This document is an amendment to Solicitation No. 140L4324Q0127 for Fence Retrofitting for Wildlife for the BLM-Lakeview District Office in Oregon. The amendment provides the attendance list from the site visit held on July 16, 2024, and the answers to questions asked during the visit. The period of performance is August 10, 2024, to September 30, 2025. Key details include:
- The solicitation is for retrofitting fences to improve wildlife passage. The work includes replacing gates, reusing fence stays and t-posts where possible, and dealing with an existing electric fence line.
- The site visit covered logistics like drive time, access to the work areas, availability of water sources, and ability to camp on-site.
- The amendment does not appear to include any changes to the overall scope of work or solicitation requirements. It serves to provide additional information to offerors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L4324Q0127_Amd_0001.pdf | ||
| B08_Solicitation_140L4324Q0127_Fence_Retrofitting_for_Wildlife.pdf | ||
| Sol_140L4324Q0127.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1
1. CONTRACT ID CODE
I
PAGE OF PAGES
1 I 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
0001 07/02/2024
6. ISSUED BY CODE LHA 7. ADMINISTERED BY (If other than Item 6) CODE I
BLM OR-ST OFC PROC MGMT BR(OR952)
1220 SW 3rd Avenue, 12th Floor
PORTLAND OR 97204
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
9A. AMENDMENT OF SOLICITATION NO.
140L4324Q0127
X
9B. DATED (SEE ITEM 11)
07/02/2024
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
IXI The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers Dis extended. ra is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
E. IMPORTANT:
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Contractor Dis not Dis required to sign this document and return ______ _ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Fence Retrofitting for Wildlife for the ELM-Lakeview District Office, Oregon
The purpose of this amendment is to provide the attendance list from the site visit held on
July 16, 2024, at 9:30 AM PD and to provide the answers to the questions asked during the site visit.
Period of Performance: 08/10/2024 to 09/30/2025
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 1 0A, as heretofore changed, remains unchanged and in full force and effect .
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED
(Signature of person authorized to sign)
Previous edition unusable
Fortunato Sapida Jr
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Project: Fence Retrofitting for Wildlife Solicitation No. 140L4324Q0127
Site visit date and time: July 16, 2024, at 9:30 AM PD
SITE VISIT ATTENDANCE
Lindsey Smith, BLM Natural Resource Specialist
Daniel Viducich, Dirt Road Excavation
Corbyn Kile, Fineline Innovations
SITE VISIT QUESTIONS AND ANSWERS
Q1: How far is the drive?
A1: Those in attendance were able to make that determination based on where they were coming from.
Q2: Condition of Option 1.
A1: Observed at site visit.
Q3: How many gates on base? Will they need to be replaced?
A3: 4. Yes, they need to be replaced.
Q4: With brush clearing, can we leave the brush we cut?
A4: Yes
Q5: Any good letdown place to store equipment?
A5: Base work – yes, nearby. Option 1 and 2 work – less availability.
Q6: Can we camp?
A6: Yes, as long as fire restrictions are followed.
AMENDMENT 0001 Page 2 of 3
Q7: How tall are the t-posts?
A7: The existing t-posts are 5 ½ to 6 ½ feet.
Q8: Can we drive along the fence to replace it?
A8: Yes, some brush clearing would be needed though.
Q9: Will Lindsey be the representative for BLM?
A9: Yes
Q10: How rocky is the area?
A10: Option area 2 is very rocky. Option area 1 is rocky as well. Base area has minimal rocks except for the eastern section.
Q11: Can the fence stays be reused?
A11: Yes
Q12: Can the t-posts be reused?
A12: Yes
Q13: Will the West Side of Base Segment gate need to be replaced?
A13: Yes, barbed wire gate is fine.
Q14: How do we deal with the electric fence line at Base Segment 2 and 3?
A14: It can be reused if it can withstand being stretched. Otherwise, removed and discarded.
Q15: Are there water sources nearby?
A15: There is one on Base Segment 3.