This document appears to be a Bid Schedule and related federal contract opportunity for the BLM Wyoming Region's Doty State Fence project.

The key details are:

  • The project involves removing approximately 16,500 linear feet of existing fence and constructing approximately 14,000 linear feet of new 4-wire wildlife friendly steel fence, 1,500 linear feet of wildlife friendly wood top rail/3-wire fence, and 1,000 linear feet of livestock exclosure fence with wood rail top and 39" woven wire.
  • The Period of Performance is 9/2/24 to 11/30/24.
  • The solicitation number is 140L6224Q0045, with a response due date of Monday, August 26th, 2024 at 2:30 pm MDT.
  • The Contract Officer is Crystal Martinez and the Contract Specialist is Jaime Hull.
  • Active SAM registration is required, and offers must meet or exceed the specifications provided in the attachments.

View the file

Other files for this federal contract opportunity

Other files attached to BLM WY - DOTY STATE FENCE - RAWLINS FEILD OFFICE, newest first.
File Type Posted
Sol_140L6224Q0045_Amd_0001.pdf PDF
Prebid_site_tour_sheet_0001.pdf PDF
SOW_Doty_Fence_Final_JLC_0001.pdf PDF
Attachment_6-_Photos.pdf PDF
Attachment_7-_SF_1442_Completion_Instructions.pdf PDF
Attachment_5_-Wage_Determination_WY20240037.pdf PDF
Sol_140L6224Q0045.pdf PDF
Attachment_1_-Statement_of_Work_-_Doty_State_Fence.pdf PDF
Attachment_2-_Bid_Schedule_-Doty_State_Fence_.xlsx XLSX spreadsheet
Attachment_3_-Project_Notes.pdf PDF
Attachment_4_-Maps_Doty_State_Fence.pdf PDF
Attachment_8-__Limitations_on_Subcontracting_Breakout.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quantity Development

BLM Workbook
Project:
Subject: Quantity Development
Date:
Estimator:
Useful Formulas
RectangleArea: Length x Width Perimeter: 2 (Length +Width) Volume: Area x Thickness or Depth
TriangleArea: 1/2 Height x Base Perimeter: sum of all three sides Volume: Area x Thickness or Depth
TrapezoidArea: 1/2 (Top + Bottom) x Height Perimeter: sum of all four sides Volume: Area x Thickness or Depth
ParallelogramArea: Base x Height Perimeter: sum of all four sides Volume: Area x Thickness or Depth
CircleArea: 3.1416 x radius x radius Circumference: 3.1416 x diameter Volume: Area x Depth or Height
Conversion Factors
Area:
Square Feet (SF) per Square Yard9.00
Square Feet (SF) per Acre43,560.00
Square Yard (SY) per Acre4,840.00
Linear:
Inches12"11"10"9"8"7"6"5"4"3"2"1"3/4"1/2"1/4"1/8"
Decimal Equivalent in Feet1.00'.917'.833'.75'.667'.583'.50'.417'.333'.25'.167'.083'.0625'.04167'.02083'.0104'
Feet (LF) per Yard (Yd.)3.00
Feet (LF) per Mile5,280.00
Yard (Yd) per Mile1,760.00
Volume:
Cubic Inches per Cubic Feet (CF)1,728.00
Cubic Feet (CF) per Cubic Yard (CY)27.00
Weight Conversions:
Asphalt Compacted Thickness(SY to Tons).055 Tons per Inch thickness per SY x Asphalt Compacted Thickness (Inches) x Asphalt Quantity (SY) = Tons
Asphalt Compacted Thickness(Tons to CY)1.98 Tons per CY
Aggregate Base Compacted Thickness (SY to Tons).05 Tons per Inch Thickness per SY x Aggregate Base Compacted Thickness (Inches)x Aggregate Base Quantity (SY) = Tons
Aggregate Base Compacted Thickness (Tons to CY)1.8 Tons per CY
Reinforcing Steel Bar Size#3#4#5#6#7#8#9#10#11#14#18
Bar Diameter (Nominal Inches)0.3750.5000.6250.7500.8751.0001.1281.2701.4101.6932.257
Area (Nominal - Sq. Inches)0.110.200.310.440.600.791.001.271.562.254.00
Weight (pounds per foot)0.3760.6681.0431.5022.0442.6703.4004.3035.3137.65013.600
Welded Wire FabricWT./CSF
6x6 - W1.4 x W1.4 (6x6 - 10/10)21
6x6 - W2.1 xW2.1 (6x6 - 8/8)29
6x6 - W2.9 x W2.9 (6x6 - 6/6)42
6x6 - W4.0 xW4.0 (6x6 - 4/4)58
4x4 - W2.9 xW2.9 (4x4 - 6/6)62
4x4 - W4.0 x W4.0 (4x4 - 4/4)85
Estimating Earthwork Link (Power Point)ESTIMATING EARTHWORK
Demolition & Removals
TasksNumberLengthWidthDepth / ThicknessTotalUnits
Volume Removal0.000.000.000.000.00CY
Volume Removal0.000.000.000.000.00CY
Volume Removal0.000.000.000.000.00CY
Linear Removal0.000.00NANA0.00LF
Lienar Removal0.000.00NANA0.00LF
Linear Removal0.000.00NANA0.00LF
Remove Item (# of Units)0.00Ea
Remove Item (# of Units)0.00Ea
Remove Item (# of Units)0.00Ea
Earthwork (End Area Method)StationLength (Ft.)Cut Area (sf)Avg. Cut AreaCut Vol. (cy)Fill Area (sf)Avg. Fill AreaFill Vol. (cy)
The sample format is based on cross-section end0.000.000.000.000.000.000.000.00
areas taken at 50' increments- modify your50.0050.000.000.000.000.000.000.00
stationing to meet you specific project.100.0050.000.000.000.000.000.000.00
Note: Station 1+50 = 150.00, etc.150.0050.000.000.000.000.000.000.00
200.0050.000.000.000.000.000.000.00
250.0050.000.000.000.000.000.000.00
300.0050.000.000.000.000.000.000.00
350.0050.000.000.000.000.000.000.00
400.0050.000.000.000.000.000.000.00
450.0050.000.000.000.000.000.000.00
500.0050.000.000.000.000.000.000.00
Total Cut (cy)0.00Fill (cy)0.00
15.00%0.00Compaction
Total Fill (cy)0.00
Pipe ExcavationPipe Diam.(inch)Bottom W. (Ft.)Depth (Ft.)Top Width (ft)Avg.W (Ft).Length (Ft.)Volume (cy)
Based on open cut excavation with 1:1 side slopes12.004.000.004.004.000.000.00
(using pipe diameter indicated - enter the Depth15.004.250.004.254.250.000.00
and Length to caulculate the pipe excavation24.005.000.005.005.000.000.00
volume)27.005.250.005.255.250.000.00
36.006.000.006.006.000.000.00
42.006.500.006.506.500.000.00
48.007.000.007.007.000.000.00
54.007.500.007.507.500.000.00
60.008.000.008.008.000.000.00
66.008.500.008.508.500.000.00
72.009.000.009.009.000.000.00
84.0010.000.0010.0010.000.000.00
96.0011.000.0011.0011.000.000.00
Structural Concrete
ConcreteNumberLengthWidth / HeightDepth / ThicknessNeatline Quantity (cy)Estimated % Waste FactorPurchase Quantity
Footings0.000.000.000.000.010.00%0.0
Abutments0.000.000.000.000.05.00%0.0
Wingwalls0.000.000.000.000.05.00%0.0
Abutment Back Walls0.000.000.000.000.010.00%0.0
Deck0.000.000.000.000.05.00%0.0
Total Quantity0.00.0
FormworkNumberLength (Ft.)Width (Ft.)Height (Ft.)Total (sf)
Footings (Perimeter)0.000.000.000.000.0
Abutments0.000.000.000.000.0
Wingwalls0.000.000.000.000.0
Bulkheads0.00NA0.000.000.0
Structural Deck0.000.000.000.000.0
Deck Edge (Perimeter)0.000.000.000.000.0
0.0Total Formwork
QuantityUnits
Reinforcing Steel (Epoxy Coated)lb
Rebar Support Accessorieslb(Cost based on total rebar weight @ $.05/lb)
Finish (Strip Forms & Patch Voids)0.0sf(use formwork total area)
Finish FlatNumberLengthWidthArea (sf)
Footings0.000.000.000.0
Abutments (Tops)0.000.000.000.0
Wingwalls (Tops)0.000.000.000.0
Deck0.000.000.000.0
0.0Total Flat Finish
Cure & Protect
Formwork Area (Total) + Flat Finish0.0sf
Concrete Paving (Variable Depth)UnitsQuantityLength (Ft.)Width (Ft.)Depth (Ft.)
Fine Grade (Hand)sf0.00.000.00NA
Edge Formssf0.00.00NA0.00
1/2" Expansion Jointsf0.00.00NA0.00
Welded Wire Fabric (Size……..)sf0.00.000.00NA
Rebar, Epoxy Coatedlb0.0
Rebar Support Accessorieslb0.0
Concrete Placement (Includes 10% waste factor)cy0.00.000.000.00
Finishsf0.0
Cure & Protectsf0.0

http://homepages.cae.wisc.edu/~cee492/note/L11_EstEarthWk9811.ppt Crews & Productions

BLM Workbook
Project: FONTENELLE CAMPGROUND RECONSTRUCTION
Subject: Anticipated Crews & Productions
Date:MAR 2019
Estimator:MF
Item #1 - Mobilization/Demobilization
Unit:LS
Quantity:1.00
Round Trip Travel Time (Hr.):4.00Allow 2hr for mob + 2 hr for demob fro a total of 4hr per piece of equipment moved
Equipment Moves:5Anticpated equipment: Grader (30,000 #), Water Truck (5,000 gal) + Roller, skid steer, dozer
Driver, LBTruck TractorLowbed Trailer
Total Time (Hr.)20.0020.0020.00
Prod Rate: (units/Hr)0.05
Notes:
Item #2 - construct 20 new campsites
Unit:SY
Quantity:2200.0031.22.16310.0100 states b32 crew can do 2000 sy per day need 2250SY for project. So prod 2200/2000 = 1.1 days say 1.5 days or 12 hrs
prod rate is 2250/12=187.50
QuantityProduction (units/hr)Estimated TimeForemanLaborersDriversgrader OperatorPick Upfront end loadersweeper
task12250.00187.5012.0012.0024.00888.0088
Totals:12.0024.008.008.008.008.008.00
Total Time (Hr.)12.00
Prod Rate: (units/Hr)183.3333333333
Grading of site for backin unit = 1050 sf per unit x 5 EA = 5250 sf
Grading of site for pull thru = 900 sf per unit x16 EA = 14,400 sf
so a total of 19,650 sf SAY 20,000 SF of grading for new units or 2222 SAY 2250 sy

using RS Means 32.01.16.71 5320 states using a crew B-70 can do 5000 SY per day = 2250SY/5000sy/day = .44 days say 1 day crew B-70 has 1 foreman, 3 laborers, 3 equip operators (medium) [1 grader, 1 road sweeper, 1 front end loader, 1 truck driver ]

Item #3 dispose of asphalt
Unit:SY
Quantity:2250.00
QuantityProduction (units/hr)Estimated TimeForemanLaborersDriversOperatorsPick UpSm. ToolsTrack Dozer (200 HP)F.E. Loader (145 HP)Excavator (1 cy)
Task #1 - ex asphalt removal2250.00281.258.008.00
Totals:8.000.000.000.000.000.000.000.000.00
Total Time (Hr.)8.00
Production Rate: (units/Hr)281.25
removal of aspahlt at sites = 20,000 sf total
say 2250 sy needed
using RS Means 32.01.16.71 5320 states using a crew B-70 can do 5000 SY per day = 2250 SY/5000sy/day = .45 days say 1 day PRODUCTION RATE = 2250/8 hrs = 277.75
crew B-70 has 1 foreman, 3 laborers, 3 equip operators (medium) [1 grader, 1 road sweeper, 1 front end loader, 1 truck driver ]
CONV FACTOR .055 TONS X 3" THICK X 2250SY = 371 TONS OF ASPHALT JNEED TO BE DISPOSED
Item #4 Paint 18 existing shelters
Unit:EA
Quantity:56.00
QuantityProduction (units/hr)Estimated TimeForemanLaborersDriversOperatorsPick UpSm. Tools
Task 1 - paint shelters11200.00350.0032.0032.00
task 2 paint tables1800.00225.008.008.00
ERROR:#DIV/0!
ERROR:#DIV/0!
ERROR:#DIV/0!
Totals:40.000.000.000.000.000.00
Total Time (Hr.)40.00
Production Rate: (units/Hr)1.4
USED RS MEANS HEAVY CONSTRUCTION COST 2018
05.01.10.51.6215 says 1 PORD can pressuer wash 10000 SF per day
Each shelter is 200SFx56=11,200 SF
each table is 26sf x 56 = 1456 sf
so need 12.656 sf done say 13,000 sf
13000 sf / 12656 sf/day = 1.02 days say 1.5 days or 12 hrs
09.97.13.23.6510 SAYS 3600 SF PER DAY FOR 2 PAINTERS say 3000 sf per daySHELTERS 11200/3000 = 3.7 SAY 4 DAYS OR 32 HRS SO PROD RATE = 11200/32=350
13000 sf / 3600 = 4.33 days or 34 hrs say 40 hrs for 2 paintersTABLES 1800SF/3000= .6 DAYS SAY 1 DAY OR 8 HRS PROD RATE = 1800/8 = 225
12,656f/3600 = 3.5 days or 28 hrs
ASSUME 2 GALLONS PER SHELTER AND TABLE = 112
USED RS MEANS SITE LANSCAPING COST 2017
01.54.33.5730 PRESSURE WASHER IS $41.50 PER DAY
01.54.33.3900 PAINT SPRAYER IS 70.50 PER DAY
Item #6 Aggregate surfacing campsites with timber borders
Unit:TONS
Quantity:675.0031.22.16310.0100 states b32 crew can do 2000 sy per day need 2250SY for project. So prod 2200/2000 = 1.1 days say 1.5 days or 12 hrs
prod rate is 2250/12=187.50
QuantityProduction (units/hr)Estimated TimeForemanLaborersDriversgrader OperatorPick Upfront end loadersweeper
task1675.0037.5018.0018.0024.00888.0088
Totals:18.0024.008.008.008.008.008.00
Total Time (Hr.)18.00
Prod Rate: (units/Hr)37.5
Area for backin unit = 1050 sf per unit x 5 EA = 5250 sf
Area for pull thru = 900 sf per unit x16 EA = 14,400 sf
say 2250 SY (CALC FROM ABOVE FOR BUILDING CAMPING UNITS (Item 2)
.05 tons x 6" deep x 2250 = 675 tons
John Tracy from NOC on email sent Sept 5, 2018 said adjust production rate to 36.388 ton/hr
.05 TONS x 6" deep x 2250 = 675 tons so 675/36.388 tons/hr = 18 hrs
crew B-36B has 1 foreman, 2 laborers, 4 equip operators (medium) 1 GRADER 1 LOADER 1 ROLLER 1 SKIDSTEER 1 TRUCK TACTOR, 1 WATER TRUCK on site
load from pit: need loader and truck (55 loads x .33 hr/load((haul) = 18 hrs
FOR LANDSCAPE TIMBER AROUND SITES 32.32.29.10.0110 SAYS 200LF/DAY SO 864LF/200 = 4.3 SAY 4.5 DAYS OR 36 HRS FOR 1 CARPENTER
Item #9 6" Aggregate surfacing Slate Creek
Unit:TONS
Quantity:3105.00
QuantityProduction (units/hr)Estimated TimeForemanLaborersDriversgrader OperatorPick Upfront end loadersweeper
task13105.0097.0332.0018.0024.00888.0088
Totals:18.0024.008.008.008.008.008.00
Total Time (Hr.)18.00
Prod Rate: (units/Hr)172.5
18 lf wide road x 3270lf = 58860 sf main rd
14'x2450'=34,300 sf sec rd
58860+34300=93160 sf or 10,351 sy
John Tracy from NOC on email sent Sept 5, 2018 said adjust production rate to 97.03 ton/hr
.05 TONS x 6" deep x 10,351 = 3105 tons so 3105/97.03 tons/hr = 32 hrs
crew B-36B has 1 foreman, 2 laborers, 4 equip operators (medium) 1 GRADER 1 LOADER 1 ROLLER 1 SKIDSTEER 1 TRUCK TACTOR, 1 WATER TRUCK on site

load from pit: need loader and truck 3105 tons with 12 ton dumptruck = 259 loads (259 loads x .33 hr/load((haul) = 85 hrs for loader and dumptruck to haul to site

Item #11 6" Aggregate surfacing Weeping Rock
Unit:TONS
Quantity:3105.00
QuantityProduction (units/hr)Estimated TimeForemanLaborersDriversgrader OperatorPick Upfront end loadersweeper
task13105.0097.0332.0018.0024.00888.0088
Totals:18.0024.008.008.008.008.008.00
Total Time (Hr.)18.00
Prod Rate: (units/Hr)172.5
16 lf wide road x 1580lf =25280 sf main rd or 2808 sy say 2810 SY
John Tracy from NOC on email sent Sept 5, 2018 said adjust production rate to 84.2 ton/hr
.05 TONS x 6" deep x 10,351 = 3105 tons so 3105/97.03 tons/hr = 32 hrs
crew B-36B has 1 foreman, 2 laborers, 4 equip operators (medium) 1 GRADER 1 LOADER 1 ROLLER 1 SKIDSTEER 1 TRUCK TACTOR, 1 WATER TRUCK on site

load from pit: need loader and truck 3105 tons with 12 ton dumptruck = 259 loads (259 loads x .33 hr/load((haul) = 85 hrs for loader and dumptruck to haul to site

Item #12 6" Aggregate surfacing around vault toilets Slate Creek
Unit:TONS
Quantity:3105.00
QuantityProduction (units/hr)Estimated TimeForemanLaborersDriversgrader OperatorPick Upfront end loadersweeper
task13105.0097.0332.0018.0024.00888.0088
Totals:18.0024.008.008.008.008.008.00
Total Time (Hr.)18.00
Prod Rate: (units/Hr)172.5
16 lf wide road x 1580lf =25280 sf main rd or 2808 sy say 2810 SY
John Tracy from NOC on email sent Sept 5, 2018 said adjust production rate to 84.2 ton/hr
.05 TONS x 6" deep x 10,351 = 3105 tons so 3105/97.03 tons/hr = 32 hrs
crew B-36B has 1 foreman, 2 laborers, 4 equip operators (medium) 1 GRADER 1 LOADER 1 ROLLER 1 SKIDSTEER 1 TRUCK TACTOR, 1 WATER TRUCK on site

load from pit: need loader and truck 3105 tons with 12 ton dumptruck = 259 loads (259 loads x .33 hr/load((haul) = 85 hrs for loader and dumptruck to haul to site

Comments & Assumptions

BLM Workbook
Project:
Subject: Comments & Assumptions
Date:
Estimator:
The pupose of this sheet is to develop a check list of items that could have a potential cost impact on the project estimated cost.
The proposed list is not meant to be all inclusive, and all of the listed items may not be applicable to a specific project
Supplement the list as needed for the specific project and specification requirements.
The associated costs for many of the checklist items are accounted for on the Item #1 Tab.
Anticipated Need/RequirementCost ElementAccounting for Applicable Cost Element
Item/DescriptionYesNo(mark if applicable)Item #1Separate ItemOther Cost ItemComments/Remarks
Erosion Control
Construction Traffic Control
Construction Surveying
Quality Control & Testing
Painting/Striping & Traffic Markings
Job Site Trailers
Field Office Expenses
General Superintendent
Contractor Field Engineer
Contractor Clerk/Time Keeper
Contractor Lodging
Contractor Per Diem
Pick Up Truck (s)
Trash Disposal, Dumpster
Project Sign
Trailer/Field Office Temporary Utilities
Permanent Signage
Seeding & Mulching/Revegatation
Job Site Chemical Toilets
Fire Prevention, Extinguishers
Contractor Safety Program
First Aid Station/Kit
Temporary Fencing
Concete Truck Clean/Wash Out
Contractor Furnished Water
Government Furnished Water
On -Site Diposal Site
Off Site Disposal Site
Government Furnished Borrow Material
Contractor Furnished Borrow Material
Other Government Furnished Materials
Documentation of Mark Up Factor Seletion%Reasoning
Contractor Burden35.00%BLM Default Value
Sales TaxPer Workbook Data Base - State wide sales tax rate
Overhead15.00%Per BLM Guidelines - preliminary cost estimate
Profit10.00%Per BLM Guidelines - preliminary cost estimate
Bond2.00%BLM Default Value
State Gross Receipts Tax0.00%Applicable to the States of: Arizona, New Mexico, & Washington

Project - Davis Bacon Wage Rate Decision MT, Carbon County, Highway Wage Decision MT180080, MT80 01/05/2018, Modification 0 Enter Wage Decision Information Directly into Data Base Labor

Data Base

BLM - SIMPLIFIED HEAVY & HIGHWAY DATA BASE
2019 CONSTRUCTION COSTS
John J. Treacy, P.E. 11/2018
Based on Rates Established by R.S. Means 2019 Site Work & Landscape Cost Data
Rates include: rental (national average), fuel and operating expenses
* Daily Cost Basis: weekly rental rate/5 days + hourly operating cost x 8 hours/day
DailyHourlyRS Means
DescriptionCostCostRef #
Air Compressor, Diesel, 250 cfm*$167.95$20.9915433400400
Air Tools, Drills, Hand, 65#*$15.80$1.9815433400950
Air Tools, Pavement Breakers, 60 lb*$10.75$1.3415433400930
Air Tools, Pavement Breakers, 80 lb*$10.90$1.3615433400940
Air Hose, 50' long, 3/4" diameter*$6.55$0.8215433401000
Drill Steel, 7/8" x 6'*$12.30$1.5415433401460
Moil Points*$3.05$0.3815433401520
Aggregate Spreader, Self Propelled, 187 HP*$836.00$104.5015433500900
Aggregate Spreader, Tailgate Type, 8' wide*$40.25$5.0315433200045
Asphalt Paver, wheel or crawler, 130 HP*$2,076.00$259.5015433504250
Asphalt Paver, Road Widener, gas 1'-6', 67 HP*$939.40$117.4315433504300
Asphalt Paver, Road Widener, diesel 2'-14', 88 HP*$1,122.00$140.2515433504400
Auger, Fence Posts, Gas, Hand Held*$7.40$0.9315433200095
Auger, Truck Mounted (Fence, Signs, Poles)*$385.85$48.2315433200055
Auger, Truck Mounted (Borings & Monitoring Wells)*$756.20$94.5315433200060
Backhoe/Loader, 40-45 HP, 5/8 cy cap.*$219.20$27.4015433200400
Backhoe/Loader, 45-60 HP, 3/4 cy cap.*$320.20$40.0315433200450
Backhoe/Loader, 80 HP, 1-1/4 cy cap*$387.85$48.4815433200460
Backhoe/Loader Attachments
Compactor, 20,000#*$141.50$17.6915433200482
Hydraulic Hammer, 750 ft-lb*$91.45$11.4315433200485
Hydraulic Hammer, 1,200 ft-lb*$171.40$21.4315433200486
Brush Chipper, 12" cutter head, 130 HP*$389.40$48.6815433200550
Caisson/ Water Well Drill Rig, Truck Mounted*$2,428.00$303.5015433200075
Chainsaw, gas, 36" long*$46.65$5.8315433405900
Compactor, 2 drum walk behind., 7.5 HP*$181.75$22.7215433201200
Compactor, Rammer Tamper, 8" Gas*$45.65$5.7115433201250
Compactor, Sheepfoot, Vib., 240 HP*$1,323.00$165.3815433203300
Compactor, Vibratory 21" plate, 5000 # Blow*$40.55$5.0715433201350
Compactor, Vib. Smooth Drum Roller, 125 HP*$650.90$81.3615433203400
Concrete Mud Jack Pump, 225 cf/hr*$155.40$19.4315433102180
Concrete Pour Bucket, 1.5 cy*$32.90$4.1115433100400
Concrete Pumper Truck, 110' Boom*$1,130.00$141.2515433102140
Concrete Saw, self propelled, gas, 30 HP*$110.15$13.7715433102650
Concrete Vibrator, 3 HP*$11.50$1.4415433102800
Crane, Crawler Mounted, 40 ton @ R=12'*$1,392.00$174.0015433600900
Crane, Truck Mounted, Hydraulic - 25 ton*$581.70$72.7115433602500
Crane, Truck Mounted, Hydraulic - 100 ton*$1,536.00$192.0015433602720
Disc Harrow Attachment for Tractor*$51.60$6.4515433201500
Dozer, 80 HP*$472.00$59.0015433204110
Dozer, 105 HP*$609.70$76.2115433204150
Ripper Attachment*$62.10$7.7615433500520
Dozer, 200 HP*$1,290.00$161.2515433204260
Ripper Attachment*$88.80$11.1015433500540
Dozer, 300 HP*$1,831.00$228.8815433204310
Ripper Attachment*$135.95$16.9915433500580
Dump Truck, 12 ton, 8 cy*$339.60$42.4515433205250
Dump Truck, 16 ton,12 cy*$567.05$70.8815433205300
Dump Truck, 25 ton, 18 cy*$705.00$88.1315433205310
Dump Truck, Off Road, 35 ton/22cy*$1,472.00$184.0015433205600
Dump Truck, Off Road, 50 ton/34 cy*$1,738.00$217.2515433205610
Excavator, 5/8 cy*$587.30$73.4115433200120
Excavator, 1 cy*$749.70$93.7115433200150
Excavator, 1.5 cy*$908.70$113.5915433200200
Excavator, 3.5 cy*$2,256.00$282.0015433200325
Excavator Attachments
Bucket Thumb*$177.20$22.1515433200342
Grapple*$154.10$19.2615433200345
Hydraulic Hammer, 5000 ft-lb*$407.60$50.9515433200347
Forklift, pnuematic tire, rough terrain, 5000# lift, gas*$276.20$34.5315433402015
Front End Loader, 2.5 - 3.5cy, 145 HP*$531.20$66.4015433204710
Front End Loader, 3.0 - 4.5 cy, 185 HP*$566.70$70.8415433204730
Front End Loader, 5.25 - 5.75 cy, 270 HP*$975.55$121.9415433204760
Generator, 1.5 - 3.0 KW*$26.70$3.3415433402100
Generator, 5 KW*$33.35$4.1715433402200
Grader, 25,000 #*$721.80$90.2315433201860
Grader, 30,000 #*$675.85$84.4815433201910
Grader, 40,000 #*$1,180.00$147.5015433201920
Hydromulcher, Truck Mounted - 3,000 gal*$292.90$36.6115433502200
Loader, Skid Steer, 30 HP*$174.55$21.8215433204880
Loader, Skid Steer, 78 HP*$392.50$49.0615433204890
Skid Steer - Auger Attachment*$87.95$10.9915433204892
Skid Steer - Backhoe Attachment*$76.90$9.6115433204893
Skid Steer - Conc. Hammer Attachment*$114.40$14.3015433204897
Skid Steer - Forks Attachment*$17.25$2.1615433204895
Mixer, power, mortar & concrete, gas, 6 cf, 18 HP*$135.35$16.9215433101800
Pile Driving Hammer, Diesel 22,400 ft-lb*$427.55$53.4415433202350
Pile Driver Leads, 90', w/hammer > 20,000 ft-lb*$134.60$16.8315433202300
Roller - Tandem, Smooth Drum, 10 ton, 35 HP*$232.05$29.0115433203050
Roller, Pneumatic Wheel, 12 ton, 80 HP*$338.35$42.2915433203200
Scraper, Dual Engine, 21 cy*$2,541.00$317.6315433203550
Scraper, Dual Engine, 31 cy*$3,603.00$450.3815433203600
Scraper, Elevating, 11 cy*$1,165.00$145.6315433203650
Scraper, Elevating, 22 cy*$2,307.00$288.3815433203700
Sheet Pile Vibr. Hammer,w/200 kW generator, 80 HP*$1,184.00$148.0015433202550
Sheet Pile Vibr. Hammer,w/200 kW generator, 150 HP*$2,236.00$279.5015433202600
Small Tools$40.00$5.00(Allowance)
Tar Kettle, Truck Mounted*$134.50$16.8115433506000
Toilet, Portable Chemical*$14.45$1.8115433406410
Torch, Cutting, Acet.-Oxygen w/150' hose, no gas*$12.50$1.5615433406350
Torch Operating Costs, tips & gas*$167.85$20.9815433406360
Tractor, Farm w/attachments*$319.35$39.9215433406465
Trailer, Dump, Rear Dump, 16.5 cy*$133.95$16.7415433205350
Trailer, Dump, Rear Dump, 20 cy, 28 ton*$148.60$18.5815433205400
Trailer, Lowbed 75 ton*$249.91$31.2415433504901
Trailer, Platform, 2 axle, Flush Deck, 25 ton*$133.00$16.6315433406500
Trailer, Platform, 2 axle, Flush Deck 40 ton*$182.50$22.8115433406600
Trailer, Platform, 3 axle, Flush Deck, 50 ton*$200.95$25.1215433406700
Trailer, Water Tank, 400 gal.*$178.20$22.2815433406340(Tar Kettle/Pot)
Trailer, Water Tanker, 5000 gal.*$149.45$18.6815433406900
Trash Pump, 2" gas, 20' suction, 100' discharge*$48.65$6.0815433405500+15433403200+2ea(15433403250)($44.80+$2.05+2*$.90)
Trash Pump, 4" diesel, 20' suction, 100' discharge*$118.00$14.7515433405600+15433403220+2ea(15433403270)($110.40+$3.10+2*$2.25)
Trash Pump, 6" diesel, 20' suction, 100' discharge*$256.70$32.0915433405650+15433403230+2ea(15433403280)($234.20+$11.10+2*$5.70)
Trench Box, 9500 lbs, 8' x 20'*$144.65$18.0815433407060
Trencher, Operator riding, 40 HP (up to 36" x 6")*$348.50$43.5615433204910
Truck - Flat Bed, gas, 1.5 ton*$195.20$24.4015433205450
Truck - Flat Bed gas, 3 ton*$245.95$30.7415433205500
Truck - Pick Up, 4 wheel drive*$121.70$15.2115433407200
Truck Tractor, 4x2, 220 HP*$303.55$37.9415433407300
Truck Tractor, 4x2, 330 HP*$430.40$53.8015433407410
Truck Tractor, 6x4, 380 HP*$487.60$60.9515433407500
Truck Tractor, 6x4, 450 HP*$594.90$74.3615433407600
Truck - Water, off highway, 6,000 gal*$1,061.00$132.6315433406950
Wagondrill, Track, Swing, 5" drifter*$1,173.00$146.6315433400970
Water Truck, Highway - 5,000 gal*$453.00$56.6315433406900+15433407300($149.45+$303.55)
Water Truck, Highway - 3,000 gal*$323.25$40.4115433401840(Distributor Truck)
Welder, gas, 300 Amp*$95.65$11.9615433408000
Wheelbarrow, 5cf*$6.70$0.8415433408100
Crane Truck Mounted, Hydraulic 40 Ton*$1,296.96$162.1215433602560(Based on a one day rental $900 + $396.96 daily operating cost)
Add Equipment*$0.00$0.00
Add Equipment*$0.00$0.00
Add Equipment*$0.00$0.00
Add Equipment*$0.00$0.00
Add Equipment*$0.00$0.00
Add Equipment*$0.00$0.00
Add Equipment*$0.00$0.00
Add Equipment*$0.00$0.00
Add Equipment*$0.00$0.00
Add Equipment*$0.00$0.00
Add Equipment*$0.00$0.00
Add Equipment*$0.00$0.00
Add Equipment*$0.00$0.00
Add Equipment*$0.00$0.00
Add Equipment*$0.00$0.00
Add Equipment*$0.00$0.00
Add Equipment*$0.00$0.00
Add Equipment*$0.00$0.00
Add Equipment*$0.00$0.00
LABOR
Local labor is subject to the current Davis Bacon Wage Rate, which can be found at (http://www.wdol.gov/)
Choose - Selecting DBA Wage Decisions then select: State, County, Wage Type (Bldg., Highway, Heavy, etc.)
For this data base, the following Davis Bacon Wage Rates were applied:
General Decision Number WY19004 01/04/2019 WY40
Const Type: Highway
Modification Number: 0 Publication Date: 01/04/2019
BaseZone RateTotal
Labor Craft/ClassificationZoneHourly Rate(if applies)FringesHourly Rate
Carpenter3$21.07$3.39$24.46
Concrete Finisher3$22.90$3.41$26.31
Electrician$32.64$9.94$42.58
Ironworker (Rebar)2$27.18$14.35$41.53
Iron Worker (Structural)2$25.68$9.25$34.93
Laborer, Group 1$16.79$0.00$16.79fences, flag person, general laborers
Laborer, Group 2$18.67$2.40$21.07asphalt workers, concrete, hand operator tampers
Laborer, Group 33$21.59$3.14$24.73Powderman, Blaster, Tender; Wagon Drill, Air-Trac.
Painter$18.67$2.40$21.07
Power Equipment Operator, Group 13$21.97$3.16$25.13backhoe, excavator (5cy) roller operator,skid steer
Power Equipment Operator, Group 23$22.86$5.84$28.70backhoe, excavator (6cy >), dozer operator,front end loader up to 10 cy, roto milling,
Power Equipment Operator, Group 3$27.06$7.48$34.54cranes, front end loader>10cy,
Truck Driver, Group 13$19.52$2.62$22.14dump truck up to 13 cy, water truck driver 3600 gal
Truck Driver, Group 23$15.85$7.36$23.21dump truck up to 13 tons, water truck driver 3600 gal, semi and low boy
Foreman*3$29.06$7.48$36.54
Electrician3$44.12$15.08$59.20
Electrician Equipment Operator3$22.18$4.50$26.68
Electrician Ground Man3$25.18$10.92$36.10
Hydrogeologist$50.00
Engineering for well construction$58.21
Force Acct Labor3$50.00$50.00
BLM Engineer$60.00$60.00
* Add $2/hr. to Top Operator Rate for Foreman Rate
MATERIAL
When and where possible, material price support should be secured locally.
Contact supplier and obtain material costs - have suppliers provide and include material delivery or haul cost to the project site.
Principal reference source for material pricing: R.S. Means 2019 Construction Cost Data
When pricing pipe, check for the length of the pipe - essentially, you need to purchase pipe in full pipe length increments.
Note: haul cost is a variable and must be adjusted for haul unit (equipment), time and local labor rates - using haul cost calculation (below)
DescriptionUnitMaterialHaul*TotalReference/Notes
Asphalt, HMA (Hot Mixed Asphalt)Ton$75.50$17.07$92.57*have to review321216130850
Rip Rap Stone, Dumped, 300# Avg.Ton$26.00$17.07$43.07how haul is calc'd313713100370
Random Broken Stone (Gabions)CY$31.50$23.89$55.39in A382313713100100
Aggregate Road Base, Crushed 3/4"Ton$17.80$23.89$41.69321123232010
Borrow/Fill Material (Common)CY$12.60$23.89$36.49312323156000
Topsoil (Import)CY$26.50$23.89$50.39312323157000
Crushed or Screened Bank Run GravelCY$21.00$23.89$44.89312323160050
Crushed Stone, 3/4" - 1-1/2"CY$27.50$23.89$51.39312323160100
Pea Gravel, 3/8" - 1/2"CY$15.75$23.89$39.6430513251100
Cobble, River StoneCY$43.00$23.89$66.8930513251055
Asphalt Crack Sealing, 1/2" wide x 1" depthLF$0.71$0.71320117610180
Grout/Concrete, 4000 psiCY$194.06$194.0633113350300, 33113351410, 33113351430, 33113351520concrete*1.1+reducer+retarder+short load*.5(128*1.1+4.01+3.25+92*.5)
Grout/Concrete, 3,000 psiCY$189.66$189.6633113350150, 33113351410, 33113351430, 33113351520concrete*1.1+reducer+retarder+short load*.5(124*1.1+4.01+3.25+92*.5)
Forms, FoundationSF$2.31$2.3131113455000
Forms, WallSF$3.08$3.0831113852400
Forms, Encasement (Sides)SF$3.07$3.0731113550020
Reinforcing Steel (Plain)LB$0.64$0.6432111600600 * 1.25 (small job)(.51*1.25)
Reinforcing Steel (Epoxy)LB$1.16$1.16(032111600600+032116100100)*1.25(.51+.42)*1.25
Reinforcing Steel Assessories (Allowance)LB$0.05$0.05Base on Rebar Total Weight
Welded Wire Mesh, 6x6, #10x#10, (per 100 SF)SF$0.16$0.1632211100100
Wall Finish MaterialSF$0.04$0.0433529600020
Curing CompoundSF$0.13$0.1333923130300
Geotextile Fabric, woven, 200# tensileSY$0.94$0.94313219161500
Polypropylene Mesh, Stapled, 6.5 oz.SY$1.73$1.73312514160200
Silt Fence, Polypropylene, 3' high (50' bundles)LF$0.49$0.49312514161000
Fertilizer, 35#/M.S.F.M.S.F.$9.90$9.90329219130400
Grass Seed, 4.5#/M.S.F.M.S.F.$22.00$22.00329219130800
Slope Hydro Seed, Fertilizer & MulchSY$0.55$0.55(329219144600*2 {small job})/111.11 sy per MSF($30.50*2/111.11)
6" Dia. Perforated PVCLF$3.67$3.67334116302110
CementSack$14.65$14.6530513300250
Sand BagsEa$6.35$6.3540513302650
Structural Steel, Galv.LB$1.87$1.8751223050020 + 50513505900 (galv)(1.59+.28)
Standard Barbed Wire - 12-3/4 gageLF$0.16$0.16323126200020
Steel T Posts with clips, 6'Ea$11.40$11.40323113402660
Fence, Open Rail, #1 cedar, 3 rail, 4' high, inc. postsLF$12.20$12.20323129100880
Fence, wood stockade, 6' high, #1 cedar, 3-1/4" rails, postsLF$13.50$13.50323129101240
Fence, Chain Link, 6' high, 9 ga, 3 strand b.w., posts @ 10'LF$20.00$20.00323113200200
Gate, 12' double leaf, 6' high, CLTF 9 ga.Ea$480.00$480.00323113205060
Gate, 4', 6' high, CLTF 9 ga.Ea$208.00$208.00323113201400
Guardrail, corr. steel, galv., posts @ 6'-3" o.c.LF$26.00$26.00347113260012
Guardrail, End Anchorage UnitEa$1,250.00$1,250.00347113260350
Guardrail, end section, flaredEa$46.50$46.50347113260365
12" Diam. CMP, Galv., 16 ga, w/coup.LF$10.46$10.46334211402560 + (334211402850/20')(9.60+17.10/20)
18" Diam. CMP, Galv., 16 ga, w/coup.LF$14.82$14.82334211402600 +( 334211402855/20')(13.85+19.45/20)
24" Diam. CMP, Galv., 14 ga, w/coup.LF$22.75$22.75334211402620 + (334211402860/20')(21.50+25.00/20)
30" Diam. CMP, Galv., 14 ga, w/coup.LF$29.03$29.03334211402640 + (334211402865/20')(27.50+30.50/20)
36" Diam. CMP, Galv., 12 ga, w/coup.LF$39.95$39.95334211402660 + (334211402870/20')(38.00+39.00/20)
48" Diam. CMP, Galv., 12 ga, w/coup.LF$58.50$58.50334211402680 + (334211402875/20')(56.00+50.00/20)
60" Diam. CMP, Galv., 10 ga, w/coup.LF$90.10$90.10334211402690 + (334211402880/20')(87.00+62.00/20)
72" Diam. CMP, Galv., 10 ga, w/coup.LF$117.78$117.78334211402695 + (334211402885/20')(114.00+75.50/20)
Flared End Section, 12" Diam. CMPEa$105.00$105.00334211402790
Flared End Section, 18" Diam. CMPEa$110.00$110.00334211402800
Flared End Section, 24" Diam. CMPEa$207.00$207.00334211402810
Flared End Section, 30" Diam. CMPEa$320.00$320.00334211402820
Flared End Section, 36" Diam. CMPEa$470.00$470.00334211402825
Flared End Section, 48" Diam. CMPEa$935.00$935.00334211402830
Flared End Scetion, 60" Diam. CMPEa$1,600.00$1,600.00334211402835
Flared End Section, 72" Diam. CMPEa$2,000.00$2,000.00334211402840
12" Diam. HDPE Type S, bell & spigotLF$7.94$7.94334211501040+15% water tight connection(6.90*1.15)
18" Diam. HDPE Type S, bell & spigotLF$14.32$14.32334211051060+15% water tight connection(12.45*1.15)
24" Diam. HDPE Type S, bell & spigotLF$22.60$22.60334211501070+15% water tight connection(19.65*1.15)
30" Diam. HDPE Type S, bell & spigotLF$28.18$28.18334211501080+15% water tight connection(24.500*1.15)
36" Diam. HDPE Type S, bell & spigotLF$38.53$38.53334211501090+15% water tight connection(33.50*1.15)
12" Diam. RCP, Class 3 w/gasketLF$15.60$15.60334211602200
18" Diam. RCP, Class 3 w/gasketLF$25.50$25.50334211602230
24" Diam. RCP, Class 3 w/gasketLF$37.50$37.50334211602240
30" Diam. RCP, Class 3 w/gasketLF$60.50$60.50334211602260
36" Diam. RCP, Class 3 w/gasketLF$86.50$86.50334211602270
48" Diam. RCP, Class 3 w/gasketLF$106.00$106.00334211602290
60" Diam. RCP, Class 3 w/gasketLF$176.07$176.07334211602090 + 334113606270 (gasket)($174+$15.50/7.5')
72" Diam. RCP, Class 3 w/gasketLF$300.00$300.00334211602310
84" Diam. RCP, Class 3 w/gasketLF$390.50$390.50334113602120 + 10% (gasket)($355*1.10)
96" Diam. RCP, Class 3 w/gasketLF$467.50$467.50334113602140 + 10% (gasket)($425*1.10)
Gabion, Galv. (6' x 3' x 1') (.67 cy )Ea$68.00$68.00313613100600(2 sy x $34.00/sy)
Gabion, Galv. (6' x 3' x 1.5') (1.0 cy)Ea$95.00$95.00313613100700(2 sy x $47.50/sy)
Gabion, Galv. (6' x 3' x 3') (2.0 cy)Ea$150.00$150.00313613100800(2 sy x $75.00/sy)
Gabion, Galv. (9' x 3' x 1') (1.0 cy)Ea$102.00$102.00313613100600(3 sy x $34.000/sy)
Gabion, Galv. (9' x 3' x 1.5') (1.5 cy)Ea$142.50$142.50313613100700(3 sy x $47.50/sy)
Gabion, Galv. (9' x 3' x 3') (3.0 cy)Ea$225.00$225.00313613100800(3 sy x $75.00/sy)
Gabion, Galv. (12' x 3' x 1') (1.33 cy)Ea$136.00$136.00313613100600(4 sy x $34.000/sy)
Gabion, Galv. (12' x 3' x 1.5') (2.0 cy)Ea$190.00$190.00313613100700(4 sy x $47.50/sy)
Gabion, Galv. (12' x 3' x 3') (4.0 cy)Ea$300.00$300.00313613100800(4 sy x $75.00/sy)
Precast Concrete M.H., 4' I.D x 8' deepEa$1,200.00$1,200.00330561101130
Precast Concrete M.H., 5' I.D.x 8' deepEa$2,575.00$2,575.00330561101170
Precast Concrete M.H., 6' I.D.x 8' deepEa$3,725.00$3,725.00330561101210
Precast Concrete Slab Top, 4' I.D.Ea$282.00$282.00330561101300
Precast Concrete Slab Top, 5' I.D.Ea$460.00$460.00330561101400
Precast Concrete Slab Top, 6' I.D.Ea$715.00$715.00330561101500
24" C.I. Frame & Cover, 400 lbEa$273.00$273.00334233132100
Manhole Steps, AluminumEa$29.00$29.00330561104100
Specific Project Material Costs
6" daimeter, SDR 35, CapEa$20.50$20.50333111253670
Filter Fabric laid in trench, polypropyleneSY$1.57$1.57334123190100
Septic Tank, precast concrete - 1,000 galEa$1,050.00$1,050.00333413130015
Distribution Box, concrete, 5 outletsEa$93.00$93.00333451130015
6" diameter, SDR35, B&S, 20' lengths (perforated/solid)LF$3.67$3.67333111252040
6" diameter, SDR35, fittings, bends or elbowsEA$31.00$31.00333111253080
Washed Rock, 3/4" to 1-1/2"Ton$18.65$17.07$35.7230513250450
Precast Concrete Abutment (+/- 1.2 cy/ea)Ea$900.00$900.00FOB the Site(Allowance)
Pre-engineered metal bridge w/wood deck; 32'(L) x 5' (W)LS$25,000.00$25,000.00FOB the Site(Allowance)
3/4" Aggregate Road Bse MaterialTon$12.00$12.00Sunroc Concrete Products - FOB Site
Disposal FeeLoad$500.00$500.00Allowance
Stall paint striping, white, 4" wideEa$9.70$9.70321723140825
Temporary Construction Signs w/spring standEa$45.00$45.00On-line Pricing - www.graniteconstructionsupply.com (30 day rental)($1.50/day)
42" Barrels w/BaseEa$12.00$12.00On-line Pricing - www.graniteconstructionsupply.com (30 day rental)($0.40/day)
Jute Control Blanket (4' x 225' per roll)Roll$59.00$59.00On-line Pricing - www.saraglove.com ($708/12 rolls = $59.00/roll)
U Staples - American FarmWorks 400 count, 2" barbedCase$19.99$19.99On-line Pricing - www.tractorsupply.com
CCA Treated Wood Post (5"-6" diameter) x 8'Ea$12.99$12.99On-line Pricing - www.tractorsupply.com
Studded T Posts, 6', 1.33 #/lf, w/clipsEa$5.49$5.49On-line Pricing - www.tractorsupply.com
12.5 Gage Barbed Wire (4 point), 80 rod unitUnits$79.99$79.99On-line Pricing - www.tractorsupply.com
Wire Fence Stay, 36"Ea$0.89$0.89On-line Pricing - www.tractorsupply.com
Tube Gate, Tarter Painted 2", 16' (L) x 50" (H)Ea$219.99$219.99On-line Pricing - www.tractorsupply.com(+/- 152 #)
Fence Staples, Hillman 8 gage. 1-3/4" galv., 57 each/boxBox$3.99$3.99On-line Pricing - www.tractorsupply.com
Chicago Heights Steel T-Posts Clips, pack of 50Pack$4.59$4.59On-line Pricing - www.tractorsupply.com
Landscape Timber (6x6x8') Pressure Treated RedwoodEa$26.98$26.98Home Depot(online pricing)
1/2" x 2' #4 Rebar StakesEa$2.70$2.70Home Depot(online pricing)
Quickcrete 50# Fast Setting Concrete MixEa$4.97$4.97Home Depot(online pricing)
Fire Ring (8"H x 30' Diameter w/Flip-Back Campfire Grill)Ea$230.00$25.00$255.00www.belson.com(online pricing - Model FR-30-G)
CONCRETE FIRE RING (OUTDOOR CREATION)Ea$1,100.00$1,100.00BOULDER LAKE BID PRICE 2019
CONCRETE PICNIC TABLE 8'Ea$1,150.00$1,150.00BOULDER LAKE BID PRICE 2019
SINGLE VAULT TOILETEa$19,000.00EA$19,000.00added by MF in 2016
DOUBLE VAULT TOILETEa$35,000.00EA$30,000.00BOULDER LAKE 2019 CONTRACT PRICE
5" x 8' AC2 Pressure Treated Flat Side Round Fence PostEa$16.99$16.99On-line Pricing - www.menards.com
1" x 6" x 16' AC2 Pressure Treated Rough Sawn LumberEa$12.99$12.99On-line Pricing - www.menards.com
#10 x 4" Grip Rite Exterior Deck Screws (+/- 1000 pieces)Box$91.97$91.97On-line Pricing - www.WholesaleBolts.com
Clearing and GrubbingAC$3,209.00RCE bid estimate sheet july 2016
Barbed WireRoll$59.00$59.00Updated 2-8-2019
Smooth WireRoll$55.00$55.00Updated 2-8-2019
GATE CLOSURES$28.00EA$28.00RSFO COSTS 2015 Updated 2-8-19
5.5' Steel T PostsEa$4.12$4.12FPD, Inc 12-1-2017 DC
6.5' X 5" Treated Wood PostsEA$9.75$9.75FPD, Inc 12-1-2017 DC
42" X 4" Treated RoundEA$2.90$2.90FPD, Inc 12-1-2017 DC
Clips for fence (1000 clips per box)Box$100.00$100.00
Nails for fenceBox$76.00$76.00
Staples for fenceBox$72.00$72.00
5" x 5.5' Barkie BucksEA$6.75$6.75From Joel quote from Pickeroon June 2018
3" x 13' Barkie RailEA$7.75$7.75From Joel quote from Pickeroon June 2018
5' Barkie StaysEA$1.50$1.50From Joel quote from Pickeroon June 2018
6" x 8' drive postEA$16.50$16.50From DC quote from Pickeroon July 2019
6" Lag ScrewsBox$119.20$119.20From Joel quote from Pickeroon June 2018
7" Lag ScrewsBox$140.87$140.87From Joel quote from Pickeroon June 2018
12' Powder River Gate, Level LatchEA$300.00$300.00From Joel quote from Pickeroon June 2018
4" x 17' Barkie RailEA$13.10$13.10From Joel quote from Pickeroon June 2018
Powder River Gate 8 FootEA$240.00EA$240.00Updated 2-8-2019 DC
8'x12' Cattle guard gridsEa$1,950.00EA$1,950.00added by MF based on contracted price in 2017
8x16' Cattle guard gridsEa$2,555.00EA$2,555.00added by MF based on contracted price in 2017
8'x20' Cattle guard gridsEa$3,215.50EA$3,225.00added by MF based on contracted price in 2017
12' Cattle guard BaseEa$500.00EA$500.00added by MF based on contracted price in 2017
16' Cattle guard BaseEa$652.00EA$652.00added by MF based on contracted price in 2017
20' Cattle guard BaseEa$820.00EA$820.00added by MF based on contracted price in 2017
3' - 4' X 16' treated railEA$17.43EA$17.43added DC July 2019, Pickeroon, Pinedale
Fenc 3 Post CornerEA$400.00EA$400.00
Fence End PanelEA$180.00EA$180.00
Fence Stress PanelEA$200.00EA$200.00
Drainage Crossing (Modified)EA$600.00EA$600.00Revised DC, 1/22/2020 Deeper than usual.
Fence RemovalLF$1.20LF$1.20Revised DC, 1/22/2020
5" X 6 1/2" Treated CCA Pointed Driver PostEA$9.99EA$9.99Added DC from Pickeroon price quote of 2019
6" X 8' Blunt Treated H Brace PostEA$16,50EA$16.50Added DC from Pickeroon price quote of 2019
Galvanized 12.5 Guage Barbed WireRoll$73.75EA$73.75Added DC from Pickeroon price quote of 2019
Galvanized 12.5 Guage Smooth WireRoll$63.99EA$63.99Added DC from Pickeroon price quote of 2019
Bright Ring Shank Spike 50# BoxBox$72.00Box$72.00Added DC from Pickeroon price quote of 2019
5.5' T Post Green White TopEA$4.60EA$4.60Added DC from Pickeroon price quote of 2019
3" Wooden Stay Treated 42"EA$4.00EA$4.00Added DC from Pickeroon price quote of 2019
T Post Clips 100 per bagBag$37.00Bag$37.00Added DC from Pickeroon price quote of 2019
Wire Gates ConstructionEA$175.00EA$175.00Added DC from previous projects
* Haul Cost - Adjustable Haul Cost CalculationQuantityCosts
Dump Truck, 12 ton, 8 cy$42.45Required Entry - Column A from drop down list select appropriate haul unit - either trailer or dump truck
Truck Tractor, 4x2, 330 HP$53.80Required Entry - Column A If tractor & dump trailer combination is used, select separate values (from drop down list) for each. If no truck tractor is required - leave blank and under Column C Costs delete #N/A
Truck Driver, (Lowboy/Tractor Haul)$23.21Required Entry - Column A from drop down list select the required truck driver.
Total Hourly Cost$119.46
Estimated Round Trip Time (hours)4.00Required Entry - adjust estimated round trip time and include time for: load, unload, wait & haul
Total Round Trip Cost$477.84
Payload, Ton (Unit Cost)28.00$17.07Required Entry - adjust quantity (Ton) based on the weight capacity of the selected haul unit
Payload, CY (Unit Cost)20.00$23.89Required Entry - adjust quantity (CY) based on the volume capacity of the selected haul unit
SALES TAX** (State & Local)
StateState RateAvg.Local Rate**Total Combined Rate
Alaska0.00%1.76%1.76%2019 Tax-Rates.org - The 2017 Tax Resource
Arizona0.00%2.57%2.57%2019 Tax-Rates.org - The 2017 Tax Resource
California7.50%0.94%8.44%2019 Tax-Rates.org - The 2017 Tax Resource
Colorado2.90%4.54%7.44%2019 Tax-Rates.org - The 2017 Tax Resource
Idaho6.00%0.01%6.01%2019 Tax-Rates.org - The 2017 Tax Resource
Montana0.00%0.00%0.00%2019 Tax-Rates.org - The 2017 Tax Resource
Nevada6.85%1.09%7.94%2019 Tax-Rates.org - The 2017 Tax Resource
New Mexico*0.00%2.22%2.22%2019 Tax-Rates.org - The 2017 Tax Resource
North Dakota5.00%1.56%6.56%2019 Tax-Rates.org - The 2017 Tax Resource
Oregon0.00%0.00%0.00%2019 Tax-Rates.org - The 2017 Tax Resource
South Dakota4.00%1.83%5.83%2019 Tax-Rates.org - The 2017 Tax Resource
Utah5.95%0.73%6.68%2019 Tax-Rates.org - The 2017 Tax Resource
Washington6.50%2.39%8.89%2019 Tax-Rates.org - The 2017 Tax Resource
Wyoming4.00%1.47%5.47%2019 Tax-Rates.org - The 2017 Tax Resource
* New Mexcio does not have a State Sales Tax - instead it has a state gross receipts tax which ranges from 5.125% - 8.675% (see below)
** Note: In addition to State Sales Tax, the project may be subject to local sales tax, including: city and county, unless the project is "Tax Exempt"
The estimator needs to verify the tax rate for the specific project location.

http://priceandcompany.com/packaging-pricing-galv.htmlhttp://www.belson.com/

BID SCHEDULE

BID SCHEDULE
Contract/Project NameEstimatorDate
Doty State Fence
Fence
Project LocationContract Number
Rawlins Field Ofice, Carbon County
Project Description
Remove all existing fence along 16,500 Linear Feet (LF) and dispose of properly. Construct approximately 14,000' (LF) of new 4-wire wildlife friendly steel fence. Construct approximately 1,500' (LF) of wildlife friendly wood top rail / 3-wire fence. Construct approximately 1,000' (LF) of livestock exclosure fence consisting of wood rail top and 39" woven wire.
FENCE STYLE 1
ItemDescriptionUnitQuantityUnit PriceCost Amount
1MoblizationEA1.00
2Fence Removal and DisposalLF16500.00
3Construct new 4-Wire FenceLF14000.00
4Corners 3 PostEA6.00
5H-bracesEA18.00
7Wire Gates (16 feet)EA4.00
8Metal panel gate(10 feet)EA2.00
FENCE STYLE 2
ItemDescriptionUnitQuantityUnit PriceCost Amount
1Construct New Rail Top Woven Wire FenceLF1000.00
2H-BraceEA4.00
TOTAL
FENCE STYLE 3
ItemDescriptionUnitQuantityUnit PriceCost Amount
1Construct New Rail Top 3-Wire FenceLF1500.00
2End PanelEA2.00
TOTAL

Total cost for all 3 segments: