SAM_Questions_and_Answers_0001.docx

DOCX document 829 KB Posted

Attached to
Janitorial Services BLM SLFO Rec Sites
Solicitation number
140L5724Q0009
Issued by

About this file

This document contains questions and answers regarding Solicitation Number 140L5724Q0009 for janitorial services at six Bureau of Land Management recreation sites in Utah. The solicitation seeks firm-fixed-price quotes for cleaning 29 restroom stalls across six sites over a 12-month base period and four option years. Services include cleaning double and single vault restrooms of various sizes at campgrounds and other locations. Square footage for each site is provided along with the incumbent contractor's name and contract period and amount. Background checks are not required for contractor employees but they will not need badges. No site walkthrough will be conducted due to winter road conditions.

View the file

Other files

File Type Posted
SAM_Questions_and_Answers_2_0002.docx DOCX document
Sol_140L5724Q0009_Amd_0002.pdf PDF
Sol_140L5724Q0009_Amd_0001.pdf PDF
Sol_140L5724Q0009.pdf PDF
Attachment_C_Bid_Schedule.xlsx XLSX spreadsheet
Attachment_B_Maps.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140L5724Q0009 RFQ for BLM Utah Salt Lake Field Office Rec Site Janitorial Services Questions and Answers

1. What are the locations?

a. See Attachment_B_Maps pages 1-8, for each site’s location.

2. What is the scope?

a. See Sol_140L5424Q0009 pages 6-15, for the full statement of work, including scope.

3. Will there be a walkthrough of the sites?

a. No. The roads to the sites aren’t plowed during the winter and aren’t currently accessible.

4. Who is the current contractor?

a. United Land Management was the most recent contractor.

b. POP – 05/28/2019 – 05/31/2023.

5. What is the current contract amount?

a. The total price of the contract was the base, plus five option years at $211,228.20.

6. Is there a bond requirement?

a. No.

7. Will the contractor's employees be required to pass a background check?

a. Waiting on answer from Sheramie

8. Will the contractor's employees be required to wear a badge?

a. No.

9. Square Footage for each location?

a. Total square footage approx. 2,310 sq. ft.

i. Double vault toilets* = approx. 154 sq. ft. @ 13 buildings = 2,002 sq. ft.

*Included below: CXT vault toilet specs examples.

ii. Single vault toilets* = approx. 77 sq. ft. @ 4 buildings = 308 sq. ft.

*The single vaults are approximately half the size of the double vaults.

b. Knolls: 3 double vaults or approx. 462 sq. ft

c. Fivemile Pass: 6 double vaults or approx. 924 sq. ft.

d. Simpson Campground: 3 double vaults or approx. 462 sq. ft

e. Birch Creek Campground: 1 double vault or approx. 77 sq. ft

f. Clover Campground: 2 single vaults or approx. 154 sq. ft

g. Little Creek Campground: 2 single vaults or approx. 154 sq. ft image1.jpg image2.jpg image3.jpg

File details come from the government source that posted it. Updated .