPS Natural Resource Management Guidelines (2001).
A hazardous tree is one that located in an identified public use area or facility, and because of a recognizable defect or mechanical flaw, poses a threat to people, property, or resources. Trees must meet two requirements: 1. show tree potential for failure and/or defect and 2. pose a threat to a target (people, property, or resources), before it is considered for removal through the park's HZT program.
The park’s developed areas include the South Rim, North Rim, and the Inner Canyon (Havasupai Garden, Phantom Ranch, Cottonwood Campground, and Roaring Springs). This statement of work (SOW) covers the complete evaluation of trees within the park’s developed areas, on an annual schedule to be determined. There is some flexibility in the timeline for work completion, but evaluations must be completed by the deadlines provided in Table 1.
Table 1. Draft schedule for annual hazard tree evaluations in Grand Canyon NP
Developed Zone Developed Areas Annual Evaluation Deadline
Inner Canyon Havasupai Garden, Phantom Ranch, Cottonwood Campground, Roaring Springs
September 31
South Rim South Rim Village, Entrance Station, Hermit Road (including Greenway trail and all viewpoints), East Rim Drive viewpoints and parking areas
May 31
Desert View Entire Area June 30
North Rim North Rim developed area, Scenics Road viewpoints and parking areas
August 30
This SOW does not cover the review or evaluation of emergency and/or urgent tree removal situations. The contractor will have a professional level of expertise (skilled pathologist or arborist) that is not available in the park. The contractor will not complete the hazard tree removals.
2. WORK TO BE PERFORMED BY CONTRACTOR:
1. Contractor shall evaluate potential hazard trees of any tree species and size in developed areas within the South Rim, North Rim, and Inner Canyon regions of GRCA using a data collection device and application provided by the park. The contractor will provide prioritized recommendations for mitigating the hazard ranging from tree monitoring, pruning, or full tree removal. The contractor will provide pricing for the 11 areas listed within the four primary developed zones. Table 2 represents the most common trees found within GRCA and serves as example only of what a contractor may encounter in the performance of the proposed contract.
Table 2. Typical hazard tree size and locations within Grand Canyon NP
Species DBH (inches) Height (feet) Locations found
Fremont cottonwood (Populus fremontii) 10—60 15—80 Inner Canyon, few on North and
South Rims
Arizona sycamore (Platanus wrightii) 10—60 15—70 Inner Canyon (Phantom Ranch)
Rocky Mountain maple (Acer glabrum) 8—25 12—50 Inner Canyon, few on North and South Rims
Gray oak (Quercus grisea) 6—25 12—40 Inner Canyon, few on North and South Rims
Velvet ash (Fraxinus velutina) 8—25 12—50 Inner Canyon, few on North and South Rims
Boxelder (Acer negundo) 8—25 12—50 Inner Canyon, few on North and South Rims
Hackberry (Celtis laevigata var. reticulata)
6—25 12—40 Inner Canyon
Redbud (Cercis orbiculata) 6—25 12—40 Inner Canyon
Siberian elm (Ulmus pumila) 8—40 15—60 Inner Canyon (Roaring Springs), few on North and South Rims
Pinyon pine (Pinus edulis) 8—30 15—80 South Rim, North Rim
Juniper (Juniperus osteosperma) 8—70 15—60 South Rim, North Rim
Ponderosa pine (Pinus ponderosa) 8—45 15—110 North Rim, South Rim
Gambel oak (Quercus gambelii) 8—18 12—30 South Rim, North Rim, Inner Canyon
White fir (Abies concolor) 8—40 15—90 North Rim, South Rim
Subalpine fir (Abies lasiocarpa) 8—40 15—90 North Rim
Douglas fir (Pseudotsuga menziesii), 8—40 15—90 North Rim, South Rim
Engelmann spruce (Picea engelmannii) 8—40 15—90 North Rim
Blue spruce (Picea pungens) 8—40 15—90 North Rim
Commented [BDL1]: Remove text
Aspen (Populus tremuloides) 8—25 15—90 North Rim
New Mexico locust (Robinia neomexicana)
8—20 15—35 North Rim, South Rim
2. Contractor shall provide and supply all the equipment to complete the evaluation work and data collection, including DBH tape, clinometer, and any other equipment necessary to detect disease or defect.
3. Contractor shall provide any camping equipment and supplies needed for projects that require more than one day of work on the South Rim, North Rim, or Inner Canyon, or will obtain their own lodging. NPS will guarantee a campsite when the Contractor needs to stay in the park for more than one day. Accommodations other than camping may be available but cannot be guaranteed. See #5, Government Furnished Material.
4. Under normal conditions, Contractor will not be transported in government conveyance.
However, exceptions may be made subject to urgency, and will be determined on a case-by-case basis. The contractor shall be notified in advance of any exception. The South Rim of Grand Canyon is approximately 77 miles from Flagstaff, AZ. The North Rim is approximately 210 miles from Flagstaff, AZ. Contractor and all contractor employees shall hike into the canyon for Inner Canyon projects located at Havasupai Gardens, Phantom Ranch, Roaring Springs, and Cottonwood Campground. Distances: South Rim to Havasupai Gardens is 5 miles one way with a change of 3000 feet via the Bright Angel Trail. South Rim to Phantom Ranch is 7 miles one way via the South Kaibab Trail with a change of 5000 feet elevation.
Phantom Ranch to Cottonwood is 7 miles one way with a change of 1800 feet elevation. North Rim to Roaring Springs is 5 miles one way with a change of 4000 feet via the North Kaibab Trail. Highway 67 is normally closed Nov. 1 to May 15, weather dependent, on the North Rim of the Grand Canyon requiring access from the South Rim of the park. South Rim to Roaring Springs is 18 miles one way with a change of 7,000 feet elevation via the South Kaibab Trail then hiking via the North Kaibab Trail. Contractor should expect to carry their own personal effects, camping items, water, and food.
4. Contractor shall coordinate with the park’s HZT Coordinator on logistics, including camping/housing arrangements, and resident/visitor notifications during evaluation periods.
Contractor will provide dates when contractor(s) will be in the park performing evaluations and provide vehicle license and description. Contractors will wear high-visibility safety vests while performing evaluations.
5. Contractor shall follow Grand Canyon National Park regulations while completing the project.
6. Contractor will return data collection device upon completion of evaluations and after all new observations have been uploaded via wifi available in the park. If data collection device is not available during evaluations, Contractor will submit the evaluation results, tree photos, and tree UTMs to the COR in the format and/or using the forms requested. The park’s HZT Coordinator and/or other authorized park personnel will provide the reporting and documentation format to the contractor in advance of work. The Contractor may not make any changes to format without advance written authorization of the change from the COR.
The contractor will not flag or mark the trees during the evaluation process. Refer to Appendix A for example formats.
6. Contractor will submit the evaluation results, tree photos, and tree UTMs to the COR in the format and/or using the forms requested. The park’s HZT Coordinator and/or other authorized park personnel will provide the reporting and documentation format to the contractor in advance of work each year. The Contractor may not make any changes to format without advance written authorization of the change from the COR. The contractor will not flag or mark the trees during the evaluation process. Refer to Appendix A for example formats.
3. POTENTIAL HAZARDS:
Please be aware that you will encounter wild animals/insects while removing trees from the park’s Inner Canyon areas.
Environmental hazards including but not limited to extreme weather conditions like lightning storms, heavy rapid rainfall resulting in flash flood events which may require Contractor personnel to immediately evacuate the work site, temperature fluctuations from below freezing up to over 100 degrees Fahrenheit, unstable and loose terrain, rock slides, high wind gusts, plant allergies/irritants, hantavirus, rabies, snakes, tarantulas, rabid bats, rodents, and other wildlife typical of Northern Arizona and the Grand Canyon.
Because of the noise, California condors may become curious and fly around job site area. If it becomes a problem, park wildlife staff shall be notified to haze the California condor away or authorized park personnel will be contacted by the COR to haze, if Wildlife Staff is unavailable. Only individuals listed on the park's Threatened and Endangered Species Permit issued by the US Fish and Wildlife Service may haze condors.
Within the Inner Canyon, Contractor may encounter Africanized honeybees. Please be aware of the surroundings and inform the Inner Canyon Rangers if there is a potential nesting site at or near the designated working area. Contractor may also encounter bark scorpions, please check your personal gear and bags.
4. GOVERNMENT-FURNISHED MATERIALS/SERVICES:
The Government will provide the following materials/services:
NPS shall provide data collection device with data collection application for use while in the park performing hazard tree evaluations. Data must be provided in the approved format by the annual date listed in Table 1. Data must still be provided in the approved format by the annual date listed in Table 1.
If NPS-owned data collection device is not available, NPS shall provide the reporting and documentation format to the contractor in advance of work.
NPS shall provide datasheets, spreadsheets, and details on the approved format for the evaluation data collected to be provided to the park. Data must be provided in the approved format by the annual date listed in Table 1.
NPS shall provide a skilled and trained COR on site during contract administration.
Commented [BDL2]: Remove text
Commented [BDL3]: Add text
Commented [BDL4]: Remove text
Commented [BDL5]: Add text
NPS shall confirm all new hazard tree observations are successfully uploaded into the geodatabase.
Under the NPS superintendent's sole discretion, and to the extent that government vehicles and NPS staff are available, the NPS may assist to transport the Contractor's equipment in a government conveyance (mules, helicopter, watercraft) to assist them in performing the work required by the agreement in situations where this is approved in advance and warranted by the emergency tree removal needs. In consideration of the NPS providing transportation in a government conveyance, the contractor hereby waives all claims, demands, and causes of action against the United States and its employees, and releases the United States and its employees from all liability arising out of the transportation in government conveyance by the contractor's employees or representatives.
NPS shall provide campsite(s) or may provide bunkhouse (bunkhouse is not guaranteed) accommodations for work on the South Rim, North Rim, and in the Inner Canyon for removal projects that require more than one day; however, contractor will be required to provide own lodging if contractor prefers motel/hotel accommodations.
5. DELIVERY SCHEDULE:
Contractor shall work continuously at the project once the work is underway. Contractor shall not perform the work in increments or start and stop the project. Work schedule and hours may vary by project, and the park HZT Coordinator will coordinate schedule and work hours with Contractor. Projected start date is to be determined as each evaluation project is prescribed.
6. BID FORMAT:
1. Contractor will provide a cost estimate for each area of evaluation and provide total cost for the full evaluation including all associated costs for the work defined for each specific developed area within the park.
2. Contractor will be evaluated based on ability to meet requirements stated above in item number 1, past performance, and lowest price technically acceptable.
8. SUMMARY OF DELIVERABLES: Tree evaluation data collection, data sheets, GRCA hazard tree spreadsheet, data review (QA/QC), summary of prioritized recommendations, tree photographs, and tree UTMs. Data will primarily be collected using NPS-provided data collection device, which will be available during evaluations. Paper data sheets will only be needed when data collection devices are not available or not operational. The GRCA HZT Coordinator will provide written verification of successful completion of tree evaluations to GRCA Contracting/Procurement Office.
9. CONTRACTOR PAYMENT SCHEDULE:
Contractor must submit invoice after completion of work. Upon Government acceptance of work, payment shall be made to Contractor.
10. TECHNICAL COORDINATION:
Commented [BDL6]: Remove text
The Contracting Officer’s Representative for this action is the Park’s Vegetation Biologist.
Daniel Boughter Vegetation Biologist Grand Canyon National Park Science and Resource Management P.O. Box 129 Grand Canyon, AZ 86023-0129 Ph: (928) 638-7857 Fax: (928) 638-7740 E-mail: daniel_boughter@nps.gov
11. ADDRESS FOR DELIVERABLES:
All deliverables shall be submitted to the following address within the allowable time frames.
National Park Service Grand Canyon National Park Contracting & Procurement (Contracting Representative to be Assigned) 1824 S. Thompson Street Flagstaff, AZ 86001 Fax: (928)637-7005
Point of Contact for Hazard Tree Project:
Dan Boughter, Restoration Biologist Grand Canyon National Park Science and Resource Management P.O. Box 129 Grand Canyon, AZ 86023 Ph: (928) 638-7455 Fax: (928) 638-7740 E-mail: Daniel_Boughter@nps.gov
Grand Canyon Regional Map
APPENDIX A
Template example:
Tree evaluation example:
D at a Sh ee t E xa m pl e:
File details come from the government source that posted it. Updated .