This document is an addendum to a statement of work for baseline monitoring at the Red Devil Mine site in Alaska. It modifies tasks and details in the original scope of work due to changed site conditions. Specifically, it removes the requirements to purchase new bladder pumps and move existing pumps, as all pumps are now installed. It also updates the monitoring well table with current details. The related federal contract opportunity is for Red Devil Mine baseline monitoring with solicitation number 140L6320R0005 issued by the Department of the Interior Bureau of Land Management. The contractor will perform two seasonal sampling events and associated field data collection and reporting following previously developed methods at the monitoring wells identified in the modified table.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum to Statement of Work

Red Devil Mine - Alaska Baseline Monitoring

Site conditions at Red Devil Mine have changed since the original Scope of Work (SOW) was generated for baseline monitoring. This addendum documents those changes by listing the text excerpted from the original SOW, followed by the revised text. Only those sections of the SOW listed in this addendum have been modified. All other elements of the initial SOW remain unchanged.

C.1 Task 1 –Planning Initial SOW:

5. Purchase three new bladder pumps to be installed in monitoring wells MW06, MW16 and MW17. The work plan shall be modified to describe new pump installation (see Task 2, bullet 2).

6. Modify the work plan to describe how three existing bladder pumps shall be moved to different monitoring wells (see Task 2, bullet 3) Revision:

All bladder pumps have been installed in assigned wells. Steps 5 and 6 are eliminated from this SOW.

Note: The Red Devil Mine Administrative Record includes an addendum to the 2019 work plan that applies to fall sampling performed in 2020. The contractor shall prepare an addendum to the 2019 work plan that reflects activities to be completed as part of 2021 baseline monitoring.

C.2. Task 2 – Field Data Collection Initial SOW:

Field data collection will be performed in two different sampling events; one in late May or early June and second in September. The spring event will be conducted shortly after spring breakup when surface runoff and water table elevation is at or near the annual maximum. The fall event will be conducted during early fall when stream flow is typically approaching a minimum prior to freeze up and water table elevations begin seasonal decline.

Revision:

Monitoring procedures covering depth to water measurement, groundwater sampling and surface water sampling shall be performed using methods previously developed and documented in the 2019 Baseline Monitoring Work Plan.

Field data collection will be performed in two different sampling events; one in late May or early June and second in September. The spring event will be conducted shortly after spring breakup when surface runoff and water table elevation is at or near the annual maximum. The fall event will be conducted during early fall when stream flow is typically approaching a minimum prior to freeze up and water table elevations begin seasonal decline.

Initial SOW:

2. During the spring 2021 event, install new bladder pumps in monitoring wells MW06, MW16 and MW17 (see Task 1, bullet 5).

3. Remove the bladder pumps for wells MW01 and MW31 and discard the tubing. Decontaminate the pumps and install in wells MW32 and MW55 using new discharge tubing (See Task 1, bullet 6).

Revision:

All bladder pumps have been installed in assigned wells. Steps 2 and 3 are eliminated from this SOW.

Initial SOW:

4. Collect depth to static water level measurements on all monitoring wells listed in Table 1, including those wells that are not scheduled for sampling collection. Depth to water measurements are to be completed for all wells within a 24 hour period during both the spring and fall sampling events.

Revision:

4. Depth to static water level measurements shall be measured at all monitoring wells listed in Table 1, including those wells that are not scheduled for sampling collection. Depth to water measurements are to be completed for all wells within a 24 hour period during both the spring and fall sampling events. In addition, data shall be downloaded during the same 24 hour period from transducers installed in the monitoring wells designed as such in Table 1. Seven (7) wells contain Solinst Model 3001 Levelogger® Edge data logger/transducer units. One (1) monitoring well contains a Solinst Model 3001 Barologger® Edge. An optical reader cable and Levellogger software are needed for data download. A user guide is available on the Solinst web site.

Note: The version of Table below has been modified and reflects the current requirements of this SOW.

Table 1 Baseline Groundwater Monitoring Well Summary Base Scope of Work

Monitoring Well ID
Bladder Pump
Transducer
Northing
Easting
Latitude
Longitude
MW01
X
6848472.892
588897.3617
61.75889973
-157.315908

MW03

6848581.065
588979.8349
61.7598512
-157.3142933

MW04

6848564.133
588907.3826
61.75971611
-157.3156735

MW06

6848656.18
588995.1024
61.76052164
-157.3139673

MW07

6848393.712
588891.9008
61.75819052
-157.3160502

MW08

6848354.155
588997.7221
61.75781096
-157.314066
MW09
X
6848491.702
588970.2143
61.75905157
-157.3145193
MW10
X
6848470.815
588950.2887
61.75886879
-157.3149068

MW11

6848454.172
588935.993
61.75872278
-157.3151857

MW12

6848354.269
588742.4843
61.75787129
-157.3188986

MW13

6848408.425
588879.97
61.75832531
-157.3162689

MW16

6848553.57
588947.871
61.75961191
-157.314912

MW17

6848551.484
588948.1433
61.75959313
-157.3149079

MW18

6848531.638
588988.1867
61.75940574
-157.3141594

MW19

6848571.165
589025.1547
61.75975182
-157.31344

MW20

6848592.8
588967.1091
61.75995945
-157.3145285

MW21

6848622.174
589000.2127
61.76021533
-157.3138872

MW22

6848638.537
589022.4639
61.76035697
-157.3134579

MW23

6848688.27
589038.5637
61.76079947
-157.3131286

MW24

6848641.681
588975.4127
61.76039613
-157.3143472

MW25

6848629.149
588940.7024
61.76029175
-157.3150107
MW26
X
6848622.444
588918.9978
61.76023664
-157.3154249
MW27
X
6848587.889
588919.2896
61.75992651
-157.3154364
MW28
X
6848585.43
588917.8712
61.75990477
-157.3154644
MW29
X
6848700.653
588897.0048
61.76094352
-157.315803

MW30

6848630.777
588855.5862
61.76032614
-157.3166216

MW31

6848717.532
588561.9681
61.7611727
-157.322139

MW32

6848725.007
589122.1639
61.76110964
-157.3115275

MW33

6848780.504
589096.4901
61.7616136
-157.3119863

MW34

6848558.6
589074.0454
61.75962768
-157.3125204

MW35

6848567.313
589075.9173
61.75970543
-157.3124807

MW36

6848564.717
589084.2718
61.75968019
-157.3123238

MW39

6848849.533
588651.3045
61.76233646
-157.3203827
MW40
X
6848767.128
588726.9626
61.76157949
-157.3189904
MW42
X
6848618.255
588792.7568
61.76022838
-157.3178174
MW43
X
6848605.028
588834.4352
61.76010001
-157.3170347
MW44
X
AcActive
6848863.449
588738.0061
61.76244122
-157.3187341
MW45
X
6848923.057
588700.9894
61.76298466
-157.3194059
MW46
X
6848994.838
588631.5805
61.76364486
-157.3206852
MW47
X
6849057.39
588604.4875
61.76421241
-157.3211676

MW48

6848841.96
588787.3862
61.76223694
-157.3178095
MW49
X
6848819.986
588882.4892
61.76201767
-157.3160193
MW50
X
X
6848912.827
588629.5502
61.76290944
-157.3207637
MW51
X
X
6848980.258
588580.2529
61.76352592
-157.3216643
MW52
X
6849032.846
588522.5802
61.76401115
-157.3227308
MW53
X
X
6848849.577
588568.7948
61.76235596
-157.3219452
MW54
X
X
6848903.625
588517.9083
61.76285272
-157.3228824

MW55

6848988.233
588449.4053
61.76362777
-157.3241383
MW56
X
X
6848851.666
588696.7599
61.76234506
-157.3195209
MW57
X
X
6848793.412
588612.8689
61.76184178
-157.321138
MW58
X
X
6848819.169
588496.7913
61.76209978
-157.3233235
MW59
X
X
6848851.296
588656.2038
61.76235113
-157.3202891

Notes:

1. Groundwater samples shall be collected from monitoring wells highlighted in yellow

2. Northing and easting are provided as Alaska State Plane coordinates.

3. Monitoring wells MW14 and MW15 have been decommissioned.

4. Monitoring wells containing dedicated bladder pumps are indicated and are to be sampled according to methods previously developed for Red Devil Mine baseline monitoring and documented in the 2019 Baseline Monitoring Work Plan.

5. Wells highlighted in yellow but don’t contain bladder pumps shall be sampled using a peristaltic pump according to methods previously developed for Red Devil Mine baseline monitoring and documented in the 2019 Baseline Monitoring Work Plan.