B12_Questions_and_Answers_0001.pdf
PDF 272 KB Posted
- Solicitation number
- 140P1321Q0032
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P1321Q0032_Amd_0001.pdf | ||
| A06_ROAD_BASE_REPORT_NMDOT_AT_1_INCH_ATTACHMENT_B.pdf | ||
| A04_STATEMENT_OF_WORK.docx | DOCX document | |
| A06_ROAD_BASE_NM_SUPPLEMENT_ATTACHMENT_A.pdf | ||
| Sol_140P1321Q0032.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
1. Is there a map or coordinates for the La Jara Borrow Pit that can be provided? Attached is the MAP
2. It is understood that equipment shall be cleaned prior to arriving on site to control noxious weeds. Does that mean that each individual truck (hauling base course) be cleaned and inspected even though it may be the same trucks 2 or 3 times a day? No if the trucks are just going back and forth between the gravel pit and the park, they only need to be inspected once.
3. How many miles from NM4, and road conditions? The delivery spot is 2 miles from
NM4 down a gravel road. The road is in good shape but does have some washboards on the outbound lane between grading operations.
File details come from the government source that posted it. Updated .