140L5725Q0018_Attachment_001_SOW_-_FFO_Parking_Lot_Pavement_Preservation.pdf

PDF 254 KB Posted

Attached to
FFO Parking Lot Pavement Preservation
Solicitation number
140L5725Q0018
Issued by

About this file

This Statement of Work (SOW) details pavement preservation requirements for the Bureau of Land Management's Fillmore Field Office in Utah. The project involves crack sealing, crack repair, and seal coating for three parking lot areas: the Fillmore Field Office ware yard (6,090 square yards), employee parking lot (1,146 square yards), and SEAT Base parking apron (4,623 square yards) located at the Fillmore City Airport. The scope includes sealing cracks 1 inch or less wide, repairing larger cracks with mastic, applying one prime coat and two seal coats of asphalt emulsion, and replacing pavement markings. The contract is anticipated to be awarded in spring 2025 with a 30-day performance period, contingent on suitable temperatures for treatment application, with work locations at 95 East 500 North and 1120 West 200 South in Fillmore, Utah.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK WEST DESERT DISTRICT, UTAH

Fillmore Parking Lot Pavement Preservation BUREAU OF LAND MANAGEMENT

Statement of Work for

Fillmore Parking Lot Pavement Preservation

Bureau of Land Management

West Desert District

Fillmore Field Office

Millard County, Utah

December 23, 2024

STATEMENT OF WORK WEST DESERT DISTRICT, UTAH

Fillmore Parking Lot Pavement Preservation BUREAU OF LAND MANAGEMENT

1. INTRODUCTION

The Fillmore Field Office ware yard was originally paved in 2002 and has since received crack seal and seal coat treatments three times. The last time this parking lot was treated was in 2016 and since that time it has developed quite a few large cracks approximately 2 inches in width and a significant amount of smaller cracks. This parking lot is 6,090 square yards.

The Fillmore employee parking lot was constructed in 2010 when the new Fillmore Field Office was built. This parking lot has been treated once with crack seal and seal coat methods. This parking lot is 1,146 square yards.

The Fillmore SEAT base parking apron was constructed in 2018 and is located at the Fillmore City Airport. The BLM leases this land for the purposes of wildland fire suppression. The apron is located adjacent to the retardant farm where planes are loaded before going out to drop on fires. This parking lot is 4,623 square yards.

2.0 SCOPE

This project will consist of providing all labor, materials, equipment, and supervision to seal cracks that are 1 inch or less in width, repair cracks with mastic that are larger than 1 inch in width, seal coat all parking lots by applying one prime coat and two seal coats of asphalt emulsion and replacing all paint striping in all three locations.

3.0 TASKS

The following tasks shall be performed at locations specified below as well as in the contract drawings:

Fillmore Field Office Ware Yard Parking Lot

1. Crack seal cracks less than 1” wide

2. Crack repair cracks over 1” wide

3. Seal coat by applying one prime coat and two seal coats

4. Replace pavement markings

Fillmore Field Office Employee Parking Lot

1. Crack seal cracks less than 1” wide

2. Crack repair cracks over 1” wide

3. Seal coat by applying one prime coat and two seal coats

4. Replace pavement markings

Fillmore Field Office Visitor Parking

1. Replace pavement markings

Fillmore SEAT Base Parking Apron

1. Crack seal cracks less than 1” wide

2. Seal coat by applying one prime coat and two seal coats

STATEMENT OF WORK WEST DESERT DISTRICT, UTAH

Fillmore Parking Lot Pavement Preservation BUREAU OF LAND MANAGEMENT

3. Replace pavement markings

Contractor will be responsible for protecting all storm drains, concrete, buildings or other structures when applying asphalt surface treatments. Contractor shall also provide traffic control until each application has dried sufficiently so as to not track or peel.

4.0 PERIOD OF PERFORMANCE

It is anticipated that a contract will be awarded in the spring of 2025 with a period of performance of 30 days. Work should commence as soon as temperatures will allow for each treatment method identified.

5.0 WORK LOCATION

The work locations are at the Fillmore Field Office located at 95 East 500 North Fillmore Utah, 84631, and at the Fillmore SEAT Base located at 1120 West 200 South Fillmore, Utah 84631.

File details come from the government source that posted it. Updated .