Attachment_3-_Quote_Schedule.pdf
PDF 212 KB Posted
- Attached to
- KFO VAULT TOILET PUMPING
- Solicitation number
- 140LL027Q0021
- Issued by
- Not on record
About this file
This is a Pricing Schedule for vault pumping services at Kortes Fish Observatory (KFO). The schedule requires bidders to provide unit costs and total costs for pumping services at ten locations across a five-year contract period consisting of one base year (FY2027) and four option years (FY2028-FY2031).
The service locations and quantities remain consistent across all contract periods and include: Names Hill/Single (1 unit), Fontenelle/Double (2 units), Fontenelle Dump Station (1 unit), River Access/Single (1 unit), Tail Race/Single (1 unit), Weeping Rock/Double (1 unit), Slate Creek/Double (2 units), Pine Creek/Double (1 unit), Boat Ramp/Double (1 unit), and Dump Fees (1 unit). Bidders must complete the pricing template for each fiscal year separately, calculating line-item totals for each location and a grand total for each year. The final page requires a combined total cost for the base year plus all four option years. All quantities are specified in each action (EA), and the template provides blank fields for contractors to insert unit pricing and extended costs.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KFO BID SCHEDULE
LOCATION/VAULT UNIT COST TOTAL COST
NAMES HILL/SINGLE $ $
FONTENELLE/DOUBLE $ $
FONTENELLE DUMP STATION $ $
RIVER ACCESS/SINGLE $ $
TAIL RACE /SINGLE $ $
WEEPING ROCK/DOUBLE $ $
SLATE CREEK/DOUBLE $ $
PINE CREEK/DOUBLE $ $
BOAT RAMP/DOUBLE $ $
DUMP FEES $ $
LOCATION/VAULT UNIT COST TOTAL COST
NAMES HILL/SINGLE $ $
FONTENELLE/DOUBLE $ $
FONTENELLE DUMP STATION $ $
RIVER ACCESS/SINGLE $ $
TAIL RACE /SINGLE $ $
WEEPING ROCK/DOUBLE $ $
SLATE CREEK/DOUBLE $ $
PINE CREEK/DOUBLE $ $
BOAT RAMP/DOUBLE $ $
DUMP FEES $ $
LOCATION/VAULT UNIT COST TOTAL COST
NAMES HILL/SINGLE $ $
FONTENELLE/DOUBLE $ $
FONTENELLE DUMP STATION $ $
RIVER ACCESS/SINGLE $ $
TAIL RACE /SINGLE $ $
WEEPING ROCK/DOUBLE $ $
SLATE CREEK/DOUBLE $ $
PINE CREEK/DOUBLE $ $
BOAT RAMP/DOUBLE $ $
DUMP FEES $ $
VAULT PUMPING BID SCHEDULE FOR KFO BASE YEAR FY2027
QUANTITY UNITS
1 EA
EA
EA1
1 EA
1 EA
1 EA
1 EA
1 EA
1 EA
1 EA
1 EA
2 EA
1 EA
UNITS
VAULT PUMPING BID SCHEDULE FOR KFO OPTION YEAR 2 FY2029
1 EA
1 EA
1 EA
EA
QUANTITY UNITS
1 EA
VAULT PUMPING BID SCHEDULE FOR KFO OPTION YEAR 1 FY2028
TOTAL COST BASE YEAR 2027
TOTAL COST OPTION YEAR 1 2028
TOTAL COST OPTION YEAR 3 2029
2 EA
EA
QUANTITY
2 EA
1 EA
EA1
EA
1 EA
1 EA
2 EA
1 EA
1 EA
1 EA
KFO BID SCHEDULE
LOCATION/VAULT UNIT COST TOTAL COST
NAMES HILL/SINGLE $ $
FONTENELLE/DOUBLE $ $
FONTENELLE DUMP STATION $ $
RIVER ACCESS/SINGLE $ $
TAIL RACE /SINGLE $ $
WEEPING ROCK/DOUBLE $ $
SLATE CREEK/DOUBLE $ $
PINE CREEK/DOUBLE $ $
BOAT RAMP/DOUBLE $ $
DUMP FEES $ $
LOCATION/VAULT UNIT COST TOTAL COST
NAMES HILL/SINGLE $ $
FONTENELLE/DOUBLE $ $
FONTENELLE DUMP STATION $ $
RIVER ACCESS/SINGLE $ $
TAIL RACE /SINGLE $ $
WEEPING ROCK/DOUBLE $ $
SLATE CREEK/DOUBLE $ $
PINE CREEK/DOUBLE $ $
BOAT RAMP/DOUBLE $ $
DUMP FEES $ $
$TOTAL COST BASE YEAR PLUS 4 OPTION YEARS
TOTAL COST OPTION YEAR 4 2030
TOTAL COST OPTION YEAR 4 2031
1 EA
2 EA
1 EA
1 EA
1 EA
2 EA
1 EA
1 EA
1 EA
2 EA
VAULT PUMPING BID SCHEDULE FOR KFO OPTION YEAR 4 FY2031
QUANTITY UNITS
1 EA
1 EA
1 EA
EA
EA
1 EA
VAULT PUMPING BID SCHEDULE FOR KFO OPTION YEAR 3 FY2030
QUANTITY UNITS
1 EA
1 EA
File details come from the government source that posted it. Updated .