WATER TANK INSPECTIONS
MESA VERDE NATIONAL PARK (MEVE)
RFQ# 140P1222Q0094
AMENDMENT 0001
QUESTIONS & ANSWERS
1. QUESTION: Question: While the subject line and Scope of Services state, "Inspection", #4 details that there is to be an in-service cleanout. Are all tanks to be cleaned and inspected?
ANSWER: Yes, all tanks are to be cleaned and inspected. Please note, this Amendment #01 includes a revised Scope of Services and Price Schedule that removes the Chapin Mesa Tank - 100,000 gallon (Lat:
37° 12' 13.51"N, Long: 108° 29" 27.76"W).
2. QUESTION: The general project description says that three (3) ground tanks and one (1) clear well were in scope. However, the RFQ listed four (4) ground tanks, one (1) clear well and two (2) raw water vaults. Also, on page 6 of the RFQ, the price schedule lists only a quantity of one (1) raw water vaults but the plural "s" of vaults would indicate two (2) or more.
ANSWER: Total of three (3) underground tanks. Clearwell is separate and the Raw Water Vaults are side by side in the same location sharing a wall.
3. QUESTION: Can you please provide the Diameter and height of each tank?
ANSWER:
1. Morefield Tank – 24' height, 48' diameter
2. Wetherill Tank – 24' height, 48' diameter
3. Navajo Hill Tank – 32' height, 104' diameter
4. Water Plant Clearwell – Single Underground Concrete 26' long, 24' wide, 10' depth
5. Raw Water Vaults – Two Underground Concrete 20' X 14' with a depth of 12'
4. QUESTION: Is the raw water tank sewage or recycled water?
ANSWER: No, the raw water tanks receive surface water from our river or reservoir sources prior to the water treatment plant.
5. QUESTION: Would the contractor be able to complete inspections back-to-back to reduce deployments costs?
ANSWER: Yes.
6. QUESTION: Can the contractor complete inspection on a Saturday as well?
ANSWER: Monday through Friday is preferred; weekend work is subject to park approval depending on access and employee availability.
7. QUESTION: How big are the access hatches?
ANSWER: The above ground tanks have 24” Hatches, the below ground tanks have square hatches about
36”. The Park had divers with feed hoses in these tanks before.
8. QUESTION: When was the last time these tanks were cleaned and inspected?
ANSWER: The above ground tanks were done in August of 2018. The Clearwell and Raw Water Tanks are unknown, the Raw Water Vaults have been drained and flushed within the last 10 years.
9. QUESTION: Where can the water be discharged?
ANSWER: As long as dechlorination tablets are used, water can be discharged on site.
10. QUESTION: Do the tanks have internal and external ladders?
11. QUESTION: What is the extent covered by the additional labor or what is the expected repairs?
ANSWER: Possibly some small epoxy repairs, float level indicator cable adjustments/repairs.
12. QUESTION: Are all the tanks accessible via 4x4 truck and trailer?
ANSWER: Yes, there is 4x4 vehicle access to each tank and a shorter trailer would make turning around easier in a couple of the locations.
13. QUESTION: Does the discharge need to be de-chlorinated or filtered?
ANSWER: Discharge needs to be de-chlorinated.
14. QUESTION: What is the average or expected sediment depth in each reservoir?
ANSWER: In the finished water tanks, the Park expects to see less than an inch. The two raw water vaults are unknown and could potentially be 6-12 inches from what we’ve seen in the past.
15. QUESTION: Will the contractor have access to all of the tanks in one trip to the Park?
End of Amendment 0001