This document is an amendment to a solicitation for the CLDQ - JNM Fossil Excavation and Stabilization project. The purpose of this amendment is to provide responses to vendor questions received regarding the project requirements.

The key details are:

  • This is a new requirement, not an extension of an existing contract.
  • The period of performance is August 1, 2024 to July 14, 2025.
  • The contractor is expected to transport the fossils to a secured location within 175 miles of the CLDQ site. There is little to no overburden to remove, and heavy equipment cannot be used due to access constraints. Exposed fossils may need consolidation prior to jacketing, and flagging/protective materials may be required. The jackets are expected to be in good condition, up to approximately 2x3x4 feet in size. The repository location is still being determined, but will be within 175 miles in Utah. The total new surface area for excavation is not expected to exceed 300 square feet. Specific consolidant requirements will be determined during initial project meetings.

View the file

Other files

File Type Posted
Sol_140L5724Q0041.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140L5724Q0041 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

LUA

SALT LAKE CITY UT 84101

440 WEST 200 SOUTH, SUITE 500

BLM UT-STATE OFC ADM SVCS BR(UT952)

06/28/20240001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/13/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

CLDQ-JNM Fossil Excavation and Stabilization

The purpose of this amendment is to provide responses to vendor questions received. See Q&A document for responses.

Quoters shall acknowledge all amendments by returning a signed copy of any amendments to this solicitation.

Period of Performance: 08/01/2024 to 07/14/2025

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Daniel Walker

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

140L5724Q0032: Question and Answer

1. Are we responsible for transport of fossils to the repository?

The contractor is expected to transport the fossils to a secured location like the repository or a prep lab. The secure location would be within 175 miles of the CLDQ.

2. How much overburden is present? Enough to warrant renting a small piece of heavy equipment?

There is little to no overburden to remove, nearly all excavation will be within the bone bed horizon and/or undocumented fill. Heavy equipment cannot be operated within the existing pits due to access constraints and potential impact to surface and buried fossils.

3. Is there anything beyond jacketing, backfilling, and/or removing fossils that they are including in "stabilizing the site"?

Exposed fossils may also need to have consolidate(s) applied prior to jacketing, regardless of if fossils are going to be removed from the quarry or left in situ. Flagging tp protect areas where exposed and covered fossils will remain in place may be required as construction proceeds. After these steps are completed the BLM and construction contractor may need to cover some of the areas with mats or other protective materials.

4. Can we be provided with a better understanding of the size and condition of the jackets that need removing?

The existing full jackets are expected to be in good condition and ready or nearly ready for removal from the quarry and building(s). These jackets range in size up to approximately 2 by 3 by 4. Once these are ready for extraction from the building(s) the BLM may be able to provide equipment to assist with removal from the quarry pit and/or building.

5. Which repository has the BLM selected to house fossils?

Repository discussions are ongoing, but the repository will be in Utah and is not located more than 175 miles from the CLDQ.

6. Is there an expectation of the size and quantity of new excavations as part of ¿Task 2 field work -line 2¿?

Per the SOW, aspects of the existing condition of the new excavations are unknown as the exact extent of previous quarrying, in situ bonebed, and number of fossils within this area is unknown. The bonebed plus caprock thickness varies slightly across the quarry and prior excavations vary in total depth throughout the area, but the combined thickness in any area is not expected to exceed 3 feet in depth. The total new surface area for excavation is not expected to exceed 300 square feet, but as noted in the SOW, additional excavation will be needed in that were previously opened but were not fully excavated. In situ bones remain exposed in some of these areas, yet not all will require extraction. If, for example, they can be stabilized and are not within the area of the existing or proposed foundations. Also, the final areas (e.g., square surface area and depth) of excavation will depend on the amount of excavation completed by researchers during their 2024 field season.

7. Are there requirements for which types of consolidants and other materials that are to be used?

These details will need to be worked out as part of the initial project meetings, as indicated in the SOW the fossils should be stabilized using professional standards and methods shall follow curation facility requirements where possible and proceed in a manner that does not conflict with previously used materials.

8. Is this a new requirement/contract?

This is a new requirement.