This is a Statement of Work (SOW) for photovoltaic system renovation at Sand Island Ranger Station near Bluff, Utah, with a 30-day performance period from Notice to Proceed.

The contractor must furnish all labor, equipment, supplies, and materials to: replace the entire existing battery bank (minimum 31 kWh, UL1973 and 9540A certified, acceptable brands including Pytes, Fortress, EG4, Discover, or Sol-Max); replace inverters and controls (Victron 5kW charge controllers or approved equal with smart shunt feature and DC breaker system); upgrade photovoltaic panels on both ground and tracker arrays (minimum 4800W total across all arrays using bifacial technology); and assess the existing fossil fuel generator with recommendations for restoring backup power capacity. The work excludes providing or installing a new generator. Site access is limited to normal working hours (Monday-Friday, 7:30 a.m. to 5:00 p.m., excluding Federal holidays) at the location 37.262630°, -109.612105°. The Government provides the existing mounting structures and battery shed (interior dimensions 9'4" x 11'4"); the contractor must supply onsite power and water. All removed items must be disposed of in accordance with applicable local, state, and federal regulations. Compensation is structured as five lump-sum line items: replace battery bank, replace inverters and controls, upgrade ground-based PV array, upgrade tracker PV arrays, and assess existing generator with recommendations. All bid prices must include shipping, handling, installation, and haul-off and disposal costs. The contractor must provide full manufacturer's warranties for all parts and systems.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW) AND SPECIFICATIONS

FOR

PHOTOVOLTAIC SYSTEM RENOVATION

AT

SAND ISLAND RANGER STATION NEAR BLUFF, UTAH

JULY 2026

Contents

PART 1 - GENERAL

PART 2 - PRODUCTS

PART 3 - EXECUTION

PART 4 - MEASUREMENT AND PAYMENT

Appendices Appendix A: Photovoltaic Batteries

Appendix B: Inverters and Controls

Appendix C: Photovoltaic Panels

SECTION 01009

GENERAL INFORMATION AND REQUIREMENTS

PART 1 - GENERAL

1.1 DESCRIPTION OF WORK

A. Contractor shall furnish all labor, equipment, supplies, and materials to perform the following work:

a. Replace entire existing battery bank

i. Remove and properly dispose of existing PV system with the exception of existing mounting infrastructure unless directed otherwise by the Contracting officer or his/her designated representative

b. Replace inverters and controls as specified

c. Upgrade photovoltaic cells on ground array as specified

d. Upgrade photovoltaic cells on tracker arrays as specified

e. Assess existing fossil fuel generator and provide recommendations for restoring backup power generation capacity at the site

i. Work will not include providing or installing a new fuel generator; the

Government is not currently seeking to replace the existing generator.

B. Period of Performance: Performance period for this contract will be 30 days from Notice to Proceed.

C. Place of Performance: Sand Island Ranger Station near Bluff, Utah (see map below).

37.262630°, -109.612105°

D. Access: Contractor may access the site to the extent required to perform this work during normal working hours (Monday-Friday, 7:30 a.m. to 5:00 p.m. excluding Federal holidays).

1.2 GOVERNMENT-FURNISHED EQUIPMENT AND MATERIALS

A. The Government will provide use of the existing ground and tracker array mounting structures, and use of the existing battery shed for purposes of completing the scope of work. All other needs, including onsite power and water, shall be met by the Contractor.

1.3 PROJECT/SITE CONDITIONS

A. The site is adjacent to UT Hwy 191, a paved road, with the last 0.3 miles being a maintained dirt road for the site itself. (See location map below.)

PART 2 - PRODUCTS

2.1 PRODUCT SPECIFICATIONS

A. Product specifications will be given below in Appendices A-C.

PART 3 - EXECUTION

3.1 INSTALLATION

a. Contractor shall remove existing photovoltaic batteries, associated electrical controls, and photovoltaic panels from the existing system on site.

b. Contractor shall replace the removed items with new items in accordance with technical specifications provided in Appendices A-D below.

c. Contractor shall be responsible for disposal of all removed items. Disposal shall be conducted in accordance with all applicable local, state, and federal laws and regulations.

PART 4 - MEASUREMENT AND PAYMENT

4.1 BID SCHEDULE

ITEM

NO.

DESCRIPTION UNIT

TOTAL

QTY

UNIT

COST

TOTAL COST

1 Replace battery bank LS 1 $

2 Replace inverters and controls LS 1 $

3 Upgrade ground-based PV array LS 1 $

4 Upgrade tracker PV arrays LS 1 $

5 Assess existing generator; provide recommendations LS 1 $

TOTAL $_____________

4.2 BASIS OF PAYMENT

A. Measurement of pay items shall be as listed in the bid schedules. All bid prices must include the full cost of shipping, handling, installation, and haul-off and disposal of any removed material.

END OF SECTION

Location Map

Appendices

Appendix A: Photovoltaic Batteries

• Battery system shall provide a minimum of 31 kWh

• Batteries shall be UL1973 certified

• Batteries shall be fire tested to 9540A

• Acceptable brands include Pytes, Fortress, EG4, Discover, Sol-Max, or approved equal

• Installation shall include:

o All hardware and connectors;

o Appropriate buswork and cabling adequate to support both the battery bank and charging system o All requisite mounting hardware

• Batteries to have a minimum of 20-year float design life at 25C (77F)

• Contractor shall provide full Manufactures Warranty for all parts and systems

Appendix B: Inverters and Controls

• Inverters and controls shall be appropriate and adequate to handle normal and peak loads for the installed battery bank

• Use Victron 5kW charge controllers or approved equal

• Inverter system shall include a “smart shunt” feature to provide redundancy for SOC reading

• Controls shall include a direct-current (DC) breaker system to isolate controllers and protect inverters

• Integrate inverters and controls with existing wiring system onsite

• Install automatic generator start control to operate onsite fossil-fuel generator; connection to generator may be made at a future date

• Completely integrate inverters and controls with the new battery system

Appendix C: Photovoltaic Panels

• Existing system has one (1) ground mount array, and two (2) elevated “tracker” arrays

• New photovoltaic system shall (all panels on all arrays) shall provide a minimum of 4800 W

• Panels shall use bifacial technology to improve efficiency and total electrical production

• New panels shall be mounted on existing mounting infrastructure wherever practical

• Panels shall completely integrate with new batteries, inverters, and controls

Appendix D: Site Photos

• The shed is a 10’x12’ shed

• The inside dimensions of the battery shed are 9’4” x 11’4”

PART 1 - GENERAL
PART 2 - PRODUCTS
PART 3 - EXECUTION
PART 4 - MEASUREMENT AND PAYMENT
Appendices
Appendix A: Photovoltaic Batteries
Appendix B: Inverters and Controls
Appendix C: Photovoltaic Panels