This document is a solicitation for the GRTE ROY CHAMBERS REHABILITATION project at Grand Teton National Park. The work involves the construction, reconfiguration, and rehabilitation of three existing historic buildings to accommodate seasonal housing and supporting functions. The scope includes architectural, structural, mechanical, electrical, plumbing, and civil site work to create 4 sleeping rooms with associated facilities in the house, bunkhouse, and garage. The project is set aside for small businesses under NAICS code 236118, with an estimated magnitude between $1,000,000 and $5,000,000. The contract performance period is 240 days, starting within 10 days of the Notice to Proceed. Offers must be submitted via email, and a detailed price breakdown may be requested during the evaluation process. Questions must be submitted to the Contract Specialist no later than 7 business days prior to the offer due date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P1424R0015_Amd_0002.pdf | ||
| Site_Visit_Sign_In_Sheet_0001.jpg | JPG image | |
| Clarification_Addendum_0001.docx | DOCX document | |
| Sol_140P1424R0015_Amd_0001.pdf | ||
| A06_40648417_Roy_Chambers_Phase_II_FINAL_Stamped_Specification.pdf | ||
| B08_Attachment_8_Limitation_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| B08_Attachment_4_Schedule_of_Values_Blank_-_Evaluation_Only.docx | DOCX document | |
| B08_Attachment_6_General_References.pdf | ||
| B08_Attachment_7_Past_Performance_Questionnaire.docx | DOCX document | |
| B03_40648417_Teton_County_Building_WY20240017_03222024.pdf | ||
| Sol_140P1424R0015.pdf | ||
| B08_Attachment_5_Project_and_Teaming_Experience_Form.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JACKSON22
KELLY
GROS VENTRE
AIRPORT
V.C. HQ.&
MOOSE
LIZARD
CREEK
COLTER BAY
VILLAGE V.C.
MORAN
JUNCTION
JACKSON
LAKE
LODGE
MT. MORAN
SOUTH TETON
MT. HUNT
GRAND
TETON
MIDDLE
TETON
MT.
OWEN
JENNY
LAKE
SN
AK
E
RIV
ER
SIGNAL
MT.
JOHN D.
ROCKEFELLER, JR.
MEMORIAL
PARKWAY
TO ROCK SPRINGS
TO
IDAHO FALLS,
IDAHO
TO
WEST THUMB,
YELLOWSTONE
NATIONAL
PARK
TO
DUBOIS
LOWER
SLIDE
LAKE
EMMA
MATILDA
LAKE
TWO OCEAN
LAKE
TETON
VILLAGE
WILSON
JACKSON
LAKE
TARGHEE
NATIONAL
FOREST
TETON
NATIONAL
FOREST
BRIDGER-TETON
NATIONAL
FOREST
JENNY
LAKE
LEIGH
LAKE
20 14
POWELL
CODY
ST. ANTHONY
REXBURG
RIGBY ID
A
H O
W Y
O M
IN
G
MONTANA
WYOMING
LANDER
JACKSON
MONTANA
IDAHO
GRAND TETON
NATIONAL PARK
YELLOWSTONE
NATIONAL PARK
JOHN D. ROCKEFELLER,JR.
MEMORIAL PARKWAY
212 310
CAMPGROUND
PICNIC AREA
RANGER STATION
PARK HEADQUARTERS
VISITOR CENTER
RIVER
HQ.
V.C.
STATE LINE
UNPAVED ROAD
PAVED ROAD
PARK BOUNDARY
LEGEND
GRAND TETON NATIONAL PARK
SCALE OF KILOMETERS
2 0 2 64 8
SCALE OF MILES
22 0 4 6
STATE
NATIONAL PARK SERVICE
REGION COUNTY
DEPARTMENT OF THE INTERIOR
UNITED STATES LOCATION WITHIN PARK
NAME OF PARK
TITLE OF DRAWING
187617
TETON WY
DRAWING NO.
ROY CHAMBERS REHABILITATION DESIGN
PHASE II - REHABILITATION
FINAL CONSTRUCTION DOCUMENTS
INTERMOUNTAIN
GRAND TETON NATIONAL PARK
136-
& JOHN D. ROCKEFELLER MEMORIAL PARKWAY
THIS PROJECT
APPROVED:
RECOMMENDED:
Superintendent
Project Manager
Date
Date
PMIS/PKG NO.
SHEET
OF
228830H
GROS VENTRE ROAD
ROY CHAMBERS REHAB.
1 77
SHEET
NO SUB SHEET NO TITLE OF SHEET
1 COVER
2 G0.1 SYMBOLS & ABBREVIATIONS
3 C1.0 CIVIL LEGEND, ABBREVIATIONS, & GENERAL NOTES
4 C2.0 SITE PLAN OVERVIEW & NOTES
5 C3.0 SITE DEMOLITION PLAN
6 C4.0 COMBINED SITE IMPROVEMENT PLAN
7 C4.1 NORTHERN SITE IMPROVEMENT PLAN
8 C4.2 SOUTHERN SITE IMPROVEMENT PLAN
9 C5.0 UTILITY PLAN
10 C6.0 GRADING PLAN
11 C6.1 LAYOUT POINT TABLES
12 C7.0 CIVIL DETAILS
13 C7.1 CIVIL DETAILS
14 C7.2 SEPTIC DETAILS
15 C7.3 SEPTIC DETAILS
16 C7.4 CIVIL DETAILS
17 C7.5 CIVIL DETAILS
18 C7.6 CONCRETE ABA RAMP DETAIL
19 D2.1 MAIN RESIDENCE DEMOLITION PLANS
20 D2.2 GARAGE & BUNKHOUSE DEMOLITION PLANS
21 D3.1 MAIN RESIDENCE DEMOLITION ELEVATIONS
22 D3.2 GARAGE DEMOLITION ELEVATIONS
23 D3.3 BUNKHOUSE DEMOLITION ELEVATIONS
24 A2.1 MAIN RESIDENCE FLOOR PLANS
25 A2.2 MAIN RESIDENCE FLOOR PLANS
26 A2.3 GARAGE & BUNKHOUSE FLOOR PLANS
27 A3.1 MAIN RESIDENCE EXTERIOR ELEVATIONS
28 A3.2 GARAGE EXTERIOR ELEVATIONS
29 A3.3 BUNKHOUSE EXTERIOR ELEVATIONS
30 A4.1 MAIN RESIDENCE SECTIONS
31 A4.2 GARAGE & BUNKHOUSE SECTIONS
32 A4.3 MAIN RESIDENCE WALL SECTIONS
33 A4.4 GARAGE & BUNKHOUSE WALL SECTIONS
34 A5.1 WALL TYPES & FINISH SCHEDULE
35 A5.2 DOOR SCHEDULE
36 A5.3 WINDOW SCHEDULE
37 A5.4 CASEWORK SCHEDULE & DETAILS
38 A6.1 39 A6.2
40 A7.1 MAIN RESIDENCE REFLECTED CEILING PLANS
41 A7.2 GARAGE & BUNKHOUSE REFLECTED CEILING PLANS
42 S0.1 STRUCTURAL GENERAL NOTES
43 S0.2 STRUCTURAL ABBREVIATIONS & LEGEND
44 S2.1 MAIN HOUSE NEW FLOOR FRAMING PLAN
45 S2.2 MAIN HOUSE NEW ROOF FRAMING PLAN
46 S2.3 BUNKHOUSE NEW ROOF FRAMING PLAN
47 S2.4 GARAGE NEW FOUNDATION PLAN
48 S2.5 GARAGE NEW ROOF FRAMING PLAN
49 S5.2 STRUCTURAL FOUNDATION DETAILS
50 S5.3 STRUCTURAL FRAMING DETAILS
51 S5.4 STRUCTURAL ROOF FRAMING DETAILS
52 S5.5 STRUCTURAL SHEAR WALL DETAILS
53 M0.0 MECHANICAL COVER SHEET
54 M1.1 MECHANICAL PLANS
55 M1.2 MECHANICAL PLANS
56 P0.0 PLUMBING COVER SHEET
57 P0.1 PLUMBING SCHEDULES
58 PD1.1 PLUMBING DEMOLITION PLANS
59 P1.1 PLUMBING PLANS
60 P1.2 PLUMBING PLANS
61 P1.3 PLUMBING PLANS
62 P5.0 PLUMBING DETAILS
63 E0.0 ELECTRICAL COVER SHEET
64 ED1.1 ELECTRICAL DEMOLITION PLANS
65 ED1.2 ELCTRICAL DEMOLITION PLANS II
66 E1.0 ELECTRICAL SITE PLAN
67 E1.1 ELECTRICAL POWER PLANS
68 E1.2 ELECTRICAL POWER PLANS
69 E1.3 ELECTRICAL POWER PLANS
70 E2.1 ELECTRICAL LIGHTING PLANS
71 E2.2 ELECTRICAL LIGHTING PLANS
72 E2.3 ELECTRICAL LIGHTING PLANS
73 E5.0 ELECTRICAL DETAILS
74 E6.0 ELECTRICAL SCHEDULES
75 E6.1 ELECTRICAL SCHEDULES
76 FP1.0 FIRE PROTECTION
77 FP2.0 FIRE PROTECTION PLANS
10.27.2023
CIVIL DETAILS
& DETAILS
, FINISH, AND APPLIANCE SCHEDULE
SCALE OF MILES
20 0 20
SHEET INDEX
INTERIOR ELEVATIONS
INTERIOR ELEVATIONS
MAIN RESIDENCE
GARAGE & BUNKHOUSE
II
P:
\23
7.0
0\D ra wi ng s & M od els
\A uto
CA
D\
G0 .1.
dw g
O ct
, 2
3 -
:17 am
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
187617
J SCHMITZ
J SCHMITZ
D JOHNSON
10.27.2023
ROY CHAMBERS REHAB - PHASE II
GRAND TETON NATIONAL PARK
228830HG0.1
SYMBOLS AND
ABBREVIATIONS
AB ANCHOR BOLT
ABV ABOVE
A/C AIR CONDITIONING
ACT ACOUSTIC CEILING TILE
ADDL ADDITIONAL
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ARCH ARCHITECT(URAL)
AWN AWNING
B/ BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BM BEAM OR BENCHMARK
BRG BEARING
BTWN BETWEEN
BUR BUILT-UP ROOF
CAB CABINET
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CONST CONSTRUCTION
CG CORNERGUARD
CPT CARPET
CSMT CASEMENT
CT CERAMIC TILE
CTOP COUNTERTOP
D DEEP
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DIM(S) DIMENSIONS
DISP DISPENSER
DN DOWN
DR DOOR
DS DOWNSPOUT
DTL DETAIL
DWG DRAWING
E EAST
(E) EXISTING
EA EACH
EC EXISTING COLUMN
EJ EXPANSION JOINT
ELEC ELECTRICAL
EL ELEVATION
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXT EXTERIOR
FACP FIRE ALARM CONTROL PANEL
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FFL FINISH FLOOR LEVEL
FIN FINISH
FIX'T FIXTURE
FLR FLOOR
FND FOUNDATION
FR FRAME
FRMG FRAMING
FT FEET/FOOT OR FIRE TREATED
FTNG FOOTING
FRP FIBERGLASS REINFORCED PANEL
GA GAUGE OR GAGE
GALV GALVANIZED
GB GYPSUM BOARD
GC GENERAL CONTRACTOR
GL GLASS, GLAZING
GWB GYPSUM WALL BOARD
GYP GYPSUM
HC HANDICAP
HDR HEADER
HDW HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HT HEIGHT
HTD HEATED
HVAC HEATING/VENTILATION & AIR CONDITIONING
ID INSIDE DIAMETER
INFO INFORMATION
ISO INSOCYANURATE
INSUL INSULATE/ INSULATION
INT INTERIOR
INV INVERT
JT JOINT
J-BOX JUNCTION BOX
KIT KITCHEN
L LONG/ LENGTH
LAM LAMINATE(D)
LAV LAVATORY
LF LINEAR FEET
LT LIGHT
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTL METAL
N NORTH
(N) NEW
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER OR OVERFLOW DRAIN
OPNG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
OVHD OVERHEAD
PL PLATE
PLAM PLASTIC LAMINATE
PLUMB PLUMBING
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
POLY POLYESTER OR POLYOLEFIN
PSF POUNDS PER SQUARE FOOT
PSI POUND PER SQUARE INCH
PT PRESSURE TREATED OR POINT
PVMT PAVEMENT
PVT PRIVATE
QT QUARRY TILE
QTR QUARTER
QTY QUANTITY
R RADIUS
RA RETURN AIR
RB RUBBER BASE
RD ROOF DRAIN
RECY RECYCLE(D)
REF REFERENCE
REFRIG REFRIGERATOR
REINF REINFORCE(D)
REQD REQUIRED
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RR RESTROOM
S SOUTH
SC SOLID CORE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FEET
SFRM SPRAY-APPLIED FIRE RESISTANT MATERIAL
SGL SINGLE
SHT SHEET
SHTG SHEATHING
SIM SIMILAR
SPECS SPECIFICATIONS
SOD SLAB ON DECK
SOG SLAB ON GRADE
SOH SAME OPPOSITE HAND
SS STAINLESS STEEL
ST STONE TILE
STND STANDARD
STL STEEL
STRUCT STRUCTURAL
TEL TELEPHONE
TEMP TEMPERED
THK THICK
THRESH THRESHOLD
T.A. TOP OF
TOBM TOP OF BEAM
T.A.P. TOP OF PLATE
T.O.S TOP OF STEEL
T/ TOP OF
T&G TONGUE AND GROOVE
TRANS TRANSOM
TV TELEVISION
TYP TYPICAL
UL UNDERWRITERS LABORATORY
UNO UNLESS NOTED OTHERWISE
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VP VENEER PLASTER
VR VAPOR RETARDER
VRF VARIABLE REFRIGERANT FLOW
VT VINYL TILE
VWC VINYL WALL TILE
W WIDE OR WEST
W/ WITH
WC WATER CLOSET
WD WOOD
WDW WINDOW
WG WALL GUARD
WH WATER HEATER
W/IN WITHIN
W/O WITHOUT
WP WATERPROOF
WR WATER RESISTANT
WT WEIGHT
WWF WELDED WIRE FABRIC
# NUMBER OR POUND
@ AT
EXPLANATION OF SYMBOLS
ARCHITECTURAL ABBREVIATIONS
DOOR NUMBER
ROOM NUMBER
INTERIOR ELEVATION
GRID LINE
ELEVATION
ELEVATION
A6.14
DETAIL
WALL TYPEW1
STRUCTURALOWNER
PROJECT TEAM
CIVIL
DJ&A
2000 MAPLE STREET
MISSOULA, MT 59808
406.721.4320
DJ&A
2000 MAPLE STREET
MISSOULA, MT 59808
406.721.4320
GRAND TETON NATIONAL PARK
NATIONAL PARK SERVICE
DEPARTMENT OF THE INTERIOR
P.O. BOX 170
MOOSE, WY 83012
307.739.3399
MAIN FLOOR
F.F.L. = 0'-0"
BUILDING SECTION
DEMOLITION
KEYNOTE
001.1
A5.1
A9.1 WALL SECTION
A4.1
A9.1
1 KEYNOTE
ROOM NAME
POSITION ON
SHEET
SHEET OF
ORIGIN
DETAIL NAME /
DESCRIPTION
SCALE
ARCHITECT
MECH/ELEC/PLUMB
A&E DESIGN
222 NORTH HIGGINS AVENUE
MISSOULA, MT 59802
406.721.5643
ASSOCIATED CONSTRUCTION
ENGINEERING, INC.
12 N BROADWAY
BELGRADE, MT 59714
406.388.3320
IN-KIND: NEW MATERIALS INDICATED TO MATCH IN-KIND SHALL REPLICATE EXACTLY, IN EVERY REGARD, THE ORIGINAL DETAIL, MATERIAL, TYPE, & FINISH OF ELEMENT TO BE REPLACED AS DETERMINED BY THE ARCHITECT.
TYPICAL (TYP.): AS USED IN THESE DOCUMENTS SHALL MEAN THE CONDITION IS THE SAME OR REPRESENTATIVE FOR ALL
SIMILAR CONDITIONS UNLESS OTHERWISE NOTED.
ALIGN: SHALL MEAN TO ACCURATELY LOCATE FINISHED FACES IN THE SAME PLANE. CONTRACTOR SHALL COORDINATE ALL
WORK NECESSARY TO ACHIEVE SAME.
DEFINITIONS
1. EVERY ATTEMPT HAS BEEN MADE TO ENSURE THE ACCURACY OF THE DRAWINGS THROUGH FIELD VERIFICATION. THE CONTRACTOR IS RESPONSIBLE TO VERIFY EXISTING CONDITIONS BEFORE CONSTRUCTION / ORDERING / INSTALLATION & NOTIFY ARCHITECT IMMEDIATELY FOR WRITTEN CLARIFICATION IF ANY DISCREPANCY EXISTS. NOTE THAT PHASE I OF THIS PROJECT INVOLVED MOVEMENT OF THE BUILDING OFF OF AND BACK ONTO ITS FOUNDATION AND RESULTANT
MOVEMENT MAY HAVE OCCURRED.
2. DRAWINGS CONTAINED WITHIN THESE DOCUMENTS ARE ABBREVIATED IN NATURE. THE CONTRACTOR SHALL USE QUALITY, ACCEPTABLE STANDARD CONSTRUCTION PRACTICES & TECHNIQUES COMPATIBLE WITH THE HISTORIC
CHARACTER OF THE BUILDING.
3. ALL CONSTRUCTION SHALL CONFORM TO THE CURRENT VERSIONS OF ALL APPLICABLE STANDARDS & REGULATIONS AS PRESCRIBED BY THE STATE OF WYOMING, BUT NOT LIMITED TO, 2021 INTERNATIONAL FIRE CODE 2021 INTERNATIONAL BUILDING CODE, 2021 INTERNATIONAL FUEL & GAS CODE, 2021 INTERNATIONAL MECHANICAL CODE, 2021 INTERNATIONAL EXISTING BUILDING CODE, 2020 NATIONAL ELECTRICAL CODE, SECRETARY OF THE INTERIOR'S STANDARDS FOR TREATMENT OF HISTORIC PROPERTIES, NATIONAL HISTORIC PRESERVATION ACT OF 1966, CURRENT ARCHITECTURAL BARRIERS ACT & STANDARDS FOR ACCESSIBILITY, CURRENT NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) STANDARDS FOR LIFE SAFETY SYSTEMS, CURRENT NFPA 101 STANDARDS, CURRENT AMERICAN NATIONAL STANDARDS INDICATED OR APPLICABLE TO THE WORK, & ANY APPLICABLE LOCAL CODES OR REGULATIONS.
4. THE CONTRACTOR IS RESPONSIBLE FOR DOCUMENTATION OF ACCURATE AS-BUILTS INFORMATION.
5. DO NOT SCALE FROM DRAWINGS. IF A DIMENSION DOES NOT EXIST OR IS IN ERROR, CONTACT THE ARCHITECT
IMMEDIATELY FOR WRITTEN CLARIFICATION.
GENERAL PROJECT NOTES
THE CONTRACTOR SHALL PROTECT HISTORIC AND EXISTING FABRIC THROUGHOUT THE CONSTRUCTION, TYPICAL OF BUILDINGS AND SITE. THE ROY CHAMBERS HOUSE IS RECOGNIZED ON THE NATIONAL REGISTER OF HISTORIC PLACES AS PART OF THE MORMON ROW HISTORIC DISTRICT. THE GROUNDS AND STRUCTURES WITHIN THE SITE NOT SPECIFICALLY CALLED OUT FOR WORK IN THESE DOCUMENTS SHALL BE PROTECTED FROM DAMAGE. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE CAUSED BY THE EXECUTION OF THIS CONTRACT, TO THE SATISFACTION OF THE ARCHITECT AND OWNER WITHOUT ADDITIONAL COMPENSATION. EACH EMPLOYEE OF THE CONTRACTOR AND HIS SUBCONTRACTORS SHALL BE INFORMED OF THE HISTORIC NATURE OF THE BUILDING AND MADE RESPONSIBLE FOR THE PROTECTION OF BUILDINGS ARTIFACTS, FOUND OBJECTS, AND OTHER "COLLECTABLE" ITEMS UNCOVERED DURING THE WORK. THESE ITEMS ARE THE PROPERTY OF THE OWNER, AND AS SUCH, ARE VALUABLE. NO SUCH PROPERTY SHALL BE REMOVED FROM THE SITE BY THE CONTRACTOR, CONTRACTOR'S EMPLOYEES, OR SUBCONTRACTORS.
IF ANY CULTURAL MATERIALS ARE DISCOVERED DURING CONSTRUCTION, WORK IN THE AREA SHALL HALT IMMEDIATELY.
THE NPS MUST BE CONTACTED AND THE MATERIALS EVALUATED BY AN ARCHAEOLOGIST OR HISTORIAN MEETING THE SECRETARY OF INTERIOR'S PROFESSIONAL QUALIFICATION STANDARDS (48 FR 22716, SEPT. 1983).
HISTORICAL NOTE
SHEET WHERE
DETAIL APPEARS
1 DRAWING NAME
A1.1 : A2.1 1/4" = 1' - 0"
/08
/23
:12 K
YL
E
R
F :\7
2.3
3 G
RT
E
RO
Y
CH
AM
BE
R
RE
HA
BI
LIT
AT
IO
N\
DW
G\
CI
VI
L\5 S
HE
ET
P
RO
DU
CT
IO
N\
C0 1.0
_L
EG
EN
D.
DW
G
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CIVIL LEGEND, ABBREVIATIONS,
& GENERAL NOTES
187617
3 77
K. DRUYVESTEIN
K. DRUYVESTEIN
K. GAUTHIER
10.27.2023
ROY CHAMBERS REHAB - PHASE II
GRAND TETON NATIONAL PARK
228830HC1.0
AC ASBESTOS CONCRETE
AC ALUMINUM CAP
ASTM AMERICAN SOCIETY FOR TESTING & MATERIALS
AWWA AMERICAN WATER WORKS ASSOCIATION
BC BLUE CAP
C.I. CAST IRON
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO SEWER CLEANOUT
CONC CONCRETE
CORP CORPORATION
CP CONTROL POINT
CPP CORRUGATED PLASTIC PIPE
DI DUCTILE IRON
DIA. DIAMETER
DR DIMENSION RATIO
E EASTING
EA EACH
EG EXISTING GROUND
EJIW EAST JORDAN IRON WORKS
ELEC ELECTRICAL
ELEV. ELEVATION
ETC ET CETERA
F.F. FINISH FLOOR ELEVATION
FG FINISH GROUND
FL FLANGE
FLG FLANGE
FND FOUND
GPS GLOBAL POSITIONING SYSTEM
HDPE HIGH DENSITY POLYETHYLENE
HQ HEADQUARTERS
I.D. INSIDE DIAMETER/DIMENSION
I.E. INVERT ELEVATION
INV. INVERT
L ARC LENGTH
LF LINEAR FEET
ABBREVIATIONS GENERAL NOTES
1. THE EXISTING SITE SHOWN HAS BEEN CREATED USING EXISTING INFORMATION, NPS PROVIDED LIDAR DATA AND AS-BUILT DRAWINGS. ALL UTILITIES AND
EXISTING GROUND ELEVATIONS MAY NOT BE SHOWN AND THOSE WHICH ARE SHOWN MAY NOT BE SHOWN ACCURATELY. THE CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATING TO DETERMINE AND VERIFY EXACT LOCATIONS, ELEVATIONS AND SIZES OF ALL EXISTING UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL NPS AND NON-NPS OWNED UTILITIES. IF ANY EXISTING UTILITY IS DAMAGED DURING CONSTRUCTION, CONTACT AND COORDINATE WITH THE UTILITY PROVIDER IMMEDIATELY, REPAIR OR REPLACE THE DAMAGED EXISTING UTILITY PER THE UTILITY PROVIDER'S
RECOMMENDATIONS AND REQUIREMENTS AT NO COST TO NPS.
2. MATERIAL STAGING REQUIREMENTS TO BE DECIDED BY CONTRACTING OFFICER. MATERIAL STAGING LOCATION IDENTIFIED ON SHEET C2.0.
3. THE CONTRACTOR SHALL REVIEW THE SITE PLANS AND DETERMINE THE CONDITIONS WITH REGARD TO THE EXISTENCE OF FENCES, DRIVEWAYS, TREES, BOULDERS, SIDEWALKS, CULVERTS, UTILITIES AND OTHER SITE IMPROVEMENTS AND MISCELLANEOUS OBSTACLES THAT MAY INTERFERE WITH CONSTRUCTION PRIOR TO SUBMITTING BID. ALL MINOR OBSTRUCTIONS MAY NOT BE SHOWN ON CONSTRUCTION DRAWINGS.
4. CONSTRUCTION SHALL COMPLY WITH ENVIRONMENTAL PROTECTION AGENCY REGULATIONS, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, AND
STATE OF WYOMING REGULATIONS.
5. THE CONTRACTOR SHALL ONLY DISTURB WITHIN THE LIMITS OF DISTURBANCE SPECIFIED AND SHOWN ON THE CONSTRUCTION DRAWINGS. NO GROUND DISTURBANCE SHALL OCCUR OUTSIDE THE LIMITS UNLESS APPROVED BY THE CONTRACTING OFFICER PRIOR TO CONSTRUCTION. ALL DISTURBANCE AREAS MUST BE RESTORED TO PRE-CONSTRUCTION OR BETTER CONDITIONS AT THE COMPLETION OF WORK.
6. THE CONTRACTOR IS RESPONSIBLE FOR PREPARING AND MAINTAINING A STORM WATER POLLUTION PREVENTION PLAN (SWPPP), AS SPECIFIED IN SECTION 01 57 23. THE CONTRACTOR SHALL NOT INTRODUCE OR TRANSPORT EXOTIC AND NON-NATIVE PLANTS INTO THE PARK. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN ROADSIDE DITCHES, SWALES AND PREVENT EROSION THROUGHOUT THE PROJECT. THE CONTRACTOR SHALL SCHEDULE EQUIPMENT INSPECTION WITH NPS PRIOR TO BRINGING ANY CONSTRUCTION EQUIPMENT INTO THE PARK.
7. STRIP TOPSOIL AND STOCKPILE FOR REPLACEMENT IN ALL AREAS OF EXCAVATION AND DISTURBANCE.
8. RESTORE ALL SURFACES DISTURBED AS SPECIFIED AND SHOWN ON THE CONSTRUCTION DRAWINGS.
9. CONTRACTOR IS RESPONSIBLE FOR ALL ASBESTOS-CONTAINING MATERIAL (ACM), LEAD-BASED PAINT AND REGULATED BUILDING MATERIAL REMEDIATION PRESENT ON THIS PROJECT SITE. AN ASBESTOS, REGULATED BUILDING MATERIALS, AND LEAD ASSESSMENT REPORT WAS COMPLETED IN 2023 AND IS AVAILABLE THROUGH THE CONTRACTING OFFICER. CONTRACTOR TO FOLLOW GUIDANCE/REQUIREMENTS OUTLINED IN REPORT AND SPEC SECTION 01 35
43, 02 81 00 AND 02 82 13.
PLAN FOOTNOTE REFERENCE5
DETAIL NOTEA
C2 NTS
DETAIL SHEET REFERENCE
A
C2
PLAN SHEET TO DETAIL SHEET REFERENCEXXXXXX
SECTION OR DETAIL IDENTIFICATION SYMBOLS
A C2
SECTION
A C2
SECTION VIEW ELEVATION VIEW LOCATION
SECTION VIEW PLAN VIEW LOCATION
MAX. MAXIMUM
MECH MECHANICAL
MH MANHOLE
MIL ONE-THOUSANDTH OF AN INCH
MIN. MINIMUM
MJ MECHANICAL JOINT
MUTCD MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
N NORTHING
NAD83 NORTH AMERICAN DATUM OF 1983
NAVD88 NORTH AMERICAN VERTICAL DATUM OF 1988
NPS NATIONAL PARK SERVICE
NTS NOT TO SCALE
O.D. OUTSIDE DIAMETER
O.S.H.A OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
P&P PLAN & PROFILE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE
R RADIUS
RCP REINFORCED CONCRETE PIPE
RTK REAL TIME KINEMATIC (SURVEY TYPE)
RV RECREATIONAL VEHICLE / CAMPER
SCH SCHEDULE
SDR STANDARD DIAMETER RATIO
SPEC. SPECIFICATIONS
SRVC. SERVICE
STA. STATION
SWPPP STORM WATER POLLUTION PREVENTION PLAN
TBD TO BE DETERMINED
T.O.P. TOP OF PIPE
TYP TYPICAL
US UNITED STATES OF AMERICA
W WEST
W/ WITH
W/O WITHOUT
WY WYOMING
LEGEND - EXISTING SYMBOLSLEGEND - PROPOSED
PROPOSED MAJOR CONTOUR
PROPOSED EDGE OF ROAD - (GRAVEL)
PROPOSED MINOR CONTOUR
PROPOSED LIMITS OF DISTURBANCE
PROPOSED UNDERGROUND ELECTRIC
PROPOSED CENTER OF ROAD
PROPOSED CONCEPTUAL PARKING STALLS
E E E x x x
EXISTING MAJOR CONTOUR
EXISTING EDGE OF ROAD - (ASPHALT)
EXISTING FENCE
EDGE OF WATER
POWER POLE
PLANT/TREE
EXISTING MINOR CONTOUR
EXISTING ROAD - SHOULDER
SIDEWALK/CONCRETE SLAB
ROAD - GRAVEL
EXISTING CENTER OF ROAD
ROAD - PULLOUT DRIVE
TRAIL
SIGN
GATE POST
BOLLARD
ABA WARNING PANEL
ABA PARKING STALL
NATURAL ROCK
EXISTING ROAD STRIPING PROPOSED OVERHEAD ELECTRIC
OH OH OH
PROPOSED SANITARY SEWERSS
PROPOSED DOMESTIC WATER
W
PROPOSED PATHWAY/CONCRETE SLAB
PROPOSED EDGE OF PARKING LOT (GRAVEL)
PROPOSED JACK LEG FENCE
PROPOSED WOOD SWING GATE ~ ~ ~ ~ ~ ~
SEWER CLEANOUT
ELECTRICAL METER
ELECTRICAL TRANSFORMERE
EM
WATER WELLW
PROPOSED CONCRETE
PROPOSED GRAVEL PARKING
PROPOSED AGGREGATE PATHWAY
TIMBER BARRIER
N:\Potential\23074 Roy Chambers\GIS\Data\Exports\Data\RoyChambers_Imagery_20230418.tiff
K
Y L
E
R
F
G
R T
E
R
O Y
C
H A
M B
H
A B
I L
I T
A T
I O
N D
W G
C
I V
I L
S
E
T
P
O
D U
C T
I O
N C
S I T
E
P
L A
N
O
V E
R
V
I E
W
N
T
E S
D
G
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
SITE PLAN
OVERVIEW & NOTES
187617
4 77
K. DRUYVESTEIN
K. DRUYVESTEIN
K. GAUTHIER
10.27.2023
ROY CHAMBERS REHAB - PHASE II
GRAND TETON NATIONAL PARK
228830H
C2.0
GENERAL NOTES:
1) CONTRACTOR MUST SUBMIT A TRAVEL CONTROL PLAN AND HAUL ROUTE TO THE CONTRACTING OFFICER
PRIOR TO BEGINNING WORK. PLAN SHALL INCLUDE A MAP DEPICTING THE ANTICIPATED HAUL ROUTES AND
COMPLIANCE WITH LEGAL LOAD RESTRICTIONS. SUBMIT PLAN AT LEAST 15 DAYS PRIOR TO HAULING
MATERIALS.
2) CONTRACTOR TO SUBMIT A TRAFFIC CONTROL PLAN, DEPENDENT UPON THE PHASING OF THE PROJECT.
3) STAGING OF MATERIALS AND EQUIPMENT TO TAKE PLACE ONSITE WITHIN DISTURBANCE LIMITS.
4) ADDITIONAL/OTHER STAGING AREAS MAY BE APPROVED BY THE CONTRACTING OFFICER.
5) CONTRACTOR TO FIX ALL STAGING SITE DISTURBANCE TO EXISTING CONDITIONS OR BETTER.
SITE PLAN OVERVIEW
JENNY LAKE
T
E
T
A
K
A
D
100 0 100 200
SCALE OF FEET
NOT TO SCALE
MORMON ROW
DISTRICT
JACKSON HOLE
AIRPORT
PROJECT SITE
MORMON ROW ROAD
EXISTING CREEK,
EXTENTS
APPROXIMATED
MORMON ROW
ROAD
GROS VENTURE
ROAD
TETON PARK
ROAD
D
IT
C H
C R
E E
K
POTENTIAL
STAGING AREA
EXISTING DEPRESSIONS TO
BE BLOCKED AND
PERMANENTLY ABANDONED
10.27.2023
K
Y
G
R T
E
R
A
M B
H
A B
I L
I T
A T
I O
N D
W G
C
I V
I L
E
O
D U
C T
I O
N C
D E
M O
L I T
I O
N
P
L A
N D
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
SITE DEMOLITION PLAN
187617
5 77
K.DRUYVESTEIN
K. DRUYVESTEIN
K. GAUTHIER
10.27.2023
ROY CHAMBERS REHAB - PHASE II
GRAND TETON NATIONAL PARK
228830H
C3.0
20 0 20 40
SCALE OF FEET
SITE DEMOLITION PLAN
EXISTING UTILITY REMOVALS: REMOVE EXISTING NONOPERATIONAL UTILITY
APPURTENANCES ABOVE GRADE AND ABANDON IN PLACE NONOPERATIONAL UTILITY
LINES BELOW GRADE, AS DIRECTED IN THE FIELD BY THE CONTRACTING OFFICER'S
REPRESENTATIVE. PROTECT EXISTING OPERATIONAL UTILITIES IN PLACE. BACKFILL
AND COMPACT EXCAVATED AREA OUTSIDE THE ABANDONED UTILITY APPURTENANCES
WITH NATIVE MATERIAL SALVAGED FROM EXCAVATION OR IMPORT FILL MATERIAL
MEETING REQUIREMENTS IN THE PROJECT SPECIFICATIONS.
HAUL OF OFFSITE: ALL REMOVED MATERIAL REQUIRED DURING DEMOLITION, SHALL BE
HAULED OFF-SITE IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL LAWS.
EXISTING TREES/STUMPS: TO BE PROTECTED IN PLACE, UNLESS OTHERWISE SHOWN
IN THE PLANS.
EXISTING BUILDINGS: TO BE PROTECTED IN PLACE, CONTRACTOR TO REFER TO
ARCHITECTURAL PLANS FOR DIRECTION OF REHABILITATION OF EXISTING BUILDINGS.
THIS WILL INCLUDE SELECTIVE REMOVAL AND REPLACEMENT/DEMOLITION.
EXISTING WOOD CLOTHES LINE: CONTRACTOR TO EXERCISE CARE WHEN REMOVING,
STORING AND REPLACING THIS HISTORICAL FEATURE. REFER TO STRUCTURAL FOR
CLOTHES LINE IMPROVEMENT DETAILS.
SEWER SERVICE: LOCATION, TYPE AND DEPTH OF EXISTING SEWER SERVICE PIPING
AND ANY ONSITE COLLECTION/TREATMENT SYSTEM IS UNKNOWN. BASED ON AGE OF
BUILDING, SITE MAY CONTAIN A CESSPIT, STATUS UNKNOWN. ABANDON IN PLACE.
NOTIFY CO IF DISCOVERED AND LOCATED.
DEMOLITION GENERAL NOTES:
1. CONTRACTOR SHALL NOT ENTER THE DITCH CREEK WETTED PERIMETER
UNDER ANY CIRCUMSTANCES WITH ANY EQUIPMENT.
2. CONTRACTOR TO PROVIDE TEMPORARY TRAFFIC CONTROL (BOTH VEHICULAR
AND PEDESTRIAN TRAFFIC CONTROL), WHEN WORK IMPEDES ON EXISTING
ROADS AND TRAILS. MAINTAIN VEHICULAR ACCESS ON ALL ROADS ADJACENT
TO THE PROJECT SITE FOR USE BY NPS AND THE PUBLIC.
3. ANY EXCAVATION REQUIRED FOR DEMOLITION IS TO BE KEPT TO THE MINIMUM
EXTENTS POSSIBLE AND AVOIDED IF POSSIBLE. ANY EXCAVATION SHALL BE
COORDINATED AND APPROVED BY THE CONTRACTING OFFICER AND NPS
PRIOR TO EXECUTION.
4. CONTRACTOR TO UTILITY "CALL BEFORE YOU DIG", THERE IS POTENTIAL FOR
SEWER, WATER AND ELECTRICAL UTILITIES WITHIN THE PROJECT AREA,
HOWEVER THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE EXISTING
CONDITIONS IN AREAS OF CONSTRUCTION.
5. SURVEY DATA WAS NOT COLLECTED FOR THIS PROJECT, EXISTING FEATURES
SHOWN ARE BASED ON FIELD DATA, SITE IMAGES AND GOOGLE EARTH. SITE
CONDITIONS MAY VARY FROM WHAT IS SHOWN ON PLAN SHEETS.
CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL FIELD CONDITIONS.
6. IF THE CONTRACTOR DISCOVERS THAT AN EXISTING SITE FEATURE EXISTS
THAT DOES NOT APPEAR ON THESE PLANS. THE CONTRACTOR SHALL
COORDINATE WITH THE CONTRACTING OFFICER ON THE APPROPRIATE
COURSE OF ACTION.
7. EXISTING UTILITIES TO BE ABANDONED IN PLACE, WILL NEED TO BE REMOVED
A MINIMUM OF 2' BACK FROM EXTERIOR OF NEW FOUNDATION LIMITS. IF THE
CONTRACTOR DISCOVERS A UTILITY LINE THAT WAS UNPLANNED FOR,
CONTRACTOR TO COORDINATE WITH CONTRACTING OFFICER ON ACTION TO
TAKE PRIOR TO COMPLETING ANY FURTHER WORK.
8. CONTRACTOR TO RE-SEED ALL DISTURBED AREAS IN COORDINATION WITH
NPS.
LEGEND
DEMOLITION FOOTNOTES:
EXISTING GRAVEL AREA TO BE PROTECTED IN PLACE.
EXISTING BUNKHOUSE,
PROTECT IN PLACE
EXISTING GARAGE,
PROTECT IN PLACE
EXISTING GRAVEL
DRIVE/PARKING,
PROTECT IN PLACE
EXISTING HOUSE WITH
CELLAR DOOR, PROTECT
IN PLACE
EXISTING TREE,
PROTECT IN
PLACE, TYP.
EXISTING WOOD CLOTHES
LINE, PROTECT IN PLACE
EXISTING WINDMILL,
PROTECT IN PLACE
EXISTING CONCRETE
CISTERN, PROTECT IN
PLACE
EXISTING ABANDONED
DRAINAGE DITCH,
PROTECT IN PLACE
EXISTING DRAINAGE
DITCH, PROTECT IN
PLACE
APPROXIMATE LOCATION
OF EXISTING OVERHEAD
POWER POLE
EXISTING
CONTOURS, TYP.
M O
R M
A
D
EXISTING
CONTOURS, TYP.
D
C
UNKNOWN SEWER
COLLECTION
APPURTENANCES
EXISTING TREES,
PROTECT IN
PLACE, TYP.
3B
A
7.0
PROTECT EXISTING CLOTHES LINE
A
PROTECT EXISTING TREES
B
PROTECT EXISTING
CISTERN AND COMPONENT
C
PROTECT EXISTING DITCH
D
DISTURBANCE
LIMITS, TYP.
EXISTING DITCH TO BE
FILLED IN KEY LOCATIONS,
SEE SITE PLAN
EXISTING
HOUSE
EXISTING
GARAGE
EXISTING
BUILDING
APPROX. PERIMETER
CONSTRUCTION FENCING
BY CONTRACTOR, TYP.
K
Y
G
R T
E
R
A
M B
H
A B
I L
I T
A T
I O
N D
W G
C
I V
I L
E
O
D U
C T
I O
N C
S
I T
E
I M
P R
O V
E M
E N
T
P
L A
N D
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
COMBINED
SITE IMPROVEMENT PLAN
187617
6 77
K.DRUYVESTEIN
K. DRUYVESTEIN
K. GAUTHIER
10.27.2023
ROY CHAMBERS REHAB - PHASE II
GRAND TETON NATIONAL PARK
228830H
C4.0
20 0 20 40
SCALE OF FEET
COMBINED SITE IMPROVEMENT PLAN
SITE IMPROVEMENT GENERAL NOTES:
1. CONTRACTOR WILL NOT ENTER NEARBY CREEK UNDER ANY CIRCUMSTANCES
WITH ANY EQUIPMENT.
2. MORMON ROW ROAD TO BE CLOSED FROM THE GATE (SOUTH OF ROY
CHAMBERS) TO THE DITCH CREEK BRIDGE. NPS TRAFFIC AND VISITOR TRAFFIC
WILL BE PRESENT NORTH OF DITCH CREEK BRIDGE.
3. ANY EXCAVATION REQUIRED FOR DEMOLITION IS TO BE KEPT TO THE MINIMUM
EXTENTS POSSIBLE AND AVOIDED IF POSSIBLE. ANY EXCAVATION SHALL BE
COORDINATED AND APPROVED BY THE CONTRACTING OFFICER AND NPS
PRIOR TO EXECUTION.
4. CONTRACTOR TO UTILITY "CALL BEFORE YOU DIG", THERE ARE NO KNOWN
UTILITIES WITHIN THE PROJECT AREA, HOWEVER THE CONTRACTOR IS
RESPONSIBLE FOR VERIFYING THAT NO UTILITIES EXIST IN AREAS OF
CONSTRUCTION.
5. TREE LOCATIONS SHOWN ARE APPROXIMATE, UTILITY AND PATHWAY
ALIGNMENTS MAY NEED TO BE ADJUSTED IN THE FIELD TO NOT BRING HARM
TO THE TREES PRESENT. CONTRACTOR TO AVOID DAMAGING ROOTS OF TREES
PRESENT. IF UNAVOIDABLE, COORDINATE WITH CONTRACTING OFFICER PRIOR
TO DAMAGE OCCURRING.
6. CONTRACTOR TO RE-SEED ALL DISTURBED AREAS IN COORDINATION WITH
NPS.
WELL LOCATION, SEE UTILITY
PLAN, SHEET C5.0
EXISTING WINDMILL TO BE REPAIRED,
SEE STRUCTURAL/ARCHITECTURAL
SHEETS
100' RADIUS, WELL ISOLATION ZONE
ALL EXISTING TREES TO BE
PROTECTED DURING
CONSTRUCTION ACTIVITIES
CONTRACTOR TO TIE PROPOSED GRAVEL
PARKING LOT INTO EXISTING GRAVEL ROAD
SWING GATE, TYP.
POST AND RAIL STYLE FENCE TO AID
IN RE-VEGETATION/VISUAL
SCREENING FOR PROPOSED
PARKING AREA, TYP.
GRAVEL PARKING
LOT, TYP.
DITCH BLOCKS/DITCH
ABANDONMENT
PRIMARY AND SECONDARY
DRAIN FIELD, SEE UTILITY
PLAN, SHEET C5.0
SANITARY SEWER
SYSTEM/LINE,
SEE UTILITY
PLAN, SHEET C5.0
PROTECT IN PLACE WOOD
CLOTHES LINE, CONTRACTOR
TO TAKE GOOD CARE TO
PRESERVE HISTORICAL
FEATURE, SEE STRUCTURAL
STREETS FOR
IMPROVEMENTS
GARAGE
MAIN
HOUSE
BUNK
HOUSE
CONTRACTOR TO ROUTE
CONDUIT TO EXISTING POWER
POLE, WHICH WILL BE UPGRADED
BY THE LOCAL UTILITY COMPANY.
CONTRACTOR TO COORDINATE
WITH LOCAL UTILITY.
TRANSFORMER LOCATION,
SEE UTILITY PLAN /
ELECTRICAL PLAN
EMPTY CONDUIT ROUTE TO
FUTURE EV CHARGER
LOCATION, SEE ELECTRICAL
PLAN
E
7.0
B
7.1
A
7.1
A
7.0
M O
R M
A
D
EXISTING MINIMAL TWO TRACK ROAD TO
HAVE MINIMIZED DISTURBANCE,
CONTRACTOR TO RESTORE TO PRE
CONSTRUCTION CONDITIONS
SEE SHEET C4.1 FOR
NORTHERN SITE
IMPROVEMENTS
SWING GATE, TYP.
POST AND RAIL STYLE FENCE TO AID
IN RE-VEGETATION/VISUAL
SCREENING FOR PROPOSED
PARKING AREA, TYP.
B
7.1
A
7.1
SEE SHEET C4.2 FOR
SOUTHERN SITE
IMPROVEMENTS
C
7.6
DISTURBANCE LIMITS, TYP.
CONTRACTOR TO RESTORE ALL AREAS DISTURBED DUE
TO UTILITY TRENCHING/CONSTRUCTION OPERATIONS
5'
5'
10.16'
18'
3'
5'
5'
R5.00
R5.00
R5.00
R5.00
R5.00
R2.00
6'
7'
R5.00
2.00'
5'
K
Y
G
R T
E
R
A
M B
H
A B
I L
I T
A T
I O
N D
W G
C
I V
I L
E
O
D U
C T
I O
N C
S I T
E
I M
P R
O V
E M
E N
T
P
L A
N D
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
NORTHERN
SITE IMPROVEMENT PLAN
187617
7 77
K.DRUYVESTEIN
K. DRUYVESTEIN
K. GAUTHIER
10.27.2023
ROY CHAMBERS REHAB - PHASE II
GRAND TETON NATIONAL PARK
228830H
C4.1
8 0 8 16
SCALE OF FEET
NORTHERN SITE IMPROVEMENT PLAN
EXISTING DITCH: WHERE THE PROPOSED PATHWAY INTERSECTS THE EXISTING
DITCH, CONTRACTOR TO INFILL THE DITCH WITH EXCESS FILL MATERAIL AND
COMPACT IN ORDER TO ACCOMMODATE THE PATHWAY SECTION. ALL REMAINING
EXTENTS OF THE DITCH ARE TO PROTECT IN PLACED, OR RESTORE TO EXISTING
CONDITIONS.
SITE IMPROVEMENT GENERAL NOTES:
1. CONTRACTOR WILL NOT ENTER NEARBY CREEK UNDER ANY CIRCUMSTANCES
WITH ANY EQUIPMENT.
2. MORMON ROW ROAD TO BE CLOSED FROM THE GATE (SOUTH OF ROY
CHAMBERS) TO THE DITCH CREEK BRIDGE. NPS TRAFFIC AND VISITOR TRAFFIC
WILL BE PRESENT NORTH OF DITCH CREEK BRIDGE.
3. ANY EXCAVATION REQUIRED FOR DEMOLITION IS TO BE KEPT TO THE MINIMUM
EXTENTS POSSIBLE AND AVOIDED IF POSSIBLE. ANY EXCAVATION SHALL BE
COORDINATED AND APPROVED BY THE CONTRACTING OFFICER AND NPS
PRIOR TO EXECUTION.
4. CONTRACTOR TO UTILITY "CALL BEFORE YOU DIG", THERE ARE NO KNOWN
UTILITIES WITHIN THE PROJECT AREA, HOWEVER THE CONTRACTOR IS
RESPONSIBLE FOR VERIFYING THAT NO UTILITIES EXIST IN AREAS OF
CONSTRUCTION.
5. UTILITIES SHOWN ARE FOR SCHEMATIC UNDERSTANDING ON THIS SHEET. SEE
SHEET C5.0 FOR UTILITY PLAN AND FURTHER UTILITY DETAIL.
SITE IMPROVEMENT FOOTNOTES:
EXISTING WOOD CLOTHES LINE,
CONTRACTOR TO TAKE GOOD CARE
TO PRESERVE HISTORICAL
FEATURE, SEE STRUCTURAL
STREETS FOR IMPROVEMENTS
GARAGE
MAIN
HOUSE
BUNK
HOUSE
TRANSFORMER LOCATION,
4'X4' CONCRETE PAD TO BE
PROVIDED
AGGREGATE PATHWAY,
TYP.
EXISTING DITCH PROTECT
IN PLACE, UNLESS
OTHERWISE SPECIFIED.
D
7.0
EXISTING TEMP DOOR TO
BE REPLACED
EXISTING CISTERN
CONCRETE, PROTECT IN
PLACE (NONFUNCTIONING)
EXISTING DITCH LINE TO CONTINUE BEYOND GARAGE
TOWARDS DITCH CREEK, PER EXTENTS SHOWN
CONCRETE WALKWAY
WITH EDGE PROTECTION
MATCHLINE - SEE SHEET C4.2
EXISTING WINDMILL TO BE REPAIRED,
SEE STRUCTURAL/ARCHITECTURAL
SHEETS
PROTECT IN PLACE EXISTING
GRAVEL DRAINAGE FEATURE
BIKE RACKS
C
7.5
CONCRETE PATIO
LANDSCAPE WITHIN AREA
TO BE GRADED PER
GRADING PLAN
DIRECTIONS
LANDSCAPE WITHIN AREA
TO BE GRADED PER
GRADING PLAN
DIRECTIONS
F
7.0
A
7.5
CONCRETE
STEPS
CONCRETE STEPS, PER
ARCHITECTURAL
SHEETS, TYP.
A
7.6
22'
9'
TYP.
18'
125.26'
5'
5'
R15
R10
R10
74'
18'
17'
K
Y
G
R T
E
R
A
M B
H
A B
I L
I T
A T
I O
N D
W G
C
I V
I L
E
O
D U
C T
I O
N C
S
I T
E
I M
P R
O V
E M
E N
T
P
L A
N D
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
SOUTHERN
SITE IMPROVEMENT PLAN
187617
8 77
K.DRUYVESTEIN
K. DRUYVESTEIN
K. GAUTHIER
10.27.2023
ROY CHAMBERS REHAB - PHASE II
GRAND TETON NATIONAL PARK
228830H
C4.2
8 0 8 16
SCALE OF FEET
SOUTHERN SITE IMPROVEMENT PLAN
POST AND RAIL STYLE FENCE TO AID
IN RE-VEGETATION/VISUAL
SCREENING FOR PROPOSED
PARKING AREA, TYP.
GRAVEL PARKING
LOT, TYP.
EMPTY CONDUIT ROUTE TO
FUTURE EV CHARGER
LOCATION, SEE ELECTRICAL
PLAN
E
7.0
B
7.1
M O
R M
A
D
TIMBER BARRIERS, TYP.
CONCRETE ABA
ACCESS AISLE
D
7.5
ABA STALL SIGN, TYP.
STRIPING WILL ONLY BE PROVIDED FOR
THE CONCRETE ABA STALLS, IN ALL
OTHER CASES LINEWORK CONCEPTUALLY
SHOWS PARKING SPACE PROVIDED.
DETECTABLE WARNING
PANEL
AGGREGATE PATHWAY,
TYP.
D
7.0
EXISTING TREES,
PROTECT IN
PLACE, TYP.
A
7.0
MATCHLINE - SEE SHEET C4.1
SITE IMPROVEMENT GENERAL NOTES:
1. CONTRACTOR WILL NOT ENTER NEARBY CREEK UNDER ANY CIRCUMSTANCES
WITH ANY EQUIPMENT.
2. MORMON ROW ROAD TO BE CLOSED FROM THE GATE (SOUTH OF ROY
CHAMBERS) TO THE DITCH CREEK BRIDGE. NPS TRAFFIC AND VISITOR TRAFFIC
WILL BE PRESENT NORTH OF DITCH CREEK BRIDGE.
3. ANY EXCAVATION REQUIRED FOR DEMOLITION IS TO BE KEPT TO THE MINIMUM
EXTENTS POSSIBLE AND AVOIDED IF POSSIBLE. ANY EXCAVATION SHALL BE
COORDINATED AND APPROVED BY THE CONTRACTING OFFICER AND NPS
PRIOR TO EXECUTION.
4. CONTRACTOR TO UTILITY "CALL BEFORE YOU DIG", THERE ARE NO KNOWN
UTILITIES WITHIN THE PROJECT AREA, HOWEVER THE CONTRACTOR IS
RESPONSIBLE FOR VERIFYING THAT NO UTILITIES EXIST IN AREAS OF
CONSTRUCTION.
5. UTILITIES SHOWN ARE FOR SCHEMATIC UNDERSTANDING ON THIS SHEET. SEE
SHEET C5.0 FOR UTILITY PLAN AND FURTHER UTILITY DETAIL.
6. TREE LOCATIONS SHOWN ARE APPROXIMATE, UTILITY AND PATHWAY
ALIGNMENTS MAY NEED TO BE ADJUSTED IN THE FIELD TO NOT BRING HARM
TO THE TREES PRESENT.
CONCRETE ABA
PARKING STALL
B
7.0
SWING GATE, TYP.
A
7.1
50'
53'
K
Y
G
R T
E
R
A
M B
H
A B
I L
I T
A T
I O
N D
W G
C
I V
I L
E
O
D U
C T
I O
N C
U
T I L I T
Y
P
L A
N D
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
UTILITY PLAN
187617
9 77
T.FRANCIS
T.FRANCIS
K. GAUTHIER
10.27.2023
ROY CHAMBERS REHAB - PHASE II
GRAND TETON NATIONAL PARK
228830H
C5.0
20 0 20 40
SCALE OF FEET
UTILITY PLAN
POWER LINE TRANSITION: AFTER POWER IS BROUGHT ONTO SITE FROM THE
POWER POLE LOCATED WITHIN THE MORMON ROW ROAD, IT WILL ROUTE TO THE
PROPOSED TRANSFORMER UNDERGROUND. AFTER THE TRANSFORMER, THE
UNDERGROUND LINE WILL CONNECT INTO THE ELECTRICAL METER, WHERE IT WILL
THEN DISPERSE POWER BETWEEN BUILDINGS, SEE ELECTRICAL PLANS.
UTILITY GENERAL NOTES:
1. CONTRACTOR WILL NOT ENTER NEARBY CREEK UNDER ANY CIRCUMSTANCES WITH
ANY EQUIPMENT.
2. MORMON ROW ROAD TO BE CLOSED FROM THE GATE (SOUTH OF ROY CHAMBERS) TO
THE DITCH CREEK BRIDGE. NPS TRAFFIC AND VISITOR TRAFFIC WILL BE PRESENT
NORTH OF DITCH CREEK BRIDGE.
3. ANY EXCAVATION REQUIRED FOR DEMOLITION IS TO BE KEPT TO THE MINIMUM
EXTENTS POSSIBLE AND AVOIDED IF POSSIBLE. ANY EXCAVATION SHALL BE
COORDINATED AND APPROVED BY THE CONTRACTING OFFICER AND NPS PRIOR TO
EXECUTION.
4. CONTRACTOR TO UTILITY "CALL BEFORE YOU DIG", THERE ARE NO KNOWN UTILITIES
WITHIN THE PROJECT AREA, HOWEVER THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING THAT NO UTILITIES EXIST IN AREAS OF CONSTRUCTION.
5. ALL DAMAGE/DISTURBANCE CAUSED BY CONSTRUCTION WILL BE REPAIRED IN KIND.
6. FOR INFORMATIONAL PURPOSES ONLY: THE WINTERIZATION OF THE WATER SYSTEM
WILL BE ACCOMPLISHED BY ALL WATER SERVICE LINES SLOPING INTO THE MAIN
RESIDENCE CRAWL SPACE. WITHIN THE CRAWL SPACE, SERVICE LINES WILL BE
DRAINED/DIRECTED INTO THE CRAWL SPACE SUMP. SEE MECHANICAL PLANS FOR
INTERIOR DESIGN.
7. CONTRACTOR TO ENSURE MINIMUM 2% SLOPE FOR WATER PIPES AND MINIMUM 2%
SLOPE FOR SEWER PIPES
8. FIRE SERVICE TIE IN LOCATIONS/ELEVATIONS ARE APPROXIMATE, SEE FIRE
PROTECTION PLANS/PLUMBING PLANS FOR CONNECTION DETAILS AND FURTHER
INFORMATION.
UTILITY FOOTNOTES:
SEWER DRAINFIELD
EFFLUENT MIXING ZONE
DRAINFIELD
LATERAL
DRAINFIELD REPLACEMENT
AREA
EFFLUENT TRANSPORT
PIPE
SEPTIC TANK
4" SCH 40 PVC
SEWER LINE, MIN.
2% SLOPE TYP.
DOMESTIC WELL
100' WELL SEPARATION
A
7.3
A
7.2
SEWER WYE &
45° ELBOW
COMBO FITTING
SEWER CLEANOUT,
TYP.
B
7.3
APPROX. TRANSFORMER LOCATION, FINAL LOCATION
TO BE COORDINATED WITH UTILITY COMPANY
ELECTRICAL METER
LOCATION
CONTRACTOR TO ROUTE
CONDUIT TO EXISTING POWER
POLE, WHICH WILL BE UPGRADED
BY THE LOCAL UTILITY COMPANY.
CONTRACTOR TO COORDINATE
WITH LOCAL UTILITY.
M O
R M
A
D
C
7.1
1-1/4" Ø HDPE
DOMESTIC
WATER LINE
C
7.4
A/B
7.4
4" PVC SCH 40 PVC
90° BEND, TYP.
" Ø HDPE DOMESTIC
WATER LINE
A/B
7.4
EMPTY ELECTRICAL
CONDUIT TO FUTURE EV
CHARGER LOCATION
UNDERGROUND POWER
LINE, SEE ELECTRICAL
SHEETS, TYP.
UNDERGROUND POWER
LINE TO WELL PUMP
4" PVC SCH 40 PVC
45° BEND, TYP.
WATER SEWER CROSSING,
CONTRACTOR TO MAINTAIN MINIMUM
2' OF VERTICAL SEPERATION
EXISTING MINOR
CONTOURS, TYP.
EXISTING MAJOR
CONTOURS, TYP.
DITCH BLOCKS TO BE
PLACED A MINIMUM OF 50'
FROM REPLACEMENT
DRAINFIELD LOCATION, TYP.
CONTRACTOR TO INSTALL
CURB STOP WITHIN THE
WELL'S CONCRETE COLLAR
DOMESTIC WATER AND SEWER INVERT ELEVATIONS:
MAIN HOUSE:
- WATER (FROM WELL): 6604.45
- WATER (TO BUNK HOUSE): 6604.73
- WATER (TO GARAGE): 6605.39
- SEWER (TO SEPTIC): 6609.63
GARAGE:
- WATER (FROM MAIN HOUSE): 6606.41
- SEWER (TO SEPTIC): 6609.84
BUNK HOUSE:
- WATER (FROM MAIN HOUSE): 6606.63
- SEWER (TO SEPTIC): 6610.96
CONTRACTOR TO BE AWARE THE INVERT INTO THE MAIN HOUSE FROM THE WELL
MAY VARY BASED ON WELL DRILLING OPERATIONS/RESULTS.
MAIN HOUSE
GARAGE
BUNK
HOUSE
FIRE PROTECTION INVERT ELEVATIONS:
MAIN HOUSE:
- FIRE PROTECTION (TO BUNK HOUSE): 6604.73
- FIRE PROTECTION (TO GARAGE): 6605.39
GARAGE:
- FIRE PROTECTION (FROM MAIN HOUSE): 6606.41
BUNK HOUSE:
- FIRE PROTECTION (FROM MAIN HOUSE): 6606.63
1-1/4" Ø HDPE FIRE
SUPPRESSION LINE, TYP.
A/B
7.4
C
7.6
-2 .1
-6.9%
6609.13
6609.32
6610.23
6611.59
6612.95
6612.95
6612.68
6612.49
6612.81
6611.58
6611.26
6611.15
6610.55
6611.87
6611.64
6611.87
6612.00
6612.05
6612.08
6612.16
6612.34
6612.31
6611.67
6611.70
6611.39
6611.46
6611.15
6611.10
6612.63
6612.65
6612.61
6612.46
6612.35
6611.90
6611.90
6612.13
6612.37
6612.39
6612.41
6612.37
6612.40
6612.66
6612.68
6612.64
6612.24
6612.29
6612.36
6612.39
6612.55
6612.85
6612.81
6612.59
6611.65
6611.83
6613.00
6613.00
6611.89
6611.91
6611.91
6612.00
6614.00
6614.00
6612.50
6612.50
6612.41
6612.35
6612.35
6612.62
6612.66
6612.67
6612.80
6612.80
6611.30
6611.22
6611.06
6611.12
6611.21
6611.30
6611.40
6611.61
6611.53
1.3%
-1.3%
-0.9%
-1.0%
-1.0%
-1.0%
6612.00
-0.1%
6611.87
6611.87
1.3%
FG 6611.8 FG 6611.7
FG 6612.0
FG 6611.9
FG 6612.0FG 6611.7
FG 6611.8
FG 6611.8
FG 6611.8
FG 6611.8
K
Y
G
R T
E
R
A
M B
H
A B
I L
I T
A T
I O
N D
W G
C
I V
I L
E
O
D U
C T
I O
N C
G
R A
D I N
G
P
L A
N D
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
GRADING PLAN
187617
10 77
K.DRUYVESTEIN
K. DRUYVESTEIN
K. GAUTHIER
10.27.2023
ROY CHAMBERS REHAB - PHASE II
GRAND TETON NATIONAL PARK
228830H
C6.0
20 0 20 40
SCALE OF FEET
GRADING PLAN
GRADING GENERAL NOTES:
1. CONTRACTOR TO ENSURE PROJECT IS CONSTRUCTED TO ABBAS
CONSTRUCTION MAXIMUMS:
- WALKING SURFACES: MAX 5%
- PARKING: MAX 2%
- LEVEL AREAS: MAX 2%
- CROSS-SLOPE: MAX 2%
2. CONTRACTOR TO FIELD VERIFY THRESHOLD ELEVATIONS PRIOR TO
CONSTRUCTION.
3. GRADE CHANGE AT ENTRY THRESHOLDS AND BETWEEN SURFACE MATERIALS
SHALL NOT EXCEED
" (0.02') PER ABAAS 303 REQUIREMENTS.
4. PROTECT ALL EXISTING SITE FEATURES IDENTIFIED ON SHEET C3.0.
5. CONTRACTOR TO ENSURE SITE GRADING DOES NOT IMPACT EXISTING
TREE/TREE ROOTS.
6. THE EXISTING HOUSE WILL REQUIRE FLASHING PROTECTION WHEREVER
FINISH GROUND HAS LESS THAN 6" OF SEPARATION FROM THE TOP OF WALL
ELEVATION (TOW) , SEE FINISHED GROUND ELEVATIONS COMPARED TO TOW
ELEVATIONS ON THIS SHEET. CONTRACTOR TO REFERENCE ARCHITECTURAL
SHEETS FOR THESE LOCATIONS/FLASHING REQUIREMENTS.
7. STEP GRADING IS NOT SHOWN, SEE ARCHITECTURAL PLANS FOR ALL STEP
GRADING INTO BUILDINGS.
8. CONTRACTOR TO GRADE LANDSCAPE AWAY FROM BUILDINGS AT A MINIMUM
2%.
9. SEE ARCHITECT PLANS FOR EXACT TIE IN LOCATION BETWEEN ABA RAMP AND
PORCH.
CONTRACTOR TO
MATCH EXISTING
ROADWAY
EXISTING
GARAGE
FFE:6612.5
EXISTING
HOUSE
FFE: 6613
TOW: 6612.170
EXISTING
BUILDING
FFE: 6614
TOS: 6613.17
M O
R M
A
D
ABANDONED IRRIGATION
DITCH, TYP.
DRAINAGE SWALE TO BE
RE-SEEDED
NTS
FG VS. TOW ELEVATIONS
EXISTING
HOUSE
FFE: 6613
TOW: 6612.170
EXISTING MINOR
CONTOURS, TYP.
EXISTING MAJOR
CONTOURS, TYP.
PROPOSED MAJOR
CONTOURS, TYP.
PROPOSED MINOR
CONTOURS, TYP.
POINT TABLE
POINT #
ELEVATION
6609.13
6609.32
6610.23
6611.59
6612.95
6612.95
6612.68
6612.49
6612.81
6611.58
6611.26
6611.15
6610.55
6611.87
6611.64
6611.87
6612.00
6612.05
6612.08
6612.16
NORTHING
1478676.56
1478716.21
1478684.65
1478685.32
1478685.99
1478707.99
1478707.80
1478709.78
1478725.78
1478724.86
1478708.86
1478706.83
1478706.64
1478725.09
1478707.10
1478707.32
1478725.20
1478730.20
1478730.23
1478730.29
EASTING
2470954.58
2470953.29
2470970.40
2471024.93
2471079.46
2471079.19
2471064.19
2471062.17
2471061.97
2470987.97
2470988.17
2470986.20
2470970.36
2471006.98
2471007.19
2471025.19
2471015.67
2471015.60
2471018.10
2471023.10
DESCRIPTION
TIE TO EXISTING
TIE TO EXISTING
EOG
EOG
EOG
EOG
EOG
EOG
EOG
EOG
EOG
EOG
EOG
FG
EOC
FG
EOC
EOS
EOS
EOS
POINT TABLE
POINT #
ELEVATION
6612.34
6612.31
6611.67
6611.70
6611.39
6611.46
6611.15
6611.10
6612.63
6612.65
6612.61
6612.46
6612.35
6611.90
6611.90
6612.13
6612.37
6612.39
6612.41
6612.37
NORTHING
1478725.49
1478730.48
1478739.86
1478741.28
1478749.28
1478750.69
1478760.47
1478755.80
1478771.21
1478775.69
1478778.77
1478790.40
1478791.77
1478791.77
1478796.77
1478796.77
1478801.77
1478806.18
1478806.27
1478798.92
EASTING
2471038.71
2471038.48
2471057.06
2471052.27
2471059.82
2471055.02
2471064.03
2471065.83
2471107.81
2471104.60
2471104.81
2471092.53
2471089.09
2471076.21
2471076.21
2471083.08
2471088.08
2471093.08
2471100.08
2471093.08
DESCRIPTION
EOS
EOS
EOS
EOS
EOS
EOS
EOS
EOS
EOS
EOS
EOS
EOS
EOS
EOS
EOS
EOS
EOS
EOS
EOS
EOC
POINT TABLE
POINT #
ELEVATION
6612.40
6612.66
6612.68
6612.64
6612.24
6612.29
6612.36
6612.39
6612.55
6612.85
6612.81
6612.59
6611.65
6611.83
6613.00
6613.00
6611.89
6611.91
6611.91
6612.00
NORTHING
1478795.29
1478777.88
1478776.51
1478771.51
1478738.22
1478738.22
1478741.80
1478745.37
1478754.10
1478761.80
1478761.76
1478757.17
1478764.26
1478782.36
1478766.81
1478766.79
1478780.62
1478780.62
1478786.62
1478796.77
EASTING
2471094.64
2471113.01
2471116.45
2471109.53
2471017.97
2471022.97
2471024.48
2471020.98
2471036.55
2471041.26
2471036.86
2471033.54
2471024.06
2471024.32
2471036.97
2471041.26
2471076.21
2471074.32
2471074.31
2471065.63
DESCRIPTION
EOS
EOS
EOS
EOS
EOS
EOS
EOS
EOS
FG
FG
FG
FG
FG
FG
FG
FG
FG
FG
FG
FG
POINT TABLE
POINT #
ELEVATION
6614.00
6614.00
6612.50
6612.50
6612.41
6612.35
6612.35
6612.62
6612.66
6612.67
6612.80
6612.80
6611.30
6611.22
6611.06
6611.12
6611.21
6611.30
6611.40
6611.61
NORTHING
1478771.51
1478776.51
1478812.27
1478812.12
1478806.18
1478800.40
1478800.40
1478770.70
1478771.51
1478777.40
1478771.51
1478776.51
1478740.61
1478733.42
1478733.84
1478745.89
1478754.15
1478760.77
1478764.89
1478764.89
EASTING
2471131.49
2471131.49
2471100.00
2471088.08
2471088.08
2471093.08
2471087.89
2471106.43
2471113.61
2471113.61
2471127.56
2471127.56
2471027.19
2471028.80
2471042.01
2471050.06
2471054.25
2471060.09
2471061.38
2471045.09
DESCRIPTION
FFE
FFE
FG
FG
EOS
EOS
EOS
EOS
EOS
EOS
EOS
EOS
FG
FG
FG
FG
FG
FG
FG
FG
POINT TABLE
POINT #
ELEVATION
6611.53
6612.00
NORTHING
1478757.50
1478786.88
EASTING
2471044.24
2471065.51
DESCRIPTION
FG
FG
K
Y
G
R T
E
R
A
M B
H
A B
I L
I T
A T
I O
N D
W G
C
I V
I L
E
O
D U
C T
I O
N C
P O
I N
T
L A
Y O
U
B
L E
D
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
LAYOUT POINT TABLES
187617
10 77
K.DRUYVESTEIN
K. DRUYVESTEIN
K. GAUTHIER
10.27.2023
ROY CHAMBERS REHAB - PHASE II
GRAND TETON NATIONAL PARK
228830H
C6.1
LAYOUT POINT TABLES
POINT TABLE ABBREVIATIONS:
EOS: EDGE OF SIDEWALK
FFE: FINISHED FLOOR ELEVATION
FG: FINISHED GROUND
K
Y
G
R T
E
R
A
M B
H
A B
I L
I T
A T
I O
N D
W G
C
I V
I L
E
O
D U
C T
I O
N C
C I V
I
N
E R
D
T
A I L S
D
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CIVIL DETAILS
187617
12 77
K. DRUYVESTEIN
K. DRUYVESTEIN
K. GAUTHIER
10.27.2023
ROY CHAMBERS REHAB - PHASE II
GRAND TETON NATIONAL PARK
228830H
C7.0
TREE PROTECTION NOTES:
1. REFER TO DEMOLITION PLAN SHEETS C3.0 FOR
TREES THAT ARE NOT BE REMOVED. TREE
PROTECTION LOCATION MAY BE ADJUSTED IN THE
FIELD BY THE CONTRACTING OFFICER'S
REPRESENTATIVE.
2. OUTSIDE EDGE OF TEMPORARY BARRIER SHALL BE
PLACED AT DRIP-LINE OF TREE. TREE GUARDS MAY
BE PLACED AROUND SINGLE TREES OR GROUPS OF
TREES.
3. MOVABLE BARRIERS MAY BE SUBSTITUTED FOR
IN-GROUND BARRIERS. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO ENSURE THAT PERIMETER OF
FENCING REMAINS AT THE DRIP-LINE OF THE TREE
AND THAT TREES ARE PROTECTED.
3'-0"
MIN.
VARIES, 6'-0" MIN.
TEMPORARY BARRIER PER
PROJECT SPECIFICATION
EXISTING DECIDUOUS TREE
TO BE PROTECTED DURING
CONSTRUCTION
TYPICAL TREE PROTECTION DETAIL
A
NTS
IN-GROUND OR
MOVABLE POSTS
C7.0
FINISH
GRADE
CONCRETE ABA PARKING DETAIL
NTS
B
C7.0
TYPICAL AGGREGATE PATHWAY SECTION DETAIL
D
NTS
C7.0
REPLACE TOPSOIL CONSERVED
FROM EXCAVATION, 4" DEPTH
OR MATCH EXISTING DEPTH
COMPACTED TRENCH BACKFILL
TOPSOIL PATCH SECTION
C
NTS
PLACE SEED PER PROJECT
SPECIFICATIONS
PATCHING NOTES:
1. SEE PROJECT SPECIFICATIONS FOR TURF ESTABLISHMENT,
SEEDING, AND APPLICATION REQUIREMENTS.
2. SEED MIX AND WILL BE PROVIDED BY NPS. THE CONTRACTOR
WILL BE RESPONSIBLE FOR SEED BED PREPARATION, SEED
PLACEMENT, AND ESTABLISHMENT.
C7.0
TYPICAL GRAVEL PARKING LOT SECTION DETAIL
E
NTS
C7.0
EXISTING SUB-GRADE - COMPACT TO 95% PROCTOR
DENSITY
VARIES, SEE
GRADING PLAN
22'
8" 8"
3" MINUS CRUSHED AGGREGATE, 6"
COMPACTED DEPTH, COMPACTED TO 95%
PROCTOR DENSITY PER AASHTO T-99
" MINUS CRUSHED AGGREGATE, 4" COMPACTED
DEPTH, COMPACTED TO 95% PROCTOR DENSITY
PER AASHTO T-99
5'
V A
R
IE
S
V
A
R
I
E
S
M
X
1.5
M
AX
COMPACTED SUBGRADE,
COMPACTION TO BE LIMITED
TO PATHWAY EXTENTS
1' SHOULDER
1' SHOULDER
PROFILE
GRADE
2" OF STALOK PAVING MATERIAL, OR APPROVED EQUIVALENT
BASE COURSE AGGREGATE
6" MIN. COMPACTED DEPTH
COMPACT TO 95% OF PROCTOR
DENSITY PER AASHTO T-99
TYPICAL CONCRETE PATIO/LANDING SECTION DETAIL
F
NTS
C7.0
COMPACTED NATIVE
MATERIAL
"WASHED AGGREGATE" CONCRETE PAVEMENT
6"
6"
W1.4 X W1.4 WELDED WIRE FABRIC
REINFORCEMENT AT PAVEMENT MID DEPTH
2.5"
BASE COURSE
AGGREGATE, 6"
COMPACTED DEPTH
9'
ABA ACCESSIBLE
SYMBOL
EPOXY PAINT (TYP.)
9'
ABA SIGNAGE
1'
DETECTABLE
WARNING PANEL
5' L X 2' W
ABA ACCESS AISLE
STRIPING, TYP.
STALOK PATHWAY
CONCRETE ABA
PARKING STALL
AND ACCESS
AISLE, TYP.
TIMBER BARRIER,
SEE DETAIL D
SHEET C7.5
B
C7.5
D
C7.0
E
C7.5
A
C7.5
B
C7.5
K
Y
G
R T
E
R
A
M B
H
A B
I L
I T
A T
I O
N D
W G
C
I V
I L
E
O
D U
C T
I O
N C
C I V
N
E R
T
A I L S
D
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CIVIL DETAILS
187617
13 77
K. DRUYVESTEIN
K. DRUYVESTEIN
K. GAUTHIER
10.27.2023
ROY CHAMBERS REHAB - PHASE II
GRAND TETON NATIONAL PARK
228830H
C7.1
TYPICAL WOOD SWING GATE DETAIL
A
NTS
C7.1
POST RAIL FENCE DETAIL
B
NTS
C7.1
6 INCH
(TYP)
3 INCH
(TYP)
OPENING WIDTH VARIES
18' NORTH ACCESS AND 22' SOUTH ACCESS
3 INCH
NOTES:
1. FENCE AND GATE LOCATIONS TO BE STAKED IN THE FIELD BY THE CONTRACTOR AND
APPROVED BY THE CONTRACTING OFFICER PRIOR TO CONSTRUCTION OF THE
FENCING.
2. CONTRACTOR TO ENSURE POST HOLES HAVE CLEAN SMOOTH EDGES PRIOR TO
BACKFILL.
3. PRE-DRILL HOLES FOR FASTENERS TO PREVENT SPLITTING OF BRACING OR POSTS.
4. COMPACT AND BACKFILL POST HOLES IN 6 INCH LIFTS UNTIL NO VISUAL
DISPLACEMENT.
SEE DETAIL B,
THIS SHEET
FOR FENCE
DETAIL
SCREEN TO BE SIZED BY SUPPLIER OR
DRILLER AS REQUIRED TO MAXIMIZE
CAPACITY
NATURAL FORMATION
PACK
STAINLESS STEEL
WELDED K-PACKER
WITH BUTYL RUBBER
SEALS
CHECK VALVE
2" SCH 40 GALVANIZED
STEEL OR SCH 80 PVC
DROP PIPE COLUMN
6" WELL CASING AS
APPROVED BY WELL
CONTRACTOR AND PUMP
SUPPLIER
ANNULAR SPACE TO
BE PRESSURE
CEMENT GROUTED
AS SURFACE
CASING IS
EXTRACTED (MIN
2" BAKER MONITOR
PITLESS UNIT OR
EQUIVALENT
3" DUCTILE IRON
PIPE
M
I N
2'Øx12"DP CONC COLLAR @
FG & SLOPED AWAY @ 2%
MIN FROM WELL HEAD
BAKER MONITOR PREMIUM
VENTED WATERTIGHT
WELL CAP OR EQUIVALENT
M
I N
M
A X
A N
T I C
I P
A T
T
P
P
R O
X I M
A T
E L
Y
B
G
S
B A
S E
D
O
N
N
E A
R B
Y
W
E L
L
L
O G
M
M
I N
N
F I N
I N
G
L
A Y
B O
V
N
F I N
Q U
I F
E R
DOMESTIC WELL DETAIL
C
NTS
C7.1
DOMESTIC WELL CONSTRUCTION NOTES:
WELL(S) SHALL BE CONSTRUCTED BY A WATER WELL CONTRACTOR LICENSED IN THE STATE OF
WYOMING. WELL(S) SHALL BE CONSTRUCTED IN ACCORDANCE REGULATIONS AND
INSTRUCTIONS, PART 3, WATER WELL MINIMUM CONSTRUCTION STANDARDS 2011. PUBLISHED BY
WYOMING DEQ.
1. AQUIFER TESTS TO BE PERFORMED BY THE CONTRACTOR ACCORDING TO STANDARD
SPECIFICATIONS.
2. THE MINIMUM PROTECTED DEPTHS OF DRILLED WELLS MUST PROVIDE WATERTIGHT
CONSTRUCTION TO SUCH DEPTH AS MAY BE REQUIRED BY WYDEQ, TO EXCLUDE
CONTAMINATION AND SEAL OFF FORMATIONS THAT ARE OR MAY BE CONTAMINATED OR
YIELD UNDESIRABLE WATER. WELLS SHALL HAVE UNPERFORATED CASING TO A MINIMUM
DEPTH OF 25 FEET.
3. PERMANENT STEEL CASING PIPE SHALL BE IN ACCORDANCE WITH SECTION 2D, BE EQUIPPED
WITH A DRIVE SHOE IN ACCORDANCE WITH SECTION 2D WHEN DRIVEN, AND HAVE WELDED
JOINTS IN ACCORDANCE WITH SECTION 2D AND ASTM A-120.
4. ALL PERMANENT WELL CASINGS SHALL BE SEALED IN ACCORDANCE WITH SECTION 2H TO A
MINIMUM DEPTH OF 20 FEET WITH HEAVY BENTONITE WATER SLURRY OR CEMENT GROUT TO
PREVENT SURFACE CONTAMINATION. THE HEAVY BENTONITE WATER SLURRY METHOD IS
PREFERRED. THE CASING SHALL BE PROVIDED WITH CENTRALIZERS. THE TEMPORARY
CASING SHALL BE WITHDRAWN AS GROUT IS APPLIED.
5. HEAVY BENTONITE WATER SLURRY SHALL BE A MIXTURE OF
POUND BENTONITE PER
GALLON OF CLEAR WATER. CEMENT GROUT SHALL BE A MIXTURE OF ONE BAG OF CEMENT
CONFORMING TO ASTM C-150 (94 LBS) AND 5 TO 6 GALLONS OF WATER. IF CEMENT GROUT IS
USED, A HOLE PLUG SHALL BE USED. HOLE PLUG METHODS SHALL BE SUBMITTED AND
APPROVED BY THE ENGINEER PRIOR TO USE ON-SITE.
6. A SUITABLE RETAINER, PACKER, OR PLUG SHALL BE PROVIDED AT THE BOTTOM OF THE
GROUTED SECTION SO THAT GROUT WILL NOT LEAK THROUGH INTO THE BOTTOM OF THE
WELL. THE GROUTING SHALL BE DONE CONTINUOUSLY AND IN SUCH A MANNER AS WILL
ENSURE THE ENTIRE FILLING OF THE ANNULAR SPACE IN ONE OPERATION. THE CASING
MUST BE PROVIDED WITH SUFFICIENT GUIDES WELDED TO THE CASING TO PERMIT
UNOBSTRUCTED FLOW AND UNIFORM THICKNESS OF GROUT.
7. EVERY WELL MUST BE DEVELOPED IN ACCORDANCE WITH THE ENTIRETY OF WYOMING DEQ
MINIMUM CONSTRUCTION STANDARDS FOR WATER WELLS. UPON COMPLETION OF THE
WELL, BEFORE CONDUCTING THE AQUIFER TESTS, THE CONTRACTOR SHALL DEVELOP THE
WELL BY SUCH METHODS AS WILL EFFECTIVELY EXTRACT FROM THE WATER-BEARING
FORMATION THE MAXIMUM PRACTICAL QUANTITY OF SAND, DRILLING MUD AND OTHER FINE
MATERIALS IN ORDER TO BRING THE WELL TO MAXIMUM YIELD PER FOOT OF DRAWDOWN
AND TO A SAND-FREE CONDITION. COMPRESSED AIR, SURGE PLUNGERS, HIGH-VELOCITY
JETTING EQUIPMENT, AND PUMPS MAY BE USED FOR THE DEVELOPMENT WORK. THIS WORK
MUST BE DONE IN SUCH A MANNER THAT DOES NOT CAUSE UNDUE SETTLEMENT AND
DISTURBANCE OF THE STRATA ABOVE THE WATER-BEARING FORMATION NOR DISTURB THE
SEAL AFFECTED AROUND THE WELL CASING AND THEREBY REDUCE THE SANITARY
PROTECTION OTHERWISE AFFORDED BY SUCH SEAL. DEVELOPMENT OF THE WELL SHALL BE
CONTINUED UNTIL WATER PUMPED FROM THE WELL AT THE MAXIMUM TEST PUMPING RATE
IS CLEAR AND FREE OF SAND. THE WATER SHALL BE CONSIDERED SAND-FREE WHEN NO
SAMPLES, TAKEN DURING TEST PUMPING, CONTAIN MORE THAN 2 PARTS PER MILLION OF
SAND BY WEIGHT.
8. TEMPORARY CAPPING SHALL BE IN ACCORDANCE WITH WYOMING DEQ MINIMUM
CONSTRUCTION STANDARDS.
9. THE CONTRACTOR SHALL TAKE PRECAUTIONS AS ARE NECESSARY OR AS MAY BE REQUIRED
PERMANENTLY TO PREVENT CONTAMINATED WATER OR WATER HAVING UNDESIRABLE
PHYSICAL OR CHEMICAL CHARACTERISTICS FROM ENTERING, THROUGH THE OPENING MADE
BY THE CONTRACTOR IN DRILLING THE WELL, THE STRATUM FROM WHICH THE WELL IS TO
DRAW ITS SUPPLY. THE CONTRACTOR SHALL ALSO TAKE ALL NECESSARY PRECAUTIONS
DURING THE CONSTRUCTION PERIOD TO PREVENT CONTAMINATED WATER, GASOLINE, ETC.,
FROM ENTERING THE WELL EITHER THROUGH THE OPENING OR BY SEEPAGE THROUGH THE
GROUND SURFACE. IN THE EVENT THAT THE WELL BECOMES CONTAMINATED OR THAT
WATER HAVING UNDESIRABLE PHYSICAL OR CHEMICAL CHARACTERISTICS DOES ENTER THE
WELL DUE TO THE NEGLECT OF THE CONTRACTOR, HE SHALL, AT HIS EXPENSE, PERFORM
SUCH WORK OR SUPPLY SUCH CASINGS, SEALS, STERILIZING AGENTS, OR OTHER MATERIAL
AS MAY BE NECESSARY TO ELIMINATE THE CONTAMINATION OR SHUT OFF THE UNDESIRABLE
WATER.
10. SLOPE GROUND AWAY FROM WELL HEAD TO PREVENT PONDING AND POSSIBLE
CONTAMINATION.
GATE LATCH MECHANISM,
AS APPROVED BY CO
MECHANICAL
JOINT
FITTING
3" HDPE WATER
SERVICE LINE
TO BUILDING
SEE DETAIL
DOMESTIC SUBMERSIBLE
PUMP. MODEL TO BE
DETERMINED.
RE-COMPACT SURROUNDING
GROUND, FINISHED GRADE
SLOPED AWAY @ 2% MIN
FROM WELL HEAD
LINSEED OIL TREATED PINE RAIL
4 INCH MINIMUM (TYP)
PRESSURE TREATED PINE
WOOD POST 5 INCH MIN (TYP)
3' MINIMUM
EMBEDMENT
DEPTH (TYP)
FLATTEN
SURFACE
TREATED PINE WOOD POST 5 INCH MIN
8' (TYP)
9 INCHES
9 INCHES
48 INCH
FENCE
HEIGHT
TREATED PINE WOOD RAIL 4 INCH MIN
60d GALV.
SPIKE
6 INCH
MINIMUM
TYPICAL POST AND STRAIGHT
RAIL FENCE SECTION
NOTCH DETAIL
6 INCH
(TYP)
CURB STOP, SEE
DETAIL D SHEET C7.4
1.5' 0.75'
15 INCHES
EARTH EMBEDMENT
TO BE HAND
TAMPERED AS FILL
IS ADDED AROUND
POST
14" Ø POST HOLE, DUG WITH
CLEAN EDGES TO PRESERVE
SURROUNDING SOIL
PRESSURE TREATED
PINE WOOD POST 8
INCH MIN
PRESSURE TREATED
PINE WOOD POST 8
INCH MIN
60d GALV. SPIKE
24" DOUBLE STRAPS WITH
CENTRAL EYE HARDWARE SET,
HOT DIPPED GALVANIZED FINISH
24" DOUBLE STRAPS WITH
CENTRAL EYE HARDWARE
SET, HOT DIPPED
GALVANIZED FINISH
LINSEED OIL TREATED PINE RAIL 4 INCH MINIMUM (TYP)
5'
MINIMUM 6' DEPTH
WITH 2' Ø POST
HOLE
ONCE POST IS SET CONTRACTOR
TO EVENLY BACKFILL POST HOLE
WITH CONCRETE (MIN. 4000 PSI
MIX), TAPPING THE POST/STIRRING
THE CONCRETE TO ENSURE
SETTLING OF CONCRETE AND
REMOVING AIR POCKETS
TAPER CONCRETE
SURFACE AWAY FROM
POST
CONTRACTOR TO USE
TEMPORARY
SUPPORTS/BRACES TO
ENSURE POST REMAINS IN
LEVEL POSITION WHILE
CONCRETE CURES
8.5' FOR NORTH
10.5' FOR SOUTH
1'
(TYP)
K
Y
G
R T
E
R
A
M B
H
A B
I L
I T
A T
I O
N D
W G
C
I V
I L
E
O
D U
C T
I O
N C
S E
P T
T
A I
D
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
SEPTIC DETAILS
187617
14 77
K. DRUYVESTEIN
K. DRUYVESTEIN
K. GAUTHIER
10.27.2023
ROY CHAMBERS REHAB - PHASE II
GRAND TETON NATIONAL PARK
228830H
C7.2
2000-GALLON DUAL COMPARTMENT
TANK, VAUGHN CONCRETE
PRODUCTS INC. OR APPROVED
EQUAL
4-INCH SCH 40 PVC
SANITARY TEE INLET
4-INCH SCH 40 PVC
SANITARY TEE INLET
4-INCH SCH 40 PVC
SANITARY TEE OUTLET
4-INCH SCH 40 PVC
SANITARY TEE INLET
6" LAYER OF TYPE 1
PIPE BEDDING
4-INCH SCH 40 PVC
INLET PIPE
4-INCH SCH 40 PVC
OUTLET TO DRAINFIELD
FINISH GRADE
FIRST COMPARTMENT
MUST BE 50% OF TANK
CAPACITY OR GREATER
WATER TIGHT SEAL
BETWEEN ACCESS
RISER AND TANK, TYP.
WATER TIGHT SEAL
BETWEEN PIPE
PENETRATIONS
AND TANK, TYP.
RIM ELEV. = 6612.9
INVERT ELEV. = 6607.7
INVERT ELEV. = 6607.4
SEPTIC TANK DETAILS
A
NTS
C7.2
13'
2432 GRADE RINGS
AS REQUIRED TYP.
24" DIA. CAST IRON RING
AND COVER, H-20 RATED
WITH…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .