Atch_7_Previous_Inspection_Reports_0002.pdf

PDF 570 KB Posted

Attached to
MEVE ANNUAL FIRE SUPPRESSION INSPECTIONS
Solicitation number
140P1225Q0068
Issued by

About this file

These documents are Water-Based Fire Protection Systems Inspection reports from Cooper Fire Protection Services Inc., conducted on multiple buildings at Mesa Verde between November 2022 and May 2023. The inspections were performed for Superior Alarms, Inc. and followed the NFPA 25 Standard for Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems (2014 edition). Inspections covered buildings including a 4-Plex, Fire Dorm, Modular Building, Archives (Tin Shed), and involved comprehensive assessments of wet and antifreeze fire suppression systems.

The reports consistently documented similar findings across locations: glycerin-based antifreeze systems (38% solution), wet sprinkler systems, control valves, alarm devices, and backflow prevention assemblies. Many inspections noted minor deficiencies that were immediately addressed ("Pass After Repair" or PAR), such as replacing painted sprinkler heads, adding missing escutcheons, or ensuring proper sprinkler head orientation. Pressure gauges, valve conditions, and system component functionality were systematically evaluated, with most systems passing initial and follow-up inspections. The technician, Robert Stefun, performed these inspections to ensure fire protection systems met NFPA standards and remained operational.

View the file

Other files

File Type Posted
Sol_140P1225Q0068_Amd_0002.pdf PDF
Atch_6_Questions_and_Answers_0002.pdf PDF
Sol_140P1225Q0068_Amd_0001.pdf PDF
Sol_140P1225Q0068.pdf PDF
Atch_2_Statement_of_Work.pdf PDF
Atch_1_EO_Deviation_FEB_2025.pdf PDF
Atch_3_Technical-Experience_Questionaire.xls XLS spreadsheet
Atch_5_DOL_WD_2015-5435__Rev_27.pdf PDF
Atch_4_Price_Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Liability Release Statement:

The owner and/or designated representative acknowledges the responsibility of the operating condition of the component parts at the time of this inspection. It is agreed that the inspection service provided by the contractor as prescribed herein is limited to performing a visual inspection and/or routine testing, and any investigation or unscheduled testing, modification, maintenance, repair, etc., of the component parts is not included as part of the inspection work performed. It is further understood that all information contained herein is provided to the best of the knowledge of the party providing such information.

Customer: N/A

11/20/2022 11/20/2022

Tech: Robert Stefun

Deficiencies *PAR response indicated "Pass After Repair". Technician notes a deficiency of a device, and repairs the deficiency during inspection.

Wet System Inspection

Ques: System piping and fittings free of mechanical damage, leaks, corrosion, misalignment, or other loads or pipe hung from system (5.2.2)

Technician Response: PAR There is a leak at the riser where a nipple is fit to a tee. We recommend replacing this piping.

Deficiency Report Inspection Location

Mesa Verde - 4 Plex - Bldg #311 80541.011

Mesa Verde, CO 81330

Phone: 970-247-8847 Fax:

Customer Superior Alarms, Inc 1955

PO Box 5056

Durango, CO 81301

Phone: 970-247-8847 Fax:

Inspection date: 11/20/2022

Cooper Fire Protection Services Inc.

604 W Pinon

Farmington, NM 87401

(505) 327-0474 www.cooperfirepro.com

Mesa Verde - 4 Plex - Bldg #311 ( A9 ) A25 Page 1 of 1 Powered by ASURiO Inspection Systems, Copyright 2023. All Rights Reserved ASURiO

Inspection performed in accordance with NFPA 25 Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, 2014 edition.

Mesa Verde - 4 Plex - Bldg #311 80541.011

Customer Superior Alarms, Inc 1955

PO Box 5056 Durango, CO 81301

Phone: 970-247-8847 Fax:

Cooper Fire Protection Services Inc.

604 W Pinon

Farmington, NM 87401

(505) 327-0474 www.cooperfirepro.com Serving the Greater Four Corners since 1973

Water-Based Fire Protection Systems Inspection

Inspector: Robert Stefun Inspection date: 11/20/2022

Additional Site Contact Role Name Phone # Fax # eMail Address

Mesa Verde - 4 Plex - Bldg #311 ( A9 ) A25 Page 1 of 4 Powered by ASURiO Inspection Systems, Copyright 2014. All Rights Reserved ASURiO

Building Owner/Representative Is building currently occupied Yes Has building occupancy, hazard, water supply or building arrangement affecting system effectiveness remained the same since last inspection (4.1.6) Yes

Are all fire protection systems in service (4.4) Yes Areas containing water-filled piping used for fire sprinkler systems, maintain a minimum temperature of 40 deg F, and are not exposed to freezing conditions. (4.1.2,4.1.2.1) Yes

Owner/Representative Signature

System Summary Number of Systems at Site Items Total Systems

Antifreeze System 1 Wet System 1

Antifreeze System Antifreeze System

Whole Building Laundry Room List type of solution in antifreeze system. (5.3.4(1)) Glycerin Record percentage of Solution mix. (5.3.4.2.1(1)) 38

Wet System Wet System Inspection

Sprinkler heads appear free of corrosion, foreign material, paint or damage, no signs of leakage and heads/deflectors installed in proper orientation (5.2.1.1.) Pass

Escutcheons and coverplates in place, if applicable. (5.2.1.1.6) Pass Minimum clearance to storage maintained below sprinkler deflectors. (5.2.1.2) Pass # of replacement sprinkler heads per # installed in head box comply: 6 per 1-300: 12 per 301 to 1,000: 24 per 1,000 (5.4.1.5) Pass

Sprinkler head wrench for each type head provided in head box (5.4.1.6) Pass List of sprinklers installed on the property posted on head box. (5.4.1.5.6) Pass System piping and fittings free of mechanical damage, leaks, corrosion, misalignment, or other loads or pipe hung from system (5.2.2) PAR

Pipe hangers and seismic braces secure and undamaged (5.2.3) Pass Bldg that has sprinklers older than 50 years, has sprinkler sample been tested? (5.3.1.1.1) N/A Bldg that has fast response sprinklers older than 20 years, has sprinkler sample been tested? (5.3.1.1.1.3) N/A Bldg that has dry sprinklers older than 10 years, has sprinkler sample been tested? (5.3.1.1.1.6) N/A

Wet System Wet Riser Main Drain/No Check Valve

Whole Building Laundry Room Exterior of connection in good condition and gauge operable (13.4.1.1) Pass Hydraulic nameplate securely attached and is legible (5.2.6) Pass Pressure (psi) shown on the pressure gauge. 125 Size of main drain 1" Pressure (psi) shown on Supply Water pressure gauge. (13.2.5) 125 Residual Pressure with valve open (13.2.5) N/I Static Pressure after valve closed (13.2.5) N/A Main Drain Test Pressure less than 10% reduction in flow from original acceptance test or previous test results (13.2.5.3) N/I

Adequate drainage for test/drain valve available (13.2.4) Pass Valve Status Test - Valves open when returned to service. (13.3.1.2.1) N/I Gauge on valve, when compared to calibrated gauge is error less than 3% full or gauge has been recalibrated or replaced (5.3.2) N/I 1/1/1900

Mesa Verde - 4 Plex - Bldg #311 ( A9 ) A25 Page 2 of 4

Control Valves Type Area/Location Model Size Signs Condition Position Secured Exercised Seal

Control Valve -sealed

BF Supply Laundry Room Ball 2" Pass Pass Pass Pass Pass

Control Valve -sealed

BF System Laundry Room Ball 2" Pass Pass Pass Pass Pass

Antifreeze System Whole Building Laundry Room

Antifreeze specific gravity as measured meet solution requirements. (5.3.4(3)) Pass Specific gravity of antifreeze. 1.037 Antifreeze tested and results indicate correct freeze points in system. (5.3.4.4.1) Pass 0

Not Inspected Backflow Prevention Assembly Device

Main Supply Laundry Room

Question: Forward flow test at minimum flow rate of system demand (13.6.2.1) Technician Response: No flow testing could be performed without diluting the antifreeze. See observations for more details.

Question: Backflow performance test conducted satisfactorily at completion of forward flow test

Technician Response: Outside scope of contract. Please contact us for pricing.

Other Components Recalled Sprinklers

Property free of any recalled sprinklers Visual Only

Backflow Prevention Assembly Device Main Supply Laundry Room

Are isolation valves in open position (13.6.1.1) Pass Differential-sensing valve relief port not continuously discharging water (13.6.1.2) Pass Forward flow test at minimum flow rate of system demand (13.6.2.1) N/I Backflow performance test conducted satisfactorily at completion of forward flow test N/I Internally inspection verifies all components operate correctly, move freely and are in good condition (13.6.1.4) Pass

Alarm Devices Type Area/Location Mfr/Model Visual

Inspection Functional

Test Waterflow Alarm - Pressure Switch/Vane Whole Building Laundry Room SYSTEM SENSOR

WFDT Pass Pass 42

Horn/Strobe Whole Building South Wall Unknown Unknown Pass Pass

Deficiencies *PAR response indicated "Pass After Repair". Technician notes a deficiency of a device, and repairs the deficiency during inspection.

Wet System Inspection

Ques: System piping and fittings free of mechanical damage, leaks, corrosion, misalignment, or other loads or pipe hung from system (5.2.2)

Technician Response: PAR There is a leak at the riser where a nipple is fit to a tee. We recommend replacing this piping.

Mesa Verde - 4 Plex - Bldg #311 ( A9 ) A25 Page 3 of 4

The owner and/or designated representative acknowledges the responsibility of the operating condition of the component parts at the time of this inspection. It is agreed that the inspection service provided by the contractor as prescribed herein is limited to performing a visual inspection and/or routine testing, and any investigation or unscheduled testing, modification, maintenance, repair, etc., of the component parts is not included as part of the inspection work performed. It is further understood that all information contained herein is provided to the best of the knowledge of the party providing such information.

Customer: N/A

11/20/2022 11/20/2022

Tech: Robert Stefun

Not Inspected Wet Riser Main Drain/No Check Valve

Whole Building Laundry Room Question: Main Drain Test Pressure less than 10% reduction in flow from original acceptance test or previous test results (13.2.5.3) Technician Response: No flow testing could be performed without diluting the antifreeze solution. See observations for more details.

Question: Valve Status Test - Valves open when returned to service. (13.3.1.2.1) Technician Response: No flow testing could be performed without diluting the antifreeze solution. See observations for more details.

Question: Gauge on valve, when compared to calibrated gauge is error less than 3% full or gauge has been recalibrated or replaced (5.3.2) Technician Response: Outside scope of contract. This question is related to a 5 year inspection cycle. Please contact us for pricing.

Mesa Verde - 4 Plex - Bldg #311 ( A9 ) A25 Page 4 of 4

The owner and/or designated representative acknowledges the responsibility of the operating condition of the component parts at the time of this inspection. It is agreed that the inspection service provided by the contractor as prescribed herein is limited to performing a visual inspection and/or routine testing, and any investigation or unscheduled testing, modification, maintenance, repair, etc., of the component parts is not included as part of the inspection work performed. It is further understood that all information contained herein is provided to the best of the knowledge of the party providing such information.

Customer: N/A

11/20/2022 11/20/2022

Tech: Robert Stefun

Deficiencies *PAR response indicated "Pass After Repair". Technician notes a deficiency of a device, and repairs the deficiency during inspection.

Fire Department Connection

Ques: Check valve clapper free from leaks and automatic drain valve in place and operating properly (13.7.1)

Technician Response: PAR Added an automatic drain valve

Deficiency Report

Mesa Verde Fire Dorm #58 80541.019

Phone: 970-247-8841 Fax:

Customer Superior Alarms, Inc 1955

PO Box 5056

Durango, CO 81301

Phone: 970-247-8847 Fax:

Inspection date: 11/20/2022

Cooper Fire Protection Services Inc.

604 W Pinon

Farmington, NM 87401

(505) 327-0474 www.cooperfirepro.com

Mesa Verde Fire Dorm #58 (A-9) A25 Page 1 of 1 of Water-Based Fire Protection Systems, 2014 edition.

Mesa Verde Fire Dorm #58 80541.019

Phone: 970-247-8841 Fax:

Customer Superior Alarms, Inc 1955

PO Box 5056 Durango, CO 81301

Phone: 970-247-8847 Fax:

Cooper Fire Protection Services Inc.

604 W Pinon

Farmington, NM 87401

(505) 327-0474

Additional Site Contact Role Name Phone # Fax # eMail Address

Local Alarms only

Mesa Verde Fire Dorm #58 (A-9) A25 Page 1 of 4

Has building occupancy, hazard, water supply or building arrangement affecting system effectiveness remained the same since last inspection (4.1.6) Yes

Are all fire protection systems in service (4.4) Yes Areas containing water-filled piping used for fire sprinkler systems, maintain a minimum temperature of 40 deg F, and are not exposed to freezing conditions. (4.1.2,4.1.2.1) Yes

Owner/Representative Signature

System Summary Number of Systems at Site Items Total Systems

Antifreeze System 1 Wet System 1

Antifreeze System Antifreeze System

Whole system Basement List type of solution in antifreeze system. (5.3.4(1)) Glycerin Record percentage of Solution mix. (5.3.4.2.1(1)) 38 heads/deflectors installed in proper orientation (5.2.1.1.) Pass

Escutcheons and coverplates in place, if applicable. (5.2.1.1.6) Pass Minimum clearance to storage maintained below sprinkler deflectors. (5.2.1.2) Pass # of replacement sprinkler heads per # installed in head box comply: 6 per 1-300: 12 per 301 to 1,000: 24 per 1,000 (5.4.1.5) Pass

Sprinkler head wrench for each type head provided in head box (5.4.1.6) Pass List of sprinklers installed on the property posted on head box. (5.4.1.5.6) N/A System piping and fittings free of mechanical damage, leaks, corrosion, misalignment, or other loads or pipe hung from system (5.2.2) Pass

Pipe hangers and seismic braces secure and undamaged (5.2.3) Pass Bldg that has sprinklers older than 50 years, has sprinkler sample been tested? (5.3.1.1.1) N/A Bldg that has fast response sprinklers older than 20 years, has sprinkler sample been tested? (5.3.1.1.1.3) N/A Bldg that has dry sprinklers older than 10 years, has sprinkler sample been tested? (5.3.1.1.1.6) N/A

Wet System Wet Riser Main Drain/No Check Valve

Main Supply Basement Exterior of connection in good condition and gauge operable (13.4.1.1) Pass Hydraulic nameplate securely attached and is legible (5.2.6) Pass Pressure (psi) shown on the pressure gauge. 60 Size of main drain 1" Pressure (psi) shown on Supply Water pressure gauge. (13.2.5) 50 Residual Pressure with valve open (13.2.5) N/I Static Pressure after valve closed (13.2.5) N/A Main Drain Test Pressure less than 10% reduction in flow from original acceptance test or previous test results (13.2.5.3) N/I

Adequate drainage for test/drain valve available (13.2.4) N/I Valve Status Test - Valves open when returned to service. (13.3.1.2.1) N/I Gauge on valve, when compared to calibrated gauge is error less than 3% full or gauge has been recalibrated or replaced (5.3.2) N/I 1/1/1900

Mesa Verde Fire Dorm #58 (A-9) A25 Page 2 of 4

Control Valve -sealed

BF Supply Basement Ball 2" Pass Pass Pass Pass Pass

Control Valve -sealed

BF System Basement Ball 2" Pass Pass Pass Pass Pass

Control Valve -sealed

Fire Department Connection Isolation Basement

Ball 1.5" Pass Pass Pass Pass N/A

Control Valve -sealed

Main Supply Basement

Butterball 2" Pass Pass Pass Pass Pass

Control Valve -sealed

System Basement

Butterball 2" Pass Pass Pass Pass Pass

Antifreeze System Whole system Basement

Antifreeze specific gravity as measured meet solution requirements. (5.3.4(3)) Pass Specific gravity of antifreeze. 1.037 Antifreeze tested and results indicate correct freeze points in system. (5.3.4.4.1) Pass 0

Are isolation valves in open position (13.6.1.1) Pass Differential-sensing valve relief port not continuously discharging water (13.6.1.2) Pass Forward flow test at minimum flow rate of system demand (13.6.2.1) N/I Backflow performance test conducted satisfactorily at completion of forward flow test N/I Internally inspection verifies all components operate correctly, move freely and are in good condition (13.6.1.4) N/I

Fire Department Connection

FDC visible and accessible, without damage and signs in place (13.7.1) Pass Couplings and swivels free of damage and rotate smoothly (13.7.1) Pass Caps, plugs and gaskets in place and free from damage (13.7.1) Pass Check valve clapper free from leaks and automatic drain valve in place and operating properly (13.7.1) PAR Interior of the connection free of obstructions. (13.7.1(9)) Pass Internal inspection of check valve - components operate properly, cleaned/repaired as needed (13.4.2.1) Pass Hydrostatic test results of piping from FDC to check valve acceptable. (13.7.4) Pass

Property free of any recalled sprinklers Yes

Alarm Devices Type Area/Location Mfr/Model Visual

Inspection Functional

Test Waterflow Alarm - Pressure Switch/Vane Main Waterflow Basement Potter VSR Pass Pass

Horn/Strobe Main Waterflow East Wall Unknown Unknown Pass Pass

Deficiencies

Mesa Verde Fire Dorm #58 (A-9) A25 Page 3 of 4

The owner and/or designated representative acknowledges the responsibility of the operating condition of the component parts at the time of this inspection. It is agreed that the inspection service provided by the contractor as prescribed herein is limited to performing a visual inspection and/or routine testing, and any investigation or unscheduled testing, modification, maintenance, repair, etc., of the component parts is not included as part of the inspection work performed.

It is further understood that all information contained herein is provided to the best of the knowledge of the party providing such information.

Customer: N/A

11/20/2022 11/20/2022

Tech: Robert Stefun

Not Inspected

Question: Forward flow test at minimum flow rate of system demand (13.6.2.1)

Technician Response: Outside scope of contract. Please contact us for pricing.

Question: Backflow performance test conducted satisfactorily at completion of forward flow test

Technician Response: Outside scope of contract. Please contact us for pricing.

Question: Internally inspection verifies all components operate correctly, move freely and are in good condition (13.6.1.4) Technician Response: Outside scope of contract. This question is related to a 5 year inspection cycle. Please contact us for pricing.

Wet Riser Main Drain/No Check Valve Main Supply Basement Question: Main Drain Test Pressure less than 10% reduction in flow from original acceptance test or previous test results (13.2.5.3) Technician Response: No flow testing could be performed without diluting the antifreeze. See observations for more details.

Question: Adequate drainage for test/drain valve available (13.2.4) Technician Response: No flow testing could be performed without diluting the antifreeze. See observations for more details.

Question: Valve Status Test - Valves open when returned to service. (13.3.1.2.1) Technician Response: No flow testing could be performed without diluting the antifreeze. See observations for more details.

Question: Gauge on valve, when compared to calibrated gauge is error less than 3% full or gauge has been recalibrated or replaced (5.3.2) Technician Response: Outside scope of contract. This question is related to a 5 year inspection cycle. Please contact us for pricing.

*PAR response indicated "Pass After Repair". Technician notes a deficiency of a device, and repairs the deficiency during inspection.

Fire Department Connection

Ques: Check valve clapper free from leaks and automatic drain valve in place and operating properly (13.7.1)

Technician Response: PAR Added an automatic drain valve

Mesa Verde Fire Dorm #58 (A-9) A25 Page 4 of 4 of Water-Based Fire Protection Systems, 2014 edition.

Mesa Verde - Modular Bldg #307 80541.006

Customer Superior Alarms, Inc 1955

PO Box 5056 Durango, CO 81301

Phone: 970-247-8847 Fax:

Cooper Fire Protection Services Inc.

604 W Pinon

Farmington, NM 87401

(505) 327-0474

Inspector: Robert Stefun Inspection date: 05/18/2023

Additional Site Contact Role Name Phone # Fax # eMail Address

Mesa Verde - Modular Bldg #307 (A-9) A25 Page 1 of 4

Has building occupancy, hazard, water supply or building arrangement affecting system effectiveness remained the same since last inspection (4.1.6) Yes

Are all fire protection systems in service (4.4) Yes Areas containing water-filled piping used for fire sprinkler systems, maintain a minimum temperature of 40 deg F, and are not exposed to freezing conditions. (4.1.2,4.1.2.1) Yes

Owner/Representative Signature

System Summary Number of Systems at Site Items Total Systems

Antifreeze System 1 Wet System 1

Antifreeze System Antifreeze System

Whole Building Closet by Restroom List type of solution in antifreeze system. (5.3.4(1)) Glycerin Record percentage of Solution mix. (5.3.4.2.1(1)) 38 heads/deflectors installed in proper orientation (5.2.1.1.) PAR

Escutcheons and coverplates in place, if applicable. (5.2.1.1.6) PAR Minimum clearance to storage maintained below sprinkler deflectors. (5.2.1.2) Pass # of replacement sprinkler heads per # installed in head box comply: 6 per 1-300: 12 per 301 to 1,000: 24 per 1,000 (5.4.1.5) PAR

Sprinkler head wrench for each type head provided in head box (5.4.1.6) PAR List of sprinklers installed on the property posted on head box. (5.4.1.5.6) Pass System piping and fittings free of mechanical damage, leaks, corrosion, misalignment, or other loads or pipe hung from system (5.2.2) Pass

Pipe hangers and seismic braces secure and undamaged (5.2.3) Pass Bldg that has sprinklers older than 50 years, has sprinkler sample been tested? (5.3.1.1.1) N/A Bldg that has fast response sprinklers older than 20 years, has sprinkler sample been tested? (5.3.1.1.1.3) N/A Bldg that has dry sprinklers older than 10 years, has sprinkler sample been tested? (5.3.1.1.1.6) N/A

Wet System Wet Riser Main Drain/No Check Valve

Whole Building Closet by Restroom Exterior of connection in good condition and gauge operable (13.4.1.1) Pass Hydraulic nameplate securely attached and is legible (5.2.6) Pass Pressure (psi) shown on the pressure gauge. 120 Size of main drain 1" Pressure (psi) shown on Supply Water pressure gauge. (13.2.5) 120 Residual Pressure with valve open (13.2.5) N/I Static Pressure after valve closed (13.2.5) N/A Main Drain Test Pressure less than 10% reduction in flow from original acceptance test or previous test results (13.2.5.3) N/I

Adequate drainage for test/drain valve available (13.2.4) Pass Valve Status Test - Valves open when returned to service. (13.3.1.2.1) N/I Gauge on valve, when compared to calibrated gauge is error less than 3% full or gauge has been recalibrated or replaced (5.3.2) N/I 9/1/2010

Mesa Verde - Modular Bldg #307 (A-9) A25 Page 2 of 4

Control Valve -locked/tamper

BF Supply Closet by Restroom Ball 1" Pass Pass Pass Pass Pass

Control Valve -locked/tamper

BF System Closet by Restroom Ball 1" Pass Pass Pass Pass Pass

Antifreeze System Whole Building Closet by Restroom

Antifreeze specific gravity as measured meet solution requirements. (5.3.4(3)) Pass Specific gravity of antifreeze. 1.037 Antifreeze tested and results indicate correct freeze points in system. (5.3.4.4.1) Pass 0

Forward flow test at minimum flow rate of system demand (13.6.2.1) N/I Backflow performance test conducted satisfactorily at completion of forward flow test N/I Internally inspection verifies all components operate correctly, move freely and are in good condition (13.6.1.4) Pass

Property free of any recalled sprinklers Visual Only

Type Area/Location Mfr/Model Visual

Inspection Functional

Test Waterflow Alarm - Pressure Switch/Vane

Whole Building Closet by Restroom System Sensor WFDT Pass Pass 7

Horn/Strobe Whole Building South West Corner Outside Unknown Unknown Pass Pass

Deficiencies *PAR response indicated "Pass After Repair". Technician notes a deficiency of a device, and repairs the deficiency during inspection.

Wet System Inspection

Ques: Sprinkler heads appear free of corrosion, foreign material, paint or damage, no signs of leakage and heads/deflectors installed in proper orientation (5.2.1.1.)

Technician Response: PAR There are four painted horizontal sidewall sprinklers. Two in the living room, one in the laundry room, and one in room A. We replaced these sprinklers to meet NFPA standards.

Ques: Escutcheons and coverplates in place, if applicable. (5.2.1.1.6) Technician Response: PAR Missing one white semi recessed escutcheon in the living room. We recommend replaced this escutcheon to meet NFPA standards.

Mesa Verde - Modular Bldg #307 (A-9) A25 Page 3 of 4

The owner and/or designated representative acknowledges the responsibility of the operating condition of the component parts at the time of this inspection. It is agreed that the inspection service provided by the contractor as prescribed herein is limited to performing a visual inspection and/or routine testing, and any investigation or unscheduled testing, modification, maintenance, repair, etc., of the component parts is not included as part of the inspection work performed. It is further understood that all information contained herein is provided to the best of the knowledge of the party providing such information.

Customer: N/A

05/18/2023 05/18/2023

Tech: Robert Stefun

Technician Response: No flow testing could be performed without diluting the antifreeze. See observations for more details.

Question: Backflow performance test conducted satisfactorily at completion of forward flow test

Technician Response: Outside scope of contract. Please contact us for pricing.

Wet Riser Main Drain/No Check Valve Whole Building Closet by Restroom Question: Main Drain Test Pressure less than 10% reduction in flow from original acceptance test or previous test results (13.2.5.3) Technician Response: No flow testing could be performed without diluting the antifreeze. See observations for more details.

Question: Valve Status Test - Valves open when returned to service. (13.3.1.2.1) Technician Response: No flow testing could be performed without diluting the antifreeze. See observations for more details.

Question: Gauge on valve, when compared to calibrated gauge is error less than 3% full or gauge has been recalibrated or replaced (5.3.2) Technician Response: Outside scope of contract. This question is related to a 5 year inspection cycle. Please contact us for pricing.

Ques: # of replacement sprinkler heads per # installed in head box comply: 6 per 1-300: 12 per 301 to 1,000: 24 per 1,000 (5.4.1.5)

Technician Response: PAR Missing two white 155 degree Viking VK450 RES 4.2K Horizontal Sidewall sprinklers. We Replaced these in the spare head box to meet NFPA standards.

Ques: Sprinkler head wrench for each type head provided in head box (5.4.1.6) Technician Response: PAR Missing socket for VK450. We added a socket in the spare head box for use in future service work and to meet NFPA standards.

Mesa Verde - Modular Bldg #307 (A-9) A25 Page 4 of 4

The owner and/or designated representative acknowledges the responsibility of the operating condition of the component parts at the time of this inspection. It is agreed that the inspection service provided by the contractor as prescribed herein is limited to performing a visual inspection and/or routine testing, and any investigation or unscheduled testing, modification, maintenance, repair, etc., of the component parts is not included as part of the inspection work performed. It is further understood that all information contained herein is provided to the best of the knowledge of the party providing such information.

Customer: N/A

5/18/2023 5/18/2023

Tech: Robert Stefun

Deficiencies *PAR response indicated "Pass After Repair". Technician notes a deficiency of a device, and repairs the deficiency during inspection.

Wet System Inspection

Ques: Sprinkler heads appear free of corrosion, foreign material, paint or damage, no signs of leakage and heads/deflectors installed in proper orientation (5.2.1.1.)

Technician Response: PAR There are four painted horizontal sidewall sprinklers. Two in the living room, one in the laundry room, and one in room A. We replaced these sprinklers to meet NFPA standards.

Ques: Escutcheons and coverplates in place, if applicable. (5.2.1.1.6)

Technician Response: PAR Missing one white semi recessed escutcheon in the living room. We recommend replaced this escutcheon to meet NFPA standards.

Ques: # of replacement sprinkler heads per # installed in head box comply: 6 per 1-300: 12 per 301 to 1,000: 24 per 1,000 (5.4.1.5)

Technician Response: PAR Missing two white 155 degree Viking VK450 RES 4.2K Horizontal Sidewall sprinklers. We Replaced these in the spare head box to meet NFPA standards.

Ques: Sprinkler head wrench for each type head provided in head box (5.4.1.6)

Technician Response: PAR Missing socket for VK450. We added a socket in the spare head box for use in future service work and to meet NFPA standards.

Deficiency Report

Mesa Verde - Modular Bldg #307 80541.006

Customer Superior Alarms, Inc 1955

PO Box 5056

Durango, CO 81301

Phone: 970-247-8847 Fax:

Inspection date: 5/18/2023

Cooper Fire Protection Services Inc.

604 W Pinon

Farmington, NM 87401

(505) 327-0474 www.cooperfirepro.com

Mesa Verde - Modular Bldg #307 (A-9) A25 Page 1 of 1

The owner and/or designated representative acknowledges the responsibility of the operating condition of the component parts at the time of this inspection. It is agreed that the inspection service provided by the contractor as prescribed herein is limited to performing a visual inspection and/or routine testing, and any investigation or unscheduled testing, modification, maintenance, repair, etc., of the component parts is not included as part of the inspection work performed. It is further understood that all information contained herein is provided to the best of the knowledge of the party providing such information.

Customer: N/A

11/20/2022 11/20/2022

Tech: Robert Stefun

Deficiencies *PAR response indicated "Pass After Repair". Technician notes a deficiency of a device, and repairs the deficiency during inspection.

Wet System Inspection

Ques: Sprinkler heads appear free of corrosion, foreign material, paint or damage, no signs of leakage and heads/deflectors installed in proper orientation (5.2.1.1.)

Technician Response: PAR The sprinklers installed in the building are for residential use only. There is also standard and quick response sprinklers located together. We replaced and fixed these to be in compliance with NFPA standards.

Deficiency Report

Mesa Verde Archives ( Tin Shed) 80541.015

Customer Superior Alarms, Inc 1955

PO Box 5056

Durango, CO 81301

Phone: 970-247-8847 Fax:

Inspection date: 11/20/2022

Cooper Fire Protection Services Inc.

604 W Pinon

Farmington, NM 87401

(505) 327-0474 www.cooperfirepro.com

Mesa Verde Archives ( Tin Shed) (A-9) A25 Page 1 of 1 of Water-Based Fire Protection Systems, 2014 edition.

Mesa Verde Archives ( Tin Shed) 80541.015

Customer Superior Alarms, Inc 1955

PO Box 5056 Durango, CO 81301

Phone: 970-247-8847 Fax:

Cooper Fire Protection Services Inc.

604 W Pinon

Farmington, NM 87401

(505) 327-0474

Additional Site Contact Role Name Phone # Fax # eMail Address

Mesa Verde Archives ( Tin Shed) (A-9) A25 Page 1 of 4

Has building occupancy, hazard, water supply or building arrangement affecting system effectiveness remained the same since last inspection (4.1.6) Yes

Are all fire protection systems in service (4.4) Yes Areas containing water-filled piping used for fire sprinkler systems, maintain a minimum temperature of 40 deg F, and are not exposed to freezing conditions. (4.1.2,4.1.2.1) Yes

Owner/Representative Signature

System Summary Number of Systems at Site Items Total Systems

Antifreeze System 1 Wet System 1

Antifreeze System Antifreeze System

Whole Building Mechanical Closet List type of solution in antifreeze system. (5.3.4(1)) Glycerin Record percentage of Solution mix. (5.3.4.2.1(1)) 38 heads/deflectors installed in proper orientation (5.2.1.1.) PAR

Escutcheons and coverplates in place, if applicable. (5.2.1.1.6) Pass Minimum clearance to storage maintained below sprinkler deflectors. (5.2.1.2) Pass # of replacement sprinkler heads per # installed in head box comply: 6 per 1-300: 12 per 301 to 1,000: 24 per 1,000 (5.4.1.5) Pass

Sprinkler head wrench for each type head provided in head box (5.4.1.6) Pass List of sprinklers installed on the property posted on head box. (5.4.1.5.6) Pass System piping and fittings free of mechanical damage, leaks, corrosion, misalignment, or other loads or pipe hung from system (5.2.2) Pass

Pipe hangers and seismic braces secure and undamaged (5.2.3) Pass Bldg that has sprinklers older than 50 years, has sprinkler sample been tested? (5.3.1.1.1) N/A Bldg that has fast response sprinklers older than 20 years, has sprinkler sample been tested? (5.3.1.1.1.3) N/A Bldg that has dry sprinklers older than 10 years, has sprinkler sample been tested? (5.3.1.1.1.6) N/A

Wet System Wet Riser Main Drain/No Check Valve

Whole Building Mechanical Closet Exterior of connection in good condition and gauge operable (13.4.1.1) Pass Hydraulic nameplate securely attached and is legible (5.2.6) Pass Pressure (psi) shown on the pressure gauge. 40 Size of main drain 1.25" Pressure (psi) shown on Supply Water pressure gauge. (13.2.5) 40 Residual Pressure with valve open (13.2.5) N/I Static Pressure after valve closed (13.2.5) N/A Main Drain Test Pressure less than 10% reduction in flow from original acceptance test or previous test results (13.2.5.3) N/I

Adequate drainage for test/drain valve available (13.2.4) Pass Valve Status Test - Valves open when returned to service. (13.3.1.2.1) N/I Gauge on valve, when compared to calibrated gauge is error less than 3% full or gauge has been recalibrated or replaced (5.3.2) Yes 11/20/2022

Mesa Verde Archives ( Tin Shed) (A-9) A25 Page 2 of 4

Supervisory Devices Type Area/Location Mfr/Model Visual

Inspection Functional

Test Tamper Switch BF Supply Mechanical Closet Potter OSYSU-2 Pass Pass

Tamper Switch BF System Mechanical Closet Potter OSYSU-2 Pass Pass

Control Valves Type Area/Location Model Size Signs Condition Position Secured Exercised Seal

Control Valve -locked/tamper

BF Supply Mechanical Closet

OS and Y 3" Pass Pass Pass Pass Pass

Control Valve -locked/tamper

BF System Mechanical Closet

OS and Y 3" Pass Pass Pass Pass Pass

Antifreeze System Whole Building Mechanical Closet

Antifreeze specific gravity as measured meet solution requirements. (5.3.4(3)) Pass Specific gravity of antifreeze. 1.037 Antifreeze tested and results indicate correct freeze points in system. (5.3.4.4.1) Pass 0

Forward flow test at minimum flow rate of system demand (13.6.2.1) N/I Backflow performance test conducted satisfactorily at completion of forward flow test N/I Internally inspection verifies all components operate correctly, move freely and are in good condition (13.6.1.4) Pass

Fire Department Connection

FDC visible and accessible, without damage and signs in place (13.7.1) Pass Couplings and swivels free of damage and rotate smoothly (13.7.1) Pass Caps, plugs and gaskets in place and free from damage (13.7.1) Pass Check valve clapper free from leaks and automatic drain valve in place and operating properly (13.7.1) Pass Interior of the connection free of obstructions. (13.7.1(9)) Pass Internal inspection of check valve - components operate properly, cleaned/repaired as needed (13.4.2.1) Pass Hydrostatic test results of piping from FDC to check valve acceptable. (13.7.4) Pass

Property free of any recalled sprinklers Yes

Type Area/Location Mfr/Model Visual

Inspection Functional

Test Horn/Strobe Whole Building Above FDC Unknown Unknown Pass Pass Waterflow Alarm - Pressure Switch/Vane Whole Building Mechanical Closet Potter VSR Pass Pass 9

Deficiencies Mesa Verde Archives ( Tin Shed) (A-9) A25 Page 3 of 4

The owner and/or designated representative acknowledges the responsibility of the operating condition of the component parts at the time of this inspection. It is agreed that the inspection service provided by the contractor as prescribed herein is limited to performing a visual inspection and/or routine testing, and any investigation or unscheduled testing, modification, maintenance, repair, etc., of the component parts is not included as part of the inspection work performed. It is further understood that all information contained herein is provided to the best of the knowledge of the party providing such information.

Customer: N/A

11/20/2022 11/20/2022

Tech: Robert Stefun

Technician Response: No flow tests could be performed without diluting the antifreeze. See observations for more details.

Question: Backflow performance test conducted satisfactorily at completion of forward flow test

Technician Response: Outside scope of contract. Please contact us for pricing.

Wet Riser Main Drain/No Check Valve Whole Building Mechanical Closet Question: Main Drain Test Pressure less than 10% reduction in flow from original acceptance test or previous test results (13.2.5.3) Technician Response: No flow testing could be performed without diluting the antifreeze. See observations for more details.

Question: Valve Status Test - Valves open when returned to service. (13.3.1.2.1) Technician Response: No flow testing could be performed without diluting the antifreeze. See observations for more details.

*PAR response indicated "Pass After Repair". Technician notes a deficiency of a device, and repairs the deficiency during inspection.

Wet System Inspection

Ques: Sprinkler heads appear free of corrosion, foreign material, paint or damage, no signs of leakage and heads/deflectors installed in proper orientation (5.2.1.1.)

Technician Response: PAR The sprinklers installed in the building are for residential use only. There is also standard and quick response sprinklers located together. We replaced and fixed these to be in compliance with NFPA standards.

Mesa Verde Archives ( Tin Shed) (A-9) A25 Page 4 of 4

10312022 - 4 Plex #311 A25 DEF
10312022 - 4 Plex #311 A25
10312022 - Fire Dorm #58 A25 DEF
10312022 - Fire Dorm #58 A25
10312022- Modular #307 A25 -1
10312022- Modular #307 A25 DEF-1
10312022- Tin Shed A25 DEF
10312022- Tin Shed A25

File details come from the government source that posted it. Updated .