Utah BLM Communications Bald Mesa Building and Tower Pad
Statement of Work
Work is to include below:
1. Heavy Equipment and fuel to complete the Job
2. Digging Tower Base, B ui l di ng Pa d and Grounding Trenches
• Tower Footing 9' X 9' X 4'6" With #8 Bar 12" o/c Both Direction, Top and
Bottom Mats with # 5 Bar tying mats together Excavation, Concrete, Labor, Rebar, Materials, Travel Expenses
• Building Pad & Thick Edge 16' X 10' X 8" With 12" Thick Edge with Rebar on
12" o/c both direction Excavation, Concrete, Labor, Rebar, Forming Materials
3. Grounding as deep as necessary to meet R56 Standards
• Grounding Materials #2 Tin/Copper, 18" X18" Grounding Plates, Or Rods, Shots, All Tails Brought out of Ground, Labor, Excavation
4. Forming, Pouring and Finishing of Cement Slabs
5. Concrete
• Cement Truck will be able to Access Site, roughly a 1 hour drive from Moab, UT
6. Rebar for Tower Base
7. Tower Base is to comply to the provided Engineered Drawings
8. Labor
9. Travel
Job will not include:
• Permits, non-needed
• No soil testing is required
• Provided by the BLM
Tower Bolt, Templates, Testing, Inspections, Bonding, Lay Out, Elevations, Being able to get Cement Truck to Site, Spoils to be Hauled off or Removed, Rock and Marifi Around Site
Site
Google Earth is required to open directions to construction site
Excavation and cement work at the following Utah Communications Site:
A. Bald Mesa
a. Closest to Moab, Utah for Cement
b. Site Lat/Long Bald Mesa 38°31'43.82"N 109°19'29.20"W 8600 ft elevation
c. Rocky Clay Soil
d. Link to Directions to construction site
Google Maps https://goo.gl/maps/b5cRaq3SUCPGtRFt7