(x)
140P1520Q0054 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PIA
Flagstaff AZ 86001-2694 1824 S Thompson St, Ste 200 NPS, IMR - Arizona MABO
08/03/20200001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/03/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment is hereby issued to answer several vendor questions. 6 questions and answers are clarified below.
1. Is an itemized Bid Schedule forthcoming? Should the Bidder provide unit prices for removal recycle/disposal of 500 cubic yards of concrete debris, 30 cubic yards of asphalt debris and (3) 10' sections of culvert pipe identified in the Statement of Work? Or should the Bidder's price be lump sum inclusive of the entire scope of work?
*This is a firm fixed priced contract requiring the removal and disposal of all items noted in the SOW and pictures as a lump sum. Due to COVID, items details were provided as most practical without a site visit but site access was noted as available upon request.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Catherine Robertson
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P1520Q0054/0001
2. Will the Bidders be required to maintain a level of dust control during field operations?
If so, is there an onsite water source for construction available for us to use?
*Yes, and there is a hydrant 150ft from the pile.
3. Should the Bidders include TERO taxes in their bid? This is a lump sum award and should include any applicable fees or taxes (but only as they apply).
*It is not believed TERO would be applicable.
NPS is federal agency issuing a small business contract for work where "key personnel" would be assumed applicable.
4. Will the Bidder's crew trucks and waste transportation trucks be required to purchase
Park Access Passes?
*No.
5. What is meant by ¿Travel Tickets¿? Is the
Bidder required to provide certified weight tickets for each truckload of waste removed from the site?
*Travel tickets will need to note the items removed from each load and signed by a park personnel before leaving, weight tickets at disposal site could be used in place of itemized load(s). These will need to also be furnished when submitting for payment.
6. Is the nearby NPS campground available to the
Bidder's crew for lodging?
*Any vendor bidding is required to obtain their own lodging and accommodations. The NPS campground is currently closed and not available for camping.
Legacy Doc #: NPS
Period of Performance: 08/20/2020 to 10/30/2020
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)