B08_40633158_Attachment_1_-_REVISED_Scope_of_Work_0001.docx
DOCX document 1 MB Posted
- Solicitation number
- 140P1423R0031
About this file
This document outlines a scope of work for repairing a water line leak at Golden Spike National Historical Park. The National Park Service is seeking to award a contract to dig up and repair a two-inch water line that has been leaking near an historic archaeological site. Care must be taken to not disturb the site during repairs. The water pipe is thought to be plastic and located approximately six feet below ground. The selected contractor will be responsible for excavating the trench, repairing the leak, backfilling, and restoring any disturbed areas. The period of performance for the work will end no later than December 29, 2023. The related federal contract opportunity is solicitation number 140P1423R0031 to repair the water line, issued by the Department of the Interior National Park Service Intermountain Region.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P1423R0031_Amd_0001.pdf | ||
| Sol_140P1423R0031.pdf | ||
| B08_40633159_Attachment_2_-_Wage_Determination.pdf | ||
| B08_40633158_Attachment_1_-_Scope_of_Work.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GOLDEN SPIKE NATIONAL HISTORICAL PARK
WATER LINE REPAIR
SCOPE OF WORK:
Golden Spike National Historical Park will award a contract to repair a two-inch water line leak. The National Park Service would like the work completed as soon after Contract award as possible. However, to offer flexibility for differing site conditions, the period of performance will end no later than December 29, 2023.
BACKGROUND:
Golden Spike National Historical Park has a two-inch water line that has been leaking. This site has been located and the line will need to be dug up, repaired, and re-buried.
DESCRIPTION:
The two-inch water line is located near an historic archaeological site (abandoned well) and care will need to be taken to not disturb the site. That said, it appears the leak is far enough away to be dug up and repaired without causing damage to the site. The water pipe is thought to be some sort of plastic but not 100% sure and approximate depth shouldn’t exceed six feet.
Removal and/or storage of subsurface materials from trench and construction excavation areas to allow installation of designated utilities or structures. All suitable material removed from excavations shall be used, insofar as practicable, in the formation of embankments, fills and backfilling. Preparation of sub-grades and backfilling of trench and construction areas upon completion of utility or structure construction. All necessary bracing, shoring and protection shall be completed, (but not including tight sheeting in trenches and structure excavation ordered left in place by the Owner or Owner’s Representative).
Protection of employees in excavations shall conform to applicable OSHA Standards. Any trench protection and modification to trenching safety plans shall be submitted to the Owner or Owner’s Representative in writing to be maintained as part of the record.
The Contractor shall install all shoring and sheeting systems required to prevent cave-ins and protect his employees and adjacent property and structures in accordance with current OSHA standards. No extra payment will be made for these items, the cost thereof being merged with and considered a part of the cost for the related excavation.
All materials in contact with potable water shall be lead free and NSF certified for use in potable water systems.
Figure 1Water leak is on the left side of this picture image1.jpeg