Sol_140L5726Q0008_Amd_0002.pdf

PDF 206 KB Posted

Attached to
Muskrat Water Well Repair
Solicitation number
140L5726Q0008
Issued by

About this file

This is Standard Form 30 Amendment No. 0002 to Solicitation 140L5726Q0008, issued by the Bureau of Land Management (BLM) Utah State Office Administrative Services Branch on March 9, 2026. The amendment is not extended and applies to the Muskrat Water Well Repairs contract. The solicitation is administered by the BLM in Salt Lake City, Utah (440 West 200 South, Suite 500, Salt Lake City, UT 84101) under contracting officer Tori Blunt Mayes.

The amendment incorporates questions and answers clarifying three technical aspects of the well repair work: (1) the contractor shall re-perforate the existing 6-inch casing in two zones at depths of 350-360 feet and 370-380 feet; (2) no gravel pack will be installed between the existing 6-inch casing and the new 5-inch sleeve casing due to rust and calcium deposit buildup preventing sufficient space; and (3) the new 5-inch steel casing is expected to be lowered without driving, rather than being driven with a drive shoe. Contractors must acknowledge receipt of this amendment prior to the hour and date specified in the original solicitation by completing items 8 and 15 on the form, acknowledging receipt on each copy of the offer submitted, or by separate letter or electronic communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt at the designated location prior to the specified deadline may result in offer rejection.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

Tori Blunt Mayes

See continuation page

BLM UT-STATE OFC ADM SVCS BR(UT952)

440 WEST 200 SOUTH, SUITE 500

SALT LAKE CITY UT 84101

LUA

140L5726Q0008

03/09/2026

02/27/2026

1 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140L5726Q0008/0002

Muskrat Water Well Repairs

This amendment incorporates the following questions and answers:

1) Perforation of Existing Casing: The

Statement of Work requires perforating the existing 6" casing in two zones (350-360 ft and

370-380 ft). The existing casing is already perforated in these intervals. Can you please confirm whether the Government intends for the contractor to: ee-perforate the existing casing, enlarge/clean the existing perforations, or simply ensure that the perforations are open and functional?

-Re-perforate the existing casing.

2) Gravel Pack Between Casings: Under typical well-construction practices, a gravel pack is installed between the existing 6" casing and the new 5" liner. The SOW does not reference gravel packing. Can you confirm whether: a gravel pack is required, a gravel pack is prohibited, or the Government prefers the

Contractor to propose the most appropriate method?

-With the buildup of rust and calcium deposits on the existing 6" casing there will not be sufficient room between the 6" existing casing and the 5" sleeve casing to install any gravel pack. For this reason it was not called out.

3) Feasibility of Installing a 5" Steel Casing in the Existing Formation: The well log indicates the formation consists of sand, gravel, cobbles, and boulders. This type of formation typically requires driving pipe with a drive shoe to keep the hole open, but a 5" steel casing with a welded drive shoe may not physically fit inside the existing 6" casing.

Can the Government confirm whether: the intent is to drive the new 5" casing, the casing is expected to be lowered without driving, or is an alternative installation method acceptable?

Continued...

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140L5726Q0008/0002

-The casing is expected to be lowered without driving.

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet