This document is a Statement of Work (SOW) for the Bureau of Land Management (BLM) Alaska State Office's Dalton Highway Vault Winter Pumping contract. The solicitation requires a contractor to provide waste removal services for three 1,000-gallon vault toilets located along the Dalton Highway in Alaska, specifically at Yukon Crossing (MP 56), Arctic Circle Truck Pullout (MP 115), and Farthest North Spruce Tree Wayside (MP 235). The contract includes a base year from May 12, 2025 to June 30, 2025, with four option years extending through March 31, 2029, during which each vault will be pumped once annually.

The contractor must remove waste from the vault toilets within 10 business days of notification, dispose of waste in accordance with state and local laws, and secure all necessary licenses and permits. Key requirements include compliance with OSHA and EPA regulations, maintaining appropriate insurance under Alaska state regulations, and providing workers' compensation coverage. The contract specifies 100% compliance as the performance standard, with monitoring through visual inspection and potential performance evaluation as an incentive/disincentive mechanism. The total annual service requirement is pumping three 1,000-gallon vaults, with billing to occur after each completed service.

View the file

Other files for this federal contract opportunity

Other files attached to Dalton Vault Winter Pumping, newest first.
File Type Posted
Sol_140L6325Q0017.pdf PDF
B08_140L6325Q0017_-_Attachment_02_-_Maps.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLM Alaska – 140L6325Q0017 - Solicitation

Statement of Work Dalton Highway Vault Winter Pumping

1. Background The BLM Fairbanks District Office oversees designated recreation lands along the Dalton Highway (Central Yukon Field Office). In managing these lands resources, the BLM is guided by the principles of multiple use and sustained yield and a recognized need to protect and enhance the natural and human environment.

2. Required Services The Contractor shall provide all personnel, equipment, tools, materials, supervision and other items and incidental services necessary to perform the removal of waste material from vault toilets along the Dalton Highway. The Contractor shall be notified when service is required and shall perform services within ten (10) business days after notification. BLM reserves the right to inspect all services to ensure completeness of service. The Contracting Officer Representative shall work with the vendor to resolve any discrepancies. Any issues needing resolution above the COR, shall immediately be brought to the attention of the warranted Contracting Officer (CO).

The Contractor is reminded that only a warranted CO can obligate the government.

3. Period of Performance, Location, Deliverables and Specifications Base Year: May 12, 2025 to June 30, 2025 Option Year One: December 1, 2025 to March 31, 2026 Option Year Two: December 1, 2026 to March 31, 2027 Option Year Three: December 1, 2027 to March 31, 2028 Option Year Four: December 1, 2028 to March 31, 2029

Project Location & Deliverables:

1. Dalton Highway MP 56, Yukon Crossing (1 each - 1,000 gallon). Vault toilet is also known as trucker’s outhouse is located on the west side of the Dalton Highway in front of Yukon River Camp. It is a stand-alone facility and is plainly visible from the highway.

Coordinates: 65.8815, -149.7173

MP 115, Arctic Circle Truck Pullout (1 each – 1,000 gallon). Vault toilet is located at the truck pullout adjacent to and on the east side of the Dalton Highway. It is below the Arctic Circle display/deck area. It is a stand-alone facility and is plainly visible from the highway.

Coordinates: 66.5560, -150.8124

MP 235, Farthest North Spruce Tree Wayside (1 each - 1,000 gallon). Vault toilet is located adjacent to and on the east side of the highway. It is a stand-alone facility and is plainly visible from highway.

Coordinates: 68.03381, -149.6630

** Total number of services annually equals pumping three (3) 1,000-gallon vaults. Each vault would be pumped once annually.

Specifications:

The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items incidental services necessary to perform the winter removal of waste material from vault toilet within the Central Yukon Field Office. All holding tanks identified in the Project Location and Deliverables section shall be serviced. The project inspector will contact contractor when pumping is required. All waste is to be removed from the vaults and disposed of in accordance with approved state and local laws within 10 business days of notification. Contractor is responsible for securing all necessary licenses and permits. Billing is to be made after every service has been made. The Contractor shall provide an original invoice to the Contracting Officers Representative and Project Inspector.

4. Government Furnished Property, Materials and Supplies No applicable requirements.

5. Business Hours.

The work shall be completed on-site work at the convenience of the Contractor, excluding Federal holidays. The contractor shall coordinate specific on-site work schedule with the Contracting Officer Representative (COR) and the Project Inspector. Work shall be completed within 10 business days of Contracting Officer notifying contractor of need for service.

6. Management.

The Contractor shall manage the total work effort in accordance with effective and efficient management principles and safe working practices to ensure on-time completion of this contract.

7. Safety and Environmental Compliance

• The contractor shall comply with pertinent provisions of the Occupational Safety and

Health Act (OSHA), and state, local, safety, laws.

• The contractor shall comply with pertinent Environmental Protection Agency laws and regulations.

• The contractor shall immediately report to the CO, COR or PI, all accidents resulting in employee injury, death or damage to property while performing this contract.

8. Insurance The Contractor shall be insured in accordance with State of Alaska insurance regulations. The

Government is not responsible for damage to Contractor's equipment, vehicles, tools or materials or their employees and the personal property brought on-site. The Government will not accept any liability due to contractor employee negligence.

• Workers Compensation: The contractor shall furnish proof of workers compensation insurance to the Contracting Officer for those employees performing work related to this contract and shall comply with the Workman's Compensation Laws of the State of Alaska.

• Liability: The Contractor shall maintain a level of insurance that will protect the contractor and the Government from any claims as a result of bodily injury (including death) and property damage which may arise from and during the performance of this contract and shall submit proof of insurance to the Contracting Officer.

Performance Requirements Summary (PRS) The Contractor performance requirements are summarized into required services that relates directly to successful contract completion.

sow Section Required Service Location Standard Monitoring

Method Incentive

Disincentive

Pump outs shall be serviced after contact has been made with contractor.

3 locations specified

100% compliance

Visual Inspection

Performance Evaluation

Statement of Work
1. Background
2. Required Services
3. Period of Performance, Location, Deliverables and Specifications
4. Government Furnished Property, Materials and Supplies
5. Business Hours.
6. Management.
7. Safety and Environmental Compliance
8. Insurance
Performance Requirements Summary (PRS)