Questions Addressed_0002.docx
DOCX document 18 KB Posted
- Attached to
- HAY SHELTER Federal contract opportunity
- Solicitation number
- 140L6220Q0077
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Inspection Tour_0002.pdf | ||
| Sol_140L6220Q0077_Amd_0002.pdf | ||
| REFERENCE DOCUMENT ONLY_0002.pdf | ||
| Sol_140L6220Q0077_Amd_0001.pdf | ||
| Past Performance Questionnaire.doc | DOC document | |
| Sol_140L6220Q0077.pdf | ||
| Rock Springs WHB Facility Hay Shelter Bid Schedule.xlsx | XLSX spreadsheet | |
| Specifications.pdf | ||
| Drawings and Maps.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140L6220Q0077 Hay Shelter
AMD 002
Questions Addressed
1. The Geotech specification states to provide 4 boreholes total, but the scope and map furnished describe borings at each corner and also one at the center of the building for a total of 5. Could you provide clarification for what is actually requested?
a. There will be a total of 5 bore locations for the geotechnical portion of the contract. One each at the corners of the structure and 1 in the center of the structure.
2. Do you have the drawings for the hay shelter?
a. Drawings, maps, and all other documentation can be found at https://beta.sam.gov/. Under attachments/links.
3. Could you please verify that no bid bond is needed on this solicitation?
a. There is no bid bond needed for the solicitation. Bonds will be required once awarded.
4. Completion of the project
a. The completion is 9/30/2020. The reason for this is the BLM is anticipating a hay delivery in October.
5. When will project be awarded
a. Response due date is August 19, 2020. The solicitation will go through the review process then an award will be made.
6. Can bidders get a set of plans from the previous hay shelter that was constructed in 2015?
a. Reference document has been provided as an example of a hay shelter constructed in 2015. Please follow the specifications for the project.