140P1221Q0059_COLM_Garage Doors RFQ Att 1_SOW.pdf

PDF 681 KB Posted

Attached to
COLM-REPLACE FIVE GARAGE DOORS Federal contract opportunity
Solicitation number
140P1221Q0059
Issued by
Department of the Interior National Park Service Intermountain Region

View the file

Other files for this federal contract opportunity

Other files attached to COLM-REPLACE FIVE GARAGE DOORS, newest first.
File Type Posted
140P1221Q0059_COLM_Garage Doors RFQ Att 3_Wage Determination.pdf PDF
Sol_140P1221Q0059.pdf PDF
140P1221Q0059_COLM_Garage Doors RFQ Att 2_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTIONAL DOOR REPLACEMENTS:

R&T/B&U/COLD STORAGE

BUILDINGS

SADDLEHORN HISTORIC DISTRICT

COLORADO NATIONAL MONUMENT

MESA COUNTY, COLORADO 81521

COLM 240946

NATIONAL PARK SERVICE

CONTRACT DOCUMENTS

5/4/2021 cmfletcher Text Box Page intentionally left blank.

SECTIONAL DOOR REPLACEMENTS:

R&T/B&U/COLD STORAGE

BUILDINGS

SADDLEHORN HISTORIC DISTRICT

COLM 240946

CONTRACT DOCUMENTS

5/4/2021

Owner

SADDLEHORN HISTORIC DISTRICT

MESA COUNTY, COLORADO 81521

(970) 858-2824

Architect

INTERIOR REGIONS 6/7/8 (INTERMOUNTAIN)

12795 WEST ALAMEDA PARKWAY

LAKEWOOD, CO 80220-2838

(303) 969-2669

Recipients of Deliverables:

Park Maintenance Supervisor/ COR Josh Denny (970) 858-3617

Colorado National Monument Joshua_denny@nps.gov

Facility Manager Kevin Dowell (970) 858-2824

Colorado National Monument kevin_dowell@nps.gov

Project Manager / Architect Carol Fletcher 720.626.4026

NPS / Intermountain Region carol_fletcher@nps.gov

Contracting Officer Bill Walton 303.503.4977

NPS / Intermountain Region bill_walton@nps.gov cmfletcher Text Box Page intentionally left blank.

TABLE OF CONTENTS

Division Section Title

FLYLEAF

TABLE OF CONTENTS

010000 013591

GENERAL REQUIREMENTS

HISTORIC PRESERVATION TREATMENT PROCEDURES

024119 SELECTIVE DEMOLITION

055000 METAL FABRICATIONS

079200 JOINT SEALANTS

083613 SECTIONAL DOORS

END OF TABLE OF CONTENTS

COLM - 240946 010000 -1

GENERAL REQUIREMENTS

SECTION 010000 - GENERAL REQUIREMENTS

PART 1 - GENERAL test

1.1 SUMMARY OF WORK

A. Background and Objectives:

1. The buildings comprising the Saddlehorn Historic District at Colorado National

Monument (of which the R&T [Road and Trails Shop], B&U [Building and Utility Shop], and Cold Storage Building are a part) were constructed by the Civilian Conservation Corps between 1935 and 1942, and now serve as administrative and service headquarters for the Park. The three sandstone structures in this project serve as facilities shops, and their effective functioning has been compromised by 60-year-old garage doors that no longer function correctly nor provide adequate protection from the elements and pests. Replacement of the 1960’s-era garage doors will improve the garage functions and the building thermal and envelope performance, while retaining a similar aesthetic to the modifications from the 1960’s (as opposed to the CCC-era).

2. The objective of this project is to address the existing overhead garage doors (also called sectional doors) (a total of 5, varying in size) on the R&T , B&U, and Cold Storage Buildings at the historic Saddlehorn Utility District, which are at the end of their useful lives and no longer provide effective barriers against the elements.

B. Work Covered by the Contract Documents: The project will remove and dispose of existing doors (panels, tracks, controls, and wiring) and replace in-kind existing garage doors with new high R-value heavy-duty commercial sectional doors (panels, tracks, wiring, motors, stationary and remote controls) and rodent-proof weather-stripping. Door panels will maintain vision lites for natural lighting. Repair to adjacent finishes will be included where affected in this Work.

The project will improve the quality and function of the doors and provide increased energy efficiency, thermal comfort, and security for the buildings and occupants by preventing rodent infestation and wind/rain penetration of the building envelope.

C. Project Location: The project Place of Performance includes three separate buildings, all located near one another in the Saddlehorn Historic District at Colorado National Monument.

Colorado National Monument is approximately 5 miles west of Grand Junction, Colorado.

1. R&T (Road and Trails) Shop/Equipment Shed (Building 4)

2. Cold Storage Equipment Shed (Building 6)

3. B&U (Building and Utilities) Shop/Warehouse and Offices (Building 7)

D. Definition of Contract Line Items: Contractor proposal shall list each line item.

1. Item No. 1 – Removal and Replacement of Sectional Doors: This item includes furnishing all labor, equipment, and materials necessary to remove and dispose of existing garage doors and associated systems (tracks, sensors, motors, wiring, controls, manual back-ups, and weather-stripping) and install new heavy-duty commercial, high R-value, sectional doors with associated systems (tracks, sensors, motors, wiring, controls, manual back-ups) and rodent-resistant weather-stripping (on bottoms and sides).

a. Site Visit for inspection of existing door conditions, existing elements expected to be re-used, adjacent systems and equipment to be protected-in-place, and field-

COLM - 240946 010000 -2

measurement verifications. Contractor shall report any discrepancies in measurements to Contracting Officer’s Representative and Project Manager.

Confirm with Park Representative hours of work, utility shut-offs timing and location, lay-down areas, noise and dust protections, and status of and access to temporary services.

b. Preparation for demolition and installation. Put up protective measures for adjacent work. Coordinate with Park for building security and access while doors are removed and/or non-functioning. Application of determinations made during Site Visit (above task).

c. Remove and dispose of existing 1960’s doors, tracks, weather-stripping, wiring, and controls.

1) Existing to Be Used in this Project: No new trim is expected; however, where impacted by this project, interior and exterior trim at garage door openings shall be repaired and touch-up painted to match existing (paint to be provided by Park). Existing metal framing attaching tracks to the building structure is believed to be in good condition, and is expected to be protected in-place and re-used to secure new track to the building structure, with new fasteners of compatible metal, per manufacturer standards.

Existing steel conduit is anticipated to be in good condition and protected-in-place for re-use in this project.

2) Protect-In-Place: Existing ceilings (including, but not limited to acoustic lay-in ceiling tile and grid, gypsum board, and plastic-lined-insulation) are to be protected-in-place. Adjacent equipment, controls, piping, and lighting of other building systems are to be protected in-place at ceilings, walls, and floors. Contractor shall take extra care to protect fire protection sprinkler piping near doors.

3) At door #4, salvage existing alarm for re-installation in this project at same location.

d. Provide Submittals for Review, including: product data and shop drawings with field-verified dimensions.

e. Install heavy-duty, high R-value doors. See reference drawings for locations, dimensions, and door schedule.

1) Provide and install tracks, using existing steel brackets that attach existing track to building structure. Provide new fasteners, of compatible metal.

2) Provide and install motors, controls, and wiring compatible with new doors.

a) Re-use existing conduit, where applicable.

b) Coordinate control locations with building user representatives.

c) At door #4, tie into existing security system.

3) Provide 2 remotes/door at a minimum.

f. Provide and install rodent-resistant weather-stripping.

g. Patch and repair any trim or adjacent systems affected by this work.

h. Arrange for inspections.

i. Submit as-built close out documents.

E. Contractor’s Use of Premises

1. General: Contractor shall have limited use of premises for construction operations as indicated on Drawings by the Contract limits.

2. Storage of Materials: Confine storage of materials to immediate vicinity of project site, unless directed otherwise by Contracting Officer.

COLM - 240946 010000 -3

3. Use of Site: Limit use of premises to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. Coordinate on-site staging of materials with Contracting Officer’s Representative.

a. Preservation of Natural Features:

1) Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

2) Provide temporary barriers to protect existing trees and plants and root zones.

3) Do not remove, injure, or destroy trees or other plants without prior approval. Consult with Contracting Officer and remove agreed upon roots and branches that interfere with construction.

4) Do not fasten ropes, cables, or guys to existing trees.

5) Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.

b. Government Occupancy: Allow for Government occupancy of Project site.

c. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

d. Use of Existing Building: Maintain existing building in a weathertight condition throughout construction period. Repair damage caused by construction operations.

Protect building and its occupants during construction period.

4. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials.

Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.

F. Work Restrictions

1. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7:30 a.m. to 4:00 p.m., Monday through Friday, except as otherwise arranged with Contracting Officer.

2. Special Construction Requirements

a. The locations of this Scope of Work are buildings that are formally deemed historic, and listed on the United States National Register. As part of the Saddlehorn Historic District, these CCC-era sandstone structures are considered locally significant, and were listed on the Register in 1994. Any impact to these buildings beyond this scope of work must be reviewed by the Colorado State Historic Preservation Office.

b. Contractor shall maintain a physically secure and watertight enclosure at the end of each workday and during periods of inclement weather. Any damage to building’s interior finishes and furnishing shall be repaired or replaced at no additional expense to the government. Interruptions of building heating, cooling, and

COLM - 240946 010000 -4

electrical systems shall be limited. When they do occur, interruptions shall be kept to a minimum and performed during the time approved by the Contracting Officer.

Reinstall all components, temporarily removed from the wall enclosures or disconnected, back to same operating conditions.

c. Exotic Vegetation and Noxious Weeds

1) Cleaning of Equipment

a) The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Contractor shall ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area. Equipment shall be considered free of soil, seeds and other such debris when a visual inspection does not disclose such material.

Disassembly of equipment components or specialized inspection tools is not required.

b) Contractor shall notify the Contracting Officer at least 2 days prior to moving any equipment onto the Project Area. Notification will include identifying the location of the equipment’s most recent operations. The Contractor shall arrange for the Contracting Officer to inspect each piece of equipment prior to it being placed in service.

2) Borrow Materials

a) Any fill, rock or topsoil needed from borrow sources shall be obtained from a Government approved source.

d. Avoid Soil Compaction

1) Avoid compaction from heavy equipment to surrounding area by keeping equipment inside the limits of work specified above. If work outside the limits is necessary do so only when the soil is dry.

2) Compacted soils must be ripped or decompacted post construction to enable vegetation.

3) All disturbances must be returned to grade and any tracks from equipment must be raked out.

3. Existing Utilities

a. Notify Contracting Officer and utility companies of proposed locations and times for excavation.

b. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.

c. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.

4. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated.

COLM - 240946 010000 -5

a. Notify Contracting Officer not less than two days in advance of proposed utility interruptions.

b. Do not proceed with utility interruptions without Contracting Officer’s written permission.

PART 2 - PRODUCTS - NOT USED

PART 3 - EXECUTION

3.1 PROJECT MANAGEMENT AND COORDINATION

A. Project Meetings

1. Pre-construction Conference: Before start of construction, Contracting Officer may arrange an on-site meeting with Contractor. The meeting agenda may include the following:

a. Roles and Responsibilities/Lines of Authority.

b. Park rules and regulations.

c. Coordination of Subcontractors.

d. Labor law application.

e. Modifications.

f. Payments to Contractor.

g. Payroll reports.

h. Contract time.

i. Liquidated damages.

j. Notice to proceed.

k. Construction Schedule.

l. Correspondence procedures.

m. Acceptance/rejection of work.

n. Progress meetings.

o. Submittal procedures.

p. As-constructed drawings/operation and maintenance (O&M) manuals.

q. Saturday, Sunday, holiday and night work.

r. Reference materials.

s. Value engineering.

t. Submittals required prior to or at Preconstruction Conference:

1) Letter designating the Project Superintendent.

2) Proposed construction schedule.

3) Schedule of values.

4) Accident prevention plan.

5) A list of Subcontractors for this project.

6) Written statements from subcontractors certifying compliance with applicable labor standard clauses.

7) Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors.

8) Waste management plan.

COLM - 240946 010000 -6

9) Quality control plan.

u. Project closeout requirements.

2. Progress Meetings: The Contracting Officer may schedule weekly meetings with the Contractor and subcontractors. The meeting agenda may include the following:

a. Submittal status.

b. Review of off-site fabrication and delivery schedules.

c. Requests for information (RFI) and other issues.

d. Modifications.

e. Work in progress and projected.

f. Construction Schedule update.

g. Status of Project Record Drawings and O&M manuals.

h. Other business relating to work.

3.2 SCHEDULES

A. After contract award and before the Pre-Construction Conference submit:

1. Schedule of Values

a. Breakdown each lump-sum item into component parts of work for which progress payments may be requested. The total costs for the component parts of work shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values. Include mobilization, general condition costs, overhead and profit in the total dollar value of unit price items and in the component parts of work for each lump-sum item. Do not include mobilization, general condition costs, overhead or profit as a separate item.

b. Do not break down unit price items. Use only the contract price for unit price items.

c. The total cost of all items shall equal the contract price. The Schedule of Values will form the basis for progress payments.

d. An acceptable Schedule of Values shall be agreed upon by the Contractor and Contracting Officer before the first progress payment is processed.

2. Construction Schedule

a. Prepare a list of all activities required to complete the Work. Prepare a skeleton network to identify probable critical paths.

b. Identify milestones in schedule including, but not limited to, the Notice to Proceed, Substantial Completion, and Final Completion.

c. Upon acceptance of the Construction Schedule by the Contracting Officer, the Construction Schedule will be used to evaluate the Contractor's monthly applications for payment.

3.3 SUBMITTALS

A. Submittal Procedures

COLM - 240946 010000 -7

1. Prepare and submit Submittals required by individual Specification Sections. Transmit each submittal using National Park Service transmittal form CM-16, which can be obtained from Contracting Officer.

2. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on Contracting Officer’s receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including re-submittals.

a. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required.

b. Re-submittal Review: Allow 15 days for review of each re-submittal.

3. Approved Equals

a. For each item proposed as an approved equal, submit supporting data, including:

1) Drawings and samples as appropriate.

2) Comparison of the characteristics of the proposed item with that specified.

3) Changes required in other elements of the work because of the substitution.

4) Name, address, and telephone number of vendor.

5) Manufacturer's literature regarding installation, operation, and maintenance.

b. A request for approval constitutes a representation that Contractor:

1) Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2) Will provide the same warranties for the proposed item as for the item specified.

3) Has determined that the proposed item is compatible with interfacing items.

4) Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5) Waives all claims for additional expenses that may be incurred as a result of the substitution.

B. Contractors Review: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions.

C. Contracting Officer’s Action: Contracting Officer or his/her authorized representative will review each submittal, make marks to indicate corrections or modifications required, and return one copy.

D. Shop Drawings, Product Data, and Samples

1. As specified in the individual sections, forward submittals to Contracting Officer at least fifteen (15) days before need for approval. Unless a different number is specified, submit three copies of each shop drawing and three copies of all other submittals requested.

2. After approving submittals, Contracting Officer will return one copy to the Contractor.

3. If submittals are not approved, Contracting Officer will return one copy to Contractor with reasons for rejection. Resubmit and identify changes.

COLM - 240946 010000 -8

E. Manufacturer's Installation Instructions - When contract documents require compliance with manufacturer's printed instructions, provide one complete set of instructions for Contracting Officer and keep another complete set of instructions at the project site until substantial completion.

3.4 SAFETY REQUIREMENTS

A. Description: The work consists of establishing and implementing an effective accident prevention program and providing a safe environment for all personnel and visitors.

B. Submittals

1. Accident Prevention Plan - The Plan shall be written to comply with OSHA and project requirements including but not limited to the following:

a. Name of responsible supervisor to carry out the program.

b. Weekly safety meetings.

c. First aid procedures.

d. Outline the work and associated hazards, and the methods proposed to ensure property protection and safety of the public, National Park Service personnel, and Contractor's employees.

e. Planning for possible emergency situations.

f. Fire Protection.

g. Fall protection plan.

C. Qualification of Employees

1. Ensure that employees are physically qualified to perform assigned duties in a safe manner.

2. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.

3. Operators of vehicles, mobile equipment, hoisting equipment, and hazardous plant equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment. Provide operating instructions for all equipment.

D. Accident Reporting

1. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, fires, and property damage by accident in excess of $100. Notify Contracting Officer immediately in the event of a reportable accident. Within 7 days of a reportable accident, fill out and forward to Contracting Officer an Accident/Property Damage Report (Form CM-22). Form may be obtained from the Contracting Officer.

2. All Other Accidents: The Contractor shall report all other accidents to the Contracting Officer as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.

E. Personnel Protective Equipment: Meet requirements of National Institute for Occupational Safety and Health (NIOSH) and OSHA.

COLM - 240946 010000 -9

F. Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

G. Protective Equipment

1. Inspect personal protective equipment daily and maintain in a serviceable condition.

Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.

2. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.

3. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary protective equipment at all times.

3.5 QUALITY REQUIREMENTS

A. Testing and inspecting services are the responsibility of the Contractor and are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements. The quality of all work shall be the responsibility of the Contractor.

B. Submittals

1. Quality Control Plan

a. A list of personnel responsible for quality control and assigned duties.

b. Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.

c. Methods of performing, documenting, and enforcing quality control of all work.

2. Contractor's Quality Control Daily Reports: Submit showing all inspections and tests on the first workday following the date covered by the report.

3. Test Reports

C. Quality Assurance

1. The Contractor's Quality Control Supervisor may also perform the duties of Project Superintendent.

2. Installer Qualifications: A firm or individual experienced in installing, erecting, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance.

3. Testing Agency Qualifications: An NRTL or an independent agency with the experience and capability to conduct testing and inspecting indicated, as documented according to ASTM E 329; and with additional qualifications specified in individual Sections; and where required by Contract, is acceptable to the Contracting Officer.

3.6 REFERENCES

A. Industry Standards

COLM - 240946 010000 -10

1. Applicability of Standards: Unless the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into the Contract Documents to the extent referenced. Such standards are made a part of the Contract Documents by reference.

2. Publication Dates: Comply with standards in effect as of date of the Contract Documents unless otherwise indicated.

3.7 TEMPORARY FACILITIES AND CONTROLS

A. Temporary Facilities

1. Storage and Fabrication Sheds: Temporary weather tight sheds or other covered facilities for storage of materials subject to weather damage. Number and size of structures shall be subject to Contracting Officer's approval.

2. Contractor may have limited use of toilet rooms in nearby government buildings.

Otherwise provide temporary toilet for use by construction personnel.

3. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations.

B. Temporary Utilities

1. General: Install temporary service or connect to existing service. Arrange with utility company, National Park Service, and existing users for time when service can be interrupted, if necessary, to make connections for temporary services.

2. Potable water is available on site. Make connections to existing facilities as needed.

Facilities must be cleaned and maintained in a condition acceptable to the National Park Service. At Substantial Completion, restore these facilities to condition existing before initial use.

a. Water from existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.

3. Electric Power Service: Use of existing electric power service will be permitted, as long as equipment is maintained in a condition acceptable to the National Park Service. When temporary connections are removed, restore existing utility services to their original condition.

a. Electric Power Service: Electric power from existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.

b. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA 70.

4. Telephone Service: No telephone service is available on site for Contractor's use. Make arrangements with Telephone Company and pay all costs. Cell phone coverage is generally dependable.

COLM - 240946 010000 -11

C. Security and Protection of Facilities

1. Tree and Plant Protection: Install temporary fencing outside the drip line of trees to protect vegetation from damage from construction operations. Protect tree root systems from damage, flooding, and erosion.

2. Site Enclosure Fence: Site enclosure fencing is not anticipated. Field verify with Contracting Officer’s Representative.

3. Barricades, Warning Signs, and Lights: Comply with requirements of authorities having jurisdiction for erecting structurally adequate barricades, including warning signs and lighting.

4. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior.

5. Temporary Partitions: Provide floor-to-ceiling dustproof partitions to limit dust and dirt migration and to separate areas occupied by NPS from fumes and noise.

6. Temporary Fire Protection: Install and maintain temporary fire-protection facilities of types needed to protect against reasonably predictable and controllable fire losses.

Comply with NFPA 241.

a. Responsible Person: A capable and qualified person shall be placed in charge of fire protection. The responsibilities shall include locating and maintaining fire protective equipment and establishing and maintaining safe torch cutting and welding procedures.

b. Smoking: Smoking within buildings or temporary storage sheds is prohibited.

c. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition according to requirements of National Park Service.

Check with park; many require burn permits for welding.

d. Hot Work permits shall be obtained from the Park Facility Manager.

e. Hazard Control: Take all necessary precautions to prevent fire during construction. Do not store flammable or combustible liquids in historic structures.

Provide adequate ventilation during use of volatile or noxious substances.

f. Spark Arresters: Equip all gasoline or diesel powered equipment used during periods of potential fire hazards or in potential forest and grass fire locations with spark arresters approved by the USDA Forest Service.

1) Written determinations of periods and areas of potential fire hazard will be issued by Contracting Officer.

7. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures.

a. Buildings: Furnish a minimum of one extinguisher for each 1,500 square feet of area or major fraction thereof.

1) Travel distance from any work station to the nearest extinguisher shall not exceed 75 feet.

b. Vehicles and Equipment: Provide one extinguisher on each vehicle or piece of equipment.

COLM - 240946 010000 -12

3.8 PRODUCT REQUIREMENTS

A. Product Delivery, Storage, and Handling: Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft. Comply with manufacturer's written instructions.

B. Packaging: Where Contractor has the option to provide one of the listed products or equal, preference shall be given to products with minimal packaging and easily recyclable packaging as defined in ASTM D5834.

C. Protection After Installation: Provide adequate coverings as necessary to protect installed materials from damage resulting from natural elements, traffic, and subsequent construction.

Remove when no longer needed.

3.9 EXECUTION

A. Examination: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Investigate and verify existence and location of utilities and other construction.

B. Coordination with Utility Service Providers: Contact utility service providers to coordinate the work, testing requirements, and inspections.

C. Preparation: Take field measurements as required to fit the work properly. Where portions of the work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication.

3.10 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT AND DISPOSAL

A. The project shall minimize the creation of construction, deconstruction, and demolition waste to protect and restore natural habitat and resources. Factors that contribute to waste such as over packaging, improper storage, ordering error, poor planning, breakage, mishandling, and contamination shall be minimized.

B. Submittal

1. Waste Management Plan

a. Develop plan consisting of waste identification and waste reduction work plan.

List each type of waste and whether it will be salvaged, recycled, or disposed of in landfill or incinerator.

1) Salvaged Materials for Reuse: For materials that will be salvaged and reused in this Project, describe methods for preparing salvaged materials before incorporation into the Work.

2) Salvaged Materials for Sale or Donation: Include a list of local receivers for materials that will be sold or donated to individuals and organizations.

3) Recycled Materials: Include list of local receivers and processors and type of recycled materials each will accept.

COLM - 240946 010000 -13

4) Disposed Materials: Indicate how and where materials will be disposed of.

3.11 CLOSEOUT PROCEDURES

A. Closeout Requirements:

1. Submit specific warranties, guarantees, workmanship bonds, final certifications, and similar documents.

2. Submit Project Record Drawings.

a. Maintain one complete full-size set of contract drawings and one full-size set of vendor-supplied drawings. Clearly mark changes, deletions, and additions using National Park Service drafting standards to show actual construction conditions.

Show additions in red, deletions in green, and special instructions in blue.

3. Submit Operation and maintenance manuals and data.

a. Manuals: Include a title page which includes project title, location, contract number, prime contractors name and address, and date of substantial completion.

Organize each manual with a separate section for each system or product.

b. Include manufacturer’s data, vendor furnished drawings, equipment data sheets, schedules, emergency instructions, etc.

c. Include operational requirements such as operating standards, procedures, controls, etc.

d. Include maintenance requirements such as maintenance procedures, repair materials, warranties, reordering information, environmental requirements, etc.

4. Posted Operating Instructions: As specified in the individual sections. Furnish operating instructions attached to or posted adjacent to equipment. Include wiring diagrams, control diagrams, control sequence, start-up, adjustment, operation, lubrication, shut-down, safety precautions, procedures in the event of equipment failure, and other items of instruction recommended by the manufacturer.

5. Deliver tools, spare parts, and extra materials.

6. Remote Operators: Submit all remote operators including duplicates.

7. Submit test and balance report.

8. Terminate and remove temporary facilities from Project site.

9. Complete final cleaning requirements, including touchup painting.

10. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.

11. Painting is not expected as part of this scope of work. Touch up painted objects damaged during the Work. Coordinate with Contracting Officer’s Representative for Park-provided paint.

12. Instruct National Park Service personnel in operation, adjustment, and maintenance of products, equipment, and systems.

B. Substantial Completion and Final Inspection

1. When project is substantially complete, request, in writing, a final inspection. Upon receipt of written request that project is substantially complete, the Contracting Officer will proceed with inspection within 10 days of receipt of request or will advise the

COLM - 240946 010000 -14

Contractor of items that prevent the project from being designated as substantially complete.

2. If, following final inspection, the work is determined to be substantially complete, Contracting Officer will prepare a Punch List to be corrected before final acceptance and issue a Letter of Substantial Completion. Contractor shall complete the work described on the Punch List within 30 calendar days, as weather permits. If the Contractor fails to complete the work within this time frame, the Contracting Officer may either replace or correct the work with an appropriate reduction in the contract price.

3. If, following final inspection, the work is not determined to be substantially complete;

Contracting Officer will notify Contractor in writing. After completing work, Contractor shall request a new final inspection.

4. After all deficiencies have been corrected, a Letter of Final Acceptance will be issued.

C. Final Cleaning

1. Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

2. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

3. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Government property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.

D. Post-Construction Inspection - Before expiration of warranty period, Contracting Officer will inspect project and notify Contractor in writing of all deficiencies.

END OF SECTION 010000

COLM - 240946 013591 - 1

HISTORIC PRESERVATION TREATMENT PROCEDURES

SECTION 013591 - HISTORIC PRESERVATION TREATMENT PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes special procedures for historic treatment on the Project including, but not limited to, the following:

1. Storage and protection of existing historic materials.

2. Temporary protection of historic materials during construction.

3. Protection during use of heat-generating equipment.

4. Historic preservation treatment procedures.

1.2 DEFINITIONS

A. "Preservation": To apply measures necessary to sustain the existing form, integrity, and materials of a historic property. Work may include preliminary measures to protect and stabilize the property.

B. "Rehabilitation": To make possible a compatible use for a property through repair, alterations, and additions while preserving those portions or features that convey its historical, cultural, or architectural values.

C. "Restoration": To accurately return the form, features, and character of a property to its appearance at a particular period of time by means of the removal of features from other periods in its history and the repair and reconstruction of missing and deteriorated features from the restoration period.

D. "Reconstruction": To reproduce in the exact form and detail a building, structure, or artifact as it appeared at a specific period in time. Reconstructed elements do not possess historic integrity in their own right since it is not original fabric.

E. "Stabilize": To apply measures designed to reestablish a weather-resistant enclosure and the structural reinforcement of an item or portion of the building while maintaining the essential form as it exists at present. This level of intervention is aimed at retarding or arresting adverse impacts to structures.

F. "Protect and Maintain": To remove deteriorating corrosion, reapply protective coatings, and install protective measures such as temporary guards; to provide the least degree of intervention.

G. "Repair": To stabilize, consolidate, or conserve; to retain existing materials and features while employing as little new material as possible. Repair includes patching, piecing-in, splicing, consolidating, or otherwise reinforcing or upgrading materials. Within restoration, repair also includes limited replacement in kind, rehabilitation, and reconstruction, with compatible substitute materials for deteriorated or missing parts of features when there are surviving prototypes.

COLM - 240946 013591 - 2

H. "Replace": To duplicate in its entirety a historic element or feature by matching its historic pattern, detail and appearance. . Replacement is justified when original or historic elements are damaged beyond repair or are missing. Replacement methods includes the following conditions:

1. Replacement with Original or Historic Fabric: Includes fabric salvaged from other locations or projects having identical architectural qualities. It means duplication of appearance using identical material possessing historical significance.

2. Replacement with New Materials: Includes replacement with new material of like kind

(custom fabricated of manufactured) that is currently in production. It means duplication of appearance using like material.

3. Replacement with Substitute Materials: Includes replacement with a compatible substitute that is frequently contemporary and unlike the historic fabric. It means duplication of appearance using modern (non-traditional) material Use of substitute materials is not approved unless matching materials are not available.

I. "Remove": To demolish or detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or removed and reinstalled.

J. "Remove and Salvage": To detach items from existing construction and deliver them to the

NPS.

K. "Remove and Reinstall": To detach items from existing construction, repair and prepare them for reuse, and reinstall them where indicated.

L. "Existing to Remain" or "Retain": Existing items of construction that are not to be removed and that are not otherwise indicated to be removed and salvaged, or removed and reinstalled.

M. "Material in Kind": Material that closely matches existing materials, through comparison of architectural qualities and salient characteristic such as species, cut, color, grain, , dimension, profile, thickness, and finish.

1.3 SUBMITTALS

A. Alternative Methods and Materials: If alternative methods and materials to those indicated are proposed for any phase of work, provide a written description including evidence of successful use on other, comparable projects, and program of testing to demonstrate effectiveness for use on this Project.

B. Photographs or Videotape: Show existing conditions of adjoining construction and site improvements, including finish surfaces that might be misconstrued as damage caused by historic treatment operations. Submit before work begins.

1.4 QUALITY ASSURANCE

A. Historic Preservation Treatment Specialist Qualifications: A firm that employs personnel, including supervisory personnel, experienced and skilled in the processes and operations indicated.

COLM - 240946 013591 - 3

1.5 STORAGE AND PROTECTION OF HISTORIC MATERIALS

A. Removed and Reinstalled Historic Materials:

1. Clean and repair historic items to functional condition adequate for intended reuse.

2. Pack or crate items after cleaning and repairing. Identify contents of containers.

3. Protect items from damage during transport and storage.

4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

B. Existing Historic Materials to Remain: Protect construction indicated to remain against damage and soiling during historic treatment. When permitted by Contracting Officer, items may be removed to a suitable, protected storage location during historic treatment and reinstalled in their original locations after historic treatment operations are complete.

C. Storage and Protection: When removed from their existing location, store historic materials within a weather-tight enclosure where they are protected from wetting by rain, snow, or ground water, and temperature variations. Secure stored materials to protect from theft.

1. Identify removed items with an inconspicuous mark indicating their original location.

2. Develop a key plan when many similar items are scheduled for removal and reinstallation.

1.6 PROJECT-SITE CONDITIONS

A. Exterior Repairing:

1. Proceed with the work only when forecasted weather conditions are favorable.

a. Wet Weather: Do not attempt repairs during rainy or foggy weather. Do not apply primer, paint, putty, or epoxy when the relative humidity is above 80 percent. Do not remove exterior elements of structures when rain is forecast or in progress.

b. Do not perform exterior wet work when the air temperature is below 40 deg F.

c. Do not begin patching or repairing when there is any likelihood of frost or freezing.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 PROTECTION, GENERAL

A. Comply with manufacturer's written instructions for precautions and effects of products and procedures on adjacent building materials, components, and vegetation.

B. Ensure that supervisory personnel are present when work begins and during its progress.

COLM - 240946 013591 - 4

C. Temporary Protection of Historic Materials during Construction:

1. Protect existing materials during installation of temporary protections and construction.

Do not deface or remove existing materials.

2. Attachments of temporary protection to existing construction shall be approved by

Contracting Officer prior to installation.

D. Protect landscape work adjacent to or within work areas as follows:

1. Provide barriers to protect tree trunks.

2. Bind spreading shrubs.

3. Use coverings that allow plants to breathe and remove coverings at the end of each day.

Do not cover plant material with a waterproof membrane for more than 8 hours at a time.

4. Set scaffolding and ladder legs away from plants.

E. Existing Drains: Prior to the start of work or any cleaning operations, test drains and other water removal systems to ensure that drains and systems are functioning properly. Notify

Contracting Officer immediately of drains or systems that are stopped or blocked. Do not begin

Work of this Section until the drains are in working order.

1. Provide a method to prevent solids including stone or mortar residue from entering the drains or drain lines. Clean out drains and drain lines that become blocked or filled by sand or any other solids because of work performed under this Contract.

2. Protect storm drains from pollutants. Block drains or filter out sediments, allowing only clean water to pass.

3.2 PROTECTION DURING USE OF HEAT-GENERATING EQUIPMENT

A. Comply with the following procedures while performing work with heat-generating equipment, including welding, cutting, soldering, brazing, paint removal with heat, and other operations where open flames or implements utilizing heat are used:

1. Obtain Contracting Officer’s approval for operations involving use of open-flame or welding equipment.

a. Notification shall be given for each occurrence and location of work with heat-generating equipment.

b. Obtain the appropriate permit from the park as required.

2. As far as practical, use heat-generating equipment in shop areas or outside the building.

3. Before work with heat-generating equipment commences, furnish personnel to serve as a fire watch (or watches) for location(s) where work is to be performed.

4. Do not perform work with heat-generating equipment in or near rooms or in areas where flammable liquids or explosive vapors are present or thought to be present. Use a combustible gas indicator test to ensure that the area is safe.

5. Remove and keep the area free of combustibles, including, rubbish, paper, waste, etc., within area of operations.

a. If combustible material cannot be removed, provide fireproof blankets to cover such materials.

COLM - 240946 013591 - 5

6. Where possible, furnish and use baffles of metal or gypsum board to prevent the spraying of sparks or hot slag into surrounding combustible material.

7. Prevent the extension of sparks and particles of hot metal through open windows, doors, holes, and cracks in floors, walls, ceilings, roofs, and other openings.

8. Inspect each location of the day's work not sooner than 30 minutes after completion of operations to detect hidden or smoldering fires and to ensure that proper housekeeping is maintained.

B. Where sprinkler protection exists and is functional, maintain it without interruption while operations are being performed. If operations are performed close to automatic sprinkler heads, shield the individual heads temporarily with guards.

3.3 HISTORIC PRESERVATION TREATMENT PROCEDURES

A. The principal aim of preservation work is to halt the process of deterioration and stabilize the item's condition, to sustain the integrity of the historic element, feature or structure being preserved. Cyclic maintenance is often required as well as repair work. Repair is required where specifically indicated. The following procedures shall be followed:

1. Retain as much existing material as possible; repair and consolidate rather than replace.

2. Use additional material or structure to reinforce, strengthen, prop, tie, and support existing material or structure.

3. Use reversible processes wherever possible.

4. Use traditional replacement materials and techniques if possible. New work shall be distinguishable from old work and original materials and techniques.

5. Record the existing condition before commencing with repair work; document with preconstruction photos, sketches and field notes. Record repair work during construction with periodic construction photos and daily inspection reporting.

B. Prohibit smoking by personnel performing work on or near historic structures.

C. Notify Contracting Officer of visible changes in the integrity of material or components whether due to environmental causes including biological attack, UV degradation, freezing, or thawing;

or due to structural defects including cracks, movement, or distortion.

1. Do not proceed with the work in question until directed by Contracting Officer.

D. Where Work requires existing features to be removed and reinstalled, perform these operations without damage to the material itself, to adjacent materials, or to the substrate.

E. Identify new or replacement materials and features with inconspicuous, permanent marks to distinguish them from original materials. Record the legend of identification marks and the locations of these marks on Record Drawings.

END OF SECTION 013591

COLM - 240946 024119 - 1

SELECTIVE DEMOLITION

SECTION 024119 - SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

A. Items indicated to be removed and salvaged remain Government's property. Carefully detach from existing construction, in a manner to prevent damage, and deliver to Government.

B. Predemolition Photographs: Show existing conditions of adjoining construction and site improvements. Submit before Work begins.

C. Government will occupy portions of building immediately adjacent to selective demolition area.

Conduct selective demolition so Government's operations will not be disrupted.

D. It is not expected that hazardous materials will be encountered in the Work. If hazardous materials are encountered, do not disturb; immediately notify Contracting Officer.

PART 2 - PRODUCTS

2.1 PEFORMANCE REQUIREMENTS

A. Regulatory Requirements:…