Attachment_3-_Quote_Schedule.pdf

PDF 212 KB Posted

Attached to
KFO VAULT TOILET PUMPING
Solicitation number
140LL027Q0021
Issued by
Not on record

About this file

This is a Pricing Schedule for vault pumping services at Kortes Fish Observatory (KFO). The schedule requires bidders to provide unit costs and total costs for pumping services at ten locations across a five-year contract period consisting of one base year (FY2027) and four option years (FY2028-FY2031).

The service locations and quantities remain consistent across all contract periods and include: Names Hill/Single (1 unit), Fontenelle/Double (2 units), Fontenelle Dump Station (1 unit), River Access/Single (1 unit), Tail Race/Single (1 unit), Weeping Rock/Double (1 unit), Slate Creek/Double (2 units), Pine Creek/Double (1 unit), Boat Ramp/Double (1 unit), and Dump Fees (1 unit). Bidders must complete the pricing template for each fiscal year separately, calculating line-item totals for each location and a grand total for each year. The final page requires a combined total cost for the base year plus all four option years. All quantities are specified in each action (EA), and the template provides blank fields for contractors to insert unit pricing and extended costs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KFO BID SCHEDULE

LOCATION/VAULT UNIT COST TOTAL COST

NAMES HILL/SINGLE $ $

FONTENELLE/DOUBLE $ $

FONTENELLE DUMP STATION $ $

RIVER ACCESS/SINGLE $ $

TAIL RACE /SINGLE $ $

WEEPING ROCK/DOUBLE $ $

SLATE CREEK/DOUBLE $ $

PINE CREEK/DOUBLE $ $

BOAT RAMP/DOUBLE $ $

DUMP FEES $ $

LOCATION/VAULT UNIT COST TOTAL COST

NAMES HILL/SINGLE $ $

FONTENELLE/DOUBLE $ $

FONTENELLE DUMP STATION $ $

RIVER ACCESS/SINGLE $ $

TAIL RACE /SINGLE $ $

WEEPING ROCK/DOUBLE $ $

SLATE CREEK/DOUBLE $ $

PINE CREEK/DOUBLE $ $

BOAT RAMP/DOUBLE $ $

DUMP FEES $ $

LOCATION/VAULT UNIT COST TOTAL COST

NAMES HILL/SINGLE $ $

FONTENELLE/DOUBLE $ $

FONTENELLE DUMP STATION $ $

RIVER ACCESS/SINGLE $ $

TAIL RACE /SINGLE $ $

WEEPING ROCK/DOUBLE $ $

SLATE CREEK/DOUBLE $ $

PINE CREEK/DOUBLE $ $

BOAT RAMP/DOUBLE $ $

DUMP FEES $ $

VAULT PUMPING BID SCHEDULE FOR KFO BASE YEAR FY2027

QUANTITY UNITS

1 EA

EA

EA1

1 EA

1 EA

1 EA

1 EA

1 EA

1 EA

1 EA

1 EA

2 EA

1 EA

UNITS

VAULT PUMPING BID SCHEDULE FOR KFO OPTION YEAR 2 FY2029

1 EA

1 EA

1 EA

EA

QUANTITY UNITS

1 EA

VAULT PUMPING BID SCHEDULE FOR KFO OPTION YEAR 1 FY2028

TOTAL COST BASE YEAR 2027

TOTAL COST OPTION YEAR 1 2028

TOTAL COST OPTION YEAR 3 2029

2 EA

EA

QUANTITY

2 EA

1 EA

EA1

EA

1 EA

1 EA

2 EA

1 EA

1 EA

1 EA

KFO BID SCHEDULE

LOCATION/VAULT UNIT COST TOTAL COST

NAMES HILL/SINGLE $ $

FONTENELLE/DOUBLE $ $

FONTENELLE DUMP STATION $ $

RIVER ACCESS/SINGLE $ $

TAIL RACE /SINGLE $ $

WEEPING ROCK/DOUBLE $ $

SLATE CREEK/DOUBLE $ $

PINE CREEK/DOUBLE $ $

BOAT RAMP/DOUBLE $ $

DUMP FEES $ $

LOCATION/VAULT UNIT COST TOTAL COST

NAMES HILL/SINGLE $ $

FONTENELLE/DOUBLE $ $

FONTENELLE DUMP STATION $ $

RIVER ACCESS/SINGLE $ $

TAIL RACE /SINGLE $ $

WEEPING ROCK/DOUBLE $ $

SLATE CREEK/DOUBLE $ $

PINE CREEK/DOUBLE $ $

BOAT RAMP/DOUBLE $ $

DUMP FEES $ $

$TOTAL COST BASE YEAR PLUS 4 OPTION YEARS

TOTAL COST OPTION YEAR 4 2030

TOTAL COST OPTION YEAR 4 2031

1 EA

2 EA

1 EA

1 EA

1 EA

2 EA

1 EA

1 EA

1 EA

2 EA

VAULT PUMPING BID SCHEDULE FOR KFO OPTION YEAR 4 FY2031

QUANTITY UNITS

1 EA

1 EA

1 EA

EA

EA

1 EA

VAULT PUMPING BID SCHEDULE FOR KFO OPTION YEAR 3 FY2030

QUANTITY UNITS

1 EA

1 EA

File details come from the government source that posted it. Updated .