Sol_140LL027Q0015_Amd_0001.pdf

PDF 222 KB Posted

Attached to
RIFO CORRAL EXTERIOR CLEANING
Solicitation number
140LL027Q0015
Issued by
Not on record

About this file

Amendment 1 to Solicitation 140LL027Q0015

This document is Amendment 1 to a small business set-aside solicitation for corral cleaning services at the Ridgecrest Wild Horse and Burro Corrals facility in California. The amendment addresses 40 vendor questions and Government responses regarding scope, pricing, performance requirements, and contract administration. Quotations were due November 13, 2026, with performance beginning at award and ending no later than January 16, 2027, with invoices due by January 23, 2027. The anticipated award date was the week of November 14, 2026. This is a firm fixed-price purchase order for lump-sum cleaning services with no separately defined priorities or option items outside the Performance Work Statement (PWS) scope.

The solicitation is set-aside for small businesses under NAICS code 562119 (Other Waste Collection Services) with a $47 million size standard. The Government does not anticipate designated facility closures but permits occasional Saturday work subject to staff availability. Offerors must provide detailed price breakdowns including labor, mobilization, equipment, transportation, lodging, disposal, overhead, and profit, with no specific format required. Key clarifications include mandatory use of specified equipment with no substitutions permitted; Government responsibility for animal relocation with one business day notice and typically next-business-day turnaround; monthly progress payments acceptable; no repeat cleaning required once areas are inspected and accepted; no performance bonds or bid bonds required; and insurance certificates required after award. The facility work location is 3647-A Randsburg Wash Road, Ridgecrest, California, with administrative functions at 300 S. Richmond Road. Work involves cleaning approximately 46 acres of pens and alleyways, approximately 27,000 linear feet of fencing, and perimeter roads to hard mineral soil, with material depths ranging from less than one inch to 18 inches or more, using Government-identified disposal areas approximately one-half mile away with confirmed adequate capacity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

Laurie Ehlinger

See continuation page

BLM California State Office

2800 COTTAGE WAY, SUITE W-1834

SACRAMENTO CA 95825

LCF

140LL027Q0015

10/29/2026

10/29/2026

1 20

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140LL027Q0015/0001

SUMMARY: Corral Cleaning Services for

Ridgecrest Wild Horse and Burro Corrals

SUBMIT QUOTES TO: laurie_ehlinger@ios.doi.gov

All responses to this notice must be In

Accordance With (IAW) the attached

Solicitation, Contract Clauses, Specifications, Requirements, Provisions, Terms, and Conditions.

This will be firm fixed purchase order Include all Shipping and/or Travel costs in the current line items

The purpose of Amendment 1 is to address questions from vendors.

1. With quotations due November 13th and the period of performance beginning November 15th, what is the anticipated award date? Is the

January 16th, 2027, completion date fixed regardless of when the award is made?

A: The PWS states "At Time of Award" is when the period of performance will start. Due to the type of funding the POP will end on January

16, 2027, and invoice no later than January 23, 2027.

2. Provision 52.212-2 states that "the price schedule can be used as a tool to outline the lump sum for each priority." No price schedule or list of priorities is attached. Should offerors use a specific format, or may the price breakdown be submitted in the offeror's own format?

A: Please provide your now price schedule with a pricing breakdown. There is no specific format. Please provide a price breakdown with an overall lump sum on the SF18. Breakdown can be done according to each task. Breakdown includes pay rates, travel/lodging (if appliable), equipment, overhead and profit.

All information is needed to determine price reasonableness and pricing is balanced.

3. May the contractor submit invoices for pens that have been inspected and accepted, or will payment be made on a single invoice upon

Continued...

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C) completion of all work?

A: Monthly progress payments are acceptable.

4. Recleaning and completion: Is two recleaning¿s of approximately 48 by 24-foot pens required? Does the final acceptance release the contractor from subsequent cleaning and newly generated piles?

A: Recleaning should not be an issue if acceptance has been done. Inspection and acceptance of each pen will be done at the time of initial pen cleaning.

5. Evaluation: The replacement of evaluations with technical approach and price. Please clarify their relative importance and whether the prior Q&A applies where expressly incorporated into this replacement.

A: The previous PWS did not change except for incorporating answers from the questions into the PWS and the types of equipment needed.

6. The PWS now lists minimum equipment. Will the Government accept equipment equivalent that meets the same purpose, such as a dozer with a box blade instead of a scraper or grader? Or is the list a strict requirement?

A: Equipment specified in the PWS cannot be substituted.

7. Givern January 16, 2027, completion date and the holidays, would the Government consider request to work on some Saturdays? What is the expected date of award?

A: Coordination with the facility manager is possible to work some Saturdays, but it should not be an expectation due to limited staffing.

8. Is there an estimate of the total volume of material, or average depth across the large pens that offerors should use the pricing?

A: Per the PWS the material depth varies greatly throughout the facility.

9. Does the work require a California contractor license (such as a C-12 Earthwork and Paving license), or is no state license required for work at the federal facility?

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

A: Not to our knowledge.

10. Small-Business Set-Aside and Limitation on

Subcontracting

The solicitation identifies this procurement as a small-business set-aside under NAICS 562119;

however, FAR 52.219-14 does not appear to be expressly incorporated.

a. Please confirm whether the limitation on subcontracting applies to this acquisition and identify the applicable clause, statutory authority, and calculation methodology.

b. May an eligible small-business prime contractor subcontract the physical cleaning, excavation, hauling, and grading operations to a qualified subcontractor while retaining overall contract management, quality control, coordination, and contractual responsibility, provided all applicable subcontracting restrictions are satisfied?

c. If the applicable subcontracting limitation distinguishes similarly situated entities from other subcontractors, please confirm the intended application to this procurement.

d. Please confirm the official set-aside designation if the electronic notice differs from the solicitation document.

A: A subcontracting plan is not required since this is a small business set aside. Also please refer FAR in accordance with 52.219-14 using the prescription from FAR 19.104-3(c) to answer your question about the Small Business

Subcontracting Limitations. The clause was not included because it is not expected to meet the threshold as prescribed.

An eligible small business prime contractor can subcontract the labor to a subcontractor. This solicitation is set-aside for small business under North American Industry Classification

System (NAICS) code 562119 for Other Waste

Collection Services. The Small Business Annual

Receipts for the preceding three (3) fiscal years do not exceed $47 Million. The Small

Business website site explains the size standards, how to calculate your small business size, and provides a table of NAICS codes in relationship to the size standards in millions

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C) of dollars and size standards in number of employees, with https://legacy.sba.gov/document/support-table-si ze-standards.

11. a. May the prime contractor rely on the qualifications, personnel, equipment, relevant experience, and technical capabilities of a committed subcontractor when demonstrating its proposed approach?

b. Is the prime contractor required to possess independent prior experience performing corral cleaning, heavy-equipment excavation, manure removal, or similar projects?

c. Are prime-contractor or subcontractor past-performance references mandatory?

d. Are personnel resumes, equipment ownership or rental documentation, subcontractor commitment letters, or other capability documents required with the quotation?

e. If these materials are not mandatory, may they be included to substantiate the proposed technical approach?

A: You can submit all this information, but the contractor must demonstrate their understanding of the requirement through a detailed work plan in accordance with the factor 1. The materials/equipment listed in the PWS are mandatory. There are no substitutes for equipment as stated in the PWS.

12. Pricing Structure, CLIN Requirements, and

Cleaning Priorities

The solicitation requests a lump-sum quotation and supporting pricing information, while the evaluation language references a pricing schedule for each priority.

a. Should offerors provide one firm-fixed-price amount for CLIN 00010 with a detailed supporting cost breakdown?

b. Are there separately defined cleaning priorities or phases that must be priced individually?

c. Are there any option items, allowances, contingent quantities, or additional services that must be priced?

d. Should the price breakdown separately identify equipment, labor, mobilization, NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C) transportation, lodging, disposal, and other direct costs?

e. Does the Government require a specific pricing spreadsheet or format?

A: Please provide the breakdown that gets you to your final price. This may include labor, mobilization, equipment expenses, transportation, lodging, disposal, overhead, profit but does not exclude any expense other outlying expenses. The Government does not have a specific pricing spreadsheet or format.

There are not any separately defined cleaning priorities or phases outside of the PWS. There are not any option items, allowance, contingent quantities or additional services outside of the PWS tasks.

13. Performance Start Date and Completion

Deadline

The SF 18 identifies November 15, 2026, as the anticipated performance start, while the PWS refers to performance beginning at award.

a. Please confirm the anticipated contract start date and whether a separate notice-to-proceed will be issued.

b. Is January 16, 2027, a fixed completion deadline regardless of the actual award date?

c. If award, notice to proceed, or initial site access is delayed, will the completion date be adjusted accordingly?

d. Does the Government anticipate any scheduled facility closures or periods during which work cannot occur?

A: The start of period of performance as stated in the PWS will be the date of award. This is services contract so there will not be notice-to- proceeds issued. All work must be completed by January 16, 2027, due to the type of funding. Invoices must be submitted no later than January 23, 2027. If there are no issues the award will be completed the week of

November 14, 2026.

The Government does not anticipate any scheduled facility closures or periods during which work cannot occur outside of federal holidays and weekends. Occasion Saturday may be coordinated with Facility Manager is

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C) possible but there should not be an expectation due to the limited staffing.

14. Service Contract Labor Standards and Wage

Determination

The solicitation includes Wage Determination

2015-5603, Revision 32.

a. Are the anticipated equipment operators, truck drivers, and general laborers covered by the attached wage determination?

b. Should offerors determine occupational classifications based on actual duties and use the applicable conformance process if a required classification is not listed?

c. Please clarify which health-and-welfare provision applies to this contract.

d. Please confirm the applicable paid-sick-leave requirements.

e. Are any additional labor classifications or labor-compliance provisions anticipated for this work?

A: Please refer to the wage determination for the labor categories to determine how they fit within your quote. The labor that is anticipated should be outlined in the price breakdown. This is a non-personal service so the Government cannot tell you how to staff.

Please refer to FAR/RFO 52.222-41, 52.222-42, 52.222-44, 52.222-54, 52.222-55 and 52.222-62 and its prescriptions for requirements wages and benefits.

15. Insurance Requirements and Surety Bonds

a. Are the insurance requirements identified in

FAR 52.228-10 and the applicable

Government-installation insurance clause the complete minimum insurance requirements?

b. Are additional commercial general liability, commercial automobile, pollution liability, or other insurance coverage required?

c. Are higher insurance limits required for equipment operations around Government-owned animals and facilities?

d. Are bid bonds, performance bonds, payment bonds, or other surety instruments required?

e. Must subcontractor insurance certificates be provided before award or only before performance begins?

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

A: The insurance requirements as identified in

FAR 52.228-10, and the applicable Government installation insurance clause meet the minimum insurance requirement. No other insurance is required. Bid bonds, performance bonds, payment bonds or other surety instruments are not required. Insurance certificates will be required once they are awarded the contract.

The prime contractor is responsible for collecting any insurance information from the subcontractor. Any damage done is the responsibility of the prime contractor.

16. The Government previously issued

Solicitation 140L1226Q0049 for Ridgecrest corral cleaning, including Amendments 0001, 0002, and 0003.

a. Are any technical clarifications, Government responses to vendor questions, or revised requirements from that earlier solicitation incorporated into the current solicitation?

b. If the previous solicitation was canceled and reissued, were there material changes to the cleaning scope, equipment requirements, performance schedule, or pricing assumptions?

c. Should offerors rely exclusively on the current solicitation and its amendments, or will the Government formally incorporate any relevant earlier clarifications?

d. If previous vendor questions and answers remain applicable, will they be made available under the current solicitation?

A: Please rely exclusively on the current solicitation.

17. Relative Importance of Technical Approach and Price

The solicitation identifies Technical Approach and Price as evaluation factors.

a. Are the two evaluation factors approximately equal in importance?

b. Is Technical Approach more important than

Price, or vice versa?

c. Will the Government evaluate equipment availability, staffing, production schedule, and subcontractor qualifications as separate technical considerations?

d. Will technical approaches receive adjectival

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C) ratings, or will quotations be evaluated on an acceptable/unacceptable basis?

A: Evaluation will be based on Best Value to the Government IAW RFO 12.203 in accordance with all the requirements and specifications.

Since this requirement is not in accordance with Part 15 both the technical approach and price will be reviewed equally. If Government finds that the pricing is unbalanced or there is not a good understanding of the requirement, they will find quote not to be in the ¿Best

Value¿ to the Government. Proposals will either be considered acceptable or unacceptable.

18. Confirmation of Place-of-Performance

Address

SF 18 Block 9 identifies 300 S. Richmond Road, Ridgecrest, California, while the PWS identifies 3647-A Randsburg Wash Road, Ridgecrest, California.

a. Please confirm that 3647-A Randsburg Wash

Road is the actual location for field operations, equipment mobilization, and performance.

b. Does the 300 S. Richmond Road address serve an administrative or receiving function only?

c. Are their specific equipment-entry gates, staging locations, or delivery restrictions that should be considered when estimating mobilization costs?

A: 3647-A Randsburg Wash Road is the actual location for the work. 300 S. Richmond Road is the address for the Field Office. Gates and staging areas will accommodate most delivery platforms including tractor/trailers.

19. Electronic Invoicing and Required

Supporting Documentation

The DOI electronic-invoicing clause contains a field concerning documentation required with invoices.

a. Please identify all mandatory supporting documents for IPP invoices.

b. Are signed inspection reports, Government acceptance records, photographs, equipment logs, labor records, or other documents required?

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

c. Must invoices identify individual completed pens or cleaning areas?

d. Will the Contracting Officer or Contracting

Officer's Representative approve completed work before the invoice is submitted?

A: The mandatory information submitted to IPP is the invoice that includes the Company Name, Contract Number, Invoice Number, Invoice

Amount. The invoice must match the information entered into IPP. Please identify completed pens or cleaning areas. A Government Point of

Contact will review and approve invoices according to the work completed. The

Contracting Officer will review the invoice after the Government Point of Contact and will be the final approval before the invoice is approved.

20. Small-Business Size Standard and

Eligibility

The solicitation identifies NAICS 562119 and references a $47 million size standard and the preceding three fiscal years.

a. Please confirm the applicable SBA size standard for this acquisition.

b. Please confirm whether offerors should calculate average annual receipts under the current SBA receipts-measurement regulations.

c. If the stated measurement period differs from current SBA requirements, will the

Government issue a correction?

A: Please see for Small Business website for

SBA size standard, ttps://legacy.sba.gov/document/support-table-siz e-standards, which shows the $47 million size standard is correct. The website also identifies how the size stand is calculated on annual receipts and averages.

Based on the information provided through this

SBA website there should not be a need to issue corrections.

21. Estimated Material Volume and Accumulation

Depth

The PWS identifies approximately 46 acres of pens and alleyways, approximately 27,000 linear feet of fencing, and accumulated material depths ranging from less than one inch to 18

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C) inches or more.

a. Does the Government have estimated total cubic yards or tons of material requiring removal? A: No accurate estimate is available.

b. Are historical removal quantities, surveys, depth measurements, or material-volume estimates available? A: NO

c. Can the Government provide approximate material quantities or average accumulation depths by pen, alleyway, or cleaning area? A:

Pen depth varies greatly, please see photos

d. If actual conditions materially exceed the quantities or conditions reasonably represented in the solicitation, how would the Government evaluate requests for adjustments to the scope or performance schedule? A: Proposals are expected to meet requirements to remove the actual material within the given performance period.

A: No accurate estimate is available. There are not any historical removals of quantities, surveys, depth measurements, or material-material volumes available. The pen depths vary greatly, see the attached photos.

The proposals are expected to meet requirements to remove the actual material with the given performance period. It is hard to give estimates historically or past day because the animal count at any one time is not consistent.

22. Cleaning Boundaries and Required Areas

a. Please confirm whether the entire 46 acres of identified pens and alleyways must be cleaned. A: All pens, alleyways, fencelines, and perimeter must be cleaned as described in the PWS.

b. Are all perimeter roads, feeder areas, temporary material piles, and designated fence-line areas included? A: Yes

c. Does the requirement to clean within eight feet of fence lines apply to both sides of each fence, including exterior perimeter fencing? A:

Yes

d. Must perimeter roads be cleaned across their entire widths? A: Yes

e. Are any areas shown on the facility overview excluded, already cleaned, inaccessible, or

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C) subject to special restrictions? A: The covered working areas, as well as the facility areas that are not intended to hold animals, except as described in the PWS (perimeter roads, fencelines, etc.), are excluded.

f. Will the Government identify any areas requiring hand-cleaning or specialized equipment before performance begins? A: Hand cleaning or specialized equipment will be required anywhere that other equipment is unable to access reasonably. These areas will be identified through coordination with the facility manager.

23. Government-Generated Material and

Additional Accumulation

The PWS includes removal of temporary material piles generated by Government personnel.

a. Does the Government have an estimated volume of these temporary piles? A: These piles are typically 20-40 cubic yards in size.

b. Will there be a cutoff date or maximum quantity for material accumulated or moved by

Government personnel during the contract period? A: Following acceptance of the final pen cleaning, no additional temporary piles will be expected to be cleared by the contractor, except those that were already present prior to the final pen being clean.

All cleaning must be completed no later than

January 16, 2027.

c. If material is deposited in previously cleaned areas, must the contractor remove it again without additional compensation? A: Once a pen is inspected and accepted as clean, recleaning will not be required.

d. How will additional material or cleaning areas outside the originally identified scope be addressed? A: Cleaning outside the scope will not be required.

24. Disposal Area Capacity and Environmental

Requirements

The PWS identifies an adjacent east-side disposal location approximately one-half mile from the cleaning areas.

a. Has the Government confirmed that the designated disposal area has sufficient

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C) capacity for the anticipated material volume?

A: Yes

b. Are their maximum pile heights, spreading depths, grading tolerances, or other restrictions beyond maintaining the existing general configuration? A: Not other than described in the PWS.

c. Are environmental permits, waste characterization, special handling, or other disposal approvals required? A: NO

d. Are there prohibited materials or contamination conditions that would require different handling procedures? A: NO

e. If the designated disposal area becomes unavailable or reaches capacity, will the

Government provide an alternate location? A:

NO, the area will be available throughout the performance period.

f. If off-site disposal becomes necessary, how will the additional transportation and disposal requirements be addressed? A: Onsite disposal will be available.

25. Animal Relocation, Access, and Work

Sequencing

We understand that Government personnel are responsible for relocating animals and that the contractor must provide at least one business day's advance notice.

a. Will the Government establish a proposed sequence of pens available for cleaning? A: The contractor is expected to coordinate with the facility manager following the contract.

b. Can multiple pens be made available simultaneously to support efficient equipment utilization? A: At times, yes.

c. What is the anticipated turnaround time for animal relocation after the required notice? A:

Animals will typically be moved the following business day.

d. How will Government-caused delays in animal relocation, restricted access, or temporary facility closures be addressed when evaluating contract completion? A: Delays due to inability to relocate animals are not expected to impact on the completion date. The sequence of pen cleaning may be adjusted to work around these issues.

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

e. Will the contractor be required to maintain equipment and personnel on standby during

Government-caused access delays? A: No

26. Corral Panel Removal, Restoration, and

Existing Infrastructure

a. Will Government personnel identify which corral panels may be temporarily removed and provide instructions for safe removal and reinstallation? A: Yes

b. Are specialized lifting devices, tools, or equipment required for panel removal beyond the minimum equipment identified in the PWS? A:

Hand tools such as hammer and punch may be needed.

c. Will the Government identify buried waterlines, utilities, plumbing, drainage infrastructure, or other concealed facilities before mechanical scraping begins? A: All known waterlines/utilities will be identified

d. Are utility drawings or infrastructure maps available? A: No

e. Will the Government permit a joint pre-performance inspection and photographic documentation of existing fencing, feeders, panels, utilities, and other properties? A:

Yes

f. How will responsibility for pre-existing damage be distinguished from contractor-caused damage? A: A walk through may be completed following award to determine any pre-existing damages/areas of concern.

27. Mandatory Equipment and Equipment

Substitutions

The PWS identifies minimum equipment categories and states that failure to use the required equipment may result in nonpayment.

a. Must all minimum equipment categories remain continuously available on-site throughout performance? A: If not in use, it is not required to remain on site

b. May equipment be deployed according to the approved work schedule when a particular unit is not needed for the current task? A: Yes

c. Will functionally equivalent equipment be considered with advanced written approval? A:

No

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

d. Please confirm that multiple hauling units may be combined to satisfy the minimum

20-cubic-yard unloading-capacity requirement.

A: Yes

e. If a required unit becomes temporarily unavailable and an approved replacement is provided; how will the nonpayment provision apply? A: If the required unit was provided at the beginning of the performance period, then becomes inoperable, a replacement may be approved, and a non-payment will not apply.

f. Does the seven-calendar-day equipment repair or replacement provision permit continued performance with an approved substitute during that period? Yes

28. Dust Suppression and Government-Furnished

Water

The PWS identifies Government-furnished water for water-truck applications.

a. Is a water truck mandatory, or is its use dependent on site conditions and Government direction? A: Not mandatory

b. Are specific dust-suppression standards, watering frequencies, or environmental controls required? A: No

c. Will the Government furnish sufficient water throughout the performance period? A: Yes

d. Are contractors responsible for furnishing hoses, fittings, water trucks, pumps, or other water-distribution equipment? A: Fittings available are described in the PWS.

e. Are their restrictions on water use or designated filling hours? A: Water usage and filling hours are restricted to staffed facility hours.

29. Inspection Procedures and Acceptance

Standards

The PWS and Quality Assurance Surveillance Plan provides for inspections of complete cleaning areas.

a. What measurable criteria will be used to determine whether cleaning to hard mineral soil has been satisfactorily completed? A: During pre-work coordination, clarification of what acceptable conditions look like may be done. No blow material or manure should exist in

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C) inspection area.

b. Is any residual manure or windblown material permitted after cleaning? A: Inspections will be completed after each pen/area has been cleaned. After pen is accepted as clean, no further cleaning will be necessary for that area.

c. How will the Government distinguish acceptable cleaning from over-excavation?

A: Any area where hard mineral soil has been noticeably removed to create a non-uniform surface will be considered over-excavation.

d. Will individual pens or designated work areas be formally accepted as they are completed? A: Yes

e. Will the Government provide written inspection or acceptance documentation for each completed area? A: A facility overview will be used to sign off each completed pen.

30. Repeat Cleaning of Previously Accepted

Areas

a. Once a pen or cleaning area has been completed, inspected, and accepted, may the

Government require the contractor to clean that same area again during the performance period?

A: No

b. If repeat cleaning is anticipated, what frequency and approximate quantity should offerors include in their firm-fixed-price quotations? A: None will be required once an area has been cleaned.

c. Will repeat cleaning caused by subsequent animal activity or Government operations be considered part of the original scope? A: No

31. Fire Restrictions, Weather, and

Government-Directed Work Interruptions

a. Are their seasonal fire restrictions, equipment-operation limitations, or special fire-prevention requirements applicable to this facility? A: Not to our knowledge

b. Must the contractor provide fire extinguishers, water trucks, fire-watch personnel, spark arrestors, or other specific fire-prevention equipment beyond ordinary regulatory requirements? A: Nothing required beyond ordinary regulatory requirements or

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C) factory equipment conditions.

c. Are their weather-related restrictions involving high winds, heavy rain, mud, or excessive dust? A: These conditions may delay work. If a work delay occurs due to weather, extension of the performance period may be possible.

d. If the Government suspends operations due to fire danger, weather, animal safety, or facility requirements, how will the resulting delay be evaluated against the completion deadline? A: Extension of the performance period may be possible if the delay is due solely to one of these issues. The extension will be evaluated at that time.

e. Are any additional permits, environmental approvals, or site-specific safety plans required before mobilization? A: No

32. Will the BLM Facility Manager identify/mark any shall buried facility water or plumbing lines within the pens and alleyways prior to scraping?

A: Any known lines will be identified prior to work beginning.

33. May contractors use additional compact equipment, including a stand-on compact loader equipped with forks, to assist with temporary removal and reinstallation of corral panels?

A: Yes

Will equipment compliance be verified before work begins or upon arrival at the facility:

A: Before work begins.

34. The PWS specifies normal operating hours of

7:00 a.m. to 3:00 p.m., Monday through Friday.

May contractors request extended working hours or weekend access to meet the January 16, 2027, completion deadline.

A: Yes, but it is subject to staff availability.

35. Will Contractors have access to the entire designated disposal area during the performance period?

A: Yes.

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

36. Evenly spreading material across the disposal area is sufficient for acceptance, provided existing access and general site configuration are maintained.

A: Yes

37. On the perimeter fence line do you want the vegetation within 8¿ of the fence line removed or left in place?

A: Existing vegetation should be left in place.

If the vegetation is to remain, do you want it to be pruned off the fence line and out of the roadway?

A: No

Do you want the perimeter on the West side of the property next to the Fire Services included?

A: No

The minimum equipment specification says to provide a Skid steer, Motor Grader and Front loader. We want to use a Cat® 415F2 front loader with a Gannon hydraulic scraper instead of 3 pieces of equipment to achieve the same result (specs attached). Is this acceptable?

A: The Cat is acceptable as a front loader, not as a replacement for the other required equipment.

There is a reference to water being available onsite. There is no requirement for compaction on the soil or dust control, so we have not included these services or a water truck. Is this correct? A: That is correct

Will the contractor keep each area¿s grade as close to existing?

A: Yes

Do you want the feeder removed and reset for cleaning or just clean underneath as they are in place?

A: Delays due to inability to relocate animals are not expected to impact on the completion date.

The sequence of pen cleaning may be adjusted to work around these issues.

A: Feeders in the inside of pens may be moved to clean beneath them. Feeders on the outside of the pen should remain in place.

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

38. IPP invoice attachments. DOI-AAAP-0028 currently includes the placeholder

¿[Contracting Officer to edit and include the documentation required under this contract]¿ for IPP invoice attachments. Please identify the documents (if any) that must be attached to each IPP invoice under this order.

A: Only the invoice is needed as the attachment. The invoice information must match the information entered IPP. Mandatory information includes company name that matches contract, contract number, invoice number, invoice amount, dates of service and brief description of services.

39. Subcontracting. FAR 52.219-14 (Limitations on Subcontracting) does not appear in the clause list. Please confirm whether subcontracting the cleaning work is permitted, and whether any self-performance percentage applies to this requirement.

A: Based on the estimated value of this requirement FAR 52.219-14 does not apply.

Subcontracting is permitted in accordance with the requirement of the SBA.

40. Perimeter visit access. The notice states a site visit will not be held due to time constraints, and that ¿Contractors are welcome to visit the outer perimeters of Ridgecrest

Corrals.¿ Please confirm (a) the point of contact and any notice required for a perimeter visit, (b) whether interior pens/alleyways may be viewed from the perimeter only, and (c) whether interior access before award is available.

A: Due to the staffing, there will not be any site visits. Contractors can visit the outer perimeters that are open to the public.

Additional information can be found in

Attachment 3 and 4 of the solicitation.

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .