Amendment_00001_-_Q_A_0001.pdf

PDF 110 KB Posted

Attached to
BLM-UT CEDAR CITY FIELD OFFICE CATTLE GUARDS Federal contract opportunity
Solicitation number
140L5723Q0020
Issued by
Department of the Interior Bureau of Land Management Utah Region

View the file

Other files for this federal contract opportunity

Other files attached to BLM-UT CEDAR CITY FIELD OFFICE CATTLE GUARDS, newest first.
File Type Posted
Sol_140L5723Q0020_Amd_0001.pdf PDF
Sol_140L5723Q0020.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLM-UT Cedar City Field Office Cattle Guard 1405723Q0020 Amendment 00001 April 6, 2023

Attachment 0001

Question and Answer

Q1: On the drawing, it calls out stringers at equal spaces per structural design. Can you get the expect spacing preferred for each size guard?

A1: This spacing would be determined by the design load from a structural engineer. Provide certificate of load rating or stamped design. The length of the cattleguard can vary.

Q2: On the drawing, a Rail and an Alternate Rail are listed. Is one preferred over the other? Or is it the manufacturers choice.

A2: The tapered rail is the preferred one, with the rectangle rail as an approved equal/alternate.

Q3: We think there might be a misprint on the dimensions concerning the cattle guards.

On the Request for Quotation form Line item 00010: 14 ‘ cattle guard. Should the dimensions be 14’ x 8’ x 8”? Vs 14’x’8’x 8’.

Same with line Item 00020: 12 ft cattle guard. Should the dimensions be 12’ x 8’ x 8”? Vs 12’ x 8’ x 8’

A3: 14’ x 8’ x 11” and 12’ x 8’ x 11” are the correct dimensions. (8” stringer/base + 3” rail). This has been corrected in the specifications and line items.

Q4: The drawings submitted with the solicitation depicts 14 rails. The photo submitted depicts 13 rails. Please verify.

A4: The drawings show 14 rails, spaced with a 5” clear opening. 13 rails would create an opening greater than 5”. I would suggest follow the drawings and submit shop drawings or cut sheets showing what they can provide for us to approve (this is requested in the specifications).

Q5: The drawing submitted with solicitation does not call out the stringer spacing on the bottom. Please advise.

A5: This spacing would be determined by the design load from a structural engineer. Provide certificate of load rating or stamped design. The length of the cattleguard can vary.

BLM-UT Cedar City Field Office Cattle Guard 1405723Q0020 Amendment 00001 April 6, 2023

Q6: Our next question concerns holding our quote for 90 days. The steel market is very volatile at this time. It is concerning to hold our quote for 90 days past 4/12/23. It would help us to know just when the award will be made after the bid submission date of 4/12/2023.

A6: The validity of quotes submitted has been corrected from 90 days to a minimum of 30 days.